CN215215039U - 一种微型顶管机安放结构 - Google Patents
一种微型顶管机安放结构 Download PDFInfo
- Publication number
- CN215215039U CN215215039U CN202121389610.7U CN202121389610U CN215215039U CN 215215039 U CN215215039 U CN 215215039U CN 202121389610 U CN202121389610 U CN 202121389610U CN 215215039 U CN215215039 U CN 215215039U
- Authority
- CN
- China
- Prior art keywords
- jacking machine
- pipe jacking
- cross
- rod
- support
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Abstract
Description
Claims (10)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202121389610.7U CN215215039U (zh) | 2021-06-22 | 2021-06-22 | 一种微型顶管机安放结构 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202121389610.7U CN215215039U (zh) | 2021-06-22 | 2021-06-22 | 一种微型顶管机安放结构 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN215215039U true CN215215039U (zh) | 2021-12-17 |
Family
ID=79434098
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202121389610.7U Active CN215215039U (zh) | 2021-06-22 | 2021-06-22 | 一种微型顶管机安放结构 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN215215039U (zh) |
-
2021
- 2021-06-22 CN CN202121389610.7U patent/CN215215039U/zh active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2019128155A1 (zh) | 沉井施工结构及其施工方法 | |
CN205296874U (zh) | 桩柱一体化信息化施工监测定位装置 | |
CN110206493A (zh) | 一种全套管全回转钻孔灌注桩施工工艺 | |
CN106958244B (zh) | 超深大直径钢管柱的安装定位方法 | |
CN104631338A (zh) | 一种钢吊箱及定位施工方法 | |
CN215215039U (zh) | 一种微型顶管机安放结构 | |
CN111778986B (zh) | 一种便于测量的基坑围护结构及方法 | |
CN116105683B (zh) | 一种逆作法施工支撑柱标高变化及差异变形监测方法 | |
CN213267538U (zh) | 浅滩u形砂岩河床钢栈桥用引孔平台 | |
CN113338985B (zh) | 一种生态综合管廊工程微型顶管施工方法 | |
CN212154180U (zh) | 一种土建施工用预定位放线装置 | |
JP3750042B2 (ja) | 構真柱建入れ装置 | |
CN106759558B (zh) | 一种控制埋入土中立柱桩方向及垂直度的施工方法 | |
CN206346201U (zh) | 一种用于安放格构柱的防砂定位系统 | |
CN217054421U (zh) | 逆作桩基施工用定位调垂装置 | |
CN214145389U (zh) | 一种用于水平定向钻的固定支座 | |
CN219798389U (zh) | 一种建筑施工测量设备 | |
CN215669529U (zh) | 一种可与钢支撑快速安装的明挖基坑连续梁 | |
CN204679021U (zh) | 管桩垂直度测量装置 | |
CN212103549U (zh) | 深桶灯定位结构 | |
CN219509632U (zh) | 一种手掘式顶管施工用的支模装置 | |
CN220725122U (zh) | 一种建筑基坑支护装置 | |
CN109138010A (zh) | 一种室内桩土模型试验的桩体固定装置 | |
CN216190644U (zh) | 简易起吊装置 | |
CN218970017U (zh) | 一种逆作法施工钢管柱与钢筋笼柔性连接装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP03 | Change of name, title or address | ||
CP03 | Change of name, title or address |
Address after: No. 2, Floor 37, Building 11, Phase II, Gezhouba City Garden, No. 162, Qiaokou Road, Qiaokou District, Wuhan, Hubei 430000 Patentee after: Gezhouba Group Ecological Environmental Protection Co.,Ltd. Address before: 430000 south side of 7th floor, area B, 558 Jiefang Avenue, Qiaokou District, Wuhan City, Hubei Province Patentee before: China Gezhouba Group Ecological Environment Engineering Co.,Ltd. |
|
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20230823 Address after: Room 1-1, 1st Floor, 1st to 3rd Floor, Building 16, Gezhouba Sun City, No. 40 Gaoxin Fourth Road, Donghu New Technology Development Zone, Wuhan City, Hubei Province, 430000 Patentee after: Gezhouba Ecological Construction (Hubei) Co.,Ltd. Address before: No. 2, Floor 37, Building 11, Phase II, Gezhouba City Garden, No. 162, Qiaokou Road, Qiaokou District, Wuhan, Hubei 430000 Patentee before: Gezhouba Group Ecological Environmental Protection Co.,Ltd. |