CN212127323U - Cableway with hoisting function - Google Patents

Cableway with hoisting function Download PDF

Info

Publication number
CN212127323U
CN212127323U CN202020392457.2U CN202020392457U CN212127323U CN 212127323 U CN212127323 U CN 212127323U CN 202020392457 U CN202020392457 U CN 202020392457U CN 212127323 U CN212127323 U CN 212127323U
Authority
CN
China
Prior art keywords
cableway
pulley
block
hoist
hoisting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202020392457.2U
Other languages
Chinese (zh)
Inventor
张帆
魏奎斐
徐晓锋
贺敏刚
李纪龙
陈卉芳
王治方
李世茂
张祥
曾庆钿
李华山
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhengzhou Engineering Co Ltd of China Railway Seventh Group Co Ltd
Original Assignee
Zhengzhou Engineering Co Ltd of China Railway Seventh Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhengzhou Engineering Co Ltd of China Railway Seventh Group Co Ltd filed Critical Zhengzhou Engineering Co Ltd of China Railway Seventh Group Co Ltd
Priority to CN202020392457.2U priority Critical patent/CN212127323U/en
Application granted granted Critical
Publication of CN212127323U publication Critical patent/CN212127323U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Jib Cranes (AREA)

Abstract

The utility model discloses a cableway with hoist and mount function relates to engineering construction hoist and mount construction technical field, and the primary structure includes the atress cableway, slides the cableway and hoist and mount cableway, the both ends of atress cableway set up respectively on first highland and second highland, it is used for the drive to slide the cableway and follow the atress cableway slides, the hoist and mount cableway is used for hoist and mount goods and materials. The utility model provides a cableway with hoist and mount function is assembled by a plurality of devices and is formed, and each device before assembling is convenient for transport in mountain area or the area that receives the construction site influence, and it assembles the simple swift of process, can solve the mountain area or receive the hoist and mount problem that the construction site influences the area in short time.

Description

Cableway with hoisting function
Technical Field
The utility model relates to an engineering construction hoist and mount construction technical field especially relates to a cableway with hoist and mount function.
Background
With the rapid development of economy, the manpower construction is mainly gradually converted into mechanical construction, the intelligent mechanical field is rapidly developed, the mechanical construction greatly improves the work efficiency, and the problem of insufficient labor in the current society is solved. However, in a mountainous area or under the influence of factors such as a field and time, some construction materials cannot be operated by large-scale hoisting equipment such as a tower crane, a gantry crane and a truck crane, and under the condition, the function of on-site rapid construction is most suitable to be realized by adopting the simple assembling hoisting device.
Disclosure of Invention
For solving above technical problem, the utility model provides a cableway with hoist and mount function to solve the mountain area condition or receive construction place, time influence to cause the difficult problem that some construction materials can't adopt large-scale hoisting equipment operations such as tower crane, gantry crane and truck crane.
In order to achieve the above object, the utility model provides a following scheme:
the utility model provides a cableway with hoist and mount function, including the atress cableway, slide the cableway and hoist and mount cableway, the both ends of atress cableway set up respectively in first highland and second highland, it is used for the drive to slide the cableway edge the atress cableway slides, the hoist and mount cableway is used for hoist and mount goods and materials.
Optionally, the stressed cableway comprises a first steel cable; both ends of the first wire rope are fixed on the first high ground and the second high ground respectively.
Optionally, the taxiing cableway comprises a second winch, a third winch and a second pulley block crane pulley; the second winch is arranged on the first highland, the third winch is arranged on the second highland, the second pulley block crane pulley is arranged on the first steel cable, and the second winch and the third winch are respectively connected with the second pulley block crane pulley through a third steel cable and a fourth steel cable.
Optionally, the hoisting ropeway comprises a first winch and a first pulley block and hook block; the first winch is arranged on the first highland, the first pulley block hook pulley is arranged below the second pulley block crane pulley, and the first winch is connected with the second pulley block crane pulley through a steel cable.
Optionally, the first highland is further provided with an assembling frame.
Optionally, the top of the assembling frame is provided with a first fixed pulley block.
Optionally, one end of the first steel cable is fixed to the first high ground through an underground cage, and the other end of the first steel cable is anchored to the second high ground after passing around the first fixed pulley in the first fixed pulley block.
Optionally, the lower part of the assembling frame is provided with a plurality of fixed pulleys.
Optionally, the free end of the steel wire rope on the first winch bypasses one fixed pulley and then bypasses a second fixed pulley in the first fixed pulley block to be connected with the first pulley block hook pulley.
Optionally, the free end of the steel wire rope on the second winch bypasses another fixed pulley and then bypasses a third fixed pulley in the first fixed pulley block and then is connected with the second pulley block hook block.
The utility model discloses for prior art gain following technological effect:
the utility model provides a cableway primary structure with hoist and mount function includes the atress cableway, slides the cableway and hoist and mount cableway, the both ends of atress cableway set up respectively in first highland and second highland, it is used for the drive to slide the cableway edge the atress cableway slides, the hoist and mount cableway is used for hoist and mount goods and materials. The utility model provides a cableway with hoist and mount function is assembled by a plurality of devices and is formed, and each device before assembling is convenient for transport in mountain area or the area that receives the construction site influence, and it assembles the simple swift of process, can solve the mountain area or receive the hoist and mount problem that the construction site influences the area in short time.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required to be used in the embodiments will be briefly described below, and it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to these drawings without creative efforts.
Fig. 1 is a schematic structural view of the ropeway with a hoisting function of the utility model;
fig. 2 is a schematic top view of the assembly frame in the cableway with a hoisting function of the present invention;
fig. 3 is the utility model discloses side direction structure schematic diagram of piece together frame in cableway with hoist and mount function.
Description of reference numerals: 1A, an underground cage; 2A, assembling frames; 3A, a first fixed pulley block; 4A, a second fixed pulley; 5A, a third fixed pulley; 6A, a first winding machine; 7A, a second winch; 1B, a third winch; 2B, a sleeper stack; 1C, a first steel cable; 2C, a second steel cord; 3C, a third steel cable; 4C, a fourth steel cable; 5C, a first pulley block and a hook pulley; 6C, a second pulley block hook pulley; 703. a main bar member; 713. a ground anchor; 716. a first counterweight coupling member; 725. a second counterweight link.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
The first embodiment is as follows:
as shown in fig. 1, the embodiment provides a cableway with a hoisting function, which includes a stressed cableway, a sliding cableway, and a hoisting cableway, where two ends of the stressed cableway are respectively disposed on a first high ground and a second high ground, the sliding cableway is used to drive the hoisting cableway to slide along the stressed cableway, and the hoisting cableway is used to hoist materials.
In this embodiment, as shown in fig. 1 to 3, an underground cage 1A is disposed on a first elevation, an assembling frame 2A is disposed on one side of the underground cage 1A close to a second elevation, the side surface of the assembling frame 2A is of a triangular structure, a first fixed pulley block 3A composed of three fixed pulleys is disposed on a top cross beam of the assembling frame 2A, a second fixed pulley 4A and a third fixed pulley 5A are disposed on a bottom cross beam of the assembling frame 2A, and a first winch 6A and a second winch 7A are disposed on an open ground at the bottom of the assembling frame 2A or an open ground between the assembling frame 2A and the underground cage 1A.
An earth anchor 713 is provided on the second elevation, a third hoist 1B is provided on the open ground on the side of the earth anchor 713 near the first elevation, and a sleeper 2B is provided between the third hoist 1B and the earth anchor 713.
The first steel cable 1C is a steel cable with a diameter of 25mm, one end of the first steel cable is connected with the underground cage 1A, the other end of the first steel cable is connected with the main rod 703 after passing through a gap of the sleeper pile 2B after passing around a first fixed pulley in the fixed pulley group 3A, and the first steel cable 1C is a stressed cableway.
Set up second assembly pulley lifting hook coaster 6C on the atress cableway, the wire rope free end of second hoist engine 7A is connected with second assembly pulley lifting hook coaster 6C after bypassing second fixed pulley 4A and the second fixed pulley in the first fixed pulley group 3A in proper order, the wire rope free end of third hoist engine 1B is connected with second assembly pulley lifting hook coaster 6C to, can control the position of second assembly pulley lifting hook coaster 6C on first wire rope 1C through second hoist engine 7A and third hoist engine 1B.
The bottom of the second pulley block hook tackle 6C is connected with the first pulley block hook tackle 5C through a hook, the free end of a steel wire rope of the first winch 6A sequentially bypasses a third fixed pulley 5A, a third fixed pulley in the first top pulley block, a first pulley in the top pulley of the first pulley block hook tackle 5C, a first pulley at the bottom of the first pulley block hook tackle 5C, a second pulley in the top pulley of the first pulley block hook tackle 5C and a second pulley at the bottom of the first pulley block hook tackle 5C are connected with the upper hook of the first pulley block hook tackle 5C, and the lower hook of the first pulley block hook tackle 5C is used for hooking goods and materials.
The assembled frame 2A is composed of a main rod 703, a first connecting piece and a second connecting piece which are fixed by bolts.
During the use, hang the goods and materials hook on first assembly pulley lifting hook coaster 5C's lower part couple, retrieve the wire rope through first hoist engine 6A and make the goods and materials rise, rethread second hoist engine 7A and third hoist engine 1B's synchronous working, adjust the position on the horizontal direction of first assembly pulley lifting hook coaster 5C, and then can hoist the goods and materials to first highland, second highland and between the above-mentioned two highland, realize the goods and materials allotment between first highland and the second highland.
It should be noted that, as is obvious to a person skilled in the art, the invention is not limited to details of the above-described exemplary embodiments, but can be embodied in other specific forms without departing from the spirit or essential characteristics thereof. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein, and any reference signs in the claims are not intended to be construed as limiting the claim concerned.
The principle and the implementation mode of the present invention are explained by applying specific examples in the present specification, and the above descriptions of the examples are only used to help understanding the method and the core idea of the present invention; meanwhile, for the general technical personnel in the field, according to the idea of the present invention, there are changes in the concrete implementation and the application scope. In summary, the content of the present specification should not be construed as a limitation of the present invention.

Claims (10)

1. The cableway with the hoisting function is characterized by comprising a stressed cableway, a sliding cableway and a hoisting cableway, wherein two ends of the stressed cableway are respectively arranged on a first high land and a second high land, the sliding cableway is used for driving the hoisting cableway to slide along the stressed cableway, and the hoisting cableway is used for hoisting materials.
2. The ropeway with hoisting function as claimed in claim 1, wherein the stressed ropeway comprises a first steel cable; both ends of the first wire rope are fixed on the first high ground and the second high ground respectively.
3. The ropeway with hoisting function of claim 2, wherein the taxiing ropeway comprises a second hoist, a third hoist and a second block and tackle crane pulley; the second winch is arranged on the first highland, the third winch is arranged on the second highland, the second pulley block crane pulley is arranged on the first steel cable, and the second winch and the third winch are respectively connected with the second pulley block crane pulley through a third steel cable and a fourth steel cable.
4. The ropeway with hoisting function of claim 3, wherein the hoisting ropeway comprises a first hoist and a first sheave block hook block; the first winch is arranged on the first highland, the first pulley block hook pulley is arranged below the second pulley block crane pulley, and the first winch is connected with the second pulley block crane pulley through a steel cable.
5. The ropeway with hoisting function as claimed in claim 4, wherein a split frame is further provided on the first highland.
6. The ropeway with hoisting function as claimed in claim 5, wherein the top of the assembly frame is provided with a first fixed pulley group.
7. The ropeway with hoisting function as claimed in claim 6, wherein one end of said first steel cable is fixed on said first highground by an underground cage, and the other end of said first steel cable is anchored on a second highground after passing around a first fixed pulley of said first fixed pulley group.
8. The ropeway with hoisting function as claimed in claim 6, wherein the lower part of the split frame is provided with a plurality of fixed pulleys.
9. The ropeway with hoisting function as claimed in claim 8, wherein the free end of the wire rope on the first winch is connected to the first block hook block after passing around one of the fixed pulleys and then passing around the second fixed pulley in the first block.
10. The ropeway with hoisting function as claimed in claim 8, wherein the free end of the wire rope on the second winch is connected to the second block hook block after passing around the other fixed block and then passing around the third fixed block of the first fixed block.
CN202020392457.2U 2020-03-25 2020-03-25 Cableway with hoisting function Expired - Fee Related CN212127323U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020392457.2U CN212127323U (en) 2020-03-25 2020-03-25 Cableway with hoisting function

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020392457.2U CN212127323U (en) 2020-03-25 2020-03-25 Cableway with hoisting function

Publications (1)

Publication Number Publication Date
CN212127323U true CN212127323U (en) 2020-12-11

Family

ID=73672749

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020392457.2U Expired - Fee Related CN212127323U (en) 2020-03-25 2020-03-25 Cableway with hoisting function

Country Status (1)

Country Link
CN (1) CN212127323U (en)

Similar Documents

Publication Publication Date Title
CN102444086A (en) Cable hanging system for inclined stay cable of bridge and cable hanging method for inclined stay cable of bridge
CN202187601U (en) Single-twisting-grinder double-pole iron tower erecting device of high-voltage power transmission line
CN107792790A (en) Installation and application for the aerial cableway of mountain region construction material transport
CN207792533U (en) Cableway applied to mountainous region construction
CN109610922B (en) Typical topography iron tower assemblage construction equipment
CN205387439U (en) Mast hoisting accessory
CN214298989U (en) Tower crane without counter weight and capable of being turned over
CN212670303U (en) Stay cable beam end mounting structure
CN212025936U (en) Equipment for mounting continuous steel strand stay cable at tower end of cable-stayed bridge
CN206767425U (en) A kind of integral hoisting device for rapid for ground-connecting-wall steel reinforcement cage
CN107476195B (en) Girder transporting pulley system for transporting stiffening girder by suspension bridge
CN111355188A (en) Live crossing construction method for high-voltage line
CN101649683A (en) Method for hoisting power transmission iron tower by assembly holding pole technology
CN110172919A (en) A kind of low-pylon cable-stayed bridge is reeved method and system
CN212127323U (en) Cableway with hoisting function
CN212475874U (en) Bridge cable crane system
CN201325826Y (en) Rock anchor beam hoisting device for underground power house
CN110002343B (en) Self-driven urban underground prefabricated comprehensive pipe gallery laying hoisting machine and construction method
CN216235734U (en) Vertical transportation hoisting structure for curtain wall unit plate
CN204609435U (en) The auxiliary tower that hoists of emergent repairing tower
CN111268571A (en) Cableway with hoisting function
CN111155822A (en) Steel strand installation method for wind driven generator support tower frame prestressed structure
CN211338564U (en) Tower top main cable saddle mounting system
CN212318045U (en) Tunnel anchor narrow space prestress steel beam gliding installation device
CN201686458U (en) Movable operating platform used for quickly processing welding seam at end opening of steel box girder

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20201211