CN215319510U CN202120391607.2U CN202120391607U CN215319510U CN 215319510 U CN215319510 U CN 215319510U CN 202120391607 U CN202120391607 U CN 202120391607U CN 215319510 U CN215319510 U CN 215319510U
Authority
CN
China
Prior art keywords
positioning
main body
arc
uniformly
column
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202120391607.2U
Other languages
Chinese (zh)
Inventor
杨军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Eiffel Industrial Co ltd
Original Assignee
Jiangsu Eiffel Industrial Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Eiffel Industrial Co ltd filed Critical Jiangsu Eiffel Industrial Co ltd
Priority to CN202120391607.2U priority Critical patent/CN215319510U/en
Application granted granted Critical
Publication of CN215319510U publication Critical patent/CN215319510U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a pipe pile steel die with a stable structure, which relates to the field of building dies and comprises a first main body and a second main body, wherein first reinforcing columns are vertically and uniformly and fixedly distributed on the outer wall of the first main body, first arc-shaped positioning hoops are horizontally and uniformly and fixedly distributed on the outer wall of the first main body, the first arc-shaped positioning hoops and the first reinforcing columns are distributed in a cross shape, and first positioning blocks are uniformly, fixedly and symmetrically arranged on two sides of the outer surface of the first main body. The equipment does not need to be fastened by bolts, so that the problem that the bolts of the tubular pile steel die are mutually abraded in the process of loosening and tightening is solved, the performance attenuation is accelerated, and the fatigue degree of the bolts is increased; the notch on the mould is easily stained with water-based slurry, so that the groove of the groove is filled with concrete thinner with different heights, an operator mistakenly thinks that the bolt is not fastened well, the operator is continuously fastened by a wrench at the position, the use strength of the bolt is exceeded, and the bolt is easily damaged by slippery threads.

