CN214995826U - High-stability protection device for high-rise building construction - Google Patents

High-stability protection device for high-rise building construction Download PDF

Info

Publication number
CN214995826U
CN214995826U CN202120857009.XU CN202120857009U CN214995826U CN 214995826 U CN214995826 U CN 214995826U CN 202120857009 U CN202120857009 U CN 202120857009U CN 214995826 U CN214995826 U CN 214995826U
Authority
CN
China
Prior art keywords
protection
box body
protective
building construction
protection box
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202120857009.XU
Other languages
Chinese (zh)
Inventor
刘兴良
李先春
蒋灵波
卢秀英
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sheng Er Construction Group Co ltd
Original Assignee
Sheng Er Construction Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sheng Er Construction Group Co ltd filed Critical Sheng Er Construction Group Co ltd
Priority to CN202120857009.XU priority Critical patent/CN214995826U/en
Application granted granted Critical
Publication of CN214995826U publication Critical patent/CN214995826U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Emergency Lowering Means (AREA)

Abstract

The utility model relates to a high building protection device for construction of high stability, belong to the field of construction equipment, it includes the protection box, be fixed with the rings that are used for hoist and mount on the protection box, the bottom surface of protection box is fixed with the supporting legs, be provided with electric putter in the bottom of protection box, electric putter's output is equipped with the connecting block, be fixed with the negative sucker on the connecting block, install the aspiration pump of being connected with the negative sucker on the protection box, the slide rail that two parallels is seted up to protection box bottom surface, it is connected with the movable block to slide on the slide rail, install the protection frame between the movable block, be provided with the protection cloth on the protection frame, the protection frame passes through spliced pole fixed connection with the connecting block. This application can make the protection box be difficult for rocking for the workman can walk about more steadily in the protection box, security when having improved high floor building construction.

Description

High-stability protection device for high-rise building construction
Technical Field
The application relates to the field of building construction equipment, in particular to a high-stability protection device for building construction.
Background
With the development of cities, buildings tend to be built in high density and high floors, and at present, workers generally take lifting equipment to ascend to a construction position for high-altitude operation during the construction of the high floors.
The hoisting equipment generally comprises a hoisting box, a fixing frame and a winch, wherein the fixing frame is fixed at the top floor position of a building, the winch is fixed on the fixing frame, a steel cable is fixed at the top end of the hoisting box and connected with the winch, and the winch winds the steel cable to achieve the purpose of lifting the hoisting box.
In view of the related art in the above, the inventors consider that there are drawbacks in that: the hoisting box is easy to shake due to wind power, and when workers walk, the hoisting box is easy to shake, so that the construction safety of the workers is affected.
SUMMERY OF THE UTILITY MODEL
In order to improve the security when high floor building construction, this application provides a high stable protection device for high building construction, can make the protection box be difficult for rocking for the workman can walk about more steadily in the protection box.
The application provides a pair of high stable high building protection device for construction adopts following technical scheme:
the utility model provides a high building protection device for construction, includes the protection box, be fixed with the rings that are used for hoist and mount on the protection box, the bottom surface of protection box is fixed with the supporting legs, be provided with electric putter in the bottom of protection box, electric putter's output is equipped with the connecting block, be fixed with the negative sucker on the connecting block, install the aspiration pump of being connected with the negative sucker on the protection box, the slide rail that two parallels is seted up to protection box bottom surface, it is connected with the movable block to slide on the slide rail, install the protection frame between the movable block, be provided with the protection cloth on the protection frame, the protection frame with the connecting block passes through spliced pole fixed connection.
Through adopting above-mentioned technical scheme, electric putter makes negative sucker move to contact building outer wall, the air pump takes out the air in the negative sucker, make negative sucker adsorb press close to with the building outer wall, thereby be connected with the building outer wall steadily with the protection box, make the protection box be difficult for shaking because of wind blows or the workman moves about, the security of workman high altitude construction has been improved, in addition, the protection frame is driven by electric putter and is removed towards the building outer wall, thereby make the protection cloth can load the article that drops from between protection box and the building outer wall, the security of building site is improved.
Preferably, a supporting seat is fixed on the protective box body, an adjusting screw rod is connected to the supporting seat in a threaded mode, a guardrail is installed at one end, far away from the supporting seat, of the adjusting bidirectional screw rod, and the guardrail is connected with the adjusting screw rod in a rotating mode.
By adopting the technical scheme, the guardrail can improve the distance between the adjusting screw rod and the supporting seat, so that the guardrail is suitable for protecting the height required by workers, and the safety of the workers in high-altitude operation is improved.
Preferably, a protective net is connected between the guardrail and the protective box body.
By adopting the technical scheme, the space between the guardrail and the protective box body is protected by the protective net, so that the possibility of high-altitude falling of articles such as construction tools of workers is reduced.
Preferably, the adjusting screw is sleeved with a convex handle.
Through adopting above-mentioned technical scheme, make the workman can more easily twist and move adjusting screw, improved work efficiency.
Preferably, the guardrail is provided with a movable ring in a penetrating manner, the movable ring is connected with a protection rope, and the tail end of the protection rope is connected with a protection waistband.
Through adopting above-mentioned technical scheme, can be safer after making the workman dress the protection waistband, the movable ring can slide on the guardrail, and the homoenergetic enough receives the protection of protection rope when making a round trip to move in the protection box.
Preferably, mounting holes are formed in two ends of the protective frame, a hanging buckle is mounted on the moving block, the mounting holes are hung in the hanging buckle, and a fixing bolt penetrates through the protective frame and is in threaded connection with the connecting column.
Through adopting above-mentioned technical scheme, make the protective frame can follow the bottom of protection box and dismantle out, be convenient for clear up the article or the dust of loading on the protection cloth.
Preferably, a buffer air bag is arranged at the side end of the protection box body.
Through adopting above-mentioned technical scheme, make the protection box at the in-process that hoist and mount go up and down, the buffering gasbag can cushion the protection box because of rocking the impact force that collides the building outer wall and produce, makes the protection box can be more steady.
Preferably, the bottom ends of the supporting legs are provided with universal wheels.
By adopting the technical scheme, the protective box body is convenient to move on the ground, so that the protective box body is conveniently pushed to a proper hoisting position.
In summary, the present application includes at least one of the following beneficial technical effects:
1. the electric push rod, the air suction pump and the negative pressure sucker are arranged in the protective box body, so that the negative pressure sucker can be firmly adsorbed on the outer wall of a building, the protective box body can be stably positioned at a high construction position and is not easy to shake, and the construction safety of workers is improved;
2. the movable block, the protective frame and the protective cloth are arranged at the bottom of the protective box body, so that when the electric push rod extends out of the protective box body, the protective frame can be driven to move towards the outer wall of the building together, the protective frame is located in a gap between the protective box body and the outer wall of the building, articles falling from the side edge of the protective box body can fall into the protective cloth, and the high-altitude falling object condition is reduced;
3. through setting up but height-adjusting's guardrail, make the workman can adjust according to the height of self or the height that the required protection of construction, further improved workman's construction safety nature.
Drawings
FIG. 1 is a schematic diagram of the overall structure in an embodiment of the present application;
FIG. 2 is a side sectional view of an embodiment of the present application;
FIG. 3 is a front view of an embodiment of the present application;
fig. 4 is an enlarged view a of fig. 3.
Description of reference numerals: 1. a protective box body; 11. a hoisting ring; 12. supporting legs; 121. a universal wheel; 2. a buffer air bag; 3. an electric push rod; 31. connecting blocks; 32. connecting columns; 4. an air pump; 5. a negative pressure sucker; 6. a moving block; 61. hanging and buckling; 7. a protective frame; 71. protective cloth; 72. fixing the bolt; 81. a support base; 82. adjusting the screw rod; 821. a handle in relief; 83. a guardrail; 84. a protective net; 85. a movable ring; 86. a protective rope; 87. a protective waistband.
Detailed Description
The present application is described in further detail below with reference to figures 1-4.
The embodiment of the application discloses high building protection device for construction is stabilized to height.
Referring to fig. 1, a high stable protection device for building construction, including protection box 1, the bottom mounting of protection box 1 has four supporting legss 12, universal wheel 121 is installed to the bottom of supporting legss 12, the both sides bottom mounting of protection box 1 has rings 11, promote protection box 1 to hoist and mount position department after, the workman gets into protection box 1, through fixing the cable wire of hoist engine on rings 11, draws high protection box 1 to construction position department to make the workman construct in the high building.
For the safety and stability when improving protection box 1 and going up and down, as shown in fig. 1, be provided with buffering gasbag 2 on the side of protection box 1 near the building outer wall, when protection box 1 rocks the in-process that goes up and down and collides the building outer wall, buffering gasbag 2 can slow down protection box 1's striking vibrations degree, makes protection box 1 more stable.
As shown in fig. 1 and 2, a plurality of electric push rods 3 are arranged inside the bottom surface of the protective box body 1, the moving directions of the output ends of the electric push rods 3 are arranged horizontally towards the outer wall of the building, a connecting block 31 is assembled at the output end of each electric push rod 3, a negative pressure suction cup 5 is fixed on the connecting block 31, and the opening of the negative pressure suction cup 5 is arranged towards the outer wall of the building. Meanwhile, an air pump 4 is fixedly installed on the outer side of the protective box body 1, and the air pump 4 is respectively connected with each negative pressure suction cup 5. After the protection box body 1 moves to the construction position, the electric push rod 3 is started, the negative pressure sucker 5 moves towards the outer wall of the building, and after the negative pressure sucker 5 contacts the outer wall of the building, the air pump 4 is started to pump out air inside the negative pressure sucker 5, so that the negative pressure sucker 5 is adsorbed on the outer wall of the building, and the protection box body 1 is stably located at the construction position and is not prone to shaking.
In addition, as shown in fig. 3 and 4, two slide rails are disposed on the bottom surface of the protective case 1, the extending direction of the slide rails is parallel to the moving direction of the electric push rod 3, a plurality of moving blocks 6 are connected to the two slide rails in a sliding manner, and a buckle 61 is fixed on the moving block 6. Meanwhile, the bottom of the protection box body 1 is provided with a protection frame 7, protection cloth 71 is arranged in the protection frame 7, the outer edge of the protection cloth 71 is fixedly connected with the inner edge of the protection frame 7, mounting holes are formed in two sides of the protection frame 7, and the mounting holes are hung in the hanging buckle 61. The bottom of connecting block 31 is fixed with spliced pole 32, and the through-hole has been seted up to the position department that protective frame 7 corresponds the connecting rod, and threaded groove has been seted up to the position department that spliced pole 32 corresponds the through-hole, and protective frame 7 passes through fixing bolt 72 threaded connection with spliced pole 32.
When negative pressure suction cup 5 adsorbs the building outer wall, protection frame 7 is driven by the carriage release lever and stretches out protection box 1 one side, make protection cloth 71 cover the space between protection box 1 and the building outer wall, when the workman drops construction tool because of losing one's hand, or during construction process dropped construction waste such as mortar, protection cloth 71 can load these articles that drop, the condition that high building took place the high altitude and fell the thing in the construction engineering has been reduced, protection frame 7 can be followed protection box 1 bottom and dismantled and go out, clear up the article on the protection cloth 71.
In this embodiment, in order to enhance the safety of workers in high-altitude construction, as shown in fig. 1 and fig. 3, two supporting seats 81 are fixed at the tops of two sides of the protection box body 1, each supporting seat is in threaded connection with an adjusting screw 82, the same guardrail 83 is installed at the top of the adjusting screw 82 on the same side, the guardrail 83 is rotatably connected with the adjusting bolt, and the workers can adjust the distance between the guardrail 83 and the protection box body 1 by screwing the adjusting bolt, so that the guardrail 83 is adapted to the protection height required by the workers in construction. In this embodiment, in order to make it easier for a worker to screw the adjustment bolt, a handle 821 of a relief pattern may be provided on the adjustment bolt.
As shown in fig. 3, the guard net 84 is connected to the guard rail 83, the side edge of the guard net 84 is connected to the side end of the guard rail 83, the bottom edge of the guard net 84 is connected to the top edge of the protective casing 1, and the guard net 84 can further improve the safety of workers.
In this embodiment, referring to fig. 1, the guard rails 83 on both sides are provided with movable rings 85, the movable rings 85 are connected with protective ropes 86, the ends of the two protective ropes 86 are connected with a same protective waistband 87, after a worker enters the protective box 1, the worker wears the protective waistband 87, and when the worker walks in high-altitude operation, the movable rings 85 can be linked by the protective ropes 86 and slide on the guard rails 83 along with the movement of the worker, so that the worker can walk in the protective box 1 more safely.
The implementation principle of the embodiment of the application is as follows:
when the protection box body 1 goes up and down on one side of the building outer wall, the buffer air bag 2 can slow down the impact force when the protection box body 1 collides with the building outer wall, the stability when the protection box body 1 moves is improved, after the protection box body 1 moves to the construction position, the electric push rod 3 moves the negative pressure sucker 5 to the position contacting with the building outer wall, then the air suction pump 4 sucks air from the sucker, until the negative pressure sucker 5 is adsorbed on the building outer wall, thereby the protection box body 1 is not easy to shake in the high altitude, the construction safety of workers is improved, and the safety of the workers can be further protected by the guardrail 83 and the protection belt 87 on the protection box body 1. Meanwhile, the electric push rod 3 drives the protective frame 7 to extend out of the bottom of the protective box body 1, so that the protective cloth 71 can load articles falling from one side of the protective box body 1, and the possibility of falling objects from high altitude during the construction of high-rise buildings is reduced.
The above are all preferred embodiments of the present application, and the present embodiment is only explained for the present application, and the protection scope of the present application is not limited by this, so: all equivalent changes made according to the structure, shape and principle of the present application shall be covered by the protection scope of the present application.

Claims (8)

1. A high-stability protection device for high-rise building construction comprises a protection box body (1), a lifting ring (11) for hoisting is fixed on the protective box body (1), supporting legs (12) are fixed on the bottom surface of the protective box, it is characterized in that an electric push rod (3) is arranged in the bottom of the protective box body (1), the output end of the electric push rod (3) is provided with a connecting block (31), a negative pressure sucker (5) is fixed on the connecting block (31), an air pump (4) connected with the negative pressure sucker (5) is installed on the protective box body (1), the bottom surface of the protective box body (1) is provided with two parallel slide rails, the slide rails are connected with a movable block (6) in a sliding way, a protective frame (7) is arranged between the moving blocks (6), protective cloth (71) is arranged on the protective frame (7), the protective frame (7) is fixedly connected with the connecting block (31) through a connecting column (32).
2. The high-stability protection device for building construction according to claim 1, wherein a support seat (81) is fixed on the protection box body (1), an adjusting screw (82) is connected to the support seat (81) in a threaded manner, a guardrail (83) is installed at one end of the adjusting bidirectional screw, which is far away from the support seat (81), and the guardrail (83) is rotatably connected with the adjusting screw (82).
3. The protection device for high-stability high-rise building construction according to claim 2, wherein a protection net (84) is connected between the guardrail (83) and the protection box body (1).
4. The high-stability protection device for high-rise building construction according to claim 2, wherein the adjusting screw rod (82) is sleeved with a convex handle (821).
5. The high-stability protection device for building construction of the high-rise building according to claim 2, wherein a movable ring (85) is arranged on the guardrail (83) in a penetrating manner, a protection rope (86) is connected to the movable ring (85), and a protection belt (87) is connected to the tail end of the protection rope (86).
6. The high-stability protection device for building construction according to claim 1, wherein mounting holes are formed at two ends of the protection frame (7), a hanging buckle (61) is mounted on the moving block (6), the mounting holes are hung in the hanging buckle (61), and a fixing bolt (72) is arranged on the protection frame (7) in a penetrating manner and is in threaded connection with the connecting column (32).
7. The high-stability protection device for high-rise building construction according to claim 1, wherein a buffer air bag (2) is provided at a side end of the protection box body (1).
8. The high-stability protection device for high-rise building construction according to claim 1, wherein universal wheels (121) are mounted at the bottom ends of the supporting legs (12).
CN202120857009.XU 2021-04-24 2021-04-24 High-stability protection device for high-rise building construction Active CN214995826U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120857009.XU CN214995826U (en) 2021-04-24 2021-04-24 High-stability protection device for high-rise building construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120857009.XU CN214995826U (en) 2021-04-24 2021-04-24 High-stability protection device for high-rise building construction

Publications (1)

Publication Number Publication Date
CN214995826U true CN214995826U (en) 2021-12-03

Family

ID=79091466

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120857009.XU Active CN214995826U (en) 2021-04-24 2021-04-24 High-stability protection device for high-rise building construction

Country Status (1)

Country Link
CN (1) CN214995826U (en)

Similar Documents

Publication Publication Date Title
CN209942205U (en) Construction hanging basket
CN214995826U (en) High-stability protection device for high-rise building construction
CN215254391U (en) Hanging flower basket is used to green building outer wall fitment
CN216196814U (en) Adjustable horizontal entrance to a cave anti-falling device
CN216340796U (en) High-altitude operation frame suitable for severe environment
CN103950872B (en) The vertical rod lifting multi-purpose tool of a kind of electric substation high-altitude equipment
CN212425367U (en) Hydraulic lifting platform with damping function
CN112431400B (en) Engineering project construction protection device
CN111732024A (en) Supplementary lift erection equipment of interior decoration heavy object
CN207109614U (en) A kind of Hanging Basket for building
CN203158956U (en) Building for preventing ladder cage of construction lift from falling
CN203064928U (en) Anti-falling system of construction elevator
CN218562974U (en) Basket is hung to bridge construction safety
CN102976183A (en) Construction lift for building under construction
CN203158962U (en) Anti-falling system of construction elevator
CN215670939U (en) Frame protective structure is climbed in building engineering construction
CN217518115U (en) Lifting hanging basket for anti-corrosion spraying construction
CN218909734U (en) Liftable support for building engineering construction
CN217921349U (en) High-safety protection lifter for construction site
CN219690314U (en) High-altitude operation installation protection device and equipment
CN215212224U (en) Be applied to electric power engineering's scaffold frame
CN219753908U (en) Sliding rack adherence operation platform for dismantling chimney and water tower
CN219863975U (en) Assembled hanging basket
CN215055095U (en) Scaffold frame convenient to remove for construction
CN215291324U (en) High altitude construction is with slowly falling equipment

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant