CN206199493U - A kind of wet electrical dust precipitator being easily installed - Google Patents
A kind of wet electrical dust precipitator being easily installed Download PDFInfo
- Publication number
- CN206199493U CN206199493U CN201621187591.9U CN201621187591U CN206199493U CN 206199493 U CN206199493 U CN 206199493U CN 201621187591 U CN201621187591 U CN 201621187591U CN 206199493 U CN206199493 U CN 206199493U
- Authority
- CN
- China
- Prior art keywords
- easily installed
- positive plate
- wet electrical
- centrum
- deduster
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Electrostatic Separation (AREA)
Abstract
The utility model provides a kind of wet electrical dust precipitator being easily installed, including dust remover roof centrum, the positive plate module with cathode line, deduster pedestal, the positive plate module upper end is connected with dust remover roof centrum, positive plate module lower end is connected with deduster pedestal, forms multisection type combining structure.Using said structure, during design and installation, first three modules each can be assembled, docked again, can be attached using bolt, welding or other fastening means between three modules, it is preferred to use detachable connection, to carry out part replacement or maintenance, reduces cost.
Description
Technical field
The utility model belongs to industrial dedusting equipment technical field, and in particular to a kind of wet-esp being easily installed
Device.
Background technology
Existing industrial wet electrical dust precipitator installs complexity and required precision is high because bulky, causes wet type electricity to remove
The installation of dirt device equipment, the time required for either mounting cost is still installed, in whole equipment expense and equipment construction week
Occupy very big ratio in phase.Traditional wet electrical dust precipitator is tubular structure, and mounting process process includes:Foundation of civil work is poured
Build, steel bracket install, ash bucket install, housing install, back timber install, positive plate install, negative electrode install, import and export loudspeaker install,
Internal Anticorrosion Construction, water system install ten big main installation steps, and installation process bottom to top is the mistake of progressive accumulation
Journey, whole installation period is long.The installation of conventional cathode line is, it is necessary to shell of dust remover, positive plate, cathode hanger are installed
Afterwards, inside workman's access arrangement, cathode line is inserted into the connection in passage one by one, in the vertical direction installation operation is not square
Just, and increased set-up time and cost of labor.
Utility model content
The deficiencies in the prior art in view of the above, the purpose of this utility model is to provide a kind of wet type being easily installed
Electric cleaner, forms Split modular structure, is easy to in-site installation.
In order to achieve the above objects and other related objects, the technical solution of the utility model is as follows:
A kind of wet electrical dust precipitator being easily installed, including dust remover roof centrum, the positive plate module with cathode line, remove
Dirt device base, the positive plate module upper end is connected with dust remover roof centrum, and positive plate module lower end connects with deduster pedestal
Connect, form multisection type combining structure.
Using said structure, during design and installation, first three modules each can be assembled, then carry out it is right
Connect, can be attached using bolt, welding or other fastening means between three modules, it is preferred to use detachable connection, with
Just part replacement or maintenance, reduces cost are carried out.
As preferred:The positive plate module is connected with dust remover roof centrum and deduster pedestal by flange.
As preferred:The positive plate module is made up of multiple independent submodule groups, and flue gas is provided with each submodule group
Circulation passage, correspondence is provided with cathode line in each passage.
As preferred:The positive plate module is formed by connecting by circumferentially distributed multiple submodule groups, the submodule group
Upper and lower side is connected with dust remover roof centrum and deduster pedestal respectively.
As preferred:The upper and lower side of the submodule group is provided with terminal pad with holes, and the outside pipeline section of the submodule group is branch
Support wallboard, the support wallboard is connected between upper and lower abutted flange.
As preferred:The cathode line is through the passage of positive plate module, and it is solid that cathode line upper and lower side is connected to first
Determine on part and the second fixture, first fixture is connected with the Intrapyramidal cathode hanger device of dust remover roof.
As preferred:First fixture and the second fixture are angle steel with holes, and cathode line upper and lower side is gone here and there respectively
Connection is fixed;First fixture is bolted or welds with cathode hanger device.
As preferred:Described dust remover roof centrum includes exhanst gas outlet cone section, heat-preserving container and hold-down support, heat-preserving container
And hold-down support and exhanst gas outlet cone section welding;Shower, cathode hanger device are provided with dust remover roof centrum, negative electrode hangs
Hang device is connected with heat-preserving container;Manhole door and explosion venting valve are provided with exhanst gas outlet cone section.
As preferred:It is provided with the deduster pedestal in inlet air stack, explosion venting valve and manhole, deduster pedestal and is set
There are airflow uniform distribution plate, dash vertebral plate, dash swash plate and drainpipe, the inlet air stack enters from deduster pedestal outer horizontal,
And 90 ° are transferred in the middle part of dash swash plate vertically into bottom support inside;Dash vertebral plate is arranged on inlet air stack top, the gas
Stream uniform board is arranged on dash swash plate and dash vertebral plate top, and the drainpipe is arranged on dash swash plate lower section.
As preferred:To strengthen supporting plate, deduster pedestal top is provided with matches the dust remover side wall with positive plate
Flange and seal.
As described above, the beneficial effects of the utility model are:The deduster is easily installed and transports, can be by traditional ten
Big installation steps be reduced to foundation of civil work pour, deduster pedestal, the positive plate module with cathode line, dust remover roof centrum four
Big step, is connected by lifting and flange, reduces installation period;Multiple independent cellular positive plate submodule groups, that is, make simultaneously
Supporting plate, but when being damaged as exhaust gases passes, and exhaust gases passes, it is only necessary to local replacing, reduce maintenance cost.
Brief description of the drawings
Fig. 1 is the structural representation of the utility model embodiment;
Fig. 2 is dust remover roof vertebral body structure schematic diagram in the utility model embodiment;
Fig. 3 is the structural representation of deduster pedestal in the utility model embodiment
Fig. 4 is the positive plate modular structure schematic diagram with cathode line in the utility model embodiment;
Fig. 5 is the structural representation of the utility model embodiment Anodic template die group;
Fig. 6 is the structural representation of the utility model embodiment Anodic plank module;
Fig. 7 is the mounting structure schematic diagram of cathode line in the utility model embodiment.
Piece mark explanation:
1 dust remover roof centrum
11 exhanst gas outlets bore section
12 heat-preserving containers
13 flanges
14 showers
15 cathode hanger devices
2 positive plate modules
21 outside pipeline sections
22nd, 23 terminal pad
24 flue gas circulation passages
3 deduster pedestals
31 inlet air stacks
32 supporting side walls
33 airflow uniform distribution plates
34 dash vertebral plates
35 dash swash plates
36 drainpipes
37 flanges
4 cathode lines
41 first fixtures
42 second fixtures
51 explosion venting valves
52 manholes
Specific embodiment
Implementation method of the present utility model is illustrated by particular specific embodiment below, those skilled in the art can be by this
Content disclosed by specification understands other advantages of the present utility model and effect easily.
Embodiment 1
As shown in Figure 1 to Figure 3, a kind of wet electrical dust precipitator being easily installed, including the deduster top for setting gradually up and down
Portion centrum 1, the positive plate module 2 with cathode line 4,3 three modules of deduster pedestal, the upper end of positive plate module 2 and deduster top
Portion centrum 1 connects, and the lower end of positive plate module 2 is connected with deduster pedestal 3, segmented combining structure is formed, in design and installation
During, first three modules each can be assembled, then docked, bolt can be used between three modules, is welded or it
He is attached fastening means, it is preferred to use detachable connection, to carry out part replacement or maintenance, reduces cost.
Further referring to Fig. 2, the upper and lower side of positive plate module 2 is arranged with steel abutted flange, dust remover roof centrum 1
Bottom and the top of deduster pedestal 3 are also equipped with adpting flange 13,37, the upper end of positive plate module 2 and the bottom of dust remover roof centrum 1
Portion is connected by flange;The lower end of positive plate module 2 is connected with the top of deduster pedestal 3 by flange.The structure make three parts it
Between formed modular attachment structure.
For the ease of the transport and assembling of positive plate module 2, positive plate module 2 is made up of multiple independent submodule groups, often
Flue gas circulation passage 24 is provided with individual sub- module, correspondence is provided with cathode line 4 in each passage 24.
In one embodiment, positive plate module 2 can be made up of the multiple submodule groups being vertically distributed, in another implementation
In mode, positive plate module 2 is formed by connecting by circumferentially distributed multiple submodule groups, and the upper and lower side of submodule group is provided with holes
Terminal pad 22,23, the upper and lower side of each submodule group by terminal pad 22,23 respectively with dust remover roof centrum 1 and deduster bottom
Seat 3 connect, all of submodule group be combined into it is cylindric, can by welding or other modes connect and to form whole positive plate module
2, as shown in Figure 5 and Figure 6.The structure can realize the installation and removal of single submodule group, be easy to repair and change, and submodule
Group is all directly coupled between deduster pedestal 3 and dust remover roof centrum 1, and whole positive plate module is not interfered with during dismounting
2, it is easy to operate.Positive plate module 2 is arranged to multiple submodule groups and is also convenient for transport, reduce assembly difficulty.
Further, in this example, positive plate module 2 is by 4 separate 90 ° fan-shaped section positive plate submodule bond pads
Into positive plate submodule group flue gas circulation passage 24 is hexagon loose structure, in corresponding anode board channel 24, installs negative electrode
Line 4 (cathodic discharge pole), the steel terminal pad 22,23 of the upper and lower side of positive plate submodule group constitutes abutted flange;90 ° of fan-shaped section sun
Pipeline section 21 is the support wallboard for thickening on the outside of pole plate submodule group, and support wallboard is connected to and is vertically connected between disk 22,23, plays branch
Support and the effect of protection, positive plate module 2 use high strength steel.In other embodiment, positive plate module 2 can be by 2-10 son
Module is constituted.
As shown in figs. 4 and 7, cathode line 4 passes through the passage 24 of positive plate module 2, the upper and lower side of cathode line 4 to be connected to
On first fixture 41 and the second fixture 42, the cathode hanger device 15 in the first fixture 41 and dust remover roof centrum 1
Connection.The upper end of cathode line 4 is connected and fixed by the first fixture 41, and the lower end of cathode line 4 is connected and fixed by the second fixture 42.This example
In, first fixture 41 is bolted or welds with cathode hanger device 15, and the first fixture 41 and second is fixed
Part 42 is preferably angle steel with holes.Traditional cathode line is installed, it is necessary to shell of dust remover, positive plate, cathode hanger are installed
Bi Hou, inside workman's access arrangement, connection one by one in passage is inserted by cathode line, increased the set-up time and it is artificial into
This.And using the structure of this deduster, cathode line can just be installed before positive plate module is lifted, specifically, by sun
After pole plate submodule group is assembled into positive plate module, positive plate module is laterally disposed, and cathode line is worn in the horizontal direction, is worn
If after the completion of by cathode line two ends respectively by angle steel concatenate fix, finally just by the positive plate module integral hoisting with cathode line
Docked by flange on to deduster pedestal, the first fixture 41 is connected with cathode hanger device 15 by fastener, lifted
The angle steel (the first fixture 41) of cathode line upper end can prevent cathode line from dropping in journey.Said structure, simplifies the peace of cathode line
Dress, substantially reduces the set-up time.
As depicted in figs. 1 and 2, dust remover roof centrum 1 includes exhanst gas outlet cone section 11, heat-preserving container 12 and hold-down support,
Heat-preserving container 12 and hold-down support are welded with exhanst gas outlet cone section 11;Shower 14, negative electrode is provided with dust remover roof centrum 1 to hang
Hang device 15, cathode hanger device 15 is connected by bolt with heat-preserving container 12;Exhanst gas outlet cone section 11 on be provided with manhole 52 and
Explosion venting valve 51.
As shown in figures 1 and 3, inlet air stack 31, explosion venting valve 51 and manhole 52, deduster are provided with deduster pedestal 3
It is provided with airflow uniform distribution plate 33, dash vertebral plate 34, dash swash plate 35 and drainpipe 36 in base 3, inlet air stack 31 is from deduster
The outer horizontal of base 3 enters, and internal vertically into bottom support in 90 ° of the middle part of dash swash plate 35 turnover;Dash vertebral plate 34 sets
Put on the top of inlet air stack 31, a number of aperture is provided with dash vertebral plate 34, two-layer airflow uniform distribution plate 33 is arranged on dash
Swash plate 35 and the top of dash vertebral plate 34, between 40~60%, drainpipe 36 is arranged on dash to the percent opening of airflow uniform distribution plate 33
The lower section of swash plate 35.The supporting side walls 32 of deduster pedestal 3 are provided with and sun using support wallboard, the top of deduster pedestal 3 is thickeied
The steel flanges 37 and seal of pole plate pairing.
Whole wet electrical dust precipitator is spliced by 3 modules, and wherein deduster pedestal 3 is connected with concrete foundation,
Positive plate module 2 with cathode line 4 is connected by flange in the bottom with deduster pedestal 3, and by top flange and deduster top
Portion centrum 1 is connected, finally, by cathode line 4 with cathode hanger device 15 is by bolt or is welded to connect.
The deduster is easily installed and transports, and deduster is arranged into modular mode, convenient maintenance and replacement, specific body
Now:It is pre-assembled to apparatus body in factory, check machining accuracy;Main parts size is splitted into automobile afterwards transportable
Size, re-assemblies and completes wet electrical dust precipitator integral installation to job site.Deduster internal anode plate (consumable accessory) is received
During damage, impaired submodule (positive plate is divided into four submodules) can be changed by lifting, easy to maintenance and reduction maintenance cost.
Any person skilled in the art all can be under without prejudice to spirit and scope of the present utility model, to above-described embodiment
Carry out modifications and changes.Therefore, such as those of ordinary skill in the art without departing from disclosed in the utility model
Spirit and all equivalent modifications for being completed under technological thought or change, should be contained by claim of the present utility model
Lid.
Claims (10)
1. a kind of wet electrical dust precipitator being easily installed, it is characterised in that:Including dust remover roof centrum, the anode with cathode line
Template die group, deduster pedestal, the positive plate module upper end are connected with dust remover roof centrum, positive plate module lower end and dedusting
Device base is connected, and forms multisection type combining structure.
2. a kind of wet electrical dust precipitator being easily installed according to claim 1, it is characterised in that:The positive plate module
It is connected by flange with dust remover roof centrum and deduster pedestal.
3. a kind of wet electrical dust precipitator being easily installed according to claim 1, it is characterised in that:The positive plate module
It is made up of multiple independent submodule groups, flue gas circulation passage is provided with each submodule group, correspondence is provided with the moon in each passage
Polar curve.
4. a kind of wet electrical dust precipitator being easily installed according to claim 3, it is characterised in that:The positive plate module
Be formed by connecting by circumferentially distributed multiple submodule groups, the upper and lower side of the submodule group respectively with dust remover roof centrum and dedusting
Device base is connected.
5. a kind of wet electrical dust precipitator being easily installed according to claim 3 or 4, it is characterised in that:The submodule group
Upper and lower side be provided with terminal pad with holes, the outside pipeline section of the submodule group is support wallboard, and the support wallboard is connected to
Between lower abutted flange.
6. a kind of wet electrical dust precipitator being easily installed according to claim 1, it is characterised in that:The cathode line is passed through
The passage of positive plate module, cathode line upper and lower side is connected on the first fixture and the second fixture, and described first fixes
Part is connected with the Intrapyramidal cathode hanger device of dust remover roof.
7. a kind of wet electrical dust precipitator being easily installed according to claim 6, it is characterised in that:First fixture
It is angle steel with holes with the second fixture, cathode line upper and lower side is connected fixation respectively;First fixture and cathode hanger
Device is bolted or welds.
8. a kind of wet electrical dust precipitator being easily installed according to claim 1, it is characterised in that:Described deduster top
Portion centrum includes exhanst gas outlet cone section, heat-preserving container and hold-down support, heat-preserving container and hold-down support and exhanst gas outlet cone section welding;Remove
Shower, cathode hanger device are provided with the centrum of dirt device top, cathode hanger device is connected with heat-preserving container;Exhanst gas outlet bores section
On be provided with manhole door and explosion venting valve.
9. a kind of wet electrical dust precipitator being easily installed according to claim 1, it is characterised in that:The deduster pedestal
On be provided with inlet air stack, explosion venting valve and manhole, airflow uniform distribution plate, dash vertebral plate, dash swash plate are provided with deduster pedestal
And drainpipe, the inlet air stack from deduster pedestal outer horizontal enter, and in the middle part of dash swash plate transfer 90 ° vertically into
Bottom support is internal;Dash vertebral plate is arranged on inlet air stack top, and the airflow uniform distribution plate is arranged on dash swash plate and dash vertebra
Plate top, the drainpipe is arranged on dash swash plate lower section.
10. a kind of wet electrical dust precipitator being easily installed according to claim 1 or 9, it is characterised in that:The deduster
To strengthen supporting plate, deduster pedestal top is provided with the flange and seal matched with positive plate to side wall.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621187591.9U CN206199493U (en) | 2016-11-04 | 2016-11-04 | A kind of wet electrical dust precipitator being easily installed |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621187591.9U CN206199493U (en) | 2016-11-04 | 2016-11-04 | A kind of wet electrical dust precipitator being easily installed |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206199493U true CN206199493U (en) | 2017-05-31 |
Family
ID=58758005
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621187591.9U Expired - Fee Related CN206199493U (en) | 2016-11-04 | 2016-11-04 | A kind of wet electrical dust precipitator being easily installed |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206199493U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106269255A (en) * | 2016-11-04 | 2017-01-04 | 中冶赛迪工程技术股份有限公司 | A kind of wet electrical dust precipitator being easily installed |
-
2016
- 2016-11-04 CN CN201621187591.9U patent/CN206199493U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106269255A (en) * | 2016-11-04 | 2017-01-04 | 中冶赛迪工程技术股份有限公司 | A kind of wet electrical dust precipitator being easily installed |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101829470B (en) | Construction technique of electric bag compound type dust remover | |
CN206199493U (en) | A kind of wet electrical dust precipitator being easily installed | |
CN106269255B (en) | A kind of wet electrical dust precipitator being easily installed | |
CN107416685B (en) | Installation of gas pipeline construction method and its supporting structure on the downside of a kind of bridge | |
CN208561474U (en) | The beehive type electrode dedusting demister of delamination modularization | |
CN109958819A (en) | A kind of gas pipeline laying method and its supporting structure | |
CN215276571U (en) | Desulfurizing tower installation base | |
CN105781159A (en) | Construction process for reinforced concrete coal hopper of power plant main building | |
CN208981357U (en) | A kind of module type concrete inspection shaft | |
CN209815472U (en) | Prefabricated cabin hoisting structure | |
CN105953599A (en) | Construction method of condenser | |
CN102392550A (en) | Reverse installation method for flue gas desulfurization and absorption tower | |
CN109573835B (en) | Layered modularized honeycomb electrode dust and mist remover | |
CN206607965U (en) | The isolation curtain wall that a kind of use modularization is installed | |
CN213516217U (en) | Concrete pipeline leakproofness detection device | |
CN207034530U (en) | A kind of dismountable foundation bolt box device | |
CN109570996B (en) | Layered modular installation construction method for honeycomb type electrode dust removal demister | |
CN218608494U (en) | Integrated easy-to-overhaul air purifying chamber applied to electrolytic flue gas purification system | |
CN109853974A (en) | Air bearing membrane system for foundation pit operation and construction method thereof | |
CN219906746U (en) | Temporary fixing device for anti-seismic device of crane | |
JPH08144334A (en) | Piping unit and its work execution | |
CN213709615U (en) | Prefabricated cabinet foundation | |
CN219548346U (en) | Water turbine spindle dismounting platform | |
CN103752243A (en) | Carbonization tower on-site assembling construction method | |
CN111266856B (en) | Bulb head and cone hoisting method of bulb tubular water turbine generator set |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170531 Termination date: 20191104 |
|
CF01 | Termination of patent right due to non-payment of annual fee |