Description

Tubular pile steel mould that structure is firm
Technical Field
The utility model relates to the field of building dies, in particular to a pipe pile steel die with a stable structure.
Background
In 1989-1992, the former national building materials institute of concrete and cement products, Suzhou research institute of concrete and Panyu yu city Qiaofeng cement products Limited company independently develops the localization prestressed high-strength concrete pipe pile according to the actual conditions of China by the digestion and absorption of the introduced pipe pile production line.
When the tubular pile steel die is used, bolt fastening is a common operation means, and operators familiar with production know that bolts of the tubular pile steel die are mutually abraded in the process of tightness, so that the performance attenuation is accelerated, and the fatigue degree of the bolts is increased. In addition, the notches on the die are easily stained with water-based slurry, so that concrete thin materials are laid on the notch grooves, the heights of the notch grooves are different, an operator mistakenly thinks that the bolts are not fastened well, the operator is continuously fastened by a wrench at the position, the use strength of the bolts is exceeded, the bolts are easily damaged by sliding threads, and meanwhile, most of the tubular pile dies cannot replace the bolts by other fasteners.
SUMMERY OF THE UTILITY MODEL
The utility model aims to provide a pipe pile steel mould with a stable structure so as to solve the problems in the background technology.
In order to achieve the purpose, the utility model provides the following technical scheme: a pipe pile steel die with a stable structure comprises a first main body and a second main body, wherein first reinforcing columns are uniformly and fixedly distributed on the outer wall of the first main body in a vertical mode, first arc-shaped positioning hoops are uniformly and fixedly distributed on the outer wall of the first main body in a horizontal mode, the first arc-shaped positioning hoops and the first reinforcing columns are distributed in a cross-shaped mode, first positioning blocks are symmetrically and fixedly arranged on the two sides of the outer surface of the first main body in a uniform mode, the first positioning blocks are parallel to the middle of the first arc-shaped positioning hoops, second reinforcing columns are uniformly and fixedly distributed on the outer wall of the second main body in a vertical mode, second arc-shaped positioning hoops are uniformly and fixedly distributed on the outer wall of the second main body in a cross-shaped mode, second positioning blocks are symmetrically and fixedly arranged on the two sides of the outer surface of the first main body in a uniform mode, the second positioning blocks are matched with the first positioning blocks, the positioning holes are formed in the second positioning block and the first positioning block, the positioning assemblies are sleeved in the positioning holes, the top of each positioning assembly is semicircular, the cross sections of the first main body, the second main body, the first reinforcing column and the second arc-shaped positioning hoop are C-shaped, and the surfaces of the two ends of the first main body, the second main body, the first reinforcing column and the second arc-shaped positioning hoop can be tightly matched.
Preferably, the positioning assembly comprises an angle adjusting ball with one end movably connected, the positioning assembly is fixedly connected with the angle adjusting ball through a hinge, one end of the outer surface of the angle adjusting ball is fixedly connected with a straight circular column or a conical circular column, and the straight circular column or the conical circular column and the positioning assembly are vertically arranged.
Preferably, the positioning hole is a circular straight hole or a conical hole, the circular straight hole is matched with the circular straight column for use, and the conical hole is matched with the conical column for use.
Advantageous effects
The utility model relates to a pipe pile steel mould with stable structure, through first horizontally placing a first main body through a mould closing machine, putting a pipe pile steel reinforcement cage into the interior of the first main body, adjusting the position of the pipe pile steel reinforcement cage, filling concrete into the first main body, after the preorder work is completed, closing a second main body on the end surface of the first main body through a machine, enabling a first arc-shaped positioning hoop and a second arc-shaped positioning hoop, a first positioning block and a second positioning block to be mutually and closely matched, bending a positioning component, enabling a straight column to pass through a positioning hole on a second positioning block after passing through the positioning hole on the first positioning block from the positioning hole on the second positioning block after the positioning hole on the straight column is completely attached with the positioning hole, bending the positioning component, enabling the positioning component and an angle adjusting ball to be on the same straight line, simultaneously locating component's top and the laminating of second arc location hoop one side, locating component's top is the semicircle form and is convenient for with the better of the laminating of second arc location hoop, all install locating component on whole locating holes and then carry out next process, just need the die sinking after all processes are accomplished, when the die sinking, bend into certain angle with angle adjusting ball locating component earlier, take out angle adjusting ball from the locating hole, all angle adjusting balls all take out the back, remove the second main part to the clean department of mould through the clapper die spotting press, just can take out finished product tubular pile after that, above-mentioned step can the loop operation accelerate production speed, whole production process does not need the bolt reinforcement, the bad consequence that the bolt reinforcement arouses has been avoided.
Drawings
FIG. 1 is a schematic perspective view of the present invention;
FIG. 2 is a front view of the present invention;
FIG. 3 is a schematic view of a cylindrical column according to the present invention;
FIG. 4 is a schematic view of a conical column structure according to the present invention;
FIG. 5 is a cross-sectional view of a circular straight hole of the present invention;
fig. 6 is a cross-sectional view of a conical bore of the present invention.
In the figure: 1. a first body; 2. a second body; 3. a first arcuate locating collar; 4. a first reinforcement column; 5. a first positioning block; 6. a second reinforcement column; 7. a second arcuate locating collar; 8. a second positioning block; 9. positioning holes; 10. a positioning assembly; 11. an angle adjusting ball; 12. a circular straight column; 13. an articulation member; 14. a conical column; 15. a round and straight hole; 16. a conical bore.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
The utility model provides a pipe pile steel die with a stable structure as shown in figures 1-6, which comprises a first main body 1 and a second main body 2, wherein first reinforcing columns 4 are vertically and uniformly and fixedly distributed on the outer wall of the first main body 1, first arc-shaped positioning hoops 3 are horizontally and uniformly and fixedly distributed on the outer wall of the first main body 1, the first arc-shaped positioning hoops 3 and the first reinforcing columns 4 are in crossed distribution, first positioning blocks 5 are uniformly and symmetrically arranged on two sides of the outer surface of the first main body 1, the first positioning blocks 5 are parallel to the middle part of the first arc-shaped positioning hoops 3, second reinforcing columns 6 are vertically and uniformly and fixedly distributed on the outer wall of the second main body 2, second arc-shaped positioning hoops 7 are horizontally and uniformly and fixedly distributed on the outer wall of the second main body 2, the second reinforcing columns 6 and the second arc-shaped positioning hoops 7 are in crossed distribution, second positioning blocks 8 are uniformly and symmetrically arranged on two sides of the outer surface of the first main body 1, the second positioning block 8 is matched with the first positioning block 5, the second positioning block 8 and the first positioning block 5 are both provided with positioning holes 9, positioning components 10 are sleeved in the positioning holes 9, the top of each positioning component 10 is semicircular, the cross sections of the first main body 1, the second main body 2, the first reinforcing column 4 and the second arc-shaped positioning hoop 7 are C-shaped, the surfaces of the two ends of the first main body 1, the second main body 2, the first reinforcing column 4 and the second arc-shaped positioning hoop 7 can be tightly matched, the positioning components 10 enable the equipment to be free of bolt fastening, the problem that bolts of a tubular pile steel mould are mutually worn in the process of tightness is solved, performance attenuation is accelerated, and the fatigue degree of the bolts is increased; the notch on the mould is easily stained with water-based slurry, so that the groove of the groove is filled with concrete thinner with different heights, an operator mistakenly thinks that the bolt is not fastened well, the operator is continuously fastened by a wrench at the position, the use strength of the bolt is exceeded, and the bolt is easily damaged by slippery threads.
Further, locating component 10 includes one end swing joint's angle modulation ball 11, and locating component 10 passes through articulated elements 13 fixed connection with angle modulation ball 11, and angle modulation ball 11's surface one end fixedly connected with circle straight column 12 or circular cone post 14, and circle straight column 12 or circular cone post 14 and locating component 10 are all vertical arranges, and the swift effectual installation of convenient and fast operator of circle straight column 12, circular cone post 14 have the effect that the antiskid is taken off after the installation.
Furthermore, the positioning hole 9 is a circular straight hole 15 or a conical hole 16, the circular straight hole 15 is matched with the circular straight column 12 for use, the conical hole 16 is matched with the conical column 14 for use, and the positioning hole 9 is matched with the circular straight column 12 or the conical column 14 for use, so that the first positioning block 5 and the second positioning block 8 are matched more firmly.
This practical theory of operation: firstly, horizontally placing a first main body 1 through a mould closing machine, placing the pipe pile reinforcement cage into the first main body 1, adjusting the position of the pipe pile reinforcement cage, filling concrete into the first main body 1, after the completion of the previous work, closing a second main body 2 on the end surface of the first main body 1 through the machine, enabling a first arc-shaped positioning hoop 3, a second arc-shaped positioning hoop 7, a first positioning block 5 and a second positioning block 8 to be mutually and tightly matched, bending a positioning assembly 10, enabling a straight cylinder 12 to pass through a positioning hole 9 on a first positioning block 5 from a positioning hole 9 on the second positioning block 8 after the positioning assembly 10 forms a certain angle with the straight cylinder 12, then penetrating through the positioning hole 9 on the second positioning block 8, bending the positioning assembly 10 after the straight cylinder 12 is completely attached to the positioning hole 9, enabling the positioning assembly 10 and an angle adjusting ball 11 to be on the same straight line, simultaneously the top of locating component 10 and the laminating of second arc location hoop 7 one side, the top of locating component 10 is the semicircle form and is convenient for with the better of the laminating of second arc location hoop 7, all install locating component 10 on whole locating hole 9 and then carry out next process, just need the die sinking after all processes are accomplished, when the die sinking, bend into certain angle with angle adjusting ball 11 locating component 10 earlier, take out angle adjusting ball 11 from locating hole 9, all angle adjusting balls 11 take out the back, remove second main part 2 to the clean department of mould through the clapper die spotting press, just can take out finished product tubular pile after that, above-mentioned step can the loop operation accelerate production speed, whole production process does not need the bolt fastening, the bad consequence that the bolt fastening arouses has been avoided.
Finally, it should be noted that: although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments or portions thereof without departing from the spirit and scope of the utility model.

Claims (3)

1. The utility model provides a tubular pile steel mould that structure is firm, includes first main part (1) and second main part (2), its characterized in that: first reinforcing columns (4) are vertically and uniformly and fixedly distributed on the outer wall of the first main body (1), first arc-shaped positioning hoops (3) are horizontally and uniformly and fixedly distributed on the outer wall of the first main body (1), the first arc-shaped positioning hoops (3) and the first reinforcing columns (4) are distributed in a cross shape, first positioning blocks (5) are uniformly and fixedly and symmetrically arranged on two sides of the outer surface of the first main body (1), the first positioning blocks (5) are parallel to the middle part of the first arc-shaped positioning hoops (3), second reinforcing columns (6) are vertically and uniformly and fixedly distributed on the outer wall of the second main body (2), second arc-shaped positioning hoops (7) are horizontally and uniformly and fixedly distributed on the outer wall of the second main body (2), the second reinforcing columns (6) and the second arc-shaped positioning hoops (7) are distributed in a cross shape, and second positioning blocks (8) are uniformly and symmetrically arranged on two sides of the outer surface of the first main body (1), the positioning structure is characterized in that the second positioning block (8) and the first positioning block (5) are matched with each other, the second positioning block (8) and the first positioning block (5) are provided with positioning holes (9), positioning components (10) are sleeved in the positioning holes (9), the top of each positioning component (10) is semicircular, the cross sections of the first main body (1), the second main body (2), the first reinforcing column (4) and the second arc-shaped positioning hoop (7) are C-shaped, and the surfaces of the two ends of the first main body (1), the second main body (2), the first reinforcing column (4) and the second arc-shaped positioning hoop (7) can be tightly matched with each other.
2. The firm tubular pile steel mould of structure of claim 1, characterized in that: the positioning assembly (10) comprises an angle adjusting ball (11) with one end movably connected, the positioning assembly (10) is fixedly connected with the angle adjusting ball (11) through a hinge piece (13), one end of the outer surface of the angle adjusting ball (11) is fixedly connected with a straight circular column (12) or a conical circular column (14), and the straight circular column (12) or the conical circular column (14) and the positioning assembly (10) are vertically arranged.
3. The firm tubular pile steel mould of structure of claim 1, characterized in that: the positioning hole (9) is a round straight hole (15) or a conical hole (16), the round straight hole (15) and the round straight column (12) are matched with each other for use, and the conical hole (16) and the conical column (14) are matched with each other for use.
CN202120391607.2U 2021-02-23 2021-02-23 Tubular pile steel mould that structure is firm Expired - Fee Related CN215319510U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120391607.2U CN215319510U (en) 2021-02-23 2021-02-23 Tubular pile steel mould that structure is firm

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120391607.2U CN215319510U (en) 2021-02-23 2021-02-23 Tubular pile steel mould that structure is firm

Publications (1)

Publication Number Publication Date
CN215319510U true CN215319510U (en) 2021-12-28

Family

ID=79581636

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120391607.2U Expired - Fee Related CN215319510U (en) 2021-02-23 2021-02-23 Tubular pile steel mould that structure is firm

Country Status (1)

Country Link
CN (1) CN215319510U (en)

Similar Documents

Publication Publication Date Title
CN102828510B (en) H type soldier pile and preparation method thereof
RU82465U1 (en) COUPLING FOR CONNECTION OF REINFORCED RODS- "LENTON"
CN105507573B (en) The installation method of shaped steel Overhanging Outside Scaffold
CN215319510U (en) Tubular pile steel mould that structure is firm
CN206428964U (en) A kind of Combined aluminum plate device for building
CN210857607U (en) Frame structure of building wall
CN202359553U (en) Pure mechanical connection structure between piles
CN102490266B (en) Method for preparing pre-tensioned prestressing concrete pile connected with basic bearing platform in non-welding mode
CN203361605U (en) Anchor ring assembly
CN102493440A (en) Method for connecting piles, and purely mechanical connection structure for method
CN104153572B (en) A kind of gradual change undergauge high-strength die mould assembly column template and assembling and construction method thereof
CN211169543U (en) H-shaped steel movable clamp
CN210828316U (en) Take cylinder shear force wall template handing-over to consolidate fixing device
CN212918301U (en) Efficient steel pipe welding device
CN210342374U (en) Cleaning-free system for truss reinforcing steel bars
CN106884533A (en) Adjustable window hole molding board support meanss
CN206256464U (en) A kind of dust block in the retaining wall for built with ribbed bricks
CN218715033U (en) Special-shaped rotary fastener
CN212502266U (en) Anti-drop anchor clamps for transport building block
CN215508740U (en) Constructional engineering construction reinforcing bar bending device
CN219081594U (en) Primary support flatness control die for tunnel
CN214868372U (en) Tubular pile skeleton welding set
CN217924973U (en) Adjustable buries a location frock
CN104563490A (en) Novel adjustable wall body back ridge
CN204753835U (en) Steel pipe " X " type crossing material connected node structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20211228