JP3971858B2 - Demolition method for tower structure - Google Patents
Demolition method for tower structure Download PDFInfo
- Publication number
- JP3971858B2 JP3971858B2 JP01693899A JP1693899A JP3971858B2 JP 3971858 B2 JP3971858 B2 JP 3971858B2 JP 01693899 A JP01693899 A JP 01693899A JP 1693899 A JP1693899 A JP 1693899A JP 3971858 B2 JP3971858 B2 JP 3971858B2
- Authority
- JP
- Japan
- Prior art keywords
- chimney
- tower
- center hole
- jack
- auxiliary
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 238000000034 method Methods 0.000 title claims description 13
- 230000000149 penetrating effect Effects 0.000 claims description 4
- 230000005484 gravity Effects 0.000 claims description 3
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 8
- 229910052742 iron Inorganic materials 0.000 description 4
- 230000008602 contraction Effects 0.000 description 3
- 239000004567 concrete Substances 0.000 description 2
- 238000010276 construction Methods 0.000 description 2
- 239000011150 reinforced concrete Substances 0.000 description 2
- 238000010586 diagram Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 230000003028 elevating effect Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000003825 pressing Methods 0.000 description 1
Images
Landscapes
- Working Measures On Existing Buildindgs (AREA)
Description
【0001】
【発明の属する技術分野】
本発明は、塔状構造物、特に煙突の解体工法に関する。
【0002】
【従来の技術】
塔状構造物、特に煙突の解体工法は、解体する煙突上部に仮設足場を設置し、その上で作業員がハンドブレーカーによって、煙突を切断解体して内部に落下させ、順次足場を下降させながら、解体作業を行っている。また、煙突を解体するのに、煙突上端に支持材を仮設して煙突内部上方に足場を設けることによって、ニプラーを吊下げて旋回するデッキを設けて煙突上部から順次解体するものが知られている。
しかし、上記従来の技術は仮設足場を設けたり、高所作業となるために作業員の安全性に欠ける。
そのために、塔状構造物特に煙突の解体工法については種々の工法が検討されている。
特開平6−17543号公報には、煙突の解体工法が開示されている。
解体装置は、煙突昇降部と切断解体部とから構成されている。
煙突昇降部は、煙突に固着する上下段の固定具と、この固定具を固着及び開放する着脱手段と、両固定具間を伸縮する伸縮手段とを備えている。また、切断解体部は本体ステージ上を旋回する切断ステージと、このステージ上にある縦切断カッターと横切断カッターとからなる。上記解体装置を用いる場合は、煙突昇降部の伸縮手段によって本装置を昇降させる。本装置を煙突最上部に位置させてから、上下回動手段で縦切断カッターを下ろして煙突端部より縦切目を設け、前進後退手段により横切断カッターで横切目を設けて第一のブロック群を煙突内に落下させ、さらに落下された個所を縦切断カッターにより縦切目を入れ、その上、上記落下した第一ブロック群に隣接する残りの第二のブロック群を煙突周方向に横切目を入れることで切断する。そして順次下方に切断して解体する。
上記煙突の解体工法によれば、仮設足場を必要とせず、遠隔操作により解体できる。
【0003】
【発明が解決しようとする課題】
しかしながら、特開平6−17543号公報に開示された技術は以下の問題がある。
、上記のような解体装置を大型煙突の最上部に位置させる場合は、その準備が大変であり、また、切断の場合は、上段と下段の固定具を交互に固着及び開放させて、縦切断カッター、横切断カッターによりブロック群を切断し、内部に落下させるので、途中引っかからないようにする必要であり、作業が繁雑である。
【0004】
また、鉄筋コンクリート製煙突、ライニング層を有する鉄製煙突等があり、それらの煙突に対して、縦切断カッター、横切断カッターの適正な選択が要求され、高価になり易く、また、切断途上でカッター交換をする場合は時間を要する。
【0005】
本発明は上記のような問題点の解決を図ったものであり、煙突等の塔状構造物を、安全に、傾倒方向にゆっくりと横倒し、切断を容易に行うことができ、工期の短縮と高所作業を低減できる煙突の解体工法を提供することを目的とする。
【0006】
【課題を解決するための手段】
本発明は、塔状構造物の傾倒方向に対して、塔状構造物の左右両側の基礎上に軸受を設け、該軸受に前記塔状構造物の下端部を貫通させた軸を取付け、該軸に一端を軸支させた一対のアームを設け、各アームの先端にセンターホール型ジャッキを回動自在に取付け、前記センターホール型ジャッキから送出されるワイヤロープの先端を前記塔状構造物の重心上方に取付けたリングに繋ぐと共に、前記塔状構造物の傾倒方向と反対の方向に前記アームに対応する補助用軸受を設け、該補助用軸受に補助用センターホール型ジャッキを回動自在に取付けて、前記補助用センターホール型ジャッキから送出されるワイヤロープの先端を前記アームの他端に繋いで、前記塔状構造物の底部に切込みを入れ、前記センターホール型ジャッキと補助用センターホール型ジャッキにより各ワイヤロープを伸縮調整させて、塔状構造物を傾倒方向に横倒し解体することを特徴とする塔状構造物の解体工法である。
【0007】
本発明は、上記のような構成により、補助用センターホール型ジャッキのワイヤロープによる押さえによって、塔状構造物を傾倒方向に、安全に、ゆっくりと横倒ができ、地上で塔状構造物を切断等により容易に解体できるので、塔状構造物の解体工期が短縮され、また、高所作業を低減できる。
【0008】
【発明の実施の形態】
以下に本発明の実施の形態を図によって詳述する。
図1は本発明の一実施の形態を示す側面図であり、図2は図1のA−A線矢視の正面図であり、図3は図1の煙突を転倒させた状態を示す図であり、図4は本発明に用いるセンターホール型ジャッキの説明図である。ここでは本発明で対象とする塔状構造物の代表的なものとして煙突の解体工法について詳述する。
本発明に用いる煙突解体装置は、図1、図2に示すように、煙突1の傾倒方向に対して、煙突1の左右両側の基礎2上に設けた軸受3a、3bと、軸受3a、3bに取付ける煙突1の下端部を貫通させた軸4と、軸4の両端に軸支して設けられた一対のアーム5a、5bと、アーム5a、5bの先端に取付けられ、ワイヤロープ6a、6bの先端を煙突1の重心Wの上方に取付けたリング7に繋ぐ、図4に示すようなスイングフレーム10a、11bに収納されたセンターホール型ジャッキ8a、8bと、煙突1の傾倒方向と反対の方向に設けた補助ジャッキ用軸受11a、11bと、補助ジャッキ用軸受11a、11bに取付けられ、ワイヤロープ14a、14bの先端をアーム5a、5bの他端に繋ぐスイングフレーム12a、12bに収納された補助用センターホール型ジャッキ13a、13bとから構成されている。符号9a、9bはジャッキ用軸受である。また、符号15は基礎であり、符号16は地上を示す。
本発明では一般に知られているジャッキからセンターホール型ジャッキを選択して用いることが必要である。図4に示すように、センターホール型ジャッキ17は、シリンダ18と、先端部チャック19と後端部チャック20(煙突側)から構成されている。ワイヤロープ21を手繰寄せる場合はピストンロッド22が油圧によって伸長されることで、先端部チャック19がワイヤロープ21をチャックし、ワイヤロープ21がストローク分手繰寄せられる。この時、後端部チャック20はゆるみ、ピストンロッド22が油圧によって縮退すると、後端部チャック20はワイヤロープ21をチャックし、先端部チャック19がゆるみ、これによりワイヤロープ21の位置が維持された状態でピストンロッド22がシリンダ18に収納される。この作動を繰返してワイヤロープ21の所定長さが手繰寄せられる。ワイヤロープ21を押出す場合は逆の作動により行われる。符号23はスイングフレーム、符号24はジャッキ用軸受である。符号25はアームの先端部に設けた固定盤である。補助用センターホール型ジャッキも同じである。一対のセンターホール型ジャッキの操作は図示しない制御装置により一人の作業員で操作される。
次に上記した煙突解体装置によって煙突を解体する場合について詳述する。
煙突解体装置は解体する煙突1に、上記のように設置された後、センターホール型ジャッキ8a、8bと補助用センターホール型ジャッキ13a、13bの作動によって、ワイヤロープ6a、6bとワイヤロープ12a、12bを伸縮調整しながら、アーム5a、5bを図1に示すような適当な位置に回動させる。
次に、ワイヤロープ6a、6bとワイヤロープ12a、12bを張った状態で、煙突1の傾倒側の下端部に図示しないカッターによって切込みを入れる。
本発明では、下端部を貫通させた軸4の位置を煙突1の軸心9より、傾倒側の反対方向にずらして、切込みを入れた際に、煙突1が傾倒側に傾き易くしている。しかし、切込み方向については上記に限定されるものではなく、傾倒側に適当に傾倒できればよい。ワイヤロープ6a、6bとワイヤロープ12a、12bを張った状態で、煙突1は図1に示すように切込みにより次第に傾き、二点鎖線で示す状態になる。ここでは、アーム5a、5bを二点鎖線で示す状態に回動させながら、伸縮調整してワイヤロープ6a、6bとワイヤロープ12a、12bを張った状態にしている。煙突1が所定の角度まで傾いたら、煙突1の自重を利用しながら、反対側から切込みを入れる。
切込みと自重により、煙突1は図3に示すようにワイヤロープ6a、6bとワイヤロープ12a、12bを張った状態で、更に傾き、二点鎖線で示す状態になる。そして、ワイヤロープ6a、6bとワイヤロープ12a、12bにより押さえられ、抑制されながら、ゆっくりと地上に横倒する。
地上に横倒した煙突1は重機により簡単に潰されて、鉄筋コンクリート製煙突の場合は、コンクリートが破壊され、鉄筋部が簡単に切断される。また、ライニング層を有する鉄製煙突の場合は、ライニング層が剥離して鉄部分が簡単に切断される。
上記の解体による一対のセンターホール型ジャッキの操作は図示しない制御装置により一人の作業員で操作することができる。
本発明の解体工法によれば、高さ85mのライニング層を有する鉄製煙突の解体は、準備、解体、取片付けによる全工期が従来の上部からの切断による解体に比較して2/3以下に短縮できる。
【0009】
以上は煙突の解体工法について述べたが、本発明は、他の塔状構造物等にも適用でき、また、形状は円筒状に限らず角状等にも適用できる。また、コンクリート製のような欠け易い構造物等の場合には、下端部の貫通孔にスリーブを挿入して補強して、軸を貫通させることができる。
【0010】
【発明の効果】
以上のように、本発明は、補助用ジャッキのワイヤロープによる押さえによって、煙突等の塔状構造物を傾倒方向に、安全に、ゆっくりと横倒しができ、地上で塔状構造物を切断等により容易に解体できるので、塔状構造物の解体工期が短縮され、また、高所作業を低減できる。
【図面の簡単な説明】
【図1】本発明の一実施の形態を示す側面図である。
【図2】図1のA−A線矢視の正面図である。
【図3】図1の煙突を転倒させた状態を示す図である。
【図4】本発明に用いるセンターホール型ジャッキの説明図である。
【符号の説明】
1 煙突
2 基礎
3a、3b 軸受
4 軸
5a、5b アーム
6a、6b、14a、14b、21 ワイヤロープ
7 リング
10a、10b、12a、12b23 スイングフレーム
8a、8b、17センターホール型ジャッキ
9a、9b24 ジャッキ用軸受
11a、11b 補助ジャッキ用軸受
13a、13b 補助用センターホール型ジャッキ
15 基礎
16 地上
18 シリンダ
19 先端部チャック
20 後端部チャック
22 ピストンロッド
25 固定盤[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a tower-like structure, particularly a chimney dismantling method.
[0002]
[Prior art]
Tower-like structures, especially chimney demolition methods, have a temporary scaffold installed on the upper part of the chimney to be demolished, and then the worker cuts and disassembles the chimney with a hand breaker and drops it into the interior, and then descends the scaffold sequentially. , Dismantling work. Also, it is known to dismantle the chimney sequentially from the top of the chimney by providing a deck that hangs the nippler and turns by temporarily providing a support material at the top of the chimney and providing a scaffolding inside the chimney Yes.
However, the above-described conventional technology lacks the safety of workers because a temporary scaffold is provided or work is performed at a high place.
For this reason, various methods have been studied for dismantling the tower structure, particularly the chimney.
Japanese Patent Laid-Open No. 6-17543 discloses a chimney dismantling method.
The dismantling device is composed of a chimney elevating part and a cutting and dismantling part.
The chimney raising / lowering unit includes upper and lower fixtures fixed to the chimney, attachment / detachment means for fixing and releasing the fixture, and expansion / contraction means for extending and contracting between the two fixtures. The cutting and disassembling unit includes a cutting stage that turns on the main body stage, and a vertical cutting cutter and a horizontal cutting cutter that are on the stage. When using the dismantling apparatus, the apparatus is moved up and down by the expansion / contraction means of the chimney lifting section. After this device is positioned at the top of the chimney, the vertical cutting cutter is lowered by the vertical rotation means to provide the vertical cut from the chimney end, and the horizontal cutting cutter is provided by the horizontal cutting cutter by the advance and retreat means, and the first block group Is dropped into the chimney, and further, a vertical cut is made at the dropped part by a vertical cutting cutter, and the remaining second block group adjacent to the dropped first block group is cut into the chimney circumferential direction. Cut by inserting. And it cuts down sequentially and dismantles.
According to the above chimney demolition method, it is possible to dismantle by remote operation without requiring a temporary scaffold.
[0003]
[Problems to be solved by the invention]
However, the technique disclosed in JP-A-6-17543 has the following problems.
When the dismantling device as described above is positioned at the top of the large chimney, it is difficult to prepare. In the case of cutting, the upper and lower fixtures are alternately fixed and released, and the longitudinal cutting is performed. Since the block group is cut by a cutter and a horizontal cutting cutter and dropped into the inside, it is necessary to prevent it from being caught halfway, and the work is complicated.
[0004]
In addition, there are reinforced concrete chimneys, iron chimneys with lining layers, etc., and appropriate selection of vertical cutting cutters and horizontal cutting cutters is required for these chimneys. It takes time to do.
[0005]
The present invention is intended to solve the above-mentioned problems, and it is possible to safely lay down a tower-like structure such as a chimney slowly in a tilting direction, easily cut, and shorten the construction period. An object is to provide a chimney dismantling method that can reduce work at high places.
[0006]
[Means for Solving the Problems]
The present invention provides a bearing on the left and right sides of the tower-like structure with respect to the tilting direction of the tower-like structure, and attaches a shaft penetrating the lower end of the tower-like structure to the bearing. A pair of arms each having one end pivotally supported on a shaft are provided, a center hole jack is rotatably attached to the tip of each arm, and the tip of the wire rope delivered from the center hole jack is connected to the tower-like structure. An auxiliary bearing corresponding to the arm is provided in a direction opposite to the tilting direction of the tower-like structure and connected to a ring attached above the center of gravity, and an auxiliary center hole jack can be rotated on the auxiliary bearing. Attach the tip of the wire rope delivered from the auxiliary center hole jack to the other end of the arm, and make a notch in the bottom of the tower-like structure. By stretching adjust each wire rope by Horu type jack, a dismantling method tower-like structure, characterized in that overturning dismantle the tower-like structure in the tilting direction.
[0007]
According to the present invention, the tower-like structure can be safely and slowly laid down in a tilting direction by pressing the auxiliary center-hole jack wire rope, and the tower-like structure can be placed on the ground. Since it can be easily disassembled by cutting or the like, the dismantling period of the tower-like structure can be shortened, and work at high places can be reduced.
[0008]
DETAILED DESCRIPTION OF THE INVENTION
Hereinafter, embodiments of the present invention will be described in detail with reference to the drawings.
FIG. 1 is a side view showing an embodiment of the present invention, FIG. 2 is a front view taken along line AA in FIG. 1, and FIG. 3 is a view showing a state in which the chimney of FIG. FIG. 4 is an explanatory view of a center hole jack used in the present invention. Here, a chimney dismantling method will be described in detail as a typical tower-like structure targeted in the present invention.
As shown in FIGS. 1 and 2, the chimney dismantling apparatus used in the present invention includes
In the present invention, it is necessary to select and use a center hole type jack from generally known jacks. As shown in FIG. 4, the
Next, the case where a chimney is disassembled by the above-described chimney disassembly apparatus will be described in detail.
After the chimney dismantling device is installed in the
Next, in a state where the
In the present invention, the position of the shaft 4 penetrating the lower end portion is shifted from the axial center 9 of the
As shown in FIG. 3, the
The
The operation of the pair of center hall jacks by the above disassembly can be operated by one worker by a control device (not shown).
According to the dismantling method of the present invention, the dismantling of an iron chimney having a lining layer with a height of 85 m is shortened to 2/3 or less compared with the dismantling by cutting from the upper part of the conventional construction period by preparation, dismantling and cutting. it can.
[0009]
Although the chimney dismantling method has been described above, the present invention can be applied to other tower-like structures and the like, and the shape is not limited to a cylindrical shape but can be applied to a square shape or the like. Further, in the case of a structure that is easily chipped, such as concrete, a sleeve can be inserted into the through hole in the lower end portion to reinforce and penetrate the shaft.
[0010]
【The invention's effect】
As described above, according to the present invention, a tower-like structure such as a chimney can be safely and slowly laid down in a tilting direction by holding the auxiliary jack with a wire rope, and the tower-like structure is cut on the ground or the like. Since it can be easily dismantled, the dismantling period of the tower-like structure can be shortened, and work at high places can be reduced.
