CN218322781U - Foundation pit supporting structure of existing pipeline - Google Patents
Foundation pit supporting structure of existing pipeline Download PDFInfo
- Publication number
- CN218322781U CN218322781U CN202222386406.0U CN202222386406U CN218322781U CN 218322781 U CN218322781 U CN 218322781U CN 202222386406 U CN202222386406 U CN 202222386406U CN 218322781 U CN218322781 U CN 218322781U
- Authority
- CN
- China
- Prior art keywords
- pipeline
- steel grating
- existing pipeline
- fender pile
- piles
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Abstract
The utility model relates to a supporting construction technical field just discloses a foundation ditch supporting construction of existing pipeline, including fender pile, pipeline, guan liang and steel grating, the fender pile is provided with a plurality ofly, steel grating is fixed with two relative one sides of fender pile that are located the middle part, the bottom of guan liang is fixed with the top of fender pile, the pipeline is located the below of steel grating. The foundation pit supporting structure with the existing pipeline can be used for solving the problems that due to the existence of the existing pipeline, pipeline position supporting cast-in-place piles cannot be constructed, the interval between the pipeline position supporting piles is too large, and soil between piles is easy to collapse.
Description
Technical Field
The utility model relates to a supporting construction technical field specifically is an underground structure of existing pipeline.
Background
With the vigorous development of urban construction, more and more deep foundation pits appear, and the row pile support is widely applied to the deep foundation pits. In a site where pipelines exist in a foundation pit, under the condition that the pipelines need to be protected due to the fact that the pipelines are not moved in time and are not close to each other, the cast-in-place piles are supported at the pipeline positions by row piles, and particularly for the pipelines with large diameters, the net spacing between the support piles at the pipeline positions needs to be large, otherwise, the pipeline construction is influenced. Due to the operation of soil pressure, the larger clear space between the support piles makes the soil between the piles collapse easily, which has great influence on the surrounding environment and needs to take safe protection measures for the soil between the piles. Through set up steel grating between the stake, spout concrete operation on steel grating surface, can effectively protect soil between the stake, prevent that soil between the stake from collapsing.
At present, due to the existence of existing pipelines between supporting piles, the pipeline position supporting cast-in-place piles cannot be constructed, so that the intervals between the supporting piles at the pipeline position are too large, pipelines which cannot be changed can not be moved, and the net intervals of the piles are too large.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
Not enough to prior art, the utility model provides a foundation ditch supporting construction of existing pipeline possesses and sets up a series of steel grating and spouts the concrete between a fender pile to the realization has solved the problem that proposes among the above-mentioned background art to the advantage of the protection of soil between the stake.
(II) technical scheme
The utility model provides a following technical scheme: the utility model provides a foundation ditch supporting construction of existing pipeline, includes fender pile, pipeline, guan liang and steel grating, the fender pile is provided with a plurality ofly, steel grating is fixed with two relative one sides of fender pile that are located the middle part, the bottom of guan liang is fixed with the top of fender pile, the pipeline is located the below of steel grating.
Further, the bottom of steel grating is equipped with the cavity, the pipeline is located the inside of cavity.
Furthermore, two sides of the steel grating are welded with main ribs of the fender post.
Further, the vertical interval of steel grating is 50cm.
Furthermore, the steel grating installation is carried out layer by layer along with the excavation of the foundation pit, and the concrete spraying operation can be carried out after one layer of steel grating is installed.
Compared with the prior art, the utility model provides a foundation ditch supporting construction of existing pipeline possesses following beneficial effect:
the foundation pit supporting structure with the existing pipeline can be used for solving the problems that due to the existence of the existing pipeline, pipeline position supporting cast-in-place piles cannot be constructed, the interval between the pipeline position supporting piles is too large, and soil between piles is easy to collapse.
Drawings
FIG. 1 is a plan view showing the position relationship between fender post and pipeline of the present invention;
FIG. 2 is a vertical view of the protection between the fender posts of the utility model;
fig. 3 is a top view of the utility model of protecting between fender piles.
Wherein: 1. a fender pile; 2. a pipeline; 3. a crown beam; 4. a steel grid.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
The utility model provides a foundation ditch supporting construction of existing pipeline, includes fender pile 1, pipeline 2, guan liang 3 and steel grating 4, and fender pile 1 is provided with a plurality ofly, and steel grating 4 is fixed with two fender piles 1 relative one side that are located the middle part, and the bottom of guan liang 3 is fixed with fender pile 1's top, and pipeline 2 is located the below of steel grating 4.
As shown in figure 1, local pipelines such as sewage pipes cannot be moved and changed, in-situ protection is needed, bored piles at the pipeline positions cannot be constructed, and support piles are arranged on two sides of the pipelines.
As shown in fig. 2, the supporting piles are constructed by adopting a grid and concrete spraying. The steel grating is arranged between the support piles, the vertical interval of the grating is 500mm, the width is generally not more than 5m, and the top of the grating is flush with the bottom of the crown beam.
As shown in fig. 3, the steel grating and the pile main reinforcement adopt double-sided welding seams.
This foundation ditch supporting construction of existing pipeline can be used for solving because the existence of existing pipeline, and pipeline position is strutted bored concrete pile and is unable to be under construction, leads to pipeline position to prop between the pile interval too big, and the problem that the soil collapses easily between the pile, through set up a series of steel grating and spray concrete between the fender pile to realize the protection to soil between the pile, guarantee foundation ditch safety, improve the stability of foundation ditch, can extensively apply to multiple job site.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.
Claims (5)
1. The utility model provides a foundation ditch supporting construction of existing pipeline, includes fender pile (1), pipeline (2), crown beam (3) and steel grating (4), its characterized in that: the fender pile (1) is provided with a plurality of, steel grating (4) are fixed with the relative one side of two fender piles (1) that are located the middle part, the bottom of hat roof beam (3) is fixed with the top of fender pile (1), pipeline (2) are located the below of steel grating (4).
2. An existing pipeline excavation supporting structure according to claim 1, wherein: the bottom of steel grating (4) is equipped with the cavity, pipeline (2) are located the inside of cavity.
3. An existing pipeline excavation supporting structure according to claim 1, wherein: and two sides of the steel grating (4) are welded with main ribs of the fender pile (1).
4. A foundation pit supporting construction for an existing pipeline according to claim 1, wherein: the vertical interval of steel grating is 50cm.
5. An existing pipeline excavation supporting structure according to claim 1, wherein: and the steel grating installation is carried out layer by layer along with the excavation of the foundation pit, and concrete spraying operation can be carried out after one layer of steel grating is installed.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202222386406.0U CN218322781U (en) | 2022-09-05 | 2022-09-05 | Foundation pit supporting structure of existing pipeline |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202222386406.0U CN218322781U (en) | 2022-09-05 | 2022-09-05 | Foundation pit supporting structure of existing pipeline |
Publications (1)
Publication Number | Publication Date |
---|---|
CN218322781U true CN218322781U (en) | 2023-01-17 |
Family
ID=84835855
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202222386406.0U Active CN218322781U (en) | 2022-09-05 | 2022-09-05 | Foundation pit supporting structure of existing pipeline |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN218322781U (en) |
-
2022
- 2022-09-05 CN CN202222386406.0U patent/CN218322781U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101560770B (en) | Novel deep building foundation pit supporting system | |
CN110374112B (en) | Deep foundation pit supporting system for weak soil field and construction method thereof | |
CN205975658U (en) | Steel platform tower crane foundation | |
CN112127370A (en) | Reverse plugging method for non-construction fender post part of main body fender structure of station | |
CN209179021U (en) | A kind of foundation pit campshed support system | |
CN213926286U (en) | Supporting construction for building foundation engineering | |
CN110565686A (en) | Construction method for penetrating river channel under pipe gallery | |
CN112523233B (en) | Construction method of water-through type river-blocking cofferdam | |
CN214883687U (en) | Foundation pit supporting structure | |
CN211395686U (en) | Foundation pit supporting system next to existing dangerous building | |
CN113373940A (en) | Construction method of foundation pit near-edge water retaining protection system | |
JP5846150B2 (en) | Construction method of river revetment structure | |
CN218322781U (en) | Foundation pit supporting structure of existing pipeline | |
CN215630021U (en) | Highway bridge construction foundation ditch protector | |
CN114250744B (en) | Ecological combined river slope retaining wall revetment | |
CN210712864U (en) | Deep foundation pit supporting system of Larsen steel sheet pile and cement mixing pile for soft soil field | |
CN206591535U (en) | Combined type cofferdam | |
CN210737555U (en) | Underground pipeline in-situ protection mechanism for foundation pit supporting system | |
CN109519219B (en) | Method for water pumping and drainage of water bin arranged on water-rich section in tunnel | |
CN207176696U (en) | A kind of buttress type supporting and protecting row pile pit structure | |
CN112575777A (en) | Frame reinforcing system and method for high-speed railway pier foundation penetrating through under channel | |
CN214993969U (en) | Envelope of water-through type river-blocking cofferdam | |
CN215562763U (en) | Supporting construction of channel excavation protection current situation signal tower | |
CN219710339U (en) | Deep foundation pit cross pipeline connection port supporting protection structure | |
CN219080388U (en) | Pier circular deep foundation |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |