CN215670939U - Frame protective structure is climbed in building engineering construction - Google Patents

Frame protective structure is climbed in building engineering construction Download PDF

Info

Publication number
CN215670939U
CN215670939U CN202121726544.8U CN202121726544U CN215670939U CN 215670939 U CN215670939 U CN 215670939U CN 202121726544 U CN202121726544 U CN 202121726544U CN 215670939 U CN215670939 U CN 215670939U
Authority
CN
China
Prior art keywords
engineering construction
building engineering
rod
bottom plate
vaulting pole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202121726544.8U
Other languages
Chinese (zh)
Inventor
张国军
崔海洋
张国正
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC First Highway Engineering Co Ltd
Original Assignee
CCCC First Highway Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC First Highway Engineering Co Ltd filed Critical CCCC First Highway Engineering Co Ltd
Priority to CN202121726544.8U priority Critical patent/CN215670939U/en
Application granted granted Critical
Publication of CN215670939U publication Critical patent/CN215670939U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Emergency Lowering Means (AREA)

Abstract

The utility model discloses a climbing frame protection structure for building engineering construction, which comprises a triangular rod arranged at the bottom of a bottom plate, wherein a stay rod capable of horizontally sliding is inserted in the triangular rod, a rotatable roller is sleeved at one end of the stay rod, a spring for resetting the stay rod is arranged in the triangular rod, a collecting plate capable of horizontally sliding is inserted in the bottom plate, a vertical rod for supporting is fixedly connected to the surface of the bottom plate, and a cross rod for connection is fixedly connected to the surface of the vertical rod. This frame protective structure is climbed in building engineering construction, through the connection between vaulting pole and the triangular prism, the vaulting pole can move about in the inside of triangular prism, combines the connection between gyro wheel and the vaulting pole, and the vaulting pole can drive the gyro wheel and move about, and some collision dynamics can be got rid of in the rotation that combines the gyro wheel when unexpected collision, combines the cooperation between vaulting pole and the spring and can absorb and cushion remaining jarring power, can effectually play the effect of protection.

Description

Frame protective structure is climbed in building engineering construction
Technical Field
The utility model relates to the technical field of protective structures, in particular to a climbing frame protective structure for building engineering construction.
Background
The climbing frame, also called lifting frame, can be divided into several main types such as hydraulic type, electrodynamic type, manual pull type and the like according to the power source, is a novel scaffold system developed in recent years, is mainly applied to high-rise shear wall type floors, and can ascend or descend along buildings.
The utility model discloses a climbing frame protective screening structure in Chinese utility model patent application publication specification CN21094768U, including net frame, fixed mounting be in net piece on the net frame and be used for connecting climb a frame support body with the first connecting piece of net frame, the net piece is the protection net piece that punches a hole, just net frame and net piece are the aluminum alloy material, the avris is equipped with outstanding first connecting pipe about the net frame, be equipped with on the net piece with the first connecting pipe corresponding aversion hole makes first connecting pipe can be outstanding from in the aversion hole, first connecting piece one end is fixed on the support body, the other end with first connecting pipe assorted second connecting pipe, pass through the fastener fixed the linking between first connecting pipe and the second connecting pipe, the utility model simple structure, convenient to use can improve the installation effectiveness and the steadiness of protective screening.
But this utility model in-service use be not convenient for play the crashproof effect of shock attenuation to the hoisting frame, cause the potential safety hazard easily when the instrument that simultaneously staff used is unexpected to drop, use and get up certain limitation.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
Aiming at the defects of the prior art, the utility model provides a protective structure of a climbing frame in building engineering construction, which solves the problems in the background technology.
(II) technical scheme
In order to achieve the purpose, the utility model is realized by the following technical scheme: the utility model provides a frame protective structure is climbed in building engineering construction, is including installing the triangular prism in the bottom plate bottom, but the inside of triangular prism is pegged graft and is had horizontal slip vaulting pole, rotatable gyro wheel has been cup jointed to the one end of vaulting pole, the inside of triangular prism is equipped with and is used for the spring that resets to the vaulting pole, but the inside of bottom plate is pegged graft and is had horizontal slip collection board, the fixed surface of bottom plate is connected with the montant that is used for supporting, the fixed surface of montant is connected with the horizontal pole that is used for connecting, it has rotatable movable fence to peg graft in the inside of montant.
Optionally, the top end of the movable fence is in threaded connection with a rotatable limiting bolt, and the surface of the limiting bolt penetrating out of the movable fence is in threaded connection with a vertical rod.
Optionally, a connecting block for connecting the placing box is inserted into the cross rod, so that the placing box can be connected with the cross rod through the connecting block.
Optionally, the inside of connecting block is equipped with the fixture block that can vertically go up and down, the inside of connecting block is equipped with the spacing spring that is used for restoring to the fixture block.
Optionally, one end of the placing box is connected with a turnover cover plate through a hinge, and a through hole for leaking materials is formed in the surface of the bottom plate.
Optionally, an auxiliary ring for auxiliary support is fixedly connected to the surface of the triangular rod.
(III) advantageous effects
The utility model provides a climbing frame protection structure for building engineering construction, which has the following beneficial effects:
1. this frame protective structure is climbed in building engineering construction, through the connection between vaulting pole and the triangular prism, the vaulting pole can move about in the inside of triangular prism, combines the connection between gyro wheel and the vaulting pole, and the vaulting pole can drive the gyro wheel and move about, and some collision dynamics can be got rid of in the rotation that combines the gyro wheel when unexpected collision, combines the cooperation between vaulting pole and the spring and can absorb and cushion remaining jarring power, can effectually play the effect of protection.
2. This frame protective structure is climbed in building engineering construction, through the connection between collecting plate and the bottom plate, the collecting plate can carry out the horizontal slip in the inside of bottom plate, and when dropping some parts or article on the bottom plate, the collecting plate can be collected the article that drops, can effectually prevent that article from dropping from the high altitude and causing certain potential safety hazard.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic view of a triangular bar according to the present invention;
FIG. 3 is a schematic view of the structure of the storage case of the present invention;
FIG. 4 is an enlarged view of the structure at A in FIG. 1 according to the present invention.
In the figure: 1. a base plate; 2. a triangular rod; 3. a stay bar; 4. a roller; 5. a spring; 6. a collection plate; 7. a vertical rod; 8. a cross bar; 9. an activity bar; 10. a limit bolt; 11. placing the box; 12. connecting blocks; 13. a clamping block; 14. a limiting spring; 15. a cover plate; 16. an auxiliary ring.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and all other embodiments obtained by a person of ordinary skill in the art based on the embodiments of the present invention without any creative efforts belong to the protection scope of the present invention.
Referring to fig. 1 to 4, the present invention provides a technical solution: a climbing frame protection structure for building engineering construction comprises a triangular rod 2 installed at the bottom of a bottom plate 1, wherein an auxiliary ring 16 for auxiliary support is fixedly connected to the surface of the triangular rod 2, and the triangular rod 2 can be supported in an auxiliary manner through the auxiliary ring 16;
the supporting rod 3 capable of sliding horizontally is inserted into the triangular rod 2, one end of the supporting rod 3 is sleeved with a rotatable roller 4, a spring 5 used for resetting the supporting rod 3 is arranged inside the triangular rod 2, the supporting rod 3 can extend out or retract inside the triangular rod 2 through connection between the triangular rod 2 and the supporting rod 3, the roller 4 can rotate at one end of the supporting rod 3 through connection between the supporting rod 3 and the roller 4, and the spring 5 can be matched with the supporting rod 3 to play a buffering role;
the collecting plate 6 capable of horizontally sliding is inserted in the bottom plate 1, the surface of the bottom plate 1 is fixedly connected with a vertical rod 7 for supporting, the surface of the vertical rod 7 is fixedly connected with a horizontal rod 8 for connecting, the inside of the horizontal rod 8 is inserted with a connecting block 12 for connecting a placing box 11, so that the placing box 11 can be connected between the connecting block 12 and the horizontal rod 8, the inside of the connecting block 12 is provided with a clamping block 13 capable of vertically lifting, the inside of the connecting block 12 is provided with a limiting spring 14 for resetting the clamping block 13, through the connection between the collecting plate 6 and the bottom plate 1, the collecting plate 6 can extend out or retract in the bottom plate 1, through the action of the horizontal rod 8, the protective effect can be achieved, through the connection between the connecting block 12 and the horizontal rod 8, the connecting block 12 can move in the horizontal rod 8, through the action of the clamping block 13, the connection between the connecting block 12 and the horizontal rod 8 can be limited, the fixture block 13 can be reset to be matched with the hole formed in the cross rod 8 through the action of the limiting spring 14, so that the limiting purpose is achieved;
place box 11's one end and have apron 15 that can overturn through hinged joint, the through-hole that is used for leaking the material is offered on the surface of bottom plate 1, the inside of montant 7 is pegged graft and is had rotatable activity fence 9, the top threaded connection of activity fence 9 has rotatable stop bolt 10, stop bolt 10 wears out the surface threaded connection of activity fence 9 and has montant 7, through placing the connection between box 11 and the apron 15, apron 15 can rotate in the one end of placing box 11, through the connection between activity fence 9 and the montant 7, activity fence 9 can rotate in the one end of montant 7, effect through stop bolt 10, can carry on spacingly to the connection between activity fence 9 and the montant 7.
In the utility model, the working steps of the device are as follows:
1. firstly, the limit between the movable rail 9 and the vertical rod 7 is released, and a worker stands on the bottom plate 1 after the movable rail 9 is put down;
2. secondly, tools needed by workers can be placed in the placing box 11, and the placing box 11 is fastened on the cross rod 8 through the connecting block 12;
3. finally, when the unexpected collision appears, the roller 4 can contact the climbing frame to buffer for the first time, the left shock force is absorbed and buffered by combining the matching between the support rod 3 and the spring 5, the effective protection effect can be achieved, and the potential safety hazard caused by the accidental falling of the working personnel using tools can be prevented through the action of the collecting plate 6.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the utility model, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a frame protective structure is climbed in building engineering construction, is including installing triangle pole (2) in bottom plate (1) bottom, its characterized in that: but the inside of three horn bars (2) is pegged graft and is had horizontal slip vaulting pole (3), rotatable gyro wheel (4) have been cup jointed to the one end of vaulting pole (3), the inside of three horn bars (2) is equipped with and is used for spring (5) to vaulting pole (3) reset, but the inside of bottom plate (1) is pegged graft and is had horizontal slip collection board (6), the fixed surface of bottom plate (1) is connected with montant (7) that are used for supporting, the fixed surface of montant (7) is connected with horizontal pole (8) that are used for connecting, the inside of montant (7) is pegged graft and is had rotatable activity fence (9).
2. The building engineering construction climbing frame protection structure according to claim 1, characterized in that: the top end of the movable fence (9) is in threaded connection with a rotatable limiting bolt (10), and the surface of the limiting bolt (10) penetrating out of the movable fence (9) is in threaded connection with a vertical rod (7).
3. The building engineering construction climbing frame protection structure according to claim 1, characterized in that: the inside of horizontal pole (8) is pegged graft and is had connecting block (12) that are used for connecting and place box (11), makes to place and connects between box (11) accessible connecting block (12) and horizontal pole (8).
4. The building engineering construction climbing frame protection structure according to claim 3, characterized in that: the inside of connecting block (12) is equipped with fixture block (13) that can vertically go up and down, the inside of connecting block (12) is equipped with and is used for spacing spring (14) that reset fixture block (13).
5. The building engineering construction climbing frame protection structure according to claim 3, characterized in that: one end of the placing box (11) is connected with a turnover cover plate (15) through a hinge, and a through hole for leaking materials is formed in the surface of the bottom plate (1).
6. The building engineering construction climbing frame protection structure according to claim 1, characterized in that: and an auxiliary ring (16) for auxiliary support is fixedly connected to the surface of the triangular rod (2).
CN202121726544.8U 2021-07-28 2021-07-28 Frame protective structure is climbed in building engineering construction Expired - Fee Related CN215670939U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121726544.8U CN215670939U (en) 2021-07-28 2021-07-28 Frame protective structure is climbed in building engineering construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121726544.8U CN215670939U (en) 2021-07-28 2021-07-28 Frame protective structure is climbed in building engineering construction

Publications (1)

Publication Number Publication Date
CN215670939U true CN215670939U (en) 2022-01-28

Family

ID=79981780

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121726544.8U Expired - Fee Related CN215670939U (en) 2021-07-28 2021-07-28 Frame protective structure is climbed in building engineering construction

Country Status (1)

Country Link
CN (1) CN215670939U (en)

Similar Documents

Publication Publication Date Title
CN211058363U (en) Anti-falling safety device for building construction
CN108534620B (en) Rail guard for mine blasting convenient to concatenation
CN215670939U (en) Frame protective structure is climbed in building engineering construction
CN212154221U (en) Safety anti-falling net for constructional engineering
CN209907899U (en) Hanging basket for constructional engineering
CN210598095U (en) Safety device for building construction climbing
CN210067378U (en) Fall-proof housing construction support
CN215760354U (en) Construction hanging basket with protection function
CN214740094U (en) High-altitude falling object blocking fence for building construction
CN114016724A (en) Protection device and protection method for building construction
CN213087398U (en) Anti-falling device for steel structure engineering construction
CN211172563U (en) Inclined glass curtain wall mounting system
CN208039787U (en) The assembled operating platform of side operation is faced in a kind of high-altitude
CN215443055U (en) Hanging basket for constructional engineering
CN219931545U (en) High-safety working platform for building construction
CN212743303U (en) Building management construction bears frame
CN220666882U (en) Protection device for building engineering
CN213654205U (en) Anti-falling device for guide rail type lifting scaffold
CN216690315U (en) Scaffold protective structure for building engineering outer wall
CN212897501U (en) Construction external protective support
CN218842867U (en) Movable bridge arch rib support frame
CN213626768U (en) High-stability protection device for high-rise building construction
CN214995826U (en) High-stability protection device for high-rise building construction
CN217871670U (en) Scaffold for steel structure construction
CN213952902U (en) Scaffold with safety protection function

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20220128

CF01 Termination of patent right due to non-payment of annual fee