[Brief description of the drawings]
FIG. 1 is a side view showing an embodiment of the present invention.
FIG. 2 is a front view taken along line AA in FIG.
FIG. 3 is a diagram showing a state in which the chimney of FIG. 1 is overturned.
FIG. 4 is an explanatory view of a center hole type jack used in the present invention.
[Explanation of symbols]
DESCRIPTION OF
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP01693899A JP3971858B2 (en) | 1999-01-26 | 1999-01-26 | Demolition method for tower structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP01693899A JP3971858B2 (en) | 1999-01-26 | 1999-01-26 | Demolition method for tower structure |
Publications (2)
Publication Number | Publication Date |
---|---|
JP2000213183A JP2000213183A (en) | 2000-08-02 |
JP3971858B2 true JP3971858B2 (en) | 2007-09-05 |
Family
ID=11930075
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP01693899A Expired - Lifetime JP3971858B2 (en) | 1999-01-26 | 1999-01-26 | Demolition method for tower structure |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP3971858B2 (en) |
Families Citing this family (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
ATE228399T1 (en) * | 2001-01-31 | 2002-12-15 | Scbi Soc De Construction Et De | METHOD FOR DECONTAMINATION OF WINDOW HEATER |
JP4790357B2 (en) * | 2005-09-21 | 2011-10-12 | ベステラ株式会社 | Depressing method of regenerative furnace of hot stove |
JP5737571B2 (en) * | 2011-04-18 | 2015-06-17 | 古河C&B株式会社 | Dismantling method |
JP6650918B2 (en) * | 2017-10-05 | 2020-02-19 | 太平電業株式会社 | Dismantling method of floating roof type circular tank |
CN114737815A (en) * | 2022-03-17 | 2022-07-12 | 五冶集团上海有限公司 | A kind of chemical removing benzene tower dismantling method and dismantling system |
WO2024157454A1 (en) * | 2023-01-27 | 2024-08-02 | 三菱重工業株式会社 | Method for dismantling construction structure |
-
1999
- 1999-01-26 JP JP01693899A patent/JP3971858B2/en not_active Expired - Lifetime
Also Published As
Publication number | Publication date |
---|---|
JP2000213183A (en) | 2000-08-02 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN113120755B (en) | Segment dismantling device for urban shield tunnel and dismantling method thereof | |
JP3971858B2 (en) | Demolition method for tower structure | |
CN112921825A (en) | Positioning device for embedded steel bars of pier body of pier and construction method | |
JPH0925719A (en) | Relocation scaffold for deep foundation | |
JP2797244B2 (en) | Shaft excavation device and shaft construction method | |
JPH06136722A (en) | Bridge floor plate disassembly method and device therefor | |
JPH07207941A (en) | Concrete distributor | |
CN213476866U (en) | Equipment is implanted to precast tubular pile | |
JP3811846B2 (en) | Steel tower dismantling method and apparatus | |
JPH1130089A (en) | Normal face boring method and device using it | |
JP6173771B2 (en) | Building demolition method and building demolition support device used therefor | |
JP3570933B2 (en) | Casing driver working scaffold | |
JP2001020697A (en) | ELECTRIC DEVICE AND ASSEMBLING METHOD OF SUPPORT | |
JP4914130B2 (en) | Climbing crane | |
JP2002349080A (en) | Tower-shaped structure dismantling device and dismantling method using it | |
JP6620992B2 (en) | Building demolition machine and building demolition method | |
JP3971859B2 (en) | Tank side plate dismantling method | |
CN1137090A (en) | Omni-directional mobile hoist in high-rise buildings | |
JPH0960311A (en) | Lift-up dismantling method | |
JP3020023B2 (en) | Structure removal method | |
CN218293602U (en) | Demolish frock to shield earlier and expand tunnel segment of digging | |
JP2942503B2 (en) | Vertical hole drilling method | |
JP3648310B2 (en) | Excavation method and apparatus | |
JP2000170381A (en) | Building assembly method and raise up device employed therein | |
GB2159205A (en) | Apparatus for and a method of demolishing stacks |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20051220 |
|
A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20070511 |
|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20070522 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20070611 |
|
R150 | Certificate of patent or registration of utility model |
Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20110615 Year of fee payment: 4 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20120615 Year of fee payment: 5 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20120615 Year of fee payment: 5 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20130615 Year of fee payment: 6 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
EXPY | Cancellation because of completion of term |