CN219710888U - High-efficient plastering unit of construction - Google Patents
High-efficient plastering unit of construction Download PDFInfo
- Publication number
- CN219710888U CN219710888U CN202320889547.6U CN202320889547U CN219710888U CN 219710888 U CN219710888 U CN 219710888U CN 202320889547 U CN202320889547 U CN 202320889547U CN 219710888 U CN219710888 U CN 219710888U
- Authority
- CN
- China
- Prior art keywords
- fixed frame
- fixed
- plastering
- frame
- face
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000010276 construction Methods 0.000 title claims abstract description 13
- 239000000463 material Substances 0.000 claims abstract description 19
- 238000007790 scraping Methods 0.000 claims description 8
- 239000011505 plaster Substances 0.000 claims description 3
- 229910000746 Structural steel Inorganic materials 0.000 claims description 2
- 235000000396 iron Nutrition 0.000 claims 2
- 239000004568 cement Substances 0.000 abstract description 11
- 230000007306 turnover Effects 0.000 abstract description 2
- 239000011083 cement mortar Substances 0.000 description 13
- 238000003756 stirring Methods 0.000 description 5
- 238000009435 building construction Methods 0.000 description 4
- 239000004570 mortar (masonry) Substances 0.000 description 3
- 238000010586 diagram Methods 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 238000005034 decoration Methods 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 239000010410 layer Substances 0.000 description 1
- 239000002344 surface layer Substances 0.000 description 1
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model provides a high-efficient plastering unit of construction, relates to wall plastering technical field, including carrier vehicle, strutting arrangement, first fixed frame, spiral lift, plastering stand and second fixed frame, carrier vehicle upper portion face is equipped with the fixed slot, strutting arrangement sets up in the fixed slot, and the both sides of fixed slot are equipped with two fixed blocks, are equipped with first fixed frame on two fixed blocks, and first fixed frame is kept away from carrier vehicle one side and is equipped with spiral lift, is equipped with the plastering stand on the spiral lift; the turnover first fixed frame is arranged on the carrier, so that the carrier can be conveniently moved and transported; the supporting device is arranged on the bearing device, so that the first fixing frame is conveniently attached to the wall surface, and the plastering thickness is ensured; the drawer is arranged on the first fixed frame, so that cement materials falling from the wall can be conveniently contained and collected; through setting up the fixed frame of second on first fixed frame for fixed first fixed frame and the fixed frame of second can be stabilized and fix between roof and ground, increase the stability when plastering the operation.
Description
Technical Field
The utility model relates to the technical field of wall plastering, in particular to a high-efficiency plastering device for building construction.
Background
The construction wall plastering is a surface layer engineering for plastering cement mortar on a wall surface, has the functions of protecting a base layer and increasing attractiveness, is mainly finished by manpower at present, has lower working efficiency of the manpower relative to a machine, and has no machine plastering effect in flatness.
The Chinese patent with the bulletin number of CN218061259U discloses a wall plastering device for building interior decoration, which is provided with a motor, a roll shaft, a laser array sensor, a microprocessor and a signal receiver, and can automatically detect the flatness of a wall surface during plastering and automatically level and fill up the wall surface, so that the plastering wall surface is smoother, and the plastering quality of the device is improved; but the device can not collect the scraped cement mortar in the plastering process, so that the cement mortar is accumulated on the indoor ground, and the cement mortar is easy to dry.
Disclosure of Invention
In order to overcome the defects in the background art, the utility model discloses a high-efficiency plastering device for building construction.
In order to achieve the aim of the utility model, the utility model adopts the following technical scheme:
the utility model provides a high-efficient plastering unit of construction, including bearing car, strutting arrangement, first fixed frame, screw lift, plaster frame and second fixed frame, be equipped with strutting arrangement and first fixed frame on the bearing car, the upper end of first fixed frame is equipped with the second fixed frame, bear car upper portion face and be equipped with the fixed slot, strutting arrangement sets up in the fixed slot, the both sides of fixed slot are equipped with two fixed blocks, be equipped with first fixed frame on two fixed blocks, first fixed frame keeps away from bearing car one side and is equipped with screw lift, be equipped with plaster frame on the screw lift.
The universal wheels are distributed at four corners of the lower surface of the carrier, each universal wheel has a locking function, two fixing blocks are arranged on the upper surface of the carrier, the fixing blocks are symmetrically arranged at one end of the upper surface of the carrier, and the lower surface of each fixing block is connected with the upper surface of the carrier.
The supporting device is composed of a hydraulic cylinder, a connecting shaft and rollers, the lower end of the hydraulic cylinder is arranged in the fixed groove, the lower end of the hydraulic cylinder is hinged with the inner wall of the fixed groove, the upper end of a hydraulic cylinder piston is provided with the connecting shaft, the side face of the connecting shaft is connected with the hydraulic cylinder piston, and the rollers are arranged at the two ends of the connecting shaft.
The first fixed frame is U-shaped structure, first fixed frame is articulated with the fixed block dorsad wall one side, first fixed frame overturns on the carrier, first fixed frame dorsad wall one side axial symmetry is equipped with two location angle bars, one side of location angle bar is connected with the side of first fixed frame, connecting axle and gyro wheel set up between two angle location angle bars, connecting axle and gyro wheel reciprocate along first fixed frame between two location angle bars, bottom one side of first fixed frame is equipped with the perforation, be equipped with the drawer in the perforation, the drawer is used for holding the cement material of falling down on the collection wall, the drawer below is equipped with spiral elevator, be equipped with the frame of plastering in the pivot of spiral elevator.
The upper portion face of screw lift and the lower part face of first fixed frame, screw lift's pivot axial sets up in first fixed frame, is equipped with the connecting block in screw lift's the pivot, connecting block and screw lift's pivot threaded connection are equipped with the frame of plastering on the connecting block, and the frame of plastering reciprocates along first fixed frame in screw lift's pivot.
The plastering frame comprises a supporting plate, transverse connecting rods, scraping plates, longitudinal connecting rods, a material box, nozzles and air pipes, wherein one side of the supporting plate is connected with the side face of a connecting block, sliding rails are arranged on two sides of the supporting plate, the sliding rails are connected with the inner wall of a first fixed frame, the supporting plate moves up and down along the first fixed frame on the two sliding rails, the transverse connecting rods are distributed on the other side of the supporting plate, each transverse connecting rod is of a telescopic structure, the scraping plates are arranged on the transverse connecting rods, the longitudinal connecting rods are distributed on the lower face of the supporting plate, each longitudinal connecting rod is of a telescopic structure, the material box is arranged at the lower end of the longitudinal connecting rod, the nozzles are distributed on one side of the material box close to a wall, and the air pipes are arranged on the lower face of the material box.
The second fixed frame is U-shaped structure, and the fixed frame cover of second is on first fixed frame, and the fixed frame both sides of second all are equipped with fixed knob, are equipped with the connecting pipe on the fixed frame of second, and the connecting pipe runs through the both sides face of the fixed frame of second, and the pipeline of carrying the cement after stirring passes the connecting pipe and is connected with the below magazine, carries the cement after stirring to in the magazine.
According to the high-efficiency plastering device for building construction, the turnover first fixed frame is arranged on the bearing vehicle, so that the bearing vehicle is convenient to move and transport; the supporting device is arranged on the bearing device, so that the first fixing frame is conveniently attached to the wall surface, and the plastering thickness is ensured; the drawer is arranged on the first fixed frame, so that cement materials falling from the wall can be conveniently contained and collected; through setting up the fixed frame of second on first fixed frame for fixed first fixed frame and the fixed frame of second can be stabilized and fix between roof and ground, increase the stability when plastering the operation.
Drawings
FIG. 1 is a side view of the present utility model;
FIG. 2 is a schematic diagram of the connection of the carriage to the hydraulic cylinder of the present utility model;
fig. 3 is a schematic diagram illustrating connection between the first fixing frame and the smearing device according to the present utility model;
FIG. 4 is a schematic view of the positional relationship of the smearing device of the present utility model;
in the figure: 1. a carrier vehicle; 2. a universal wheel; 3. a hydraulic cylinder; 4. a first fixing frame; 5. a second fixing frame; 6. a connecting pipe; 7. fixing a knob; 8. a drawer; 9. a fixing groove; 10. a fixed block; 11. a connecting shaft; 12. a roller; 13. a screw elevator; 14. a connecting block; 15. perforating; 16. a slide rail; 17. positioning angle iron; 18. a plastering frame; 19. a support plate; 20. a transverse connecting rod; 21. a scraper; 22. a longitudinal connecting rod; 23. a magazine; 24. a nozzle; 25. and an air pipe.
Detailed Description
The utility model will be explained in more detail by the following examples, the purpose of which is to protect all technical improvements within the scope of the utility model.
Combining 1~4 of attached drawings a construction high-efficient plastering unit, including bearing car 1, strutting arrangement, first fixed frame 4, spiral lift 13, plastering frame 18 and second fixed frame 5, be equipped with strutting arrangement and first fixed frame 4 on the bearing car 1, the upper end of first fixed frame 4 is equipped with second fixed frame 5, bearing car 1 upper portion face is equipped with fixed slot 9, strutting arrangement sets up in fixed slot 9, the both sides of fixed slot 9 are equipped with two fixed blocks 10, be equipped with first fixed frame 4 on two fixed blocks 10, first fixed frame 4 keeps away from bearing car 1 one side and is equipped with spiral lift 13, be equipped with plastering frame 18 on the spiral lift 13.
The universal wheels 2 are distributed at four corners of the lower surface of the carrier 1, each universal wheel 2 has a locking function, two fixing blocks 10 are arranged on the upper surface of the carrier 1, the fixing blocks 10 are symmetrically arranged at one end of the upper surface of the carrier 1, and the lower surface of each fixing block 10 is connected with the upper surface of the carrier 1.
The supporting device is composed of a hydraulic cylinder 3, a connecting shaft 11 and rollers 12, the lower end of the hydraulic cylinder 3 is arranged in a fixed groove 9, the lower end of the hydraulic cylinder 3 is hinged with the inner wall of the fixed groove 9, the upper end of a piston of the hydraulic cylinder 3 is provided with the connecting shaft 11, the side face of the connecting shaft 11 is connected with the piston of the hydraulic cylinder 3, and the rollers 12 are arranged at the two ends of the connecting shaft 11.
The first fixed frame 4 is U-shaped structure, first fixed frame 4 is dorsad wall one side and fixed block 10 are articulated, first fixed frame 4 overturns on bearing car 1, first fixed frame 4 dorsad wall one side axial symmetry is equipped with two location angle bars 17, one side of location angle bar 17 is connected with the side of first fixed frame 4, connecting axle 11 and gyro wheel 12 set up between two angle location angle bars 17, connecting axle 11 and gyro wheel 12 reciprocate along first fixed frame 4 between two location angle bars 17, bottom one side of first fixed frame 4 is equipped with perforation 15, be equipped with drawer 8 in the perforation 15, drawer 8 is used for holding the cement material that falls down on the collection wall, drawer 8 below is equipped with spiral elevator 13, be equipped with plastering frame 18 in the pivot of spiral elevator 13.
The upper surface of the spiral lifter 13 and the lower surface of the first fixed frame 4 are axially arranged in the first fixed frame 4, a connecting block 14 is arranged on the rotating shaft of the spiral lifter 13, the connecting block 14 is in threaded connection with the rotating shaft of the spiral lifter 13, a plastering frame 18 is arranged on the connecting block 14, and the plastering frame 18 moves up and down along the first fixed frame 4 on the rotating shaft of the spiral lifter 13.
The plastering frame 18 comprises a supporting plate 19, transverse connecting rods 20, scraping plates 21, longitudinal connecting rods 22, a material box 23, nozzles 24 and air pipes 25, one side of the supporting plate 19 is connected with the side face of the connecting block 14, sliding rails 16 are arranged on two sides of the supporting plate 19, the sliding rails 16 are connected with the inner wall of the first fixed frame 4, the supporting plate 19 moves up and down along the first fixed frame 4 on the two sliding rails 16, transverse connecting rods 20 are distributed on the other side of the supporting plate 19, each transverse connecting rod 20 is of a telescopic structure, the scraping plates 21 are arranged on the transverse connecting rods 20, the lower face of the supporting plate 19 is provided with the longitudinal connecting rods 22, each longitudinal connecting rod 22 is of a telescopic structure, the lower end of each longitudinal connecting rod 22 is provided with the material box 23, the nozzles 24 are distributed on one side, close to the wall face, of the material box 23, and the air pipes 25 are arranged on the lower face of the material box 23.
The second fixed frame 5 is U-shaped, and the second fixed frame 5 cover is on first fixed frame 4, and the second fixed frame 5 both sides all are equipped with fixed knob 7, are equipped with connecting pipe 6 on the second fixed frame 5, and connecting pipe 6 runs through the both sides face of second fixed frame 5, and the pipeline of carrying the cement after stirring passes connecting pipe 6 and is connected with below magazine 23, carries the cement after stirring to in the magazine 23.
According to the high-efficiency plastering device for building construction, when the high-efficiency plastering device is installed, the bearing vehicle 1 is placed beside a wall surface and is fixed with the universal wheels 2, the hydraulic cylinder 3 is started, the hydraulic cylinder 3 is used for enabling the piston of the hydraulic cylinder 3 to jack up and buckle the first fixing frame 4 on the wall surface, the second fixing frame 5 above the hydraulic cylinder is further jacked on the roof and fixed by the fixing knob 7, the first fixing frame 4 is fixed on the roof and the ground, the power supply of the spiral lifter 13 is connected, the plastering device 18 is lifted to the highest point, then cement mortar is stirred, cement is conveyed to the material box 23 by using the mortar pump, a pipeline on the mortar pump penetrates through the connecting pipe 6 and is connected with the lower material box 23, cement after stirring is conveyed to the material box 23, then the pipeline is connected with the air pipe 25 by using the air pump, so that cement mortar can be sprayed on the wall surface from each nozzle 24, the spiral lifter 13 is started, the plastering device 18 is used for downwards moving, the mortar on the lower wall surface is uniformly plastered on the wall surface, in the plastering process, the cement mortar falls from the wall frames on two sides of the scraping plate 21, the cement mortar falls down from the side surfaces of the first fixing frame 4, the cement mortar falls down from the side surfaces of the cement frames on the sides of the scraping plate 21, the cement mortar falls down inside the drawer 8, the cement mortar is prevented from falling into the drawer 8, and the cement mortar is continuously to be recovered, and the cement mortar is convenient to be recovered.
While the utility model has been particularly shown and described with reference to a preferred embodiment, it will be understood by those skilled in the art that various changes in form and details may be made therein without departing from the spirit and scope of the utility model as defined by the appended claims.
Claims (7)
1. The utility model provides a high-efficient plastering unit of construction, includes carrier vehicle (1), strutting arrangement, first fixed frame (4), spiral elevator (13), plastering rack (18) and second fixed frame (5), is equipped with strutting arrangement and first fixed frame (4) on carrier vehicle (1), and the upper end of first fixed frame (4) is equipped with second fixed frame (5), its characterized in that: the upper portion face of the carrier (1) is provided with a fixed groove (9), the supporting device is arranged in the fixed groove (9), two sides of the fixed groove (9) are provided with two fixed blocks (10), the two fixed blocks (10) are provided with first fixed frames (4), one side, far away from the carrier (1), of the first fixed frames (4) is provided with a spiral lifter (13), and the spiral lifter (13) is provided with a plastering frame (18).
2. The construction efficient plastering device according to claim 1, wherein: the universal wheels (2) are distributed at four corners of the lower surface of the bearing vehicle (1), each universal wheel (2) has a locking function, two fixing blocks (10) are arranged on the upper surface of the bearing vehicle (1), the fixing blocks (10) are symmetrically arranged at one end of the upper surface of the bearing vehicle (1), and the lower surface of each fixing block (10) is connected with the upper surface of the bearing vehicle (1).
3. The construction efficient plastering device according to claim 1, wherein: the supporting device is composed of a hydraulic cylinder (3), a connecting shaft (11) and rollers (12), the lower end of the hydraulic cylinder (3) is arranged in a fixed groove (9), the lower end of the hydraulic cylinder (3) is hinged to the inner wall of the fixed groove (9), the upper end of a piston of the hydraulic cylinder (3) is provided with the connecting shaft (11), the side face of the connecting shaft (11) is connected with the piston of the hydraulic cylinder (3), and the rollers (12) are arranged at the two ends of the connecting shaft (11).
4. The construction efficient plastering device according to claim 1, wherein: the U-shaped structure is adopted by the first fixed frame (4), one side of the back of the first fixed frame (4) is hinged to the fixed block (10), the first fixed frame (4) is overturned on the bearing vehicle (1), two positioning angle irons (17) are axially symmetrically arranged on one side of the back of the first fixed frame (4), one side surface of the positioning angle iron (17) is connected with one side surface of the first fixed frame (4), a connecting shaft (11) and a roller (12) are arranged between the two positioning angle irons (17), a perforation (15) is arranged on one side of the bottom of the first fixed frame (4), a drawer (8) is arranged in the perforation (15), a spiral lifter (13) is arranged below the drawer (8), and a frame (18) is arranged on a rotating shaft of the spiral lifter (13) for plastering.
5. The construction efficient plastering device according to claim 4, wherein: the upper portion face of screw lift (13) and the lower part face of first fixed frame (4), the pivot axial setting of screw lift (13) is in first fixed frame (4), is equipped with connecting block (14) in the pivot of screw lift (13), and connecting block (14) and the pivot threaded connection of screw lift (13) are equipped with on connecting block (14) and plaster frame (18).
6. The construction efficient plastering device according to claim 5, wherein: the plastering frame (18) comprises a supporting plate (19), a transverse connecting rod (20), a scraping plate (21), a longitudinal connecting rod (22), a material box (23), a nozzle (24) and an air pipe (25), wherein one side of the supporting plate (19) is connected with the side face of the connecting block (14), sliding rails (16) are arranged on two sides of the supporting plate (19), the sliding rails (16) are connected with the inner wall of the first fixed frame (4), the transverse connecting rod (20) is distributed on the other side of the supporting plate (19), the scraping plate (21) is arranged on the transverse connecting rod (20), the longitudinal connecting rod (22) is distributed on the lower face of the supporting plate (19), the material box (23) is arranged at the lower end of the longitudinal connecting rod (22), the nozzle (24) is distributed on one side, close to the wall face, of the material box (23), and the air pipe (25) is arranged on the lower face of the material box (23).
7. The construction efficient plastering device according to claim 1, wherein: the U-shaped structure is adopted as the second fixed frame (5), the second fixed frame (5) is sleeved on the first fixed frame (4), fixing knobs (7) are arranged on two sides of the second fixed frame (5), connecting pipes (6) are arranged on the second fixed frame (5), and the connecting pipes (6) penetrate through two side faces of the second fixed frame (5).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202320889547.6U CN219710888U (en) | 2023-04-20 | 2023-04-20 | High-efficient plastering unit of construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202320889547.6U CN219710888U (en) | 2023-04-20 | 2023-04-20 | High-efficient plastering unit of construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN219710888U true CN219710888U (en) | 2023-09-19 |
Family
ID=88015768
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202320889547.6U Active CN219710888U (en) | 2023-04-20 | 2023-04-20 | High-efficient plastering unit of construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN219710888U (en) |
-
2023
- 2023-04-20 CN CN202320889547.6U patent/CN219710888U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109025215B (en) | Full-automatic floor tile paving machine | |
CN212044045U (en) | Polishing and grinding device for wooden door processing | |
CN219710888U (en) | High-efficient plastering unit of construction | |
CN212053658U (en) | Floor tile paving mechanism capable of lifting floor tiles | |
CN219387818U (en) | Sleeve type downhole fishing tool | |
CN211597792U (en) | Automatic wall building system | |
CN217005824U (en) | Hoisting type rapid detection and maintenance platform for large-area cement leveling inspection | |
CN214523982U (en) | Carrying equipment for building decoration material | |
CN103182745B (en) | Slide block side hanging type cutting machine rack for portable electric cutting machine | |
CN213010258U (en) | Conveyer capable of adjusting lifting | |
CN206796975U (en) | A kind of reliable floor tile dyeing apparatus | |
CN221297497U (en) | Road surface leveling machine | |
CN218192044U (en) | Base box structure of flanging puncher | |
CN219011075U (en) | Dust collector in job site | |
CN214933434U (en) | Construction device for combined building board wall | |
CN215714441U (en) | Concrete road surface leveling device | |
CN219485146U (en) | Interior decoration wall surface grinding and leveling device | |
CN220080651U (en) | House building plastering device | |
CN218083259U (en) | Concrete brick processing roll paper-back edition is put for construction machinery | |
CN214494531U (en) | Grit conveying system is used to job site | |
CN213799743U (en) | Conveyor for building engineering | |
CN220247630U (en) | Construction template waste material clearing device | |
CN211572622U (en) | A auxiliary device that puts in storage for archaize building backing plate concrete placement | |
CN214828680U (en) | Hoisting accessory is used in utility tunnel construction | |
CN215319721U (en) | Foldable hydraulic gas-filling block cutting machine |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |