CN215254653U - Foundation pit operation all-in-one machine - Google Patents

Foundation pit operation all-in-one machine Download PDF

Info

Publication number
CN215254653U
CN215254653U CN202121178793.8U CN202121178793U CN215254653U CN 215254653 U CN215254653 U CN 215254653U CN 202121178793 U CN202121178793 U CN 202121178793U CN 215254653 U CN215254653 U CN 215254653U
Authority
CN
China
Prior art keywords
control cabinet
air
blower
rod
foundation pit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202121178793.8U
Other languages
Chinese (zh)
Inventor
李强
周勇
武勇
徐红强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Loudi Huaxing Power Machinery Co ltd
Original Assignee
Loudi Huaxing Power Machinery Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Loudi Huaxing Power Machinery Co ltd filed Critical Loudi Huaxing Power Machinery Co ltd
Priority to CN202121178793.8U priority Critical patent/CN215254653U/en
Application granted granted Critical
Publication of CN215254653U publication Critical patent/CN215254653U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The utility model discloses a foundation ditch operation all-in-one, this device include pylon, electric block, air-blower, gaseous detector, the warning light of combination formula, pylon structural strength is big, satisfies transportation, installation demand, electric block operation convenient to use can provide the heavy object lifting function, air-blower and gaseous detector can carry out real-time analysis to job site air quality to with the air-blower linkage, guarantee the security of construction environment air quality, gaseous detection device still is equipped with the data of the thing networking and uploads the function simultaneously, can carry out remote information sharing and control with equipment such as cell-phones, improve the convenience of using.

Description

Foundation pit operation all-in-one machine
Technical Field
The utility model relates to a foundation ditch operation technical field specifically indicates a foundation ditch operation all-in-one.
Background
The operation of the foundation pit is an important process in the construction engineering, but during the operation of the foundation pit, a heavy wellhead support is usually adopted to cooperate with manpower to control a winch frame or a small-sized winch to carry materials, meanwhile, in the operation of the foundation pit, in order to ensure the safety of operators, the content of oxygen and harmful gas in the foundation pit needs to be detected in time, at present, it is common that constructors carry a gas detection alarm device with them, and the materials are evacuated after the oxygen is insufficient or the harmful gas exceeds the standard, so that the safety controllability is greatly reduced.
SUMMERY OF THE UTILITY MODEL
The to-be-solved technical problem of the utility model is to overcome the defect of above-mentioned technique, provide a foundation ditch operation all-in-one.
In order to solve the technical problem, the utility model provides a technical scheme is a foundation ditch operation all-in-one, including pylon, electric block, electric drum, electrical control cabinet, instrument control cabinet and air-blower, the pylon includes bracing piece, horizontal pole, montant and installation pole, the bracing piece bottom is equipped with the fixed plate that is used for fixed pylon, the montant is located the bracing piece top, be equipped with swing joint's first mounting bracket on the installation pole, first mounting bracket both ends are equipped with buckle structure, first mounting bracket passes through buckle structure and installs on the installation pole, first mounting bracket and electric block fixed connection, be equipped with second mounting bracket and hanging point on the horizontal pole, second mounting bracket both ends are equipped with buckle structure, the second mounting bracket passes through buckle structure and installs on two different horizontal poles, be equipped with electric drum, electrical control cabinet on the second mounting bracket, Instrument switch board and air-blower, the electrical control cabinet output respectively with electric block, instrument switch board, air-blower electric connection, the instrument switch board opens through the instrument line to the air-blower and stops control.
Further, electric block includes reel, wire rope one end is equipped with the connecting plate, the connecting plate bottom is equipped with the couple.
Further, the hanging points can be used for fixing a rope ladder or a descent control device.
Furthermore, the supporting rods are connected with the cross rods in an inserting mode, and the vertical rods are connected with the mounting rods through inserting structures.
Furthermore, one end of the air blower is provided with an air outlet used for being connected with an air supply hose.
Further, the top of the instrument control cabinet is provided with a warning lamp, and the bottom of the instrument control cabinet is provided with a connector for connecting a gas detector.
Further, the gas detector has the function of uploading data of the Internet of things.
Compared with the prior art, the utility model the advantage lie in: this device is including pylon, electric block, air-blower, gaseous detector, the warning light of combination formula, pylon structural strength is big, satisfies transportation, installation demand, electric block operation convenient to use can provide heavy object lifting function, air-blower and gaseous detector can carry out real-time analysis to job site air quality to with the air-blower linkage, guarantee the security of construction environment air quality, gaseous detection device still is equipped with the data of thing networking and uploads the function simultaneously, can carry out remote information sharing and control with equipment such as cell-phones, improve the convenience of using.
Drawings
Fig. 1 is a front view of the integrated foundation pit operation machine of the present invention;
fig. 2 is an enlarged view of a partial structure in fig. 1 of the foundation pit operation all-in-one machine of the present invention;
FIG. 3 is a perspective view of the integrated foundation pit operation machine of the present invention;
fig. 4 is the utility model relates to an air-blower structure sketch map of foundation ditch operation all-in-one.
As shown in the figure: 1. the tower, 101, bracing piece, 102, horizontal pole, 103, montant, 104, installation pole, 2, fixed plate, 3, first mounting bracket, 4, hang some, 5, electric block, 6, couple, 7, second mounting bracket, 8, electric drum, 9, electrical control cabinet, 10, instrument control cabinet, 11, air-blower, 12, supply-air outlet, 13, connector, 14, warning light.
Detailed Description
The following description is made in detail with reference to the accompanying drawings for a foundation pit operation all-in-one machine of the present invention.
With reference to fig. 1-4, the foundation pit operation all-in-one machine comprises a tower frame 1, an electric hoist 5, an electric drum 8, an electric control cabinet 9, an instrument control cabinet 10 and an air blower 11, wherein the tower frame 1 comprises a support rod 101, a cross rod 102, a vertical rod 103 and an installation rod 104, a fixing plate 2 for fixing the tower frame 1 is arranged at the bottom of the support rod 101, the vertical rod 103 is positioned at the top of the support rod 101, a first mounting frame 3 which is movably connected is arranged on the installation rod 104, buckling structures are arranged at two ends of the first mounting frame 3, the first mounting frame 3 is arranged on the installation rod 104 through the buckling structures, the first mounting frame 3 is fixedly connected with the electric hoist 5, a second mounting frame 7 and hanging points 4 are arranged on the cross rod 102, buckling structures are arranged at two ends of the second mounting frame 7, the second mounting frame 7 is arranged on two different cross rods 102 through the buckling structures, be equipped with on the second mounting bracket 7 electric drum 8, electrical control cabinet 9, instrument control cabinet 10 and air-blower 11, 9 output terminals of electrical control cabinet respectively with electric block 5, instrument control cabinet 10, 11 electric connection of air-blower, instrument control cabinet 10 opens through instrument line to air-blower 11 and stops control.
As a preferred embodiment of this embodiment, the electric hoist 5 includes a winding drum and a steel wire rope, one end of the steel wire rope is provided with a connecting plate, and the bottom end of the connecting plate is provided with a hook 6.
As a preferred embodiment of this embodiment, the hanging point 4 can be used for fixing a rope ladder or a descent control device.
In the preferred embodiment of the present invention, the supporting rod 101 is connected to the cross rod 102 by a plug-in connection, and the vertical rod 103 is connected to the mounting rod 104 by a plug-in connection.
As a preferred embodiment of the present embodiment, an air outlet 12 for connecting an air supply hose is provided at one end of the blower 11.
As a preferred embodiment of this embodiment, a warning light 14 is disposed on the top of the instrument control cabinet 10, and a connection port 13 for connecting a gas detector is disposed on the bottom of the instrument control cabinet 10.
As a preferred embodiment of this embodiment, the gas detector has a function of uploading data of the internet of things.
As a preferred embodiment of this embodiment, the bottom of the supporting rod 101 is provided with a supporting net plate for strengthening the supporting function.
When the device is used in concrete implementation, the tower frame 1 is fixed above a foundation pit through the fixing plate 2, the supporting rod 101 is connected with the cross rod 102 through a plug, the vertical rod 103 is connected with the mounting rod 104 through a plug structure, the device has high structural strength, meets the requirements of site construction, and simultaneously is used for further strengthening the structural strength of the support, and the bottom of the supporting rod 101 is provided with a supporting screen plate for strengthening the support function; the electric hoist 5 is mounted on the mounting rod 104 through the first mounting frame 3, the two ends of the first mounting frame 3 are provided with the buckle structures, the first mounting frame 3 is mounted on the mounting rod 104 through the buckle structures, the electric hoist 5 comprises a winding drum and a steel wire rope, one end of the steel wire rope is provided with a connecting plate, the bottom end of the connecting plate is provided with the hook 6, the electric hoist 5 is provided with the control handle, and the electric hoist is simple to operate and convenient to use and has a protection function of power-off braking; the second mounting frame 7 is provided with an electric drum 8, an electric control cabinet 9, an instrument control cabinet 10 and a blower 11, the top of the instrument control cabinet 10 is provided with a warning lamp 14, the bottom of the instrument control cabinet 10 is provided with a connecting port 13 for connecting a gas detector, the gas detector can detect the oxygen content and the harmful gas content of the air in the foundation pit in real time, the gas detector has the function of uploading data of the internet of things, can share and control remote information with equipment such as a mobile phone and the like, the use convenience is improved, meanwhile, when the detected value of the gas detector is not within the normal value range set by the instrument control cabinet 10, the warning lamp 14 can give out sound and light alarm, the instrument control cabinet 10 is linked with the blower 11, after the blower 11 is started, fresh air is output into the foundation pit through an air supply hose, and after the detected value of the gas detector is normal, the blower 11 may be manually stopped; meanwhile, in order to meet the requirement of foundation pit operation, hanging points 4 for fixing a rope ladder or a descent control device are arranged on the cross rod 102, so that operating personnel can conveniently enter and exit the foundation pit.
The present invention and the embodiments thereof have been described above, but the description is not limited thereto, and the embodiment shown in the drawings is only one of the embodiments of the present invention, and the actual structure is not limited thereto. In summary, those skilled in the art should understand that they should not be limited to the embodiments described above, and that they can design the similar structure and embodiments without departing from the spirit of the invention.

Claims (7)

1. A foundation pit operation all-in-one machine is characterized by comprising a tower (1), an electric hoist (5), an electric drum (8), an electric control cabinet (9), an instrument control cabinet (10) and an air blower (11), wherein the tower (1) comprises a support rod (101), a cross rod (102), a vertical rod (103) and an installation rod (104), a fixing plate (2) used for fixing the tower (1) is arranged at the bottom of the support rod (101), the vertical rod (103) is positioned at the top of the support rod (101), a first mounting frame (3) in movable connection is arranged on the installation rod (104), buckle structures are arranged at two ends of the first mounting frame (3), the first mounting frame (3) is arranged on the installation rod (104) through the buckle structures, the first mounting frame (3) is fixedly connected with the electric hoist (5), a second mounting frame (7) and hanging points (4) are arranged on the cross rod (102), second mounting bracket (7) both ends are equipped with buckle structure, second mounting bracket (7) are installed on two different horizontal poles (102) through buckle structure, be equipped with on second mounting bracket (7) electric drum (8), electrical control cabinet (9), instrument control cabinet (10) and air-blower (11), electrical control cabinet (9) output respectively with electronic calabash (5), instrument control cabinet (10), air-blower (11) electric connection, instrument control cabinet (10) open through instrument line to air-blower (11) and stop control.
2. A foundation pit operation all-in-one machine as claimed in claim 1, wherein the electric hoist (5) comprises a winding drum and a steel wire rope, one end of the steel wire rope is provided with a connecting plate, and the bottom end of the connecting plate is provided with a hook (6).
3. A foundation pit working integrated machine according to claim 1, wherein the hanging point (4) can be used for fixing a rope ladder or a descent control device.
4. A foundation pit operation all-in-one machine as claimed in claim 1, wherein the support rod (101) is connected with the cross rod (102) through a plug-in connection, and the vertical rod (103) is connected with the mounting rod (104) through a plug-in structure.
5. A foundation pit operation all-in-one machine as claimed in claim 1, wherein one end of the air blower (11) is provided with an air outlet (12) for connecting an air supply hose.
6. A foundation pit operation all-in-one machine as claimed in claim 1, wherein a warning lamp (14) is arranged at the top of the instrument control cabinet (10), and a connecting port (13) for connecting a gas detector is arranged at the bottom of the instrument control cabinet (10).
7. A foundation pit operation all-in-one machine as claimed in claim 6, wherein the gas detector has Internet of things uploading function.
CN202121178793.8U 2021-05-29 2021-05-29 Foundation pit operation all-in-one machine Active CN215254653U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121178793.8U CN215254653U (en) 2021-05-29 2021-05-29 Foundation pit operation all-in-one machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121178793.8U CN215254653U (en) 2021-05-29 2021-05-29 Foundation pit operation all-in-one machine

Publications (1)

Publication Number Publication Date
CN215254653U true CN215254653U (en) 2021-12-21

Family

ID=79474556

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121178793.8U Active CN215254653U (en) 2021-05-29 2021-05-29 Foundation pit operation all-in-one machine

Country Status (1)

Country Link
CN (1) CN215254653U (en)

Similar Documents

Publication Publication Date Title
CN106121255A (en) Apparatus installed by a kind of Super High glass curtain wall
CN215254653U (en) Foundation pit operation all-in-one machine
CN210037664U (en) X-ray live-line flaw detection device and system for power transmission line
CN205892588U (en) Hoisting equipment
CN208500121U (en) A kind of splicing apparatus
CN114362038A (en) Hoisting system for electrified lead wire connecting line of power distribution network
CN211046251U (en) Cable erecting device for building electromechanical installation
CN112523223A (en) A pipe device for pouring into concrete
CN203959697U (en) The equalizing bar of hoisting platform truss
CN206487129U (en) Safety hanging cradle for industrial premises Construction of Steel Structure
CN207165365U (en) A kind of outdoor transformer installation support frame
CN206051364U (en) A kind of curtain wall profiles boom hoisting
CN210848874U (en) Combined safety electric welding machine cage
CN108565769A (en) One kind ± 1100kV direct-current wall bushing installation and repairing methods
CN210029781U (en) Anti-shaking device for hoisting
CN217921154U (en) Portable hoisting tool
CN208814542U (en) A kind of New Type Construction Hoist
CN220893417U (en) Hanging basket monitoring system
CN103244167B (en) Manhole shaft forced ventilation construction method and manhole shaft forced ventilation cloth curtain
CN203754287U (en) Small-sized interval dual-purpose lifting appliance
CN208843629U (en) A kind of crane upper mechanism is from dismantling device and crane
CN205933005U (en) Novel intelligent lifting device of super high -rise building core section of thick bamboo component
CN111824979A (en) Material lifting machine for building engineering
CN208577374U (en) A kind of simplicity detachable hoisting apparatus
CN207079894U (en) Construction of Steel Structure steel platform and device is set up at the top of light shaft