CN215210619U - Hoisting is demolishd under water and is tied up structure for pier stud segment - Google Patents

Hoisting is demolishd under water and is tied up structure for pier stud segment Download PDF

Info

Publication number
CN215210619U
CN215210619U CN202120472098.6U CN202120472098U CN215210619U CN 215210619 U CN215210619 U CN 215210619U CN 202120472098 U CN202120472098 U CN 202120472098U CN 215210619 U CN215210619 U CN 215210619U
Authority
CN
China
Prior art keywords
pier stud
wire rope
hoisting
pier
knot structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202120472098.6U
Other languages
Chinese (zh)
Inventor
何建祥
王伟卿
张燕辉
陈云红
满航硕
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yunnan Luweixin Engineering Technology Co ltd
Original Assignee
Yunnan Luweixin Engineering Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yunnan Luweixin Engineering Technology Co ltd filed Critical Yunnan Luweixin Engineering Technology Co ltd
Priority to CN202120472098.6U priority Critical patent/CN215210619U/en
Application granted granted Critical
Publication of CN215210619U publication Critical patent/CN215210619U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model relates to a lift by crane and be demolishd pier stud knot structure for segment under water belongs to the bridge and demolishs journey equipment field, the knot structure adopts the fixed lifting by crane of major diameter wire rope, and wire rope bundles fixedly with the pier stud is ingenious, the utility model discloses stability is good, the reliability is high, and wire rope can mutually support with the mount, at the fixed pier stud of accuracy under water, under diver's cooperation, will lift by crane the release of tying up with the string slack of mount department, and the tip at wire rope both ends links to each other with hoisting equipment's rings, will bind the wire rope tensioning of pier stud through pier stud segment gravity, finally lifts by crane the large-tonnage pier stud segment safely.

Description

Hoisting is demolishd under water and is tied up structure for pier stud segment
Technical Field
The utility model belongs to the engineering equipment field is demolishd to the bridge, specifically speaking, the utility model relates to a lift by crane and be demolishd pier stud knot structure for segment under water.
Background
In the bridge dismantling process, after the deep-water high pier is mechanically cut underwater, the cross section area of the pier column segment is large, the lifting tonnage of a single segment is large, a conventional lifting steel wire rope and the pier segment are not easy to effectively fix, the lifting device is used for lifting, and the lifting device is inconvenient to deeply lift underwater due to the fact that the cutting environment is underwater.
Disclosure of Invention
For overcoming the problem that the background art exists, the utility model discloses a lift by crane and demolish pier stud segment under water and use knot structure, the knot structure adopts the fixed lifting by crane of major diameter wire rope, and wire rope bundles fixedly with the pier stud is ingenious, the utility model discloses stability is good, the reliability is high, and wire rope can bind with the string earlier with the mount, at the fixed pier stud of accuracy under water, under diver's cooperation, will lift by crane the release of binding up the string pine of wire rope and mount department, and the mount sinks abandonly, and the cable loop at wire rope both ends links to each other with hoisting equipment's rings, will bind the wire rope tensioning of pier stud through pier stud segment gravity when lifting by crane, finally lifts by crane the large-tonnage pier stud segment safely.
In order to achieve the above purpose, the utility model is realized by the following technical scheme:
the rope knot structure mainly comprises a pier stud, a fixing frame, a steel wire rope and a string, wherein the fixing frame is arranged on the periphery of the pier stud, the steel wire rope is arranged on the periphery of the pier stud, the fixing frame and the steel wire rope are bound through the string, and the hanging ring is connected with a rope buckle at the end part of the steel wire rope.
The fixing frame is a square frame formed by four pipe bodies, and the pipe bodies are plastic pipes or steel pipes.
And the side surface of the pier column is provided with a steel wire rope to circumferentially bind the pier column.
The steel wire rope is provided with two steel wire ropes, and two ends of each steel wire rope are provided with rope buckles.
The lifting ring is a lifting equipment lifting ring.
The utility model has the advantages that: the knot structure adopts the fixed lifting by crane of major diameter wire rope, and wire rope bundles fixedly with the pier stud is ingenious, the utility model discloses stability is good, the reliability is high, and wire rope can bind each other with the mount, at the fixed pier stud of accuracy under water, under diver's cooperation, will lift by crane the release of tying up with the string slack of mount department, and the mount sinks abandonedly, and the cable loop at wire rope both ends links to each other with hoisting equipment's rings, will bind the wire rope tensioning of pier stud through pier stud segment gravity, finally lifts by crane the large-tonnage pier stud segment safely.
Drawings
Fig. 1 is a schematic structural view of the present invention;
fig. 2 is a schematic view of the connection relationship between the steel cable and the fixing frame.
In the figure, 1-pier stud, 2-fixing frame, 3-steel wire rope, 4-string and 5-hanging ring.
Detailed Description
In order to make the above objects, technical solutions and advantages clearer and clearer, the present invention is specifically described below with reference to the accompanying drawings.
As shown in fig. 1, the rope knot structure mainly comprises a fixed frame 2, two steel wire ropes 3 and a string 4, wherein the fixed frame 2 is arranged at the periphery of a pier stud 1, the steel wire ropes 3 are arranged at the periphery of the pier stud 1, two ends of each steel wire rope 3 are provided with steel wire rope buckles, the steel wire rope buckles are hole-shaped buckles on the steel wire ropes 3, the two steel wire ropes 3 respectively horizontally wind half rings of the pier stud 1 and then pass through the rope buckles at the respective ends of the steel wire ropes, the pier stud 1 is tightly tied when the steel wire ropes are pulled up, the fixed frame 2 is a square frame formed by four pipe bodies, the pipe bodies are made of plastic pipes or steel pipes, the fixed frame 2 and the steel wire ropes 3 are tied through the string 4, the string 4 is tied into a movable knot, the hanging ring 5 is connected with the rope buckles at the ends of the steel wire ropes 3, and the hanging ring 5 is provided with two hanging rings for hoisting equipment and is respectively passed through the rope buckles at the ends of the steel wire ropes 3.
The rope knot structure mainly comprises two steel wire ropes 3 and a fixed frame 2, the fixed frame 2 is a square frame consisting of 4 straight steel pipes or plastic pipes, the two steel wire ropes 3 are wound on the periphery of a pier stud 1, the steel wire ropes 3 are bound with the fixed frame 2 through thin ropes 4, the fixed frame 2 and the two steel wire ropes 3 are wound on the pier stud 1, the thin ropes 4 are provided with a plurality of ropes, and the thin ropes 4 can be confirmed to be tied into a slip knot according to the actual construction condition, the utility model adopts the large-diameter steel wire ropes 3 to be fixedly hoisted, the steel wire ropes 3 are bound with the pier stud 1, the steel wire ropes are round connecting buckles on the steel wire ropes 3, the two steel wire ropes 3 penetrate through each other 3 at the cross positions, thereby binding the pier stud 1 tightly when being pulled, the rope ends of the steel wire ropes 3 are connected with hoisting rings 5, the rope ends of the steel wire ropes 3 are fixed through the hoisting rings 5, before hoisting, the hoisting rings 5 at the rope ends of the steel wire ropes 3 are connected with hoisting equipment, untie string 4 under the diver's cooperation, follow the follow and down dismantle the mount cover from pier stud 1 and abandonment, will bind 3 tensionings and the pull-up of wire rope of pier stud 1 through 1 segment gravity of pier stud and rings 5 up-pulling force during lifting, finally lift by crane large-tonnage pier stud segment safely, utilize this knot structure cooperation to lift by crane equipment and carry out the pier stud and lift by crane, this knot structure passes through engineering practice and verifies, easy and simple to handle, it is durable reliable, the practicality is high.
Finally, it is noted that the above-mentioned preferred embodiments illustrate rather than limit the invention, and that, although the invention has been described in detail with reference to the above-mentioned preferred embodiments, it will be understood by those skilled in the art that various changes in form and details may be made therein without departing from the scope of the invention as defined by the appended claims.

Claims (4)

1. The utility model provides a hoist and is demolishd pier stud segment under water and use knot structure which characterized in that, the knot structure mainly includes pier stud, mount, wire rope, string, rings, the mount sets up in pier stud periphery, and wire rope sets up in pier stud periphery, and the mount is binded through the string with wire rope, rings and wire rope end connection.
2. The rope knot structure for hoisting the pier stud segments of the demolished pier underwater according to claim 1, wherein the fixing frame is a square frame consisting of four pipe bodies, and the pipe bodies are plastic pipes or steel pipes.
3. The knot structure for hoisting the pier stud segment under water where the pier is dismantled according to claim 1, wherein: and a steel wire rope buckle is arranged on the side surface of the pier stud.
4. The knot structure for hoisting the pier stud segment under water where the pier is dismantled according to claim 1, wherein: the hoisting ring is provided with two hoisting rings which are respectively arranged at the end positions of the steel wire rope.
CN202120472098.6U 2021-03-05 2021-03-05 Hoisting is demolishd under water and is tied up structure for pier stud segment Active CN215210619U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120472098.6U CN215210619U (en) 2021-03-05 2021-03-05 Hoisting is demolishd under water and is tied up structure for pier stud segment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120472098.6U CN215210619U (en) 2021-03-05 2021-03-05 Hoisting is demolishd under water and is tied up structure for pier stud segment

Publications (1)

Publication Number Publication Date
CN215210619U true CN215210619U (en) 2021-12-17

Family

ID=79441872

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120472098.6U Active CN215210619U (en) 2021-03-05 2021-03-05 Hoisting is demolishd under water and is tied up structure for pier stud segment

Country Status (1)

Country Link
CN (1) CN215210619U (en)

Similar Documents

Publication Publication Date Title
CN102444086A (en) Cable hanging system for inclined stay cable of bridge and cable hanging method for inclined stay cable of bridge
CN201670644U (en) Roof truss hoisting device
CN108149928A (en) The tower end installation method of suspension cable
CN215210619U (en) Hoisting is demolishd under water and is tied up structure for pier stud segment
CN207566717U (en) A kind of I-shaped floor steel beam lifting structure
CN105905815A (en) Work method of seating-type self-balance holding pole
CN111409773B (en) Construction navigation cable pressing device and cable pressing method
CN202022652U (en) Device capable of fast lifting oil tanks in group
CN202265302U (en) Hoisting structure of reinforcement cage
CN105110205B (en) A kind of reverse method for dismounting of derrick crane
CN201180056Y (en) Winch lift hook assembly
CN201027135Y (en) Hanging tool mechanism for swinging 55mPHC pipe pile
CN202542743U (en) Auxiliary reeving mechanism for mounting tower crane
CN210634723U (en) Simple and easy anchor stone transportation input device
CN113529579A (en) Cableway transfer device based on circulation type steel wire rope catenary structure
CN201605579U (en) Tubular pile industrial steel cage suspending device
CN201619944U (en) Sling instrument
CN201530682U (en) Hoisting lifting device suitable for hoisting steel box girder
CN109114167B (en) Steel wire rope pre-tightening device and method
CN108750944B (en) Hoisting windproof auxiliary device and hoisting windproof auxiliary method
CN210226566U (en) Strong anchor grabbing system for deep sea net cage
CN211769990U (en) Aerial sliding hoisting device
CN217780507U (en) Hoisting device for hoisting submarine cable joint into water
CN212127323U (en) Cableway with hoisting function
CN114108637B (en) Positioning construction method for underwater film bag

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant