CN215483877U - Plant decoration curtain wall - Google Patents

Plant decoration curtain wall Download PDF

Info

Publication number
CN215483877U
CN215483877U CN202121391632.7U CN202121391632U CN215483877U CN 215483877 U CN215483877 U CN 215483877U CN 202121391632 U CN202121391632 U CN 202121391632U CN 215483877 U CN215483877 U CN 215483877U
Authority
CN
China
Prior art keywords
plant
protrusion
groove
curtain wall
steel frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202121391632.7U
Other languages
Chinese (zh)
Inventor
邹广金
伍基红
李应春
罗帝框
韦日锦
叶海凡
高通林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Anxing Construction Group Co ltd
Original Assignee
Shenzhen Anxing Construction Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Anxing Construction Group Co ltd filed Critical Shenzhen Anxing Construction Group Co ltd
Priority to CN202121391632.7U priority Critical patent/CN215483877U/en
Application granted granted Critical
Publication of CN215483877U publication Critical patent/CN215483877U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Cultivation Receptacles Or Flower-Pots, Or Pots For Seedlings (AREA)

Abstract

The utility model provides a plant decorative curtain wall which comprises a steel frame, plant lattices and a water dripping pipe. The steel frame is in a grid shape and is connected with the wall body. The steel frame is connected with a flat iron which is horizontally arranged. The plant check includes hangers and hanging basket of interconnect, and the hanging basket is used for holding the plant. The cross section of the hanging lug is L-shaped, and the hanging lug and the hanging basket form a first clamping groove. The hanging lug comprises a vertical portion, a first groove is formed in the vertical portion, a trapezoidal limiting groove is formed in the side wall of the first groove, a first protrusion is connected to the flat iron, the first protrusion is horizontally arranged, the upper end and the lower end of the first protrusion are connected with trapezoidal limiting blocks, the first groove is connected with the first protrusion in a detachable mode, the limiting groove is connected with the limiting blocks, and the first clamping groove is connected with the flat iron in a detachable mode. Effectively solved current plant and hung basket and plant and decorated the curtain and be difficult to be connected firm technical problem.

