CN215702569U - Quick manufacturing installation of adobe brick that ancient building wall was used - Google Patents

Quick manufacturing installation of adobe brick that ancient building wall was used Download PDF

Info

Publication number
CN215702569U
CN215702569U CN202120908667.7U CN202120908667U CN215702569U CN 215702569 U CN215702569 U CN 215702569U CN 202120908667 U CN202120908667 U CN 202120908667U CN 215702569 U CN215702569 U CN 215702569U
Authority
CN
China
Prior art keywords
plate
adobe
fixing
ancient building
fixing plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202120908667.7U
Other languages
Chinese (zh)
Inventor
刘伟
宣平
胡宗胜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tiandijian Bozhan Technology Co ltd
Original Assignee
Anhui Tiandijian Ancient Architecture Renovation Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Tiandijian Ancient Architecture Renovation Co ltd filed Critical Anhui Tiandijian Ancient Architecture Renovation Co ltd
Priority to CN202120908667.7U priority Critical patent/CN215702569U/en
Application granted granted Critical
Publication of CN215702569U publication Critical patent/CN215702569U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Press-Shaping Or Shaping Using Conveyers (AREA)
  • Devices For Post-Treatments, Processing, Supply, Discharge, And Other Processes (AREA)

Abstract

The utility model provides a rapid manufacturing device of adobe bricks for ancient building walls, and relates to the field of adobe brick manufacturing. The fixing device comprises a first fixing plate, wherein supporting legs are mounted on the lower surface of the first fixing plate, and fixing columns are mounted on the upper surface of the first fixing plate. This quick manufacturing installation of adobe brick that ancient building wall was used, through last terrace die, reset spring, the fixed block, the movable rod, sweep cooperation use of native pole and lower die cavity, go on the in-process that moves down at last terrace die, can cooperate and sweep the unnecessary raw materials of native pole to lower die cavity surface and push away, when making last terrace die extrude lower die cavity interior raw materials, reduce the probability that the raw materials piled up at the bar inslot, improve the manufacturing speed of adobe brick greatly, through fixed plate two, including a motor, an end cap, a controller, and a cover plate, the conveyer belt, the drive roll, the cooperation of driven voller and hang plate is used, can be with the adobe of press forming, go out through the conveyer belt, better collection, accelerate the speed that the adobe made, and is easy to operate, and flexible to use.

Description

Quick manufacturing installation of adobe brick that ancient building wall was used
Technical Field
The utility model relates to the technical field of adobe brick manufacturing, in particular to a quick adobe brick manufacturing device for an ancient building wall.
Background
Wall bricks are immediately associated with clay bricks, cement bricks, foamed lightweight bricks and the like which are machined on urban building sites, the walls are built by adobes, clay slurry is used for replacing mortar, house beams and doors and windows are made by cutting trees on mountains, and roofs are covered by thatch for keeping out wind and rain. From the time of blank beating to the time of preparation work such as drying the blank thoroughly, timber preparation and the like, a house usually spans more than one year.
At present, the adobe brick that ancient building wall was used is at the in-process of making, because the requirement of process, needs to carry out the press forming to adobe brick raw materials, because the raw materials is placed in the die cavity, has unnecessary raw materials to remain on the die cavity, and the fragment of brick press forming of not being convenient for reduces the speed that the fragment of brick was made.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
Aiming at the defects of the prior art, the utility model provides a device for quickly manufacturing adobe bricks for ancient building walls, which solves the problems mentioned in the background technology.
(II) technical scheme
In order to achieve the purpose, the utility model is realized by the following technical scheme: the utility model provides a quick manufacturing installation of adobe brick that ancient building wall was used, includes fixed plate one, the lower surface mounting of fixed plate one has the supporting leg, the last surface mounting of fixed plate one has the fixed column, the backup pad is installed on the top of fixed column, the last surface mounting of backup pad has the mounting bracket, first telescoping device is installed to the inboard of mounting bracket, the terrace die is installed to the one end of first telescoping device, the fixed block is installed to one side of going up the terrace die, the inboard of fixed block articulates there is the movable rod, the one end of movable rod is equipped with reset spring, the other end of movable rod is installed and is swept native pole, the upper surface of fixed plate one is equipped with the lower die cavity, one side of fixed plate one is provided with thrust unit, the bottom of fixed plate one is provided with conveyor.
Preferably, the pushing device comprises a fixing rod, a second telescopic device is installed on one side of the fixing rod, and a bottom plate is installed at one end of the second telescopic device.
Preferably, the upper surface of the first fixing plate is provided with a sliding groove, and the bottom plate is in sliding connection with the sliding groove.
Preferably, conveyor includes fixed plate two, the motor is installed to one side of fixed plate two, the drive roll is installed to the output of motor, the outside of drive roll is rotated and is connected with the conveyer belt, the drive roll is connected with the driven voller through the conveyer belt transmission.
Preferably, a connecting plate is installed on one side of the second fixing plate, and an inclined plate is arranged on the other side of the second fixing plate.
Preferably, a strip-shaped groove is formed in the inner side of the upper male die, and the movable rod is movably clamped with the strip-shaped groove.
(III) advantageous effects
The utility model provides a device for quickly manufacturing adobe bricks for ancient building walls. Has the following beneficial effects:
1. this quick manufacturing installation of adobe brick that ancient building wall was used, through last terrace die, reset spring, fixed block, movable rod, sweep the cooperation of native pole and lower die cavity and use, go up the in-process that the terrace die moved down, can cooperate and sweep the unnecessary raw materials of native pole to lower die cavity surface and push away for when going up the terrace die and extrudeing the interior raw materials of lower die cavity, reduce the raw materials and pile up the probability at the bar inslot, improve the manufacturing speed of adobe brick greatly.
2. This quick manufacturing installation of adobe brick that ancient building wall was used uses through the cooperation of fixed plate two, motor, connecting plate, conveyer belt, drive roll, driven voller and hang plate, can carry away the adobe that the suppression takes shape through the conveyer belt, and better collection for the speed that the adobe was made, easy operation uses in a flexible way.
Drawings
FIG. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is a second overall view of the present invention;
FIG. 3 is an enlarged view of the structure at A in FIG. 2 according to the present invention;
FIG. 4 is a front sectional view of the present invention.
In the figure: the automatic soil sweeping machine comprises a first fixing plate 1, a supporting plate 2, a first telescopic device 3, an upper male die 4, a lower die cavity 5, a fixing rod 6, a second telescopic device 7, a second fixing plate 8, a motor 9, a connecting plate 10, a conveying belt 11, an inclined plate 12, supporting legs 13, fixing columns 14, a mounting rack 15, a soil sweeping rod 16, a movable rod 17, a bottom plate 18, a driving roller 19, a driven roller 20, a return spring 21, a fixing block 22 and a sliding chute 23.
Detailed Description
The utility model is explained in more detail below with reference to the figures and examples.
The embodiment of the utility model provides a device for quickly manufacturing adobe bricks for ancient building walls, which comprises a first fixing plate 1, wherein supporting legs 13 are installed on the lower surface of the first fixing plate 1, fixing columns 14 are installed on the upper surface of the first fixing plate 1, supporting plates 2 are installed at the top ends of the fixing columns 14, an installation frame 15 is installed on the upper surface of the supporting plates 2, a first telescopic device 3 is installed on the inner side of the installation frame 15, an upper male die 4 is installed at one end of the first telescopic device 3, a fixing block 22 is installed on one side of the upper male die 4, a movable rod 17 is hinged to the inner side of the fixing block 22, a return spring 21 is arranged at one end of the movable rod 17, a soil sweeping rod 16 is installed at the other end of the movable rod 17, a lower die groove 5 is formed in the upper surface of the first fixing plate 1, a pushing device is arranged on one side of the first fixing plate 1, and a conveying device is arranged at the bottom of the first fixing plate 1.
In the embodiment, by arranging the upper male die 4, the return spring 21, the fixed block 22, the movable rod 17, the soil sweeping rod 16 and the lower die cavity 5 in a matching manner, in the process that the upper male die 4 moves downwards, the soil sweeping rod 16 pushes away redundant raw materials on the surface of the lower die cavity 5, the movable rod 17 rotates, the return spring 21 generates elastic deformation, when the upper male die 4 contacts with the lower die cavity 5 to extrude the raw materials, the movable rod 17 can tighten up the strip-shaped groove on the inner side of the upper male die 4, and then the adobe brick is extruded and formed, the probability that the raw materials are accumulated in the strip-shaped groove is reduced, the manufacturing speed of the adobe brick is greatly improved, and by arranging the fixed plate II 8, the motor 9, the connecting plate 10, the conveyor belt 11, the driving roller 19, the driven roller 20 and the inclined plate 12 in a matching manner, the starting motor 9 can drive the driving roller 19, the driven roller 20 and the conveyor belt 11 to move, carry away the adobe brick that the suppression is good, place and temporarily preserve on the hang plate 12, the staff of being convenient for carries the collection for the speed that the adobe was made, easy operation uses in a flexible way.
Specifically, thrust unit includes dead lever 6, and second telescoping device 7 is installed to one side of dead lever 6, and bottom plate 18 is installed to the one end of second telescoping device 7, through the cooperation that sets up dead lever 6 and second telescoping device 7 and bottom plate 18, can control bottom plate 18 and remove, is convenient for carry out drawing of patterns operation to the adobe brick of making.
Specifically, the sliding groove 23 has been seted up to the upper surface of fixed plate 1, and bottom plate 18 and sliding connection of sliding groove 23 are through setting up sliding groove 23, and the bottom plate 18 of being convenient for removes in the bottom of die cavity 5, the quick removal of being convenient for.
Specifically, conveyor includes two 8 of fixed plate, motor 9 is installed to one side of two 8 of fixed plate, drive roll 19 is installed to motor 9's output, the outside of drive roll 19 is rotated and is connected with conveyer belt 11, drive roll 19 is connected with driven voller 20 through the transmission of conveyer belt 11, cooperation through setting up motor 9 and drive roll 19 and conveyer belt 11 and driven voller 20 can transport the adobe brick of making, make the collection that the adobe brick of making can be quick get up, carry out the subsequent handling.
Specifically, connecting plate 10 is installed to one side of the second fixed plate 8, and the opposite side of the second fixed plate 8 is equipped with hang plate 12, and through the cooperation that sets up two fixed plates 8 and connecting plate 10 and hang plate 12, can temporarily place the adobe brick of carrying out on hang plate 12, and the staff of being convenient for collects.
Specifically, the bar groove has been seted up to the inboard of last terrace die 4, and movable rod 17 and bar groove activity joint through setting up movable rod 17, can be fine when moving, accomodate the inboard bar inslot of last terrace die 4, can not influence the process that terrace die 4 and lower die slot 5 extruded the manufacturing adobe, have more the practicality.
All the electric equipment in the scheme supplies power through the external power supply.
The working principle is as follows: when the device is used, raw materials for manufacturing adobe bricks are poured into the lower die cavity 5, then the first telescopic device 3 is controlled to drive the upper male die 4 to move downwards, at the moment, the return spring 21 is in an initial state, in the process that the upper male die 4 moves downwards, the soil sweeping rod 16 pushes away redundant raw materials on the surface of the lower die cavity 5, the movable rod 17 rotates, the return spring 21 generates elastic deformation, when the upper male die 4 contacts with the lower die cavity 5 to extrude the raw materials, the movable rod 17 can tighten up in the strip-shaped groove on the inner side of the upper male die 4, then adobe bricks are extruded and formed, then the second telescopic device 7 is controlled to withdraw the bottom plate 18 along the sliding groove 23, so that the bottom of the lower die cavity 5 is emptied, then the first telescopic device 3 is controlled to continuously push the upper male die 4 to move downwards, so that formed adobe bricks in the lower die cavity 5 are demoulded and then conveyed onto the conveyor belt 11, the starter motor 9 rotates and can drive the drive roll 19 and the driven voller 20 and the motion of conveyer belt 11, carries away the adobe brick that the suppression is good, places on the hang plate 12 temporary storage, and the staff's transport of being convenient for is collected, then controls first telescoping device 3 and resets and go up terrace die 4, at the in-process that last terrace die 4 upwards removed, reset spring 21's elastic action resets movable rod 17, and the extrusion operation of next time of being convenient for is used.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the utility model, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a quick manufacturing installation of adobe brick that ancient building wall was used, includes fixed plate one (1), its characterized in that: the lower surface mounting of the first fixing plate (1) is provided with supporting legs (13), the upper surface mounting of the first fixing plate (1) is provided with a fixing column (14), the top end of the fixing column (14) is provided with a supporting plate (2), the upper surface mounting of the supporting plate (2) is provided with a mounting frame (15), the inner side of the mounting frame (15) is provided with a first telescopic device (3), one end of the first telescopic device (3) is provided with an upper male die (4), one side of the upper male die (4) is provided with a fixing block (22), the inner side of the fixing block (22) is hinged with a movable rod (17), one end of the movable rod (17) is provided with a reset spring (21), the other end of the movable rod (17) is provided with a soil sweeping rod (16), the upper surface of the first fixing plate (1) is provided with a lower die groove (5), and one side of the first fixing plate (1) is provided with a pushing device, and a conveying device is arranged at the bottom of the first fixing plate (1).
2. The apparatus for rapidly manufacturing adobe bricks for ancient building walls according to claim 1, wherein: the pushing device comprises a fixing rod (6), a second telescopic device (7) is installed on one side of the fixing rod (6), and a bottom plate (18) is installed at one end of the second telescopic device (7).
3. The apparatus for rapidly manufacturing adobe bricks for ancient building walls according to claim 2, wherein: the upper surface of the first fixing plate (1) is provided with a sliding groove (23), and the bottom plate (18) is in sliding connection with the sliding groove (23).
4. The apparatus for rapidly manufacturing adobe bricks for ancient building walls according to claim 1, wherein: conveyor includes fixed plate two (8), motor (9) are installed to one side of fixed plate two (8), drive roll (19) are installed to the output of motor (9), the outside rotation of drive roll (19) is connected with conveyer belt (11), drive roll (19) are connected with driven voller (20) through conveyer belt (11) transmission.
5. The apparatus for rapidly manufacturing adobe bricks for ancient building walls according to claim 4, wherein: and a connecting plate (10) is installed on one side of the second fixing plate (8), and an inclined plate (12) is arranged on the other side of the second fixing plate (8).
6. The apparatus for rapidly manufacturing adobe bricks for ancient building walls according to claim 1, wherein: a strip-shaped groove is formed in the inner side of the upper male die (4), and the movable rod (17) is movably clamped with the strip-shaped groove.
CN202120908667.7U 2021-04-29 2021-04-29 Quick manufacturing installation of adobe brick that ancient building wall was used Active CN215702569U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120908667.7U CN215702569U (en) 2021-04-29 2021-04-29 Quick manufacturing installation of adobe brick that ancient building wall was used

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120908667.7U CN215702569U (en) 2021-04-29 2021-04-29 Quick manufacturing installation of adobe brick that ancient building wall was used

Publications (1)

Publication Number Publication Date
CN215702569U true CN215702569U (en) 2022-02-01

Family

ID=80030344

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120908667.7U Active CN215702569U (en) 2021-04-29 2021-04-29 Quick manufacturing installation of adobe brick that ancient building wall was used

Country Status (1)

Country Link
CN (1) CN215702569U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116476201A (en) * 2023-04-25 2023-07-25 新网电(山东)能源装备科技有限公司 High temperature resistant steel slag heat accumulation brick production facility

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116476201A (en) * 2023-04-25 2023-07-25 新网电(山东)能源装备科技有限公司 High temperature resistant steel slag heat accumulation brick production facility
CN116476201B (en) * 2023-04-25 2024-03-22 新网电(山东)能源装备科技有限公司 High temperature resistant steel slag heat accumulation brick production facility

Similar Documents

Publication Publication Date Title
CN215702569U (en) Quick manufacturing installation of adobe brick that ancient building wall was used
CN112196293A (en) Preparation device capable of improving wall building efficiency of workers
CN214942114U (en) Automatic wall tile sticking device for building construction
CN212170782U (en) Automatic brick machine of getting of pottery brick that permeates water
CN112593715A (en) Building wall building machine
CN114961304B (en) Automatic wall building machine for building construction
CN215631378U (en) Portable wall plastering unit
CN211666195U (en) Building wall plastering device
CN216402813U (en) Transmission supporting mechanism for construction concrete prefabricated part
CN117067359B (en) Garbage fly ash recycling treatment process
CN220386923U (en) Brick spraying device for building construction
CN116586170B (en) Preparation system and preparation process of recycled concrete
CN219710888U (en) High-efficient plastering unit of construction
CN220058695U (en) Wall plastering device
CN219114318U (en) Slag brickmaking former
CN219211240U (en) Lining plate processing is with moulding forming device
CN217079758U (en) High-rise building construction discharge apparatus
CN216299605U (en) Brick forming equipment
CN221068625U (en) Baling press with automatic feeding function
CN218894357U (en) Greasy device is scraped in wall decoration construction
CN218798053U (en) Automatic dust extraction of stone crusher
CN216941214U (en) Aerated brick production cleaning device for framed
CN216296945U (en) Mortar scraping device for processing heat-insulation composite board
CN215594668U (en) High-altitude profiling equipment for steel structure roof
CN217648807U (en) Plate compression molding device for building model manufacturing

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20230525

Address after: 230031 room 2906, super high-rise office building of Huabang World Trade Center, No. 190 Qianshan Road, Shushan District, Hefei City, Anhui Province

Patentee after: Tiandijian Bozhan Technology Co.,Ltd.

Address before: Room 1603, building a, Xincheng international, No.999, Dongliu Road, administrative district, Hefei City, Anhui Province 230000

Patentee before: ANHUI TIANDIJIAN ANCIENT ARCHITECTURE RENOVATION Co.,Ltd.

TR01 Transfer of patent right