CN110593559A - A concrete beam formwork support device and its construction technology - Google Patents

A concrete beam formwork support device and its construction technology Download PDF

Info

Publication number
CN110593559A
CN110593559A CN201910824668.0A CN201910824668A CN110593559A CN 110593559 A CN110593559 A CN 110593559A CN 201910824668 A CN201910824668 A CN 201910824668A CN 110593559 A CN110593559 A CN 110593559A
Authority
CN
China
Prior art keywords
positioning
beam formwork
fixing
supporting
adjustable
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910824668.0A
Other languages
Chinese (zh)
Inventor
刘江
李涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MCC Tiangong Group Tianjin Corp Ltd
Original Assignee
MCC Tiangong Group Tianjin Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC Tiangong Group Tianjin Corp Ltd filed Critical MCC Tiangong Group Tianjin Corp Ltd
Priority to CN201910824668.0A priority Critical patent/CN110593559A/en
Publication of CN110593559A publication Critical patent/CN110593559A/en
Pending legal-status Critical Current

Links

Classifications

    • E—FIXED CONSTRUCTIONS
    • E04—BUILDING
    • E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G13/00—Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills
    • E04G13/04—Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills for lintels, beams, or transoms to be encased separately; Special tying or clamping means therefor
    • E—FIXED CONSTRUCTIONS
    • E04—BUILDING
    • E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G17/00—Connecting or other auxiliary members for forms, falsework structures, or shutterings

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

本发明提供一种混凝土梁模板支撑装置及其施工工艺,包括置于定位部、支撑部、固定部和夹紧部,定位部、固定部和夹紧部均对称设置于梁模板横截面两外侧面处,支撑部置于梁模板下方且平行于梁模板宽度方向设置;定位部靠近梁模板设置,且置于支撑部上方;固定部置于定位部外侧,固定部两端分别与定位部和支撑部连接;夹紧部置于定位部内侧,夹紧部两端分别与定位部和支撑部连接;支撑部与夹紧部倾斜对位设置,且固定部与定位部连接处的位置高于夹紧部与定位部连接处的位置;固定部与支撑部连接处的位置远离梁模板设置,夹紧部与支撑部连接处的位置靠近梁模板设置。本发明设计的支撑装置,结构简单、易于控制且通用性强,可重复使用,成本低。

The invention provides a concrete beam formwork support device and its construction technology, including a positioning part, a support part, a fixing part and a clamping part, and the positioning part, the fixing part and the clamping part are symmetrically arranged on both sides of the cross section of the beam formwork On the side, the supporting part is placed below the beam formwork and set parallel to the width direction of the beam formwork; the positioning part is set close to the beam formwork and placed above the supporting part; the fixing part is placed outside the positioning part, and the two ends of the fixing part are respectively connected with the positioning part and the The supporting part is connected; the clamping part is placed inside the positioning part, and the two ends of the clamping part are respectively connected with the positioning part and the supporting part; The position of the connection between the clamping part and the positioning part; the position of the connection between the fixed part and the support part is set away from the beam formwork, and the position of the connection between the clamping part and the support part is set close to the beam formwork. The support device designed by the invention has a simple structure, is easy to control, has strong versatility, can be used repeatedly, and has low cost.

Description

一种混凝土梁模板支撑装置及其施工工艺A concrete beam formwork support device and its construction technology

技术领域technical field

本发明属于住宅项目建筑工程技术领域,尤其是涉及一种混凝土梁模板支撑装置及其施工工艺。The invention belongs to the technical field of residential project construction engineering, and in particular relates to a concrete beam formwork support device and a construction process thereof.

背景技术Background technique

传统200mm、300mm宽且不大于500mm高梁下侧模支撑多采用钢管或型钢卡具,侧面缺少有效斜向支撑,使梁模板侧面易发生涨模现象以及底部出现漏浆问题。因梁横截面面积较小,使用预制卡件时需分别根据尺寸设置,无法调节,材料需求量大,且过于依赖固定的尺寸,对出现偏差的梁,可调范围窄,安装困难,固定效果较差。The traditional 200mm, 300mm wide and not more than 500mm high beam lower side formwork is mostly supported by steel pipes or steel clamps, and the side lacks effective oblique support, which makes the beam formwork prone to mold swelling on the side and grout leakage at the bottom. Due to the small cross-sectional area of the beam, when using prefabricated clips, they need to be set according to the size respectively, which cannot be adjusted. The demand for materials is large, and it is too dependent on the fixed size. For beams with deviations, the adjustable range is narrow, difficult to install, and the fixing effect poor.

发明内容Contents of the invention

本发明要解决的问题是提供一种混凝土梁模板支撑装置及其施工工艺,尤其适合梁模板横截面高度不超过500mm且宽度在200-300mm内的支撑固定,本发明设计的支撑装置,结构简单、易于控制且通用性强,不仅可减少因传统固定方式对梁模板侧面的支撑不足而导致的涨模问题,而且还可以解决因对梁模板侧面夹紧不足而导致的漏浆问题,避免后期返修,实现支撑装置的多次周转和重复使用,减少施工成本。The problem to be solved by the present invention is to provide a concrete beam formwork supporting device and its construction technology, especially suitable for supporting and fixing the cross-sectional height of the beam formwork not exceeding 500mm and the width within 200-300mm. The supporting device designed by the present invention has a simple structure , Easy to control and strong versatility, not only can reduce the problem of mold expansion caused by insufficient support of the side of the beam formwork by traditional fixing methods, but also can solve the problem of grout leakage caused by insufficient clamping of the side of the beam formwork, avoiding the later stage Rework, realize multiple turnover and repeated use of support devices, and reduce construction costs.

为解决上述技术问题,本发明采用的技术方案是:In order to solve the problems of the technologies described above, the technical solution adopted in the present invention is:

一种混凝土梁模板支撑装置,包括置于定位部、支撑部、固定部和夹紧部,所述定位部、所述固定部和所述夹紧部均对称设置于梁模板横截面两外侧面处,所述支撑部置于所述梁模板下方且平行于所述梁模板宽度方向设置;所述定位部靠近所述梁模板设置,且置于所述支撑部上方;所述固定部置于所述定位部外侧,所述固定部两端分别与所述定位部和所述支撑部连接;所述夹紧部置于所述定位部内侧,所述夹紧部两端分别与所述定位部和所述支撑部连接;所述支撑部与所述夹紧部倾斜对位设置,且所述固定部与所述定位部连接处的位置高于所述夹紧部与所述定位部连接处的位置;所述固定部与所述支撑部连接处的位置远离所述梁模板设置,所述夹紧部与所述支撑部连接处的位置靠近所述梁模板设置。A concrete beam formwork support device, including a positioning part, a support part, a fixing part and a clamping part, and the positioning part, the fixing part and the clamping part are all symmetrically arranged on the two outer surfaces of the cross section of the beam formwork , the support part is placed below the beam formwork and arranged parallel to the width direction of the beam formwork; the positioning part is arranged close to the beam formwork and placed above the support part; the fixing part is placed Outside the positioning part, both ends of the fixing part are respectively connected with the positioning part and the support part; the clamping part is placed inside the positioning part, and both ends of the clamping part are respectively connected with the positioning part part and the support part; the support part and the clamping part are arranged in oblique alignment, and the position of the connection between the fixing part and the positioning part is higher than the connection between the clamping part and the positioning part The position of the connection between the fixing part and the support part is set away from the beam formwork, and the position of the connection between the clamping part and the support part is set close to the beam formwork.

进一步的,所述定位部包括定位板,所述定位板垂直于所述支撑部设置,所述定位板的一端固定设置在所述支撑部的上端面上,另一端竖直悬空设置。Further, the positioning part includes a positioning plate, the positioning plate is arranged perpendicular to the supporting part, one end of the positioning plate is fixedly arranged on the upper end surface of the supporting part, and the other end is vertically suspended.

进一步的,在所述定位板和所述梁模板之间设有若干并行设置的木方,所述木方垂直与所述定位板设置,且所述木方两端分别与所述梁模板外侧面和所述定位板内侧面连接。Further, between the positioning board and the beam formwork, there are several wooden squares arranged in parallel. The side is connected with the inner side of the positioning plate.

进一步的,所述支撑部包括支撑板,所述支撑板的宽度不小于所述定位板的宽度,且所述支撑板的长度大于对称设置的所述定位板之间的横向宽度;所述支撑板相对于所述梁模板竖直中心线对称设置。Further, the support part includes a support plate, the width of the support plate is not smaller than the width of the positioning plate, and the length of the support plate is greater than the transverse width between the symmetrically arranged positioning plates; the support The plates are arranged symmetrically with respect to the vertical centerline of the beam formwork.

进一步的,在所述支撑板与所述梁模板下端面之间设有至少两个所述木方,所述木方垂直于所述梁模板且所述木方对称于所述梁模板竖直中心线设置。Further, there are at least two wooden squares between the support plate and the lower end surface of the beam formwork, the wooden squares are perpendicular to the beam formwork and the wooden squares are vertically symmetrical to the beam formwork. Centerline settings.

进一步的,所述固定部包括对称设置的固定件和第一可调件,所述固定件依次贯穿所述定位部和所述支撑部设置,且与所述定位部和所述支撑部均垂直设置;所述固定件与所述第一可调件首尾可拆卸连接;所述第一可调件分别对称于所述固定件设置。Further, the fixing part includes a symmetrically arranged fixing part and a first adjustable part, and the fixing part is arranged through the positioning part and the supporting part in turn, and is perpendicular to the positioning part and the supporting part Setting; the fixing part is detachably connected with the first adjustable part end to end; the first adjustable part is arranged symmetrically to the fixing part respectively.

进一步的,所述第一可调件与所述定位部连接的位置靠近所述梁模板设置;所述第一可调件与所述支撑部连接的位置远离所述梁模板设置。Further, the position where the first adjustable part is connected to the positioning part is set close to the beam formwork; the position where the first adjustable part is connected to the support part is set away from the beam formwork.

进一步的,所述夹紧部包括所述固定件和第二可调件,所述固定件与所述第二可调件首尾可拆卸连接;所述第二可调件分别对称于所述固定件设置。Further, the clamping part includes the fixing part and a second adjustable part, and the fixing part and the second adjustable part are detachably connected end to end; the second adjustable parts are respectively symmetrical to the fixed parts file settings.

进一步的,所述第二可调件与所述定位部连接的位置远离所述梁模板设置;所述第二可调件与所述支撑部连接的位置靠近所述梁模板设置。Further, the position where the second adjustable member is connected to the positioning portion is set away from the beam formwork; the position where the second adjustable member is connected to the support portion is set close to the beam formwork.

一种混凝土梁模板支撑装置的施工工艺,采用如上任一项所述的支撑装置,步骤如下:A construction process for a concrete beam formwork support device, using the support device described in any one of the above, the steps are as follows:

S1:将所述固定件分别贯穿所述定位部和所述支撑部设置,并使每个所述定位部设有两个所述固定件,所述支撑部上设有四个所述固定件;S1: Install the fixing parts through the positioning part and the supporting part respectively, and make each positioning part be provided with two fixing parts, and the supporting part be provided with four fixing parts ;

S2:将所述支撑部置于竖直设置在脚手架上,并保证所述支撑部水平设置;再将所述定位部对称设置在所述支撑部竖直中心线的两侧,且所述定位部垂直设置在所述支撑部上端面上;S2: Place the support part vertically on the scaffold, and ensure that the support part is horizontally arranged; then arrange the positioning part symmetrically on both sides of the vertical center line of the support part, and the positioning part The part is vertically arranged on the upper end surface of the support part;

S3:依次用所述第一可调件和所述第二可调件将所述定位部和所述支撑部连接在一起,但不完全拧紧固定;S3: Using the first adjustable part and the second adjustable part to connect the positioning part and the supporting part in sequence, but do not completely tighten and fix them;

S4:再根据所述梁模板的宽度调整所述定位部的位置,并固定所述第一可调件的位置,使所述夹紧部分别与所述定位部和所述支撑部固定连接;S4: adjusting the position of the positioning part according to the width of the beam template, and fixing the position of the first adjustable part, so that the clamping part is fixedly connected with the positioning part and the supporting part respectively;

S5:按照混凝土梁的宽度设置所述梁模板的宽度和所述木方的宽度,并将所述木方和所述梁模板依次固定设置在所述定位部和所述支撑部内侧;S5: Setting the width of the beam formwork and the width of the wooden square according to the width of the concrete beam, and fixing the wooden square and the beam formwork on the inside of the positioning part and the support part in sequence;

S6:再调整所述第一可调件,并使所述定位部与所述支撑部连接固定,进而完成所述梁模板的支撑固定。S6: adjusting the first adjustable part again, and connecting and fixing the positioning part with the supporting part, thereby completing the supporting and fixing of the beam formwork.

与现有技术相比,本发明设计的建筑工程混凝土梁模板用支撑装置,尤其适合梁模板横截面高度不超过500mm且宽度在200-300mm内的支撑固定,本发明设计的支撑装置,结构简单、易于控制且通用性强,不仅可减少因传统固定方式对梁模板侧面的支撑不足而导致的涨模问题,而且还可以解决因对梁模板侧面夹紧不足而导致的漏浆问题,避免后期返修,实现支撑装置的多次周转和重复使用,减少施工成本。Compared with the prior art, the supporting device for construction concrete beam formwork designed by the present invention is especially suitable for supporting and fixing the cross-sectional height of the beam formwork not exceeding 500 mm and the width within 200-300 mm. The supporting device designed by the present invention has a simple structure , Easy to control and strong versatility, not only can reduce the problem of mold expansion caused by insufficient support of the side of the beam formwork by traditional fixing methods, but also can solve the problem of grout leakage caused by insufficient clamping of the side of the beam formwork, avoiding the later stage Rework, realize multiple turnover and repeated use of support devices, and reduce construction costs.

附图说明Description of drawings

图1是本发明一实施例的一种混凝土梁模板支撑装置的结构示意图;Fig. 1 is the structural representation of a kind of concrete beam formwork supporting device of an embodiment of the present invention;

图2是本发明一实施例的定位部、固定部和支撑部的俯视图;Fig. 2 is a top view of a positioning part, a fixing part and a supporting part according to an embodiment of the present invention;

图3是本发明一实施例的定位部的结构示意图;Fig. 3 is a schematic structural diagram of a positioning part according to an embodiment of the present invention;

图4是本发明一实施例的支撑部的结构示意图;Fig. 4 is a schematic structural view of a support part according to an embodiment of the present invention;

图5是本发明一实施例的固定件的结构示意图;Fig. 5 is a schematic structural view of a fixing member according to an embodiment of the present invention;

图6是本发明一实施例的第一可调件的结构示意图;Fig. 6 is a schematic structural diagram of a first adjustable member according to an embodiment of the present invention;

图7是本发明一实施例的第二可调件的结构示意图。Fig. 7 is a schematic structural diagram of a second adjustable member according to an embodiment of the present invention.

图中:In the picture:

10、定位部 11、定位板 12、通孔10. Positioning part 11. Positioning plate 12. Through hole

20、支撑部 21、支撑板 22、通孔20. Support part 21. Support plate 22. Through hole

30、固定部 31、固定件 311、固定杆30. Fixing part 31. Fixing piece 311. Fixing rod

312、螺母 32、第一可调件 321、钢板312, nut 32, first adjustable part 321, steel plate

322、螺杆 40、夹紧部 41、第二可调件322, screw rod 40, clamping part 41, second adjustable part

50、木方 60、梁模板 70、顶模板50, wooden square 60, beam formwork 70, top formwork

80、脚手架 90、横梁80. Scaffolding 90. Beam

具体实施方式Detailed ways

下面结合实施例和附图对本发明做进一步说明:Below in conjunction with embodiment and accompanying drawing, the present invention will be further described:

在房屋建筑工程的室内结构中,如图1所示,在房顶部中常有向下凸出的房梁,该房梁的横截面较小,高度一般不超过500mm,宽度在200-300mm之间。但在建造过程中,需要提前搭制梁模板60,以使梁模板60的内部结构与房梁的外壁结构相适配。在房梁的梁模板60的两侧还设有横向的顶模板70,顶模板70与梁模板60一体连接设置。而在实际浇注混凝土之前,顶模板70是通过木方50固定在横梁90上,而横梁90固定在脚手架80上。若直接用固定顶模板70的方式固定梁模板60的方式进行固定,则在梁模板60的侧面会在浇注混凝土过程中出现涨模的问题,而且在梁模板60的下端面会出现漏浆的问题,这样不利于房梁的成型,导致房梁的强度和刚度无法满足要求,严重影响房屋质量。故,需要设计一种梁模板支撑装置,来解决现有技术中出现的涨模和漏浆问题。In the indoor structure of a house construction project, as shown in Figure 1, there is often a downward protruding beam on the roof of the house. The cross section of the beam is small, the height generally does not exceed 500mm, and the width is between 200-300mm . However, during the construction process, the beam formwork 60 needs to be built in advance, so that the internal structure of the beam formwork 60 is compatible with the outer wall structure of the house beam. Horizontal top templates 70 are also provided on both sides of the beam template 60 of the house beam, and the top template 70 is integrally connected with the beam template 60 . Before actually pouring concrete, the top formwork 70 is fixed on the crossbeam 90 through the wooden square 50, and the crossbeam 90 is fixed on the scaffold 80. If the beam formwork 60 is directly fixed in the same way as the top formwork 70 is fixed, there will be a mold expansion problem on the side of the beam formwork 60 during pouring of concrete, and there will be a problem of grout leakage on the lower end surface of the beam formwork 60 , This is not conducive to the forming of the beam, resulting in the strength and stiffness of the beam cannot meet the requirements, seriously affecting the quality of the house. Therefore, it is necessary to design a beam formwork support device to solve the problems of mold expansion and slurry leakage in the prior art.

本发明的一实施例一种混凝土梁模板支撑装置,如图1-2所示,包括置于用于对梁模板60的侧面定位的定位部10、用于对梁模板60的底部及定位部10起支撑作用的支撑部20、以及用于对梁模板60的侧面进行倾斜支撑、夹紧的固定部30和夹紧部40。其中,定位部10、固定部30和夹紧部40均对称设置在梁模板60的横截面两外侧面处,支撑部20设置在梁模板60的正下方且平行于梁模板60的宽度方向设置。定位部10靠近梁模板60设置,且置于支撑部20的上方。固定部30设置在定位部10的外侧,固定部30两端分别与定位部10和支撑部20连接。夹紧部40设置在定位部10的内侧,夹紧部40两端分别与定位部10和支撑部20连接。支撑部20与夹紧部40倾斜对位设置,且固定部30与定位部10连接处的位置高于夹紧部40与定位部10连接处的位置;固定部30与支撑部20连接处的位置远离梁模板60设置,夹紧部40与支撑部20连接处的位置靠近梁模板60设置。One embodiment of the present invention is a concrete beam formwork support device, as shown in Figure 1-2, including a positioning part 10 for positioning the side of the beam formwork 60, a bottom and a positioning part for aligning the beam formwork 60 10 is a supporting part 20 for supporting, and a fixing part 30 and a clamping part 40 for obliquely supporting and clamping the side of the beam formwork 60 . Wherein, the positioning part 10, the fixing part 30 and the clamping part 40 are all arranged symmetrically on the two outer sides of the cross section of the beam formwork 60, and the support part 20 is arranged directly below the beam formwork 60 and parallel to the width direction of the beam formwork 60. . The positioning part 10 is disposed close to the beam template 60 and placed above the supporting part 20 . The fixing part 30 is disposed outside the positioning part 10 , and two ends of the fixing part 30 are respectively connected to the positioning part 10 and the supporting part 20 . The clamping part 40 is disposed inside the positioning part 10 , and two ends of the clamping part 40 are respectively connected to the positioning part 10 and the supporting part 20 . The supporting part 20 and the clamping part 40 are arranged in oblique alignment, and the position of the connection between the fixing part 30 and the positioning part 10 is higher than the position of the connection between the clamping part 40 and the positioning part 10; The position is set away from the beam formwork 60 , and the position where the clamping part 40 connects with the supporting part 20 is set close to the beam formwork 60 .

如图1-3所示,定位部10包括定位板11,用于安装定位梁模板60的侧面位置,相对于梁模板60对称设置,优选地,定位板11为槽钢结构,从图2可看出,定位板11的开口方向远离梁模板60方向设置。定位板11垂直于支撑部20设置,且定位板11的一端固定设置在支撑部20的上端面上,另一端竖直悬空设置。在定位板11上设有两组通孔12,通孔12贯穿定位板11两侧面设置,两组通孔12均为Φ16的孔,且对应于定位板11宽度方向的中心轴线设置,通孔12被固定部30和夹紧部40中的固定件31贯穿设置,目的是使固定部30和夹紧部40对位倾斜地通过定位板10向梁模板60提供侧面支撑,进而可进一步加强梁模板60侧面的支撑力,防止在浇筑混凝土过程中在梁模板60的侧面出现涨模,导致房梁强度不够,影响房屋质量。As shown in Figures 1-3, the positioning part 10 includes a positioning plate 11, which is used to install the side position of the positioning beam formwork 60, and is arranged symmetrically with respect to the beam formwork 60. Preferably, the positioning plate 11 is a channel steel structure, as can be seen from Figure 2 It can be seen that the opening direction of the positioning plate 11 is set away from the direction of the beam template 60 . The positioning plate 11 is arranged perpendicular to the supporting portion 20 , and one end of the positioning plate 11 is fixedly arranged on the upper end surface of the supporting portion 20 , and the other end is vertically suspended. Two groups of through holes 12 are arranged on the positioning plate 11, and the through holes 12 are arranged on both sides of the positioning plate 11. The two groups of through holes 12 are holes of Φ16, and are set corresponding to the central axis of the positioning plate 11 in the width direction. 12 is set through the fixing part 30 and the fixing part 31 in the clamping part 40, the purpose is to make the fixing part 30 and the clamping part 40 provide side support to the beam formwork 60 through the positioning plate 10 in an oblique position, so as to further strengthen the beam The supporting force on the side of the formwork 60 prevents mold expansion from occurring on the side of the beam formwork 60 during the pouring of concrete, resulting in insufficient beam strength and affecting the quality of the house.

进一步的,在定位板11和梁模板60之间设有若干并行设置的木方50,木方50垂直与定位板11设置,且木方50两端分别与梁模板60的外侧面和定位板11的内侧面固定连接,优选地,选用钉子将木方与梁模板60连接在一起,即可满足固定要求又可以重复拆卸多次使用。两侧设置的木方50需对称于梁模板60竖直的中线轴线,且单侧木方50至少设有两个,上部木方50置于定位板11的上顶端位置处,下部的木方50靠近梁模板60下端面设置,保证梁模板60的侧面受力均匀的同时还要保证整体的稳定性。Further, between the positioning board 11 and the beam formwork 60, there are several wooden squares 50 arranged in parallel. The inner side of 11 is fixedly connected. Preferably, nails are used to connect the wooden square and the beam template 60 together, which can meet the fixing requirements and can be repeatedly disassembled and used for many times. The wooden squares 50 arranged on both sides need to be symmetrical to the vertical midline axis of the beam formwork 60, and there are at least two wooden squares 50 on one side. 50 is arranged close to the lower end surface of the beam formwork 60 to ensure that the side of the beam formwork 60 is evenly stressed and at the same time ensure the overall stability.

如图4所示,支撑部20包括水平设置的支撑板21,支撑板21的宽度不小于定位板11的宽度,且支撑板21的长度大于对称设置的定位板11之间的横向宽度,便于定位板11固定安装在支出表21上,使支撑装置更稳固地防止在支撑板21上。支撑板21相对于梁模板60的竖直中心线对称设置。因支撑板21固定在脚手架80上,且两端及中部均受力,故需要强度一致的型材制成,优选地,支撑板21为方钢。在支撑板21的上下端面上设有四组通孔22,且通孔22贯穿上下端面设置,通孔22均为Φ16的孔,且对应于支撑板21宽度方向的中心轴线对称设置。最外侧两组通孔22与固定部30配合使用,最内侧两组通孔22与夹紧部40配合使用。As shown in Figure 4, the support portion 20 includes a support plate 21 arranged horizontally, the width of the support plate 21 is not less than the width of the positioning plate 11, and the length of the support plate 21 is greater than the lateral width between the symmetrical positioning plates 11, which is convenient The positioning plate 11 is fixedly installed on the payment table 21, so that the support device is more firmly prevented from being on the support plate 21. The support plate 21 is arranged symmetrically with respect to the vertical center line of the beam formwork 60 . Since the support plate 21 is fixed on the scaffold 80 and both ends and the middle are stressed, it needs to be made of profiles with consistent strength. Preferably, the support plate 21 is made of square steel. Four sets of through holes 22 are arranged on the upper and lower end surfaces of the support plate 21, and the through holes 22 are set through the upper and lower end surfaces. The outermost two groups of through holes 22 are used in conjunction with the fixing portion 30 , and the innermost two groups of through holes 22 are used in conjunction with the clamping portion 40 .

进一步的,在支撑板21与梁模板60的下端面之间设有至少两个木方50,用于支撑连接梁模板60的下端面,木方50垂直于梁模板60且相对于梁模板60的竖直中心线对称设置,目的是使梁模板60的下端面受力均匀且固定安装稳定。Further, at least two wooden squares 50 are arranged between the support plate 21 and the lower end surface of the beam formwork 60 for supporting the lower end surface of the connecting beam formwork 60, and the wooden squares 50 are perpendicular to the beam formwork 60 and relative to the beam formwork 60 The vertical center line of the beam formwork is arranged symmetrically, and the purpose is to make the lower end surface of the beam formwork 60 be stressed evenly and the fixed installation is stable.

如图5-6,固定部30包括对称设置的固定件31和第一可调件32,第一可调件32分别对称于固定件31设置,且与固定件32垂直。同时,固定件31依次贯穿定位板11和支撑板21设置,且与定位板11和支撑板21均垂直设置。固定件31与第一可调件32为首尾可拆卸连接,即两组固定件31和第一可调件32相互围成一个“口”字型的结构,并贯穿定位板11和支撑板21设置,进而使得固定部30形成一个稳固的方型结构,进一步加固梁模板60的侧面支撑力。As shown in FIGS. 5-6 , the fixing part 30 includes symmetrically arranged fixing parts 31 and first adjustable parts 32 , and the first adjustable parts 32 are arranged symmetrically to the fixing parts 31 and perpendicular to the fixing parts 32 . At the same time, the fixing member 31 is arranged through the positioning plate 11 and the supporting plate 21 in sequence, and is vertically arranged to both the positioning plate 11 and the supporting plate 21 . The fixing part 31 and the first adjustable part 32 are detachably connected end to end, that is, the two sets of fixing parts 31 and the first adjustable part 32 form a "mouth"-shaped structure and run through the positioning plate 11 and the supporting plate 21 setting, so that the fixing part 30 forms a stable square structure, and further strengthens the side supporting force of the beam formwork 60 .

固定件31包括位于中间的固定杆311和固定焊接在固定杆311两端的螺母312,螺母312外端面垂直于固定杆311长度方向设置,固定杆311选用钢筋制成,取材方便且便于加工。在组装过程过程中,先使固定杆311分别贯穿通孔12和通孔22设置,再在固定杆311两端分别焊接螺母312,进而完成固定件31与定位板11和支撑板21的固定连接工作。第一可调件32包括螺杆322和固定焊接在螺杆322一端的钢板321,钢板321垂直于螺杆322设置且钢板321的最小宽度大于螺母312的外径,优选地,钢板321位正方形结构的钢板片,可在工地上取用废铁片加工制作而成。螺杆322的两端均设有外螺纹,与螺母312相适配,在钢板321与远离钢板321外螺纹之间为圆柱形结构;螺杆322远离钢板321一端外螺纹的长度大于靠近钢板321一端外螺纹的长度,目的是使螺杆322与固定件31相互配合的长度尽可能地大,最大限度地增加可调节的范围,使定位板11与支撑板21的连接更加牢固。在本实施例中,钢板321的尺寸为12mm×12mm的钢板片,螺杆322的直径为Φ14mm,当然只要结构类似,都在本发明保护的范围之内。Fixing member 31 comprises fixing rod 311 in the middle and nut 312 fixedly welded on the two ends of fixing rod 311. The outer end surface of nut 312 is perpendicular to the length direction of fixing rod 311. During the assembly process, the fixing rods 311 are respectively set through the through hole 12 and the through hole 22, and then the nuts 312 are respectively welded at both ends of the fixing rod 311, thereby completing the fixed connection between the fixing member 31, the positioning plate 11 and the support plate 21 Work. The first adjustable part 32 includes a screw rod 322 and a steel plate 321 fixedly welded on one end of the screw rod 322. The steel plate 321 is arranged perpendicular to the screw rod 322 and the minimum width of the steel plate 321 is greater than the outer diameter of the nut 312. Preferably, the steel plate 321 is a steel plate with a square structure. Sheets, which can be processed from scrap iron sheets on the construction site. Both ends of the screw rod 322 are provided with external threads, which are compatible with the nut 312, and have a cylindrical structure between the steel plate 321 and the external threads away from the steel plate 321; The purpose of the length of the thread is to make the length of the screw rod 322 and the fixing member 31 cooperate with each other as large as possible, increase the adjustable range to the greatest extent, and make the connection between the positioning plate 11 and the supporting plate 21 more firm. In this embodiment, the size of the steel plate 321 is 12mm×12mm, and the diameter of the screw 322 is Φ14mm. Of course, as long as the structures are similar, they are all within the protection scope of the present invention.

进一步的,第一可调件32与定位板11连接的位置靠近梁模板60设置;第一可调件32与支撑板21连接的位置远离梁模板60设置,即第一可调件32的上端朝向靠近梁模板60的方向设置,下端远离梁模板60的方向设置,且第一可调件32与支撑板21的夹角θ为锐角,当梁模板60的宽度较宽时夹角θ越大,当梁模板60的宽度较小时,夹角θ越小,在此不做具体限定。第一可调件32靠近钢板321的位置置于靠近定位板11的一侧设置,另一可活动的一端靠近支撑板21设置,通过螺母将第一可调件32固定在固定件31上。Further, the position where the first adjustable part 32 is connected to the positioning plate 11 is set close to the beam formwork 60; Set towards the direction close to the beam formwork 60, the lower end is set away from the direction of the beam formwork 60, and the angle θ between the first adjustable member 32 and the support plate 21 is an acute angle, and the greater the angle θ is when the width of the beam formwork 60 is wider , when the width of the beam template 60 is smaller, the smaller the included angle θ is, which is not specifically limited here. The first adjustable part 32 is placed close to the position of the steel plate 321 on one side of the positioning plate 11 , and the other movable end is set close to the support plate 21 , and the first adjustable part 32 is fixed on the fixed part 31 by a nut.

如图5和图7所示,夹紧部40包括固定件31和第二可调件41,固定件31与第二可调件41首尾可拆卸连接且相互垂直设置,第二可调件41分别对称于固定件31设置,固定件31与第二可调件41的连接结构与固定件31与第一可调件32的连接结构一样,在此不再详述。As shown in Fig. 5 and Fig. 7, the clamping part 40 includes a fixing part 31 and a second adjustable part 41, the fixing part 31 and the second adjustable part 41 are detachably connected and arranged perpendicular to each other, the second adjustable part 41 They are arranged symmetrically to the fixing part 31 respectively, and the connection structure between the fixing part 31 and the second adjustable part 41 is the same as the connection structure between the fixing part 31 and the first adjustable part 32 , which will not be described in detail here.

进一步的,第二可调件41为螺杆,首尾设有外螺纹,与螺母312相适配,在相邻外螺纹之间为圆柱形结构;第二可调件41其中一端外螺纹的长度大于另一端外螺纹的长度,目的是最大限度地增加第二可调件41与固定件31相互配合的可调节长度的范围,使定位板11与支撑板21的连接更加牢固。在本实施例中,第二可调件41为的直径为Φ14mm。Further, the second adjustable part 41 is a screw rod, with external threads at the head and tail, adapted to the nut 312, and a cylindrical structure between adjacent external threads; the length of the external thread at one end of the second adjustable part 41 is greater than The purpose of the length of the external thread at the other end is to maximize the range of adjustable lengths in which the second adjustable member 41 cooperates with the fixing member 31 to make the connection between the positioning plate 11 and the supporting plate 21 more firm. In this embodiment, the diameter of the second adjustable member 41 is Φ14mm.

进一步的,对于第二可调件41与固定件31配合的位置而言,第二可调件41与定位件11连接的位置,即第二可调件41的上端部远离梁模板60朝外设置;第二可调件41与支撑件21连接的位置,即第二可调件41的下端部靠近梁模板60朝内设置。第二可调件41与支撑板21的夹角β为锐角,当梁模板60的宽度较宽时夹角β越大,当梁模板60的宽度较小时,夹角β越小。第二可调件41中短外螺纹是靠近定位板11的一侧设置,另一端长外螺纹是靠近梁模板60的设置。在实际安装过程中,将第二可调件41上端面用螺纹连接,再依次从上到下贯穿同侧面的固定件31中的螺母312,再在下端用螺母将第二可调件41固定。Further, for the position where the second adjustable part 41 is matched with the fixing part 31, the position where the second adjustable part 41 is connected to the positioning part 11, that is, the upper end of the second adjustable part 41 is away from the beam formwork 60 and faces outward. Setting; the position where the second adjustable member 41 is connected to the support member 21 , that is, the lower end of the second adjustable member 41 is set close to the beam template 60 and faces inward. The angle β between the second adjustable member 41 and the support plate 21 is an acute angle, and the angle β is larger when the width of the beam formwork 60 is wider, and the angle β is smaller when the width of the beam formwork 60 is smaller. The short external thread in the second adjustable part 41 is provided near one side of the positioning plate 11 , and the long external thread at the other end is provided near the beam template 60 . In the actual installation process, the upper end of the second adjustable part 41 is threaded, and then runs through the nut 312 in the fixing part 31 on the same side from top to bottom, and then the second adjustable part 41 is fixed with a nut at the lower end. .

由图1可以看出,对称设置的定位部40倾斜向外设置,与倾斜向内设置的固定部30是对位设置,进而可知,定位板11在竖直方向上设有两个对位设置的支撑力,其中,位于下端部设置的定位部40可将定位板11倾斜拉向梁模板60方向,使定位板11推着水平放置的木方50向梁模板60靠近,同时使定位板11还受一向下朝支撑板21方向的拉里,使定位板11紧固在支撑板21上,相应地,支撑板21也对竖直设置的木方50对梁模板60的下端面一个向上的推力,进而可完全加固梁模板60侧面和底面之间的配合,防止在浇注混凝土时,梁模板60的下端面出现漏浆的问题。It can be seen from FIG. 1 that the symmetrical positioning portion 40 is arranged obliquely outward, and is aligned with the fixed portion 30 inclined inwardly. It can be seen that the positioning plate 11 is provided with two alignment settings in the vertical direction. The supporting force, wherein, the positioning part 40 located at the lower end can obliquely pull the positioning plate 11 to the direction of the beam formwork 60, so that the positioning plate 11 pushes the horizontally placed wooden square 50 to approach the beam formwork 60, and at the same time makes the positioning plate 11 Also be subjected to pull in a direction downwards towards the support plate 21, the positioning plate 11 is fastened on the support plate 21, correspondingly, the support plate 21 is also upward to the lower end surface of the beam template 60 on the wooden side 50 that is vertically arranged. Thrust, and then can fully strengthen the cooperation between the side and the bottom surface of the beam formwork 60, prevent the problem of grout leakage from the lower end surface of the beam formwork 60 when pouring concrete.

相应地,倾斜向内设置的固定部30对称地给定位板11上端部一个向内的支撑力,且固定部30也拉紧支撑板21靠近定位板11,使得定位板11无论是上段部还是下端部均受到斜面支撑的力进行加固,进而可保证定位板11对梁模板60两侧面的夹紧固定,进而可防止在浇注混凝土过程中侧面出现涨模现象。Correspondingly, the fixed portion 30 arranged obliquely inward symmetrically gives an inward supporting force to the upper end of the positioning plate 11, and the fixed portion 30 also pulls the support plate 21 close to the positioning plate 11, so that the positioning plate 11 is either the upper section or the upper end of the positioning plate. The lower ends are all reinforced by the force of the inclined plane support, so as to ensure that the positioning plate 11 clamps and fixes the two sides of the beam formwork 60, and then prevents mold expansion from occurring on the side during pouring concrete.

本发明中通过对位倾斜设置的可调固定单元30和可调夹紧单元40对梁模板60的侧面和底面进行调节,实现同时满足高度不超过500mm且宽度在200-300mm范围内的小截面梁模板60的支撑固定,不仅可减少因传统固定方式对梁模板60侧面的支撑不足而导致的涨模问题,而且还可以解决因对梁模板60侧面夹紧不足而导致的漏浆问题,避免后期返修,实现支撑装置的多次周转和重复使用,减少施工成本。In the present invention, the side and bottom surfaces of the beam formwork 60 are adjusted through the adjustable fixing unit 30 and the adjustable clamping unit 40 arranged obliquely, so as to realize the small cross-section with a height not exceeding 500mm and a width within the range of 200-300mm at the same time. The support and fixation of the beam formwork 60 can not only reduce the problem of mold expansion caused by insufficient support of the side of the beam formwork 60 by the traditional fixing method, but also solve the problem of grout leakage caused by insufficient clamping of the side of the beam formwork 60, avoiding Later repairs can realize multiple turnover and repeated use of support devices, reducing construction costs.

一种混凝土梁模板支撑装置的施工工艺,采用如上所述的支撑装置,步骤如下:A kind of construction technology of concrete beam formwork supporting device adopts the above-mentioned supporting device, and the steps are as follows:

S1:将固定件31分别贯穿定位部10和支撑部20设置,并使每个定位部10设有两个固定件31,支撑部20上设有四个固定件31。S1: Install the fixing parts 31 through the positioning part 10 and the supporting part 20 respectively, and make each positioning part 10 be provided with two fixing parts 31 , and the supporting part 20 be provided with four fixing parts 31 .

S2:将支撑部20固定放置在竖直设置在脚手架80上,并保证支撑部20水平设置;再将定位部10对称设置在支撑部20竖直中心线的两侧,且定位部10垂直设置在支撑部20的上端面上。S2: Fix the supporting part 20 on the scaffold 80 vertically, and ensure that the supporting part 20 is set horizontally; then set the positioning part 10 symmetrically on both sides of the vertical center line of the supporting part 20, and set the positioning part 10 vertically on the upper end surface of the support portion 20 .

S3:依次用第一可调件32和第二可调件41将定位部10和支撑部20连接在一起,但不完全拧紧固定。S3: Using the first adjustable part 32 and the second adjustable part 41 to connect the positioning part 10 and the supporting part 20 together in sequence, but do not tighten them completely.

S4:再根据梁模板60的宽度调整定位部10的位置,并固定第一可调件32的位置,使夹紧部40分别与定位部10和支撑部20固定连接。S4: Adjust the position of the positioning part 10 according to the width of the beam template 60, and fix the position of the first adjustable part 32, so that the clamping part 40 is fixedly connected with the positioning part 10 and the supporting part 20 respectively.

S5:按照混凝土梁的宽度设置梁模板60的宽度、水平放置木方50的宽度和竖直放置木方50的高度,并将木方50和梁模板60依次固定设置在定位部10和支撑部20的内侧。S5: Set the width of the beam template 60 according to the width of the concrete beam, the width of the wooden cube 50 placed horizontally and the height of the wooden cube 50 placed vertically, and the wooden cube 50 and the beam template 60 are fixed and arranged on the positioning part 10 and the supporting part in sequence 20 inside.

S6:再调整第一可调件32,并使定位部10与支撑部20连接固定,进而完成梁模板60的支撑固定。S6: adjust the first adjustable part 32 again, and connect and fix the positioning part 10 with the support part 20, and then complete the support and fixation of the beam formwork 60.

本技术方案具有如下的优点和有益效果:与现有技术相比,通过对位倾斜设置的可调固定单元和可调夹紧单元对梁模板的侧面和底面进行调节,实现同时满足高度不超过500mm且宽度在200-300范围内的小截面梁模板的支撑固定,不仅可减少因传统固定方式对梁模板侧面的支撑不足而导致的涨模问题,而且还可以解决因对梁模板侧面夹紧不足而导致的漏浆问题,避免后期返修,实现支撑装置的多次周转和重复使用,减少施工成本。This technical solution has the following advantages and beneficial effects: Compared with the prior art, the side and bottom surface of the beam formwork are adjusted through the adjustable fixing unit and the adjustable clamping unit arranged on an inclination in alignment, so as to realize the simultaneous satisfaction of the height not exceeding The support and fixation of small-section beam formwork with a width of 500mm and a width of 200-300 can not only reduce the problem of mold expansion caused by insufficient support for the side of the beam formwork by traditional fixing methods, but also solve the problem of clamping the side of the beam formwork Insufficient grout leakage problem, avoid later repairs, realize multiple turnover and repeated use of support devices, and reduce construction costs.

以上对本发明的实施例进行了详细说明,所述内容仅为本发明的较佳实施例,不能被认为用于限定本发明的实施范围。凡依本发明申请范围所作的均等变化与改进等,均应仍归属于本发明的专利涵盖范围之内。The embodiments of the present invention have been described in detail above, and the content described is only a preferred embodiment of the present invention, and should not be considered as limiting the implementation scope of the present invention. All equivalent changes and improvements made according to the application scope of the present invention shall still belong to the scope covered by the patent of the present invention.

Claims (10)

1. A concrete beam template supporting device is characterized by comprising a positioning part, a supporting part, a fixing part and a clamping part, wherein the positioning part, the fixing part and the clamping part are symmetrically arranged on two outer side surfaces of the cross section of a beam template; the positioning part is arranged close to the beam template and is arranged above the supporting part; the fixing part is arranged on the outer side of the positioning part, and two ends of the fixing part are respectively connected with the positioning part and the supporting part; the clamping part is arranged on the inner side of the positioning part, and two ends of the clamping part are respectively connected with the positioning part and the supporting part; the supporting part and the clamping part are obliquely arranged in an aligned mode, and the position of the joint of the fixing part and the positioning part is higher than the position of the joint of the clamping part and the positioning part; the beam template is arranged on the beam template, and the beam template is arranged on the beam template.
2. A concrete beam formwork support device according to claim 1, wherein the positioning portion includes a positioning plate, the positioning plate is perpendicular to the support portion, one end of the positioning plate is fixedly arranged on the upper end face of the support portion, and the other end of the positioning plate is vertically suspended.
3. A concrete beam formwork support apparatus as claimed in claim 2, wherein a plurality of battens are provided between the positioning plate and the beam formwork in parallel, the battens are perpendicular to the positioning plate, and both ends of the battens are connected to the outer side surface of the beam formwork and the inner side surface of the positioning plate, respectively.
4. A concrete beam formwork support arrangement as claimed in claim 2 or 3, wherein the support portion includes a support plate, the support plate has a width not less than the width of the alignment plates and a length greater than the transverse width between the alignment plates which are symmetrically arranged; the supporting plates are symmetrically arranged relative to the vertical center line of the beam template.
5. A concrete beam formwork support arrangement as claimed in claim 4, wherein at least two said battens are provided between said support plate and said beam formwork lower end surface, said battens being perpendicular to said beam formwork and said battens being symmetrically disposed about said beam formwork vertical centerline.
6. A concrete beam formwork support arrangement according to any one of claims 1 to 3, 5, wherein the fixing portion includes a fixing member and a first adjustable member which are symmetrically arranged, the fixing member is arranged to extend through the positioning portion and the support portion in sequence and to be perpendicular to both the positioning portion and the support portion; the fixed piece is detachably connected with the first adjustable piece end to end; the first adjustable parts are respectively arranged symmetrically to the fixed parts.
7. A concrete beam formwork support arrangement as claimed in claim 6, wherein the first adjustable member is connected to the locating portion at a location adjacent the beam formwork; the first adjustable part is connected with the supporting part at a position far away from the beam template.
8. A concrete beam formwork support arrangement as claimed in claim 7, wherein the clamp portion includes said fixed member and a second adjustable member, the fixed member being releasably connected end to end with the second adjustable member; the second adjustable parts are respectively arranged symmetrically to the fixed parts.
9. A concrete beam formwork support arrangement as claimed in claim 8, wherein the second adjustable member is connected to the locating portion at a location remote from the beam formwork; the second adjustable part is connected with the supporting part and is arranged close to the beam template.
10. A process for constructing a concrete beam formwork support assembly, using a support assembly as claimed in any one of claims 1 to 9, comprising the steps of:
s1: the fixing pieces are respectively arranged by penetrating through the positioning parts and the supporting parts, each positioning part is provided with two fixing pieces, and the supporting parts are provided with four fixing pieces;
s2: the supporting part is vertically arranged on the scaffold, and the supporting part is ensured to be horizontally arranged;
the positioning parts are symmetrically arranged on two sides of the vertical center line of the supporting part, and the positioning parts are vertically arranged on the upper end surface of the supporting part;
s3: the positioning part and the supporting part are connected together by the first adjustable part and the second adjustable part in sequence, but are not screwed and fixed completely;
s4: adjusting the position of the positioning part according to the width of the beam template, and fixing the position of the first adjustable part to ensure that the clamping part is fixedly connected with the positioning part and the supporting part respectively;
s5: setting the width of the beam template and the width of the battens according to the width of the concrete beam, and sequentially and fixedly arranging the battens and the beam template at the inner sides of the positioning part and the supporting part;
s6: and adjusting the first adjustable part, and connecting and fixing the positioning part and the supporting part to further complete the supporting and fixing of the beam template.
CN201910824668.0A 2019-09-02 2019-09-02 A concrete beam formwork support device and its construction technology Pending CN110593559A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910824668.0A CN110593559A (en) 2019-09-02 2019-09-02 A concrete beam formwork support device and its construction technology

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910824668.0A CN110593559A (en) 2019-09-02 2019-09-02 A concrete beam formwork support device and its construction technology

Publications (1)

Publication Number Publication Date
CN110593559A true CN110593559A (en) 2019-12-20

Family

ID=68857280

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910824668.0A Pending CN110593559A (en) 2019-09-02 2019-09-02 A concrete beam formwork support device and its construction technology

Country Status (1)

Country Link
CN (1) CN110593559A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111677321A (en) * 2020-06-04 2020-09-18 江苏文博建筑设计有限公司 Assembled building reinforced structure
CN115929033A (en) * 2022-12-21 2023-04-07 中交路桥建设有限公司 A turnable building masonry structure ring beam formwork fixing device
CN117967036A (en) * 2024-03-21 2024-05-03 山西建筑工程集团有限公司 Template supporting device at joint of superimposed sheet and beam

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR1547697A (en) * 1967-10-18 1968-11-29 Formwork for beams
JPH04174172A (en) * 1990-11-07 1992-06-22 Okabe Co Ltd Support unit of beam mold
CN204357117U (en) * 2014-12-04 2015-05-27 广厦湖北第六建设工程有限责任公司 A kind of after-pouring band beam-slab template and lattice column thereof
CN205348768U (en) * 2015-12-30 2016-06-29 中国建筑第八工程局有限公司 Full adaptive type fixture device of adjustable combination formula
CN106088662A (en) * 2016-06-20 2016-11-09 中国二十二冶集团有限公司 Concrete frame structure Vierendeel girder, superimposed sheet Construction of Supporting method
CN205875714U (en) * 2016-07-19 2017-01-11 中国建筑第六工程局有限公司 A consolidate fixture for retainer plate beam mold board
CN207314839U (en) * 2017-09-19 2018-05-04 北京卓良模板有限公司 A kind of adjustable beam fixture of specification
CN211396612U (en) * 2019-09-02 2020-09-01 中冶天工集团天津有限公司 Concrete beam formwork support device

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR1547697A (en) * 1967-10-18 1968-11-29 Formwork for beams
JPH04174172A (en) * 1990-11-07 1992-06-22 Okabe Co Ltd Support unit of beam mold
CN204357117U (en) * 2014-12-04 2015-05-27 广厦湖北第六建设工程有限责任公司 A kind of after-pouring band beam-slab template and lattice column thereof
CN205348768U (en) * 2015-12-30 2016-06-29 中国建筑第八工程局有限公司 Full adaptive type fixture device of adjustable combination formula
CN106088662A (en) * 2016-06-20 2016-11-09 中国二十二冶集团有限公司 Concrete frame structure Vierendeel girder, superimposed sheet Construction of Supporting method
CN205875714U (en) * 2016-07-19 2017-01-11 中国建筑第六工程局有限公司 A consolidate fixture for retainer plate beam mold board
CN207314839U (en) * 2017-09-19 2018-05-04 北京卓良模板有限公司 A kind of adjustable beam fixture of specification
CN211396612U (en) * 2019-09-02 2020-09-01 中冶天工集团天津有限公司 Concrete beam formwork support device

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111677321A (en) * 2020-06-04 2020-09-18 江苏文博建筑设计有限公司 Assembled building reinforced structure
CN111677321B (en) * 2020-06-04 2021-10-08 江苏文博建筑设计有限公司 Assembled building reinforced structure
CN115929033A (en) * 2022-12-21 2023-04-07 中交路桥建设有限公司 A turnable building masonry structure ring beam formwork fixing device
CN117967036A (en) * 2024-03-21 2024-05-03 山西建筑工程集团有限公司 Template supporting device at joint of superimposed sheet and beam
CN117967036B (en) * 2024-03-21 2024-06-04 山西建筑工程集团有限公司 Template supporting device at joint of superimposed sheet and beam

Similar Documents

Publication Publication Date Title
CN202731297U (en) Adjustable beam form support jacking bracket apparatus
CN217924842U (en) Adjustable support-free truss for steel structure cast-in-place floor
CN106592775A (en) High-precision embedded part reinforcing and mounting device and method and purpose
CN113685024A (en) Frame post template strutting arrangement
CN111877755B (en) Device and method for supporting corner formwork during secondary concrete pouring at the intersection of precast beams and slabs
CN214090989U (en) Adjustable beam template fixing device
CN112696012A (en) Wall column template device capable of being spliced
CN212385315U (en) Positioning device for assembling cross steel pull rod
CN210888099U (en) Platform beam auxiliary mounting device of platform is encorbelmented in opposite directions in narrow space
CN214834809U (en) A formwork-free jig
CN110017141A (en) A kind of ultra-deep shaft concrete ring grid beam quick template supporting system and its construction method
CN212129218U (en) A single-sided formwork support system for basement exterior walls
CN220451464U (en) Steel bar truss floor carrier plate positioning device
CN211396612U (en) Concrete beam formwork support device
CN221896034U (en) A building decoration ceiling assembly transfer layer installation system
CN102031869A (en) Horizontal template steel structure bracket
CN112443159A (en) Template tapping-free clamp and construction method thereof
CN220828037U (en) Truss floor carrier plate supporting structure
CN103195079B (en) Installing type template, installing type template group and complete installing type plate device
CN218374447U (en) Assembled ring beam and constructional column connection structure
CN218668507U (en) Steel bar truss floor support plate supporting structure
CN111042519B (en) An early dismantling system for floor formwork containing beam and slab structure buildings
CN223104123U (en) A super-high frame column formwork system
CN209194588U (en) A steel formwork for the side wall of a subway station
CN210122816U (en) Be used for assembled coincide floor bottom plate board seam template reinforcing apparatus

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20191220

RJ01 Rejection of invention patent application after publication