Description

Plant decoration curtain wall
Technical Field
The utility model relates to the field of architectural decoration, in particular to a decorative curtain wall.
Background
With the continuous improvement of life quality, people pay more and more attention to green, energy-saving, emission-reducing and low-carbon living environment. The application of the plant curtain wall technology is further for realizing the low-carbon living target of people. But the plant is hung the basket and is decorated the curtain with the plant and be difficult to be connected firmly, therefore the plant is hung the basket and is decorated the curtain from the plant and drop easily, perhaps the plant is hung the basket and is decorated the curtain at the plant and shift easily on the wall, influences the pleasing to the eye of curtain is decorated to the plant. The technical problem that the existing plant hanging basket and the plant decorative curtain wall are difficult to connect stably exists.
Therefore, it is desirable to provide a plant-decorated curtain wall to solve the above problems.
SUMMERY OF THE UTILITY MODEL
The utility model provides a plant decorative curtain wall, which effectively solves the technical problem that the existing plant hanging basket and the plant decorative curtain wall are difficult to connect stably.
The utility model provides a plant decorative curtain wall, which comprises:
the steel frame is in a grid shape and is connected with the wall body, and flat irons are connected to the steel frame and horizontally arranged;
the plant grid comprises a hanging lug and a hanging basket which are connected with each other, the hanging basket is used for containing plants, the cross section of the hanging lug is L-shaped, and the hanging lug and the hanging basket form a first clamping groove;
the hanging lug comprises a vertical portion, a first groove is formed in the vertical portion, a trapezoidal limiting groove is formed in the side wall of the first groove, a first protrusion is connected to the flat iron, the first protrusion is horizontally arranged, the upper end and the lower end of the first protrusion are connected with trapezoidal limiting blocks, the first groove is connected with the first protrusion in a detachable mode through a buckle, the limiting groove is connected with the limiting blocks, and the first clamping groove is connected with the flat iron in a detachable mode through the buckle and used for enabling the flat iron to be connected with the plant lattices more stably.
Furthermore, one side of the hanging lug, which deviates from the first clamping groove, is provided with a reinforcing block, and the reinforcing block is fixedly connected with the hanging lug and used for increasing the strength of the hanging lug.
Furthermore, the limiting block and the first protrusion are integrally formed, and the limiting block is connected with the first protrusion more stably.
Further, the plant decorates the curtain including the drip pipe, the plant check are provided with the through-hole, the one end of drip pipe is worn to locate the through-hole extends in the inside of plant check, the through-hole link up the top surface of plant check, and form the opening at the top surface, open-ended width is less than the maximum width of through-hole, the diameter of drip pipe is greater than open-ended width.
Further, be provided with the second recess on the hangers, the upper end of band iron is connected with the second arch, the second recess with the buckle connection can be dismantled to the second arch.
Further, the steelframe still includes the stand, the vertical setting of stand, the stand with the hookup location of band iron is provided with the bandage, the material of bandage is elastic material, the bandage with steelframe fixed connection, the bandage is cross, the one end of bandage is connected with joint spare, be provided with the second draw-in groove on the joint spare, the other three-terminal of bandage all is connected with the fixture block, the second draw-in groove with the connection can be dismantled to the fixture block for when the steelframe hung heavier plant check and plant, the hookup location's of bandage multiplicable stand and band iron intensity.
Further, the plant decoration curtain includes angle sign indicating number pole and chemical crab-bolt, the chemical crab-bolt is worn to locate angle sign indicating number pole with the steelframe, thereby the steelframe with wall body fixed connection.
Furthermore, the second protrusion is sleeved with an elastic sleeve, and the elastic sleeve is fixedly connected with the second protrusion and used for avoiding a gap between the second groove and the second protrusion.
Furthermore, the reinforcing block is trapezoidal, the reinforcing block and the hangers are integrally formed.
Furthermore, the first protrusion and the limiting block are sleeved with a buffer sleeve, and the buffer sleeve is fixedly connected with the first protrusion and the limiting block.
Compared with the prior art, the utility model has the beneficial effects that: the utility model provides a plant decoration curtain wall which comprises a steel frame and plant lattices. The hangers and the hanging baskets form first clamping grooves, and the first clamping grooves are connected with the flat irons on the steel frame in a detachable and buckling mode. And the hangers of plant check are elastic material, and the hangers is provided with first recess, is connected with first arch on the band iron, and buckle connection can be dismantled with first arch to first recess. Further, be provided with trapezoidal spacing groove on the lateral wall of first recess, first bellied upper end and lower extreme all are connected with trapezoidal stopper, and the spacing groove is connected with the stopper. Because first recess and first protruding buckle are connected, spacing groove and stopper fixed connection, the plant check are connected more firmly with the steelframe. After the plant check or the steelframe received the exogenic action, the plant check is difficult to loosen from the steelframe, and the plant check also is difficult to take place to shift on the steelframe in addition. The connection structure of plant check and steelframe is comparatively stable, has effectively solved current plant and has hung the basket and decorate the curtain with the plant and be difficult to be connected firm technical problem.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required in the embodiments are briefly introduced below, and the drawings in the following description are only corresponding to some embodiments of the present invention.
Fig. 1 is a schematic plan view of an embodiment of the plant decorative curtain wall of the present invention.
Fig. 2 is a schematic plan view of a steel frame of an embodiment of the plant decoration curtain wall of the utility model.
Fig. 3 is a schematic plan view of a connection surface of a suspension loop at a connection position of the suspension loop and a flat iron of the plant decoration curtain wall according to an embodiment of the utility model.
Fig. 4 is a structural diagram of a flat iron of an embodiment of the plant decorative curtain wall of the utility model.
Fig. 5 is a schematic plan view of a connection position of a binding band and a steel frame of an embodiment of the plant decoration curtain wall of the utility model.
Fig. 6 is a schematic plan view of a binding band of an embodiment of the plant decorative curtain wall of the utility model.
FIG. 7 is a schematic plan view of a through hole of an embodiment of the plant decoration curtain wall of the utility model.
In the figure, 10 plant decorates the curtain wall; 11. a steel frame; 111. flat iron; 1111. a first protrusion; 1112. a second protrusion; 1113. a limiting block; 1114. an elastic sleeve; 112. a column; 12. plant lattices; 121. hanging a lug; 1211. a first groove; 1212. a second groove; 1213. a limiting groove; 122. hanging a basket; 123. a through hole; 124. an opening; 125. a reinforcing block; 13. a first card slot; 14. binding bands; 141. a clamping piece; 142. a second card slot; 143. a clamping block; 15. a drip pipe; 16. angle sign indicating number pole.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
In the present invention, directional terms such as "up", "down", "front", "back", "left", "right", "inner", "outer", "side", "top" and "bottom" are used only with reference to the orientation of the drawings, and the directional terms are used for illustration and understanding of the present invention, and are not intended to limit the present invention.
The terms "first," "second," and the like in the terms of the utility model are used for descriptive purposes only and not for purposes of indication or implication relative importance, nor as a limitation on the order of precedence.
In the drawings, elements having similar structures are denoted by the same reference numerals.
Referring to fig. 1 to 2, the present invention provides a plant-decorated curtain wall 10, wherein the plant-decorated curtain wall 10 includes a steel frame 11, plant lattices 12, and a drip pipe 15. The steel frame 11 is in a grid shape, and the steel frame 11 is connected with a wall body. The steel frame 11 is connected with a flat iron 111, the flat iron 111 is horizontally arranged, and the flat iron 111 is a thick galvanized flat iron. The steel frame 11 further comprises a vertical column 112, and the vertical column 112 is vertically arranged. The plant grid 12 comprises a hanging lug 121 and a hanging basket 122 which are connected with each other, and the hanging lug 121 of the plant grid 12 is made of elastic materials. The hanging basket 122 is used for holding plants. The cross section of the hanging lug 12 is L-shaped, the hanging lug 121 and the hanging basket 122 form a first clamping groove 13, and the first clamping groove 13 is detachably connected with the flat iron 111 in a clamping mode. The plant decoration curtain wall 10 comprises angle code rods 16 and chemical anchor bolts, wherein the chemical anchor bolts penetrate through the angle code rods 16 and the steel frame 11, so that the steel frame 11 is fixedly connected with a wall body. Because the steel frame 11 is fixedly connected with the wall body through the angle code rod 16 and the chemical anchor bolt, the steel frame 11 is connected with the wall body more stably, and therefore the steel frame 11 is not easy to loosen from the wall body. The plant lattice 12 is made of non-toxic, odorless, sun-proof, anti-corrosion and anti-aging materials, and the materials meet the national standard and relevant standards, so that the plant lattice meets the environmental protection concept and can be recycled.
Referring to fig. 5 and 6, the following is a detailed description of band 14:
the connecting position of the upright post 112 and the flat iron 111 is provided with a binding band 14, and the material of the binding band 14 is elastic rubber material. The binding band 14 is fixedly connected with the steel frame 11, and the binding band 14 is in a cross shape. One end of the bandage 14 is connected with a clamping piece 141, and a second clamping groove 142 is arranged on the clamping piece 141. The other three ends of the binding band 14 are connected with a fixture block 143, and the second fixture slot 142 is detachably connected with the fixture block 143. When the steel frame 11 hangs the heavier plant compartment 12 and the plant, the user can place the binding band 14 near the plant compartment 12 at the connection position of the upright 112 and the flat iron 111. After the binding band 14 is installed, the binding band 14 and the steel frame 11 form a structure shaped like a Chinese character 'mi'. Straps 14 may increase the strength of the connection between uprights 112 and flats 111, thereby making the construction of steel frame 11 more robust.
Referring to fig. 3 and 4, the following is a detailed description of the hanger 121 and the flat iron 111:
the hanging lug 121 includes a vertical portion on which a first groove 1211 is provided and a horizontal portion. First protrusion 1111 is connected to band iron 111, and first protrusion 1111 level sets up, and first recess 1211 is connected with first protrusion 1111 removable buckle. A trapezoidal limiting groove 1213 is formed in the side wall of the first groove 1211, and trapezoidal limiting blocks 1113 are connected to the upper end and the lower end of the first protrusion 1111. The thickness of first protruding 1111 upper end stopper 1113 is less than the thickness of first protruding 1111 lower extreme stopper 1113, and this stopper 1113 structure of different thickness is favorable to being connected of hangers 121 and band iron 111. The limiting block 1113 and the first protrusion 1111 are integrally formed, so that the limiting block 1113 is more stably connected with the first protrusion 1111. The limiting groove 1213 is connected with the limiting block 1113, so the flat iron 111 is connected with the plant grid 121 more firmly.
Referring to fig. 3 to 4, the first protrusion 1111 and the limiting block 1113 are sleeved with a buffering sleeve. The cushion collar is fixedly connected with the first protrusion 1111, and the cushion collar is fixedly connected with the limiting block 1113. Since the first protrusion 1111 is made of steel, the first protrusion 1111 may easily damage the first groove 1211 during a process of connecting the first groove 1211 and the first protrusion 1111 for a plurality of times. In the connection process of the limiting groove 1213 and the limiting block 1113, the limiting block 1113 is easy to damage the limiting groove 1213. When the first groove 1211 is connected to the first protrusion 1111, the buffering sleeve 1214 may protect the first groove 1211 because the buffering sleeve may reduce the impact of the first protrusion 1111 on the first groove 1211. Therefore, the provision of the buffer sleeve can prevent the first groove 1211 from being easily damaged. When the limiting groove 1213 is connected with the limiting block 1113, because the buffer sleeve can slow down the impact force of the limiting block 1113 on the limiting groove 1213, the buffer sleeve 1214 can be used for protecting the limiting groove 1213. Therefore, the provision of the cushion sheath can prevent the spacing groove 1213 from being easily damaged.
Referring to fig. 3 and 4, the following is a further description of the hanger 121 and the flat iron 111:
the hanging lug 121 is provided with a second groove 1212. The upper end of the flat iron 111 is connected with a second protrusion 1112, and the second groove 1212 is detachably connected with the second protrusion 1112 in a snap-fit manner. The second protrusion 1112 is sleeved with an elastic sleeve 1114, the elastic sleeve 1114 can be made of elastic rubber, and the elastic sleeve 1114 is fixedly connected with the second protrusion 1112. Due to the gap between the second groove 1212 and the second protrusion 1112, the second groove 1212 and the second protrusion 1112 are difficult to be connected stably. Therefore, the elastic sleeve 1114 is sleeved on the second protrusion 1112, and the elastic sleeve 1114 is arranged to prevent a gap from being formed between the second protrusion 1112 and the second groove 1212, so that the connection between the second protrusion 1112 and the second groove 1212 is more stable.
Referring to fig. 3, a reinforcing block 125 is disposed on a side of the hanging lug 121 away from the first slot 13, and the reinforcing block 125 is trapezoidal. The reinforcing block 125 is integrally formed with the hanger 121. Since the thickness of the horizontal portion of the hanger 121 is small, the strength of the hanger 121 is insufficient, and the hanger 121 is easily damaged. The reinforcing block 125 can increase the strength of the hanging lug 121 and prevent the hanging lug 121 from being easily damaged. According to different modeling patterns designed by gardening, a user can freely place and move the plant grids 12 with plants, and the user can also replace the plant modeling patterns according to different festivals or themes. When the plant model is changed, the user only needs to take down the original plant and hang the plant grid 12 on the flat iron 111 according to the new model pattern. The user need not to change the inner structure of this plant decoration curtain 10 again, therefore this plant decoration curtain 10 changes convenient simple, can practice thrift the loss.
Referring to fig. 1 and 7, the plant decoration curtain wall 10 includes a water dropping pipe 15, the plant lattice 12 is provided with a through hole 123, and one end of the water dropping pipe 15 penetrates through the through hole 123 and extends into the plant lattice 12. The through hole 123 penetrates the top surface of the plant compartment 12 and forms an opening 124 on the top surface, the width of the opening 124 is smaller than the maximum width of the through hole 123, and the diameter of the drip pipe 15 is larger than the width of the opening 124. The water dripping pipe 15 is connected to the wall surface within the range of the plant decorative curtain wall 10, and the material of the water dripping pipe 15 is polyvinyl chloride. Drip irrigation points are arranged according to the number of the plant grids 12, and the drip pipes 15 are firmly fixed and are not easy to fall off. The automatic drip irrigation system is provided with a special power distribution control box, and the electric control box provides power needed by the electromagnetic valve and the controller. The drip line 15 drips the plants through an automatic drip irrigation system.
The installation process of the utility model is as follows:
before the plant decorative curtain wall 10 is installed, a construction responsible person organizes field personnel to carry out technical background such as construction schemes, quality targets, inspection systems and the like. The plant decoration curtain wall 10 has the advantages that the product qualification certificate and the inspection report are required to be provided for the main material, and the main material can be used for entering the field and construction after the main material is qualified through self-inspection and then is reported to the supervision and construction unit, and the supervision and construction unit verifies and confirms that the main material is qualified. When the construction defect of the construction enclosure wall is hollowing, cracking, sanding and the like, constructors need to repair the construction enclosure wall firstly to keep the construction enclosure wall smooth, and the constructors select the green environment-friendly waterproof coating for construction, so that the waterproof effect of the wall surface is ensured to meet the design requirement.
And the constructor carries out measurement setting-out within the construction range according to the construction drawing. Marking at every criss-cross position of ink line bullet line, setting up the elevation control point, the total powerstation is carried out the elevation control at each process for the construction overall process, ensures each position structure frame mounting height and straightness that hangs down, satisfies the design standard requirement.
According to the marked mark, the constructor uses the impact drill to drill at the mark point
Figure BDA0003127684150000071
A hole having a depth of not less than 80 mm. Then the constructor implants the drilled hole
Figure BDA0003127684150000072
The chemical anchor bolt of stainless steel is implanted into the concrete wall body by at least 80 mm. The wall surface implanted with the chemical anchor bolt is firmly fixed, a constructor takes the angle brace 16 with the opened hole, and then the constructor sleeves the angle brace 16 on the implanted chemical anchor bolt. The angle code rod 16 needs to abut against the nut, and then a constructor uses a guiding ruler to measure and lean against the nut, adjust the horizontal position of the angle code rod 16 and keep the vertical surface of the angle code rod 16 flat.
The constructor selects steel materials meeting the design requirements to manufacture the upright post 112, and the upright post 112 is welded and fixed with the fixed angle code rod 16. According to the size, the number and the modeling pattern of the plant lattices 12, constructors need to determine position and height marked lines, then the flat irons 111 are welded on the firmly welded upright posts 112, and the flat irons 111 and the upright posts 112 form a steel frame 11 structure. After the steel frame 11 structure is welded, constructors remove slag and remove impurities on the surface of each welding point and coat antirust paint.
The construction personnel lay the drip irrigation pipe 15 on the wall of the plant decoration curtain wall 10 scope, and the construction personnel can arrange the drip irrigation point according to the plant check 12 quantity well. The drip pipes 15 need to be fixed firmly and not to fall off easily, the constructors need to set up a special distribution control box, and the constructors need to provide the electric control box with the power required by the electromagnetic valve and the controller, so that an automatic drip irrigation system is formed. The drip line 15 drips the plants through an automatic drip irrigation system.
According to the designed gardening modeling pattern, the constructor can hang the plant grids 12 on the welded 30 x 4 thick galvanized flat iron in sequence. When the plant grid 12 is installed, a user firstly connects the first clamping groove 13 with the flat iron 111. The worker then snaps the first protrusion 1111 into the first groove 1211. Meanwhile, the limiting block 1113 is fixedly connected with the limiting groove 1213. In order to prevent the first protrusion 1111 from easily damaging the first groove 1211 and the stop block 1113 from easily damaging the stop groove 1213, a buffer sleeve is sleeved on the first protrusion 1111 and the stop block 1113. Subsequently, the user snaps the second protrusion 1112 into engagement with the second groove 1212. In order to avoid a gap between the second groove 1212 and the second protrusion 1112, an elastic sleeve 1114 is sleeved on the second protrusion 1112. The elastic sleeve 1114 is provided to make the connection of the second protrusion 1112 and the second groove 1212 more stable. In order to increase the strength of the hanging lug 121, a reinforcing block 125 is disposed on a side of the hanging lug 121 facing away from the first card slot 13. Thereafter, the user completes the installation of the plant compartment 12. During the installation of the plant lattices 12, the constructors should pay attention to the arrangement sequence of the modeling patterns. When the steel frame 11 hangs the heavier plant compartment 12 and the plant, the user can install the binding band 14 near the plant compartment 12 at the connection position of the upright 112 and the flat iron 111.
The constructor presses the drip pipe 15 into the through hole 123 through the opening 124, and the drip pipe 15 penetrates the inside of the hanging basket 122 through the through hole 123. And then, the constructor debugs the automatic drip irrigation system. And then the automatic drip irrigation system carries out self-inspection, and after the automatic drip irrigation system is qualified, constructors inform relevant personnel to carry out system acceptance inspection. After that, the constructor completes the installation of the plant-decorated curtain wall 10.
Compared with the prior art, the utility model has the beneficial effects that: the utility model provides a plant decoration curtain wall 10, and the plant decoration curtain wall 10 comprises a steel frame 11 and plant lattices 12. The hanging lug 121 and the hanging basket 122 form a first clamping groove 13, and the first clamping groove 13 is detachably connected with the flat iron 111 on the steel frame 11 in a clamping manner. And the hangers 121 of the plant lattices are made of elastic materials, the hangers 121 are provided with first grooves 1211, the flat iron 111 is connected with first protrusions 1111, and the first grooves 1211 and the first protrusions 1111 are detachably connected in a buckling mode. Further, a trapezoidal limiting groove 1213 is formed in the side wall of the first groove 1211, the upper end and the lower end of the first protrusion 1111 are both connected with a trapezoidal limiting block 1113, and the limiting groove 1213 is connected with the limiting block 1113. Because the first groove 1211 is connected with the first protrusion 1111 in a buckling manner, the limiting groove 1213 is fixedly connected with the limiting block 1113, and the connection between the plant lattice 12 and the steel frame 11 is more stable. After the plant lattices 12 or the steel frame 11 are subjected to the action of external force, the plant lattices 12 are difficult to loosen from the steel frame 11, and the plant lattices 12 are difficult to shift on the steel frame 11. Plant check 12 is comparatively stable with steelframe 11's connection structure, has effectively solved current plant and has hung the basket and decorate the curtain with the plant and be difficult to be connected firm technical problem.
In summary, although the present invention has been described with reference to the preferred embodiments, the above-described preferred embodiments are not intended to limit the present invention, and those skilled in the art can make various changes and modifications without departing from the spirit and scope of the present invention, therefore, the scope of the present invention shall be determined by the appended claims.

Claims (10)

1. A plant decoration curtain wall is characterized by comprising:
the steel frame is in a grid shape and is connected with the wall body, and flat irons are connected to the steel frame and horizontally arranged;
the plant grid comprises a hanging lug and a hanging basket which are connected with each other, the hanging basket is used for containing plants, the cross section of the hanging lug is L-shaped, and the hanging lug and the hanging basket form a first clamping groove;
the hanger comprises a vertical portion, a first groove is formed in the vertical portion, a trapezoidal limiting groove is formed in the side wall of the first groove, a first protrusion is connected to the flat iron, the first protrusion is horizontally arranged, the upper end and the lower end of the first protrusion are connected with trapezoidal limiting blocks, the first groove is connected with the first protrusion in a detachable mode through a buckle, the limiting groove is connected with the limiting blocks, and the first clamping groove is connected with the flat iron in a detachable mode through the buckle.
2. The plant decoration curtain wall of claim 1, wherein a reinforcing block is arranged on one side of the hanging lug, which is far away from the first clamping groove, and the reinforcing block is fixedly connected with the hanging lug.
3. The plant decorating curtain wall of claim 1 wherein the stop block is integrally formed with the first protrusion.
4. The curtain wall is decorated to plant of claim 1, wherein the curtain wall is decorated to plant includes the weeping pipe, the plant check is provided with the through-hole, the one end of weeping pipe is worn to locate the through-hole extends in the inside of plant check, the through-hole link up the top surface of plant check, and form the opening at the top surface, the open-ended width is less than the maximum width of through-hole, the diameter of weeping pipe is greater than the open-ended width.
5. The plant decoration curtain wall as claimed in claim 1, wherein the hanging lugs are provided with second grooves, the upper ends of the flat irons are connected with second protrusions, and the second grooves are detachably connected with the second protrusions in a clamping manner.
6. The plant decoration curtain wall according to claim 1, wherein the steel frame further comprises a vertical column, the vertical column is vertically arranged, a binding band is arranged at a connecting position of the vertical column and the flat iron, the binding band is made of elastic materials and is fixedly connected with the steel frame, the binding band is in a cross shape, one end of the binding band is connected with a clamping piece, a second clamping groove is formed in the clamping piece, the other three ends of the binding band are connected with clamping blocks, and the second clamping groove is detachably connected with the clamping blocks.
7. The plant-decorating curtain wall of claim 1, wherein the plant-decorating curtain wall comprises angle code rods and chemical anchor bolts, and the chemical anchor bolts penetrate through the angle code rods and the steel frame, so that the steel frame is fixedly connected with the wall body.
8. The plant decorative curtain wall as claimed in claim 1, wherein the second protrusion is sleeved with an elastic sleeve, and the elastic sleeve is fixedly connected with the second protrusion.
9. The plant-decorating curtain wall of claim 2 wherein the reinforcing block is trapezoidal and is integrally formed with the hanging lugs.
10. The plant decorative curtain wall as claimed in claim 1, wherein a buffer sleeve is sleeved on the first protrusion and the limiting block, and the buffer sleeve is fixedly connected with the first protrusion and the limiting block.
CN202121391632.7U 2021-06-22 2021-06-22 Plant decoration curtain wall Active CN215483877U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121391632.7U CN215483877U (en) 2021-06-22 2021-06-22 Plant decoration curtain wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121391632.7U CN215483877U (en) 2021-06-22 2021-06-22 Plant decoration curtain wall

Publications (1)

Publication Number Publication Date
CN215483877U true CN215483877U (en) 2022-01-11

Family

ID=79720863

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121391632.7U Active CN215483877U (en) 2021-06-22 2021-06-22 Plant decoration curtain wall

Country Status (1)

Country Link
CN (1) CN215483877U (en)

Similar Documents

Publication Publication Date Title
CN213329955U (en) Flower basket diagonal rod type overhanging scaffold
CN107060166A (en) A kind of circular arc rhombus stone curtain wall
CN215483877U (en) Plant decoration curtain wall
CN205558476U (en) Fender is enclosed in combination
CN207092308U (en) Stone curtain-wall hanging part device
CN204592560U (en) A kind of adjustable cable crane span structure support supported for curved wall
CN203514920U (en) Communication stay wire tower with movable platforms
CN210263929U (en) A preformed hole template for building civil engineering
CN201938128U (en) Putting and hanging type facade greening loading device
CN204311724U (en) A kind of hanging basket suspension device away from structure limit
CN203603443U (en) Overhanging type external scaffold bearing structure
CN206110589U (en) Stone cladding process slabstone fixed knot constructs with high anti -shock function
CN109488008A (en) A kind of coupling type hanger job platform
CN206159649U (en) Pipeline suspends bracket in midair
CN202236987U (en) Fire-fighting device for site board house
CN208749072U (en) A kind of hanging basket connection system
CN107675892A (en) A kind of glass curtain wall monorail hoisting structure
CN203022260U (en) Three-dimensional greening flowerpot brick
CN106088514A (en) A kind of stone material dry suspending slabstone fixed structure with high anti-seismic function
CN203569905U (en) Novel safety protection structure for decoration
CN208749071U (en) A kind of reinforcing heightening type hanging basket connection system
CN103015696B (en) Hanging basket outer protective layer for super high-rise building
CN207484991U (en) A kind of glass curtain wall monorail hoisting structure
CN202031308U (en) Inverted-hanging type scaffold
CN210870827U (en) Afforestation is with multi-functional ecological frame of afforestation

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant