CN215562763U - Supporting construction of channel excavation protection current situation signal tower - Google Patents

Supporting construction of channel excavation protection current situation signal tower Download PDF

Info

Publication number
CN215562763U
CN215562763U CN202121623269.7U CN202121623269U CN215562763U CN 215562763 U CN215562763 U CN 215562763U CN 202121623269 U CN202121623269 U CN 202121623269U CN 215562763 U CN215562763 U CN 215562763U
Authority
CN
China
Prior art keywords
signal tower
supporting structure
current situation
supporting
channel excavation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202121623269.7U
Other languages
Chinese (zh)
Inventor
郑盘石
和礼红
彭定新
蔡清
郭开
裴启涛
汤勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan Municipal Engineering Design and Research Institute Co Ltd
Original Assignee
Wuhan Municipal Engineering Design and Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan Municipal Engineering Design and Research Institute Co Ltd filed Critical Wuhan Municipal Engineering Design and Research Institute Co Ltd
Priority to CN202121623269.7U priority Critical patent/CN215562763U/en
Application granted granted Critical
Publication of CN215562763U publication Critical patent/CN215562763U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model provides a supporting construction of channel excavation protection current situation signal tower, supporting construction is the structure for satisfying channel excavation protection current situation signal tower, its characterized in that: the device comprises a supporting structure arranged around a current signal tower, wherein a reinforced concrete crown beam is arranged at the top of the supporting structure; and one side of the supporting structure, which is close to the signal tower, is provided with a waterproof curtain pile, and the adjacent water side of the supporting structure is provided with a concrete protective surface. The utility model relates to a permanent supporting structure of a channel excavation protection status quo signal tower, which adopts a combined supporting system of drilling cast-in-place piles, high-pressure jet grouting piles and surface-facing cast-in-place concrete which are arranged on the periphery, is convenient to construct and operate, has high safety, is economic and reasonable, has short construction period, and can play a role in permanently protecting the status quo signal tower in the channel construction process so as to ensure the engineering safety.

Description

Supporting construction of channel excavation protection current situation signal tower
Technical Field
The utility model relates to the technical field of supporting construction of structures under the current situation of channel excavation protection, in particular to a supporting structure of a signal tower under the current situation of channel excavation protection.
Background
With the continuous progress and development of urban construction, urban water system construction is more and more close to the current situation of important building structures such as houses, pipelines, bridges, signal towers and the like. The channel construction is a measure for connecting a water system and optimizing urban drainage corridors, the channel side slope is a permanent structure, meanwhile, the safety protection of a large number of building structures is involved in the channel water system construction process, and particularly, the signal tower relates to a sensitive building structure for civil safety and is more important to protect. The common channel supporting scheme includes steel sheet pile, prestressed pipe pile, cement-soil mixing pile, cast-in-place pile and other methods. However, the channel of the signal tower section is excavated to form a permanent near-water surface, the signal tower is easy to deform, and the near-water surface is easy to corrode the land, so that a supporting structure for excavating the channel to protect the signal tower in the current situation is urgently needed.
SUMMERY OF THE UTILITY MODEL
The utility model aims to provide a supporting structure system for protecting a signal tower, simultaneously has the advantages of economy, reasonability and convenient construction, and provides an effective current building protection technical scheme.
The technical scheme for solving the technical problems is as follows:
the utility model provides a supporting construction of channel excavation protection current situation signal tower, supporting construction is the structure for satisfying channel excavation protection current situation signal tower, its characterized in that: the device comprises a supporting structure arranged around a current signal tower, wherein a reinforced concrete crown beam is arranged at the top of the supporting structure; and one side of the supporting structure, which is close to the signal tower, is provided with a waterproof curtain pile, and the adjacent water side of the supporting structure is provided with a concrete protective surface.
Furthermore, the supporting structure is composed of a plurality of cast-in-situ bored piles vertically fixed on the periphery of the current signal tower; the cast-in-situ bored piles are arranged at equal intervals along the periphery of the current signal tower.
Furthermore, the waterproof curtain pile is a waterproof wall formed by meshing double-pipe high-pressure jet grouting piles.
Further, the concrete facing is cast-in-place 20cmC20 underwater concrete.
The utility model has the beneficial effects that: the utility model adopts a combined supporting system of drilling cast-in-place piles arranged around, high-pressure jet grouting piles and water-facing surface cast-in-place concrete, and has strong construction applicability, high safety coefficient and reasonable manufacturing cost. The supporting structure is connected through reinforced concrete crown beam and forms whole atress antiskid, sets up high pressure jet grouting pile stagnant water curtain simultaneously at the supporting structure inboard, prevents silt or sand loss between the stake, and the side of just being watered sets up the concrete mask and can prevent the erosion influence of rivers to soil between the stake, ensures the permanent stability of signal tower after channel side slope construction and construction completion.
Drawings
Fig. 1 is a schematic plan view of a supporting structure of a signal tower for protecting the current situation of channel excavation according to the utility model.
Fig. 2 is a cross-sectional view a-a of fig. 1.
In the drawings, the components represented by the respective reference numerals are listed below:
1. supporting structure, 2, crown beam, 3, waterproof curtain pile, 4, concrete facing, 5, current situation signal tower.
Detailed Description
The principles and features of this invention are described below in conjunction with the following drawings, which are set forth by way of illustration only and are not intended to limit the scope of the utility model.
As shown in fig. 1-2, a supporting structure for a channel excavation protection status quo signal tower, the supporting structure 1 is a plurality of cast-in-situ bored piles arranged on the periphery of the signal tower, and the cast-in-situ bored piles are arranged at a certain interval. The top of the supporting structure 1 is provided with a reinforced concrete crown beam 2, the inner side of the supporting structure 1 close to a signal tower is provided with a waterproof curtain pile 3, the waterproof curtain pile 3 is a water stop wall formed by meshing double-pipe high-pressure jet grouting piles, the waterside side of the supporting structure 1 is provided with a concrete protective surface 4, and the concrete protective surface 4 is cast-in-situ C20 underwater concrete.
In the concrete implementation process of the supporting structure, the concrete sizes are as follows:
the supporting structure 1 adopts reinforced concrete cast-in-place piles with the diameter of 800mm and the pile spacing of 1200 mm; the reinforced concrete crown beam 2 is of a reinforced concrete structure of 1200mm multiplied by 700 mm; the waterproof curtain piles 3 are high-pressure jet grouting piles with the diameter of 800mm and the interval of 0.6 m; the concrete facing 4 is 20cm of cast-in-place C20 underwater concrete.
In the utility model, fig. 1-2 show a supporting structure of a signal tower under the current situation of channel excavation protection, which comprises the following specific implementation steps:
the method comprises the following steps: leveling the site and removing the obstacles influencing the construction.
Step two: and constructing the supporting structures 1 arranged around, and constructing the reinforced concrete crown beam 2 and achieving the design strength after the design strength is achieved and the detection is qualified.
Step three: and constructing a waterproof curtain pile 3, wherein the center distance between the waterproof curtain pile and the supporting structure 1 is 0.6 m.
Step four: and excavating a construction design channel after the waterproof curtain piles 3 reach the design strength.
Step five: and (5) excavating a construction design channel bottom and constructing a concrete facing 4 on the water side.
The utility model adopts a combined supporting system of drilling cast-in-place piles arranged on the periphery, high-pressure jet grouting piles and water-facing surface cast-in-place concrete, has mature construction scheme, high safety, economy and reasonability and shorter construction period, and is a reasonable supporting type.
The above description is only for the purpose of illustrating the preferred embodiments of the present invention and is not to be construed as limiting the utility model, and any modifications, equivalents, improvements and the like that fall within the spirit and principle of the present invention are intended to be included therein.

Claims (4)

1. The utility model provides a supporting construction of channel excavation protection current situation signal tower, supporting construction is the structure for satisfying channel excavation protection current situation signal tower, its characterized in that: the device comprises a supporting structure (1) arranged around a current signal tower, wherein a reinforced concrete crown beam (2) is arranged at the top of the supporting structure (1); one side, close to the signal tower, of the supporting structure (1) is provided with a waterproof curtain pile (3), and the adjacent water side of the supporting structure (1) is provided with a concrete protective surface (4).
2. The supporting structure of the channel excavation protection current situation signal tower of claim 1, characterized in that: the supporting structure (1) is composed of a plurality of cast-in-situ bored piles vertically fixed on the periphery of the current signal tower; the cast-in-situ bored piles are arranged at equal intervals along the periphery of the current signal tower.
3. The supporting structure of the channel excavation protection current situation signal tower of claim 1, characterized in that: the waterproof curtain pile (3) is a waterproof wall formed by meshing double-pipe high-pressure jet grouting piles.
4. The supporting structure of the channel excavation protection current situation signal tower of claim 1, characterized in that: the concrete facing (4) is cast-in-place 20cmC20 underwater concrete.
CN202121623269.7U 2021-07-16 2021-07-16 Supporting construction of channel excavation protection current situation signal tower Active CN215562763U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121623269.7U CN215562763U (en) 2021-07-16 2021-07-16 Supporting construction of channel excavation protection current situation signal tower

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121623269.7U CN215562763U (en) 2021-07-16 2021-07-16 Supporting construction of channel excavation protection current situation signal tower

Publications (1)

Publication Number Publication Date
CN215562763U true CN215562763U (en) 2022-01-18

Family

ID=79826244

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121623269.7U Active CN215562763U (en) 2021-07-16 2021-07-16 Supporting construction of channel excavation protection current situation signal tower

Country Status (1)

Country Link
CN (1) CN215562763U (en)

Similar Documents

Publication Publication Date Title
KR100738488B1 (en) Pier basis caisson structure using a precast concrete block
CN112127370A (en) Reverse plugging method for non-construction fender post part of main body fender structure of station
CN112609591A (en) Construction method for deep-water shallow-covering-layer fully-socketed bridge foundation
KR20110107888A (en) Construction method of the pier without the temporary dam in the sea or the river
CN215105880U (en) Concrete inverted well suitable for connecting new and old water supply and drainage pipelines
CN105862662B (en) A kind of curl arched mole
CN113006144B (en) Permeable structure tunnel structure
CN108179759B (en) Underwater core drilling and undercutting bottomless method for pilot well
CN114032934A (en) Safe riverway cofferdam and construction method thereof
CN110117959B (en) Construction method for foundation pit support near river
CN215562763U (en) Supporting construction of channel excavation protection current situation signal tower
CN112095644A (en) Deep foundation pit water intercepting and draining device and construction method thereof
CN203821306U (en) Flexible anti-scour protection pad
CN103485348B (en) Anti-side pier body combined type building enclosure in a wide range of excavation of foundation pit
CN215442042U (en) Anti-scouring device for offshore wind power single-pile foundation
CN211815989U (en) Over-current type permeable breakwater structure
CN111042163A (en) Large-diameter polyethylene plastic pipeline installation structure and construction method
CN213867833U (en) Bottom-falling type foundation pit water stop structure for crossing existing supporting piles
CN219158994U (en) Deep soft soil area ultra-deep large-diameter round pipe jacking working well foundation pit supporting structure
CN114809106B (en) Construction method of combined protection structure of existing tunnel
CN218322781U (en) Foundation pit supporting structure of existing pipeline
CN215165652U (en) Pipe gallery top pipe working well foundation pit supporting structure
CN218667392U (en) Channel structure suitable for Chengdu clay section
CN211849594U (en) Three-purpose underwater construction system of diversion cofferdam construction platform
CN107724404A (en) A kind of half vertical type cofferdam structure and its construction method

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant