CN215276571U - Desulfurizing tower installation base - Google Patents
Desulfurizing tower installation base Download PDFInfo
- Publication number
- CN215276571U CN215276571U CN202120217032.2U CN202120217032U CN215276571U CN 215276571 U CN215276571 U CN 215276571U CN 202120217032 U CN202120217032 U CN 202120217032U CN 215276571 U CN215276571 U CN 215276571U
- Authority
- CN
- China
- Prior art keywords
- seat
- mounting seat
- limiting seat
- mounting base
- mounting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Treating Waste Gases (AREA)
Abstract
The utility model relates to the field of desulfurizing towers, in particular to a desulfurizing tower mounting base which is used for improving the flexibility of the disassembling and secondary hoisting of the desulfurizing tower and enhancing the mounting stability of the desulfurizing tower; the method comprises the following steps: the device comprises a mounting seat, a limiting seat, a foundation and a supporting device arranged on the mounting seat; the limiting seat is of a circular ring structure and is fixed on the upper surface of the mounting seat; the foundation array type is fixed on the lower surface of the mounting seat, and part of the foundation array type extends out of the mounting seat; the supporting device is arranged on the upper surface of the mounting seat and surrounds the limiting seat array; the support device includes: the device comprises a coaming, a supporting plate and a locking clamp; the coaming is tightly attached to the outer surface of the limiting seat; one end of the supporting plate is fixed on the surrounding plate, and the other end of the supporting plate is fixed on the upper surface of the mounting seat; the locking clamp is inserted on the coaming and can move towards the direction of the inside of the limiting seat.
Description
Technical Field
The utility model relates to a desulfurizing tower field especially relates to a desulfurizing tower installation base.
Background
The desulfurization tower is equipment for performing desulfurization treatment on industrial waste gas by utilizing a desulfurization absorbent and a chemical reaction mode, and the existing desulfurization tower fixing mode is generally that cement is directly poured at the bottom of a tower for fixing, but the fixing mode is not flexible enough and is troublesome in disassembly and secondary hoisting; now provide a comparatively convenient desulfurizing tower installation base, be convenient for installation and dismantlement to and the installation stability of reinforcing desulfurizing tower.
SUMMERY OF THE UTILITY MODEL
To exist not enough among the prior art, the utility model provides a desulfurizing tower installation base improves the flexibility that the desulfurizing tower was dismantled, secondary hoisted in order to overcome above-mentioned prior art's defect to the installation stability of reinforcing desulfurizing tower.
According to the utility model discloses an embodiment, a desulfurizing tower installation base, include: the device comprises a mounting seat, a limiting seat, a foundation and a supporting device arranged on the mounting seat; the limiting seat is of a circular ring structure and is fixed on the upper surface of the mounting seat; the foundation array type is fixed on the lower surface of the mounting seat, and part of the foundation array type extends out of the mounting seat; the supporting device is arranged on the upper surface of the mounting seat and surrounds the limiting seat array; the support device includes: the device comprises a coaming, a supporting plate and a locking clamp; the coaming is tightly attached to the outer surface of the limiting seat; one end of the supporting plate is fixed on the surrounding plate, and the other end of the supporting plate is fixed on the upper surface of the mounting seat; the locking clamp is inserted on the coaming and can move towards the direction of the inside of the limiting seat.
Preferably, the coaming is an arc plate; the supporting plate is arranged at the center of the back of the enclosing plate; two thread channels are respectively arranged on the surface of the enclosing plate at the left side and the right side of the supporting plate; the locking clamp is in threaded connection with the threaded passage.
Preferably, the locking clamp includes: a screw, a chuck and a tightening nut; the screw thread is arranged in the thread channel and penetrates through the enclosing plate; the chuck and the tightening nut are respectively arranged on two end faces of the screw rod.
Preferably, T-shaped support frames are symmetrically arranged on two sides of the support plate.
Preferably, the inner wall of the limiting seat is provided with a channel in an array manner, and the channel extends to the surface of the mounting seat.
Preferably, the foundation surface is provided with a triangular channel steel used for being connected with the lower surface of the mounting seat.
Preferably, a plurality of air inlet pipeline avoiding holes are arranged on the limiting seat in a penetrating mode.
Preferably, a plurality of pipeline holes are arranged on the mounting seat in a penetrating mode.
Compared with the prior art, the utility model discloses following beneficial effect has:
the utility model uses the building module to replace the traditional regional cement pouring mode; the foundation and part of the mounting seats are buried under the ground and are fixed by pouring cement, the tower body of the desulfurizing tower is placed in the limiting seat, and then the supporting device is used for carrying out auxiliary supporting, so that whether proper amount of cement is poured in the channel for auxiliary fixing can be selected according to the actual size of the desulfurizing tower; the utility model discloses rational in infrastructure, convenient assembling has not only promoted the flexibility of desulfurizing tower installation with the dismantlement, can also strengthen the stability after the installation of desulfurizing tower.
Drawings
Fig. 1 is a schematic structural diagram of an embodiment of the present invention;
fig. 2 is a top view of an embodiment of the present invention;
fig. 3 is a schematic structural view of a locking clamp according to an embodiment of the present invention.
In the above drawings: 1. a mounting seat; 2. a limiting seat; 21. a channel; 3. a foundation; 4. a support device; 41. enclosing plates; 411. a threaded passage; 42. a support plate; 43. a locking clamp; 431. a screw; 432. screwing down the nut; 433. a chuck; 5. a T-shaped support frame; 6. triangular channel steel; 7. an air inlet pipeline avoidance hole; 8. a conduit bore.
Detailed Description
The technical solution of the present invention will be further explained with reference to the accompanying drawings and embodiments.
As shown in fig. 1 to 3, a desulfurization tower mounting base includes: the device comprises a mounting seat 1, a limiting seat 2, a foundation 3 and a supporting device 4 arranged on the mounting seat 1; the mounting seat 1 is of a rectangular structure, and the limiting seat 2 is of a circular ring structure and is fixed in the center of the upper surface of the mounting seat 1; the foundations 3 are fixed on the lower surface of the mounting seat 1 in an array manner, and part of the foundations extend out of the mounting seat 1, in the utility model, the foundations 3 are rectangular reinforced concrete pouring blocks which are buried under the ground during installation; the supporting devices 4 are arranged at four corners of the upper surface of the mounting seat 1, four groups are arranged in total, and the four groups surround the outer surface array of the limiting seat 2; the support device 4 comprises: the coaming 41, the supporting plate 42 and the locking clamp 43; the coaming 41 is tightly attached to the outer surface of the limiting seat 2; one end of the supporting plate 42 is fixed on the back surface of the enclosing plate 41, and the other end is fixed on the upper surface of the mounting seat 1; the locking clamp 43 is inserted into the surrounding plate 41 and can move towards the direction of the inside of the limiting seat 2 (i.e. the direction of the center of the mounting seat 1).
As shown in fig. 1 and 2: the coaming 41 is an arc plate; the supporting plate 42 is arranged in the middle of the back surface (i.e. the outer arc surface) of the enclosing plate 41; two threaded passages 411 which penetrate through the enclosing plates 41 are respectively arranged on the surfaces of the enclosing plates 41 on the left side and the right side of the supporting plate 42; the locking clamp 43 is threaded into the threaded passage 411.
As shown in fig. 3: the locking clamp 43 includes: a screw 431, a collet 433, and a tightening nut 432; the screw rod 431 is arranged in the threaded passage 411 in a threaded manner and penetrates through the enclosing plate 41; chuck 433, screw up nut 432 and set up respectively on screw rod 431's inner terminal surface and outer terminal surface the utility model discloses an in the embodiment, use the return bend spanner to twist and screw up nut 432 to make screw rod 431 rotate, and drive chuck 433 and be close to and until the contact towards the shaft of the desulfurizing tower, reach the purpose of support, thereby strengthen the stability after the installation of desulfurizing tower.
As shown in fig. 1 and 2, the T-shaped support frames 5 are symmetrically arranged on the left side and the right side of the support plate 42, each T-shaped support frame 5 comprises a tripod and a bottom plate, the bottom plate is fixed on the upper surface of the mounting base 1 through a bolt, one end of each tripod is fixed on the side surface of the support plate 42, the other end of each tripod is fixed on the bottom plate, and the T-shaped support frames 5 are used for supporting the left side and the right side of the support plate 42, so that the support plate 42 is more stable.
As shown in fig. 1 and 2: the limiting seat 2 is provided with a channel 21 extending to the surface of the mounting seat 1 in an array manner on the inner wall, and the channel 21 is used for selecting a part of cement to be poured in the channel 21 according to the actual size of the desulfurizing tower to assist in fixing the desulfurizing tower.
As shown in fig. 1 and 2: the surface of the foundation 3 is provided with a triangular channel steel 6 of a hollow structure connected with the side wall of the mounting seat 1, and bolts are installed on the side surface and the bottom surface of the triangular channel steel 6 and are fixed with the foundation 3 and the mounting seat 1 respectively.
As shown in fig. 1: a plurality of air inlet pipeline avoiding holes 7 are formed in the limiting seat 2 in a penetrating mode and used for installing a plurality of air inlet pipelines, and the specific number of the air inlet pipeline avoiding holes can be selected according to actual requirements.
As shown in fig. 2: the mounting seat 1 is provided with a plurality of pipeline holes 8 in a penetrating mode and used for mounting liquid drainage pipelines or liquid inlet pipelines, and the specific number of the pipeline holes can be selected according to actual requirements.
Finally, although the present invention has been described in detail with reference to the preferred embodiments, it should be understood by those skilled in the art that the present invention can be modified or replaced by other means without departing from the spirit and scope of the present invention, which should be construed as limited only by the appended claims.
Claims (8)
1. The utility model provides a desulfurizing tower installation base which characterized in that includes: the device comprises a mounting seat, a limiting seat, a foundation and a supporting device arranged on the mounting seat; the limiting seat is of a circular ring structure and is fixed on the upper surface of the mounting seat; the foundation array type is fixed on the lower surface of the mounting seat, and part of the foundation array type extends out of the mounting seat; the supporting device is arranged on the upper surface of the mounting seat and surrounds the limiting seat array; the support device includes: the device comprises a coaming, a supporting plate and a locking clamp; the coaming is tightly attached to the outer surface of the limiting seat; one end of the supporting plate is fixed on the surrounding plate, and the other end of the supporting plate is fixed on the upper surface of the mounting seat; the locking clamp is inserted on the coaming and can move towards the direction of the inside of the limiting seat.
2. The desulfurization tower mounting base of claim 1, wherein said shroud is a circular arc; the supporting plate is arranged at the center of the back of the enclosing plate; two thread channels are respectively arranged on the surface of the enclosing plate at the left side and the right side of the supporting plate; the locking clamp is in threaded connection with the threaded passage.
3. The desulfurization tower mounting base of claim 2, wherein said locking clamp comprises: a screw, a chuck and a tightening nut; the screw thread is arranged in the thread channel and penetrates through the enclosing plate; the chuck and the tightening nut are respectively arranged on two end faces of the screw rod.
4. The desulfurization tower mounting base of claim 1, wherein the support plate is symmetrically provided with T-shaped support brackets at both sides.
5. The desulfurization tower mounting base of claim 1, wherein the inner wall of the limiting seat is provided with a plurality of grooves in an array manner, and the grooves extend to the surface of the mounting seat.
6. A desulfurization tower mounting base according to claim 1, wherein said foundation surface is provided with a triangular channel for connection with a lower surface of the mounting base.
7. The desulfurizing tower mounting base of claim 1, wherein a plurality of air inlet duct relief holes are provided through the limiting seat.
8. The desulfurization tower mounting base of claim 1, wherein said mounting base has a plurality of conduit holes formed therethrough.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202120217032.2U CN215276571U (en) | 2021-01-26 | 2021-01-26 | Desulfurizing tower installation base |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202120217032.2U CN215276571U (en) | 2021-01-26 | 2021-01-26 | Desulfurizing tower installation base |
Publications (1)
Publication Number | Publication Date |
---|---|
CN215276571U true CN215276571U (en) | 2021-12-24 |
Family
ID=79530325
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202120217032.2U Active CN215276571U (en) | 2021-01-26 | 2021-01-26 | Desulfurizing tower installation base |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN215276571U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114653186A (en) * | 2022-03-17 | 2022-06-24 | 江苏嘉泰蒸发设备股份有限公司 | Power plant calcium method desulfurization device and method with energy-saving and emission-reducing effects |
-
2021
- 2021-01-26 CN CN202120217032.2U patent/CN215276571U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114653186A (en) * | 2022-03-17 | 2022-06-24 | 江苏嘉泰蒸发设备股份有限公司 | Power plant calcium method desulfurization device and method with energy-saving and emission-reducing effects |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN215276571U (en) | Desulfurizing tower installation base | |
CN110468727B (en) | Temporary prestress tensioning pedestal and lifting point integrated structure of segmental beam and construction method | |
CN210177511U (en) | Foundation ditch steel sheet pile supporting construction | |
WO2023246952A1 (en) | Recyclable cylindrical structure and construction method therefor | |
US20240052744A1 (en) | A device and method for adjusting tunnel support force | |
CN110593559A (en) | Concrete beam formwork supporting device and construction process thereof | |
CN103015718A (en) | Storey-through structural steel fixing support for concrete pump | |
CN214834809U (en) | Template drilling-free clamp | |
CN211396612U (en) | Concrete beam formwork support device | |
CN210858015U (en) | Supporting device for adjusting verticality of single-sided template | |
CN203010022U (en) | Floor crossing type steel fixing support of concrete pump | |
CN206199493U (en) | A kind of wet electrical dust precipitator being easily installed | |
CN211172065U (en) | Shared equipment foundation for multi-pipeline space | |
CN111980300A (en) | Assembled building stand module | |
CN212351821U (en) | Butt joint equipment for pressure vessel pipeline installation | |
CN218148489U (en) | Circular equipment foundation template device | |
CN220468873U (en) | Support changing structure for inner support detachment | |
CN220870296U (en) | PCCP (prestressed concrete cylinder pipe) with inner cladding | |
CN219585711U (en) | Horizontal control device for embedded section of tower crane | |
CN203742200U (en) | Detachable jacking and supporting device | |
CN220768848U (en) | Adjustable inner containment form reinforcing apparatus | |
CN220827827U (en) | Assembled electrochemical energy storage equipment foundation structure adopting steel corbels | |
CN218205677U (en) | Post-cast strip construction formwork | |
CN203008379U (en) | Fixing support of concrete pump pipe | |
CN218540775U (en) | Special well seat of rectangle assembled inspection shaft |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |