CN215516335U - Brick hanging barrel for construction engineering construction - Google Patents

Brick hanging barrel for construction engineering construction Download PDF

Info

Publication number
CN215516335U
CN215516335U CN202121226514.0U CN202121226514U CN215516335U CN 215516335 U CN215516335 U CN 215516335U CN 202121226514 U CN202121226514 U CN 202121226514U CN 215516335 U CN215516335 U CN 215516335U
Authority
CN
China
Prior art keywords
wall
inner barrel
outer shell
jack
brick
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202121226514.0U
Other languages
Chinese (zh)
Inventor
王培成
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin Jintou Jinrong Human Resources Co ltd
Original Assignee
Tianjin Jintou Jinrong Human Resources Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin Jintou Jinrong Human Resources Co ltd filed Critical Tianjin Jintou Jinrong Human Resources Co ltd
Priority to CN202121226514.0U priority Critical patent/CN215516335U/en
Application granted granted Critical
Publication of CN215516335U publication Critical patent/CN215516335U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a brick bucket for construction of building engineering, in particular to the field of building construction, and the technical scheme is as follows: the inner barrel comprises an outer shell, an inner barrel body and universal wheels, wherein the universal wheels are installed at the bottom end of the outer shell, the inner barrel body is arranged on the inner side of the outer shell, the outer walls at two ends of the inner barrel body are rotatably connected with the inner wall of the outer shell through a circular shaft, and the outer wall on one side of the top end of the inner barrel body is connected with the side wall of the outer shell through a limiting assembly, so that the inner barrel has the beneficial effects that: utilize the cooperation of the interior staving, shell body and circle axle, the spacing subassembly that set up, through opening the baffle after, to the staving proper slope in whole, conveniently carry out the unloading to the brick body in the interior staving from this, do not need artifical one to take out the brick body from the staving, further promoted the efficiency of unloading, labour saving and time saving has also accelerated holistic construction progress from the side.

Description

Brick hanging barrel for construction engineering construction
Technical Field
The utility model relates to the field of building construction, in particular to a brick bucket for building engineering construction.
Background
The building engineering refers to an engineering entity formed by the construction of various building buildings and their auxiliary facilities and the installation of lines, pipes and equipment matched with them, wherein the building buildings refer to the engineering which has top covers, beams, columns, walls, foundations and can form internal spaces and meet the requirements of people for production, living, study and public activities.
The prior art has the following defects: the brick bucket that hangs of current building engineering construction usefulness, the structure is too crude, does not have two with the splendid attire bucket of building materials such as ordinary hoist and mount cement, grit to after in the middle of the region of hoist and mount to be under construction, need the manual work to take out the fragment of brick from the hoist and mount bucket a bit, waste time and energy, inefficiency, thereby seriously influence follow-up normal construction progress.
Therefore, the utility model is necessary to develop a brick bucket for construction engineering.
SUMMERY OF THE UTILITY MODEL
Therefore, the utility model provides a brick bucket for building engineering construction, which solves the problems in the prior art by arranging a limiting assembly, a clamping assembly, a hoisting connection assembly and other structures.
In order to achieve the above purpose, the utility model provides the following technical scheme: a brick hanging bucket for construction of constructional engineering comprises an outer shell, an inner bucket body and universal wheels, wherein the universal wheels are mounted at the bottom end of the outer shell, the inner bucket body is arranged on the inner side of the outer shell, the outer walls at two ends of the inner bucket body are rotatably connected with the inner wall of the outer shell through a round shaft, and the outer wall on one side of the top end of the inner bucket body is connected with the side wall of the outer shell through a limiting assembly;
the outer wall of one side of the inner barrel body is provided with a feed opening, a baffle is arranged in the feed opening, the bottom end of the baffle is rotatably connected with the side wall of the inner barrel body through a first rotating shaft, a clamping assembly is arranged on the side wall of the top end of the baffle, and a hoisting connection assembly is arranged on the outer wall of the outer shell.
Preferably, the limiting assembly comprises a first jack arranged on the outer wall of the inner barrel body, a first jack with the same size is also arranged on the outer wall of one side of the outer shell body, two first insertion rods are inserted between the first jacks in a penetrating manner, one end of each first insertion rod, which is far away from the inner barrel body, of the rotary disk, two jacks are symmetrically arranged on the side wall, close to the rotary disk, of the outer shell body, the two jacks are provided with two groups, two insertion rods are inserted in the two jacks, and one ends of the two insertion rods are fixedly connected with the side wall of the rotary disk.
Preferably, the clamping assembly comprises a first limiting pipe fixedly connected to the outer wall of the baffle, two second limiting pipes are symmetrically arranged on two sides of the first limiting pipe, the second limiting pipes are two groups, the second limiting pipes are fixedly connected with the outer wall of the inner barrel body, one of the second limiting pipes is inserted with a limiting rod, and one end of the limiting rod penetrates through the other second limiting pipe and the first limiting pipe in sequence.
Preferably, the hoisting connection assembly comprises hoisting rods which are symmetrically and fixedly connected to the outer walls of the two sides of the outer shell, and through holes are formed in the side walls of the hoisting rods.
Preferably, the outer shell and the inner barrel body are both made of aluminum alloy materials, and the outer surface of the outer shell is coated with reflective paint.
Preferably, the corners of the outer shell and the outer wall of the inner barrel body are provided with arc chamfers, and the inner wall of the through hole is provided with anti-skid lines.
Preferably, one end of the limiting rod is fixedly connected with a handle, and a protective sleeve made of rubber materials is arranged on the surface of the handle.
Preferably, the limiting assembly further comprises a first insertion hole formed in the outer wall of the inner barrel body, a first insertion hole with the same size is also formed in the outer wall of one side of the outer shell, a threaded rod is connected between the first insertion holes in a threaded mode, and the threaded rod is far away from the rotary table fixedly connected with one end of the inner barrel body.
The utility model has the beneficial effects that:
1. through the arranged hoisting connection assembly, the brick bodies for the building are placed by means of the inner barrel body, and the whole brick hanging barrel is conveniently moved to a construction area by using hoisting equipment;
2. the brick in the inner barrel body can be conveniently discharged by utilizing the matching of the arranged inner barrel body, the outer shell, the round shaft and the limiting assembly and properly inclining the whole inner barrel body after the baffle is opened, the bricks are not required to be manually taken out of the barrel body one by one, the discharging efficiency is further improved, the time and the labor are saved, and the whole construction progress is accelerated from the side surface;
3. whole hanging brick bucket can carry out nimble removal through the universal wheel that sets up, and the constructor of being convenient for operates, and stability is better, and the practicality compares current hanging brick bucket has had showing the promotion.
Drawings
FIG. 1 is a front view provided by the present invention;
FIG. 2 is a side view provided by the present invention;
FIG. 3 is a side view of the inner barrel structure provided by the present invention;
FIG. 4 is an enlarged view of the structure of area A of FIG. 1 according to the present invention;
FIG. 5 is a perspective view of the outer shell, inner barrel, and baffle structure provided by the present invention;
FIG. 6 is a diagram of a spacing assembly according to embodiment 1 of the present invention;
fig. 7 is a diagram of a position limiting assembly according to embodiment 2 of the present invention.
In the figure: the lifting connection assembly comprises an outer shell 1, universal wheels 2, an inner barrel body 3, a circular shaft 4, a lifting rod 5, a through hole 6, a baffle 7, a rotating shaft I8, a limiting pipe I9, a limiting pipe II 10, a limiting rod 11, a handle 12, a jack I13, an inserted rod I14, a rotating disc 15, a jack II 16, an inserted rod II 17, a threaded rod 18, a limiting assembly 101, a clamping assembly 201 and a lifting connection assembly 301.
Detailed Description
The preferred embodiments of the present invention will be described in conjunction with the accompanying drawings, and it will be understood that they are described herein for the purpose of illustration and explanation and not limitation.
Embodiment 1, referring to fig. 1 to 6, the brick bucket for building engineering construction provided by the utility model comprises an outer shell 1, an inner bucket body 3 and universal wheels 2, wherein the universal wheels 2 are installed at the bottom end of the outer shell 1, specifically, the whole bucket body is convenient to move through the arrangement of the universal wheels 2, the inner bucket body 3 is arranged at the inner side of the outer shell 1, the outer walls at two ends of the inner bucket body 3 are rotatably connected with the inner wall of the outer shell 1 through a circular shaft 4, specifically, the inner bucket body 3 can be inclined at a certain angle at the inner side of the outer shell 1, so that blanking is convenient, and the outer wall at one side of the top end of the inner bucket body 3 is connected with the side wall of the outer shell 1 through a limiting assembly 101;
a feed opening is formed in the outer wall of one side of the inner barrel body 3, a baffle 7 is arranged in the feed opening, the bottom end of the baffle 7 is rotatably connected with the side wall of the inner barrel body 3 through a first rotating shaft 8, a clamping assembly 201 is arranged on the side wall of the top end of the baffle 7, specifically, after the baffle 7 is opened, bricks in the inner barrel body 3 can be poured out, and a hoisting connection assembly 301 is arranged on the outer wall of the outer shell body 1;
furthermore, the limiting assembly 101 comprises a first jack 13 arranged on the outer wall of the inner barrel body 3, a first jack 13 with the same size is also arranged on the outer wall of one side of the outer shell 1, a first inserted rod 14 penetrates between the first jacks 13, a rotary table 15 is fixedly connected to one end, far away from the inner barrel body 3, of the first inserted rod 14, second jacks 16 are symmetrically arranged on one side wall, close to the rotary table 15, of the outer shell 1, two groups of the second jacks 16 are arranged, a second inserted rod 17 is inserted in the second jack 16, one end of the second inserted rod 17 is fixedly connected with the side wall of the rotary table 15, when the inner barrel body 3 is kept in a horizontal state, the inner barrel body 3 and the outer shell 1 are fixed through the first inserted rod 14, and the inner barrel body 3 is prevented from inclining in the process of hoisting and moving the brick body after the barrel body is transferred;
furthermore, the clamping assembly 201 comprises a first limiting pipe 9 fixedly connected to the outer wall of the baffle 7, two second limiting pipes 10 are symmetrically arranged on two sides of the first limiting pipe 9, two groups of the second limiting pipes 10 are arranged, the second limiting pipes 10 are fixedly connected with the outer wall of the inner barrel body 3, a limiting rod 11 is inserted into one second limiting pipe 10, one end of the limiting rod 11 sequentially penetrates through the other second limiting pipe 10 and the first limiting pipe 9, so that the whole baffle 7 is fixed, bricks in the inner barrel body 3 are shielded by the baffle 7 to avoid falling off, otherwise, the limitation of the clamping assembly 201 on the baffle 7 can be removed when blanking is performed, and the bricks can be conveniently led out from the inner barrel body 3 after the baffle 7 is turned over;
further, the hoisting connection assembly 301 comprises hoisting rods 5 symmetrically and fixedly connected to the outer walls of the two sides of the outer shell 1, and through holes 6 are formed in the side walls of the hoisting rods 5, so that hoisting steel wires can conveniently pass through the through holes;
furthermore, the main bodies of the outer shell 1 and the inner barrel 3 are made of aluminum alloy materials, reflective paint is coated on the outer surface of the outer shell 1, the integral structural strength of the outer shell is guaranteed not to be affected, meanwhile, the outer shell is light in weight, workers in a construction area are prompted by the reflective paint, so that the workers are far away from a hoisting area, and the safety is improved;
furthermore, arc chamfers are arranged at corners on the outer walls of the outer shell 1 and the inner barrel 3, so that collision caused by too sharp corners is avoided, anti-slip lines are arranged on the inner wall of the through hole 6, friction force is improved, and hoisting steel wires are prevented from slipping;
further, one end of the limiting rod 11 is fixedly connected with a handle 12, a protective sleeve made of rubber material is arranged on the surface of the handle 12, and the whole limiting rod 11 can be conveniently pulled and pulled by holding the handle 12.
The using process of the utility model is as follows: in the use of the utility model, after the brick body is introduced into the inner barrel body 3, at the moment, the first inserting rod 14 is inserted into the first inserting hole 13, therefore, the inner barrel body 3 is kept in a horizontal state (as shown in figure 2), the hoisting steel wire passes through the through hole 6 on the hoisting rod 5, the whole equipment is hoisted by using hoisting equipment, after the whole equipment is hoisted to the construction area, the handle 12 is held, the limiting rod 11 is pulled out from the first limiting pipe 9 and the second limiting pipe 10, the baffle 7 is turned down (as shown in figure 5), simultaneously, the first inserting rod 14 and the second inserting rod 17 are respectively drawn out of the first inserting hole 13 and the second inserting hole 16, then, after a certain thrust is applied to the inner barrel body 3, the whole inner barrel body 3 is inclined towards the turning-down direction of the baffle 7, therefore, the brick bodies in the inner barrel body 3 can be conveniently led out, the whole process is more convenient and faster, and the operation is very simple.
Embodiment 2, referring to fig. 7, the brick bucket for building engineering construction provided by the utility model comprises an outer shell 1, an inner bucket body 3 and universal wheels 2, wherein the universal wheels 2 are installed at the bottom end of the outer shell 1, specifically, the whole bucket body is convenient to move through the arrangement of the universal wheels 2, the inner bucket body 3 is arranged at the inner side of the outer shell 1, the outer walls at two ends of the inner bucket body 3 are rotatably connected with the inner wall of the outer shell 1 through a circular shaft 4, specifically, the inner bucket body 3 can be inclined at a certain angle at the inner side of the outer shell 1, so that blanking is convenient, and the outer wall at one side of the top end of the inner bucket body 3 is connected with the side wall of the outer shell 1 through a limiting assembly 101;
a feed opening is formed in the outer wall of one side of the inner barrel body 3, a baffle 7 is arranged in the feed opening, the bottom end of the baffle 7 is rotatably connected with the side wall of the inner barrel body 3 through a first rotating shaft 8, a clamping assembly 201 is arranged on the side wall of the top end of the baffle 7, specifically, after the baffle 7 is opened, bricks in the inner barrel body 3 can be poured out, and a hoisting connection assembly 301 is arranged on the outer wall of the outer shell body 1;
further, the limiting assembly 101 further comprises a first insertion hole 13 formed in the outer wall of the inner barrel 3, the first insertion hole 13 with the same size is also formed in the outer wall of one side of the outer shell 1, a threaded rod 18 is connected between the first insertion holes 13 in a threaded mode, and the threaded rod 18 is fixedly connected with a rotary table 15 far away from one end of the inner barrel 3.
The using process of the utility model is as follows: when the utility model is used, a person skilled in the art replaces the first inserting rod 13 and the second inserting rod 17 in the embodiment 1 with the threaded rod 18, so that the inner barrel body 3 and the outer shell body 1 can be fixed through the threaded rod 18, the stability is higher, but the first inserting rod 13 and the second inserting rod 17 are not convenient to assemble and disassemble.
The above description is only a preferred embodiment of the present invention, and any person skilled in the art may modify the present invention or modify it into an equivalent technical solution by using the technical solution described above. Therefore, any simple modifications or equivalent substitutions made in accordance with the technical solution of the present invention are within the scope of the claims of the present invention.

Claims (8)

1. The utility model provides a brick hanging bucket for building engineering construction, includes shell body (1), interior staving (3) and universal wheel (2), universal wheel (2) are installed to the bottom of shell body (1), interior staving (3) set up the inboard of shell body (1), its characterized in that: the outer walls of the two ends of the inner barrel body (3) are rotatably connected with the inner wall of the outer shell body (1) through a circular shaft (4), and the outer wall of one side of the top end of the inner barrel body (3) is connected with the side wall of the outer shell body (1) through a limiting assembly (101);
be provided with the feed opening on the outer wall of interior staving (3) one side, be provided with baffle (7) in the feed opening, the bottom of baffle (7) is rotated through pivot (8) and the lateral wall of interior staving (3) and is connected, be provided with joint subassembly (201) on the lateral wall on baffle (7) top, be provided with hoist and mount coupling assembling (301) on the outer wall of shell body (1).
2. The brick bucket for construction according to claim 1, wherein: spacing subassembly (101) is including setting up jack one (13) on staving (3) outer wall including, the same size jack one (13) are provided with on the outer wall of shell body (1) one side equally, two alternate between jack one (13) have inserted bar one (14), the one end fixedly connected with carousel (15) of interior staving (3) are kept away from in inserted bar one (14), the shell body (1) is close to on the lateral wall of carousel (15) the symmetry be provided with jack two (16), jack two (16) are equipped with two sets ofly, the grafting has inserted bar two (17) in jack two (16), the one end of inserted bar two (17) and the lateral wall fixed connection of carousel (15).
3. The brick bucket for construction according to claim 1, wherein: joint subassembly (201) is including the spacing pipe one (9) of fixed connection on baffle (7) outer wall, the bilateral symmetry of spacing pipe one (9) is provided with spacing pipe two (10), spacing pipe two (10) are equipped with two sets ofly, the outer wall fixed connection of spacing pipe two (10) and interior staving (3), one of them spacing pipe two (10) peg graft in has gag lever post (11), the one end of gag lever post (11) passes in proper order from another spacing pipe two (10) and spacing pipe one (9).
4. The brick bucket for construction according to claim 1, wherein: the hoisting connection assembly (301) comprises hoisting rods (5) which are symmetrically and fixedly connected to the outer walls of the two sides of the outer shell (1), and through holes (6) are formed in the side walls of the hoisting rods (5).
5. The brick bucket for construction according to claim 1, wherein: the outer shell (1) and the inner barrel body (3) are made of aluminum alloy materials, and reflective paint is coated on the outer surface of the outer shell (1).
6. The brick bucket for construction according to claim 4, wherein: corners on the outer wall of the outer shell (1) and the outer wall of the inner barrel body (3) are provided with arc chamfers, and anti-skid lines are arranged on the inner wall of the through hole (6).
7. The brick bucket for construction according to claim 3, wherein: one end of the limiting rod (11) is fixedly connected with a handle (12), and a protective sleeve made of rubber materials is arranged on the surface of the handle (12).
8. The brick bucket for construction according to claim 1, wherein: spacing subassembly (101) is still including setting up jack one (13) on staving (3) outer wall including, be provided with same size jack one (13) on the outer wall of shell body (1) one side equally, two threaded connection has threaded rod (18) between jack one (13), one end fixedly connected with carousel (15) of staving (3) in keeping away from threaded rod (18).
CN202121226514.0U 2021-06-03 2021-06-03 Brick hanging barrel for construction engineering construction Active CN215516335U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121226514.0U CN215516335U (en) 2021-06-03 2021-06-03 Brick hanging barrel for construction engineering construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121226514.0U CN215516335U (en) 2021-06-03 2021-06-03 Brick hanging barrel for construction engineering construction

Publications (1)

Publication Number Publication Date
CN215516335U true CN215516335U (en) 2022-01-14

Family

ID=79806380

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121226514.0U Active CN215516335U (en) 2021-06-03 2021-06-03 Brick hanging barrel for construction engineering construction

Country Status (1)

Country Link
CN (1) CN215516335U (en)

Similar Documents

Publication Publication Date Title
CN208869129U (en) Telescopic building hoist day beam is set in elevator traction
CN102777030A (en) Method for building up formwork construction platform of lift shaft
CN212243453U (en) Building materials conveyer of material loading is convenient for with building materials production
CN111217266B (en) Working method of assembled wall body hoisting device
CN109110616A (en) Telescopic building hoist day beam and its installation and application are set in elevator traction
CN110685433A (en) Chimney construction device and construction method applying hydraulic lifting and rollover technology
CN202449788U (en) Special crane device for wall bricks
CN110318529A (en) The construction method of structure is climbed in a kind of elevator shaft
CN211283649U (en) Curb removes device of taking one's place
CN215516335U (en) Brick hanging barrel for construction engineering construction
CN209797314U (en) adjustable assembled door-shaped frame for assembling and disassembling tower crane
CN111075207A (en) Assembled ground and ALC partition wall composite set
CN108190735A (en) A kind of construction reinforcing bar clamper
CN105952129B (en) A kind of elevator combined type entirety lifting operation platform and its construction method
CN201133078Y (en) Electric hoisting barrel type formwork
CN2599134Y (en) Construction device for lifting scaffold turnover plate of towering chimney
CN206646836U (en) A kind of exterior wall, inner partition plate movement lifting frame
CN211691524U (en) Prefabricated post positioner
CN104925671A (en) Telescopic manipulator installation and maintenance trolley
CN220412694U (en) Large-scale pipeline hoist device in high-rise building underground garage
CN113415731A (en) Hoisting equipment for concrete prefabricated pipeline production
JP3971858B2 (en) Demolition method for tower structure
CN216360368U (en) Vertical transportation ladder convenient to equipment
CN214298986U (en) Be used for supplementary hoisting device of building door and window construction
CN204960280U (en) But integral hoisting and used repeatedly's scaffold

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant