CN215107441U - Open-air construction team barracks hoist and mount and keep off rope ear - Google Patents
Open-air construction team barracks hoist and mount and keep off rope ear Download PDFInfo
- Publication number
- CN215107441U CN215107441U CN202120430734.9U CN202120430734U CN215107441U CN 215107441 U CN215107441 U CN 215107441U CN 202120430734 U CN202120430734 U CN 202120430734U CN 215107441 U CN215107441 U CN 215107441U
- Authority
- CN
- China
- Prior art keywords
- metal
- rope
- cuboid
- angle
- barracks
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000010276 construction Methods 0.000 title claims abstract description 12
- 239000002184 metal Substances 0.000 claims abstract description 55
- 238000005516 engineering process Methods 0.000 abstract 2
- 230000007547 defect Effects 0.000 abstract 1
- 230000000903 blocking effect Effects 0.000 description 8
- 238000010586 diagram Methods 0.000 description 4
- 238000000034 method Methods 0.000 description 3
- 238000005553 drilling Methods 0.000 description 2
- 238000009434 installation Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 210000005069 ears Anatomy 0.000 description 1
- 238000011900 installation process Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 239000003208 petroleum Substances 0.000 description 1
Images
Landscapes
- Tents Or Canopies (AREA)
Abstract
A hoisting rope-blocking lug for a camp of a field construction team is a hoisting technology for moving the camp of the field construction team, overcomes the defects of other technologies, and has the structural relationship that one end of the hoisting rope-blocking lug is a metal right-angle triangle, the other end of the hoisting rope-blocking lug is a metal cuboid, and the hoisting rope-blocking lug and the metal right-angle triangle are integrated; the oblique angle of the metal right-angle triangular body is 30 degrees so as to be convenient for fixing, and a rope sleeving groove is arranged in the middle of the metal rectangular body and is in an inverted U shape so as to be convenient for rope sleeving; one side of the metal cuboid is a straight edge of the metal right-angle triangle, the other side of the metal cuboid is in an opening shape, and a rope sleeving groove is formed in the opening; the thicknesses of the metal right-angle triangle body and the metal cuboid body are both 16-20mm, and the total length of the bottom edges of the metal right-angle triangle body and the metal cuboid body is 150-200 mm.
Description
Technical Field
The utility model relates to a hoist and mount technique is removed in open-air construction team barracks, especially a open-air construction team barracks hoist and mount rope blocking ear.
Background
In the relocation installation process of petroleum drilling machine room equipment, when barracks, material rooms, drill floor deflection rooms and the like are hoisted, the hoisting hooks like a scale hook are mostly used and fixed on the roof, and due to the appearance design of rope blocking lugs on the side part of the roof, the withdrawing efficiency and safety of the four-in-one hoisting rope are directly influenced. The four-in-one hoisting rope for hoisting the camping house generally needs to be withdrawn after hoisting is finished, four hoisting rope blocking lugs are welded on the outer side of the top of the camping house, and the appearance of the existing rope blocking lugs is not beneficial to rope withdrawal, so that the hoisting rope is unsafe and low in efficiency because the appearance of the existing rope blocking lugs is about 10 meters away from the ground, particularly in the high-altitude installation of the camping house, such as a drilling rig bias house, and the rope withdrawal needs to be carried out by a specially-assigned person.
Disclosure of Invention
The utility model aims at providing a suitable barracks hoist and mount and retreat a field construction team barracks hoist and mount rope blocking lug of rope, it has overcome the shortcoming of other techniques, the utility model aims at realizing like this, the one end of hoist and mount rope blocking lug is the metal right angle triangle body, and its other end is the metal cuboid, and its two is a whole.
The oblique angle of the metal right-angle triangle body is 30 degrees, so that the metal right-angle triangle body is convenient to fix.
A rope sleeving groove is formed in the middle of the metal cuboid, and the rope sleeving groove is inverted U-shaped so as to facilitate rope sleeving.
One side of the metal cuboid is a straight edge of the metal right-angle triangle, the other side of the metal cuboid is in an opening shape, and a rope sleeving groove is formed in the opening.
The thicknesses of the metal right-angle triangle body and the metal cuboid body are both 16-20mm, and the total length of the bottom edges of the metal right-angle triangle body and the metal cuboid body is 150-200 mm.
The utility model discloses an application method is, is fixed in the four corners of barracks respectively with four fender rope ears to every set rope groove opening direction outwards arrange can, during hoist and mount, embolia set rope groove hoist and mount with the cover rope can, hoist and mount finishes, loosens the lifting rope, and after four ropes in the fender rope ear withdraw from two, the crane swung to barracks one end, then released two in addition.
The utility model has the following significance: because the rope sleeving groove is in an inverted U shape and the openings are arranged outwards, the phenomenon of messy hanging when the hoisting rope is withdrawn is avoided; the manpower is saved, and the push-out can be realized without manpower; the working efficiency is higher; the potential safety hazard caused by manual operation is avoided.
Drawings
Fig. 1 is a schematic structural diagram of a rope stopping lug for hoisting a barracks of a field construction team, and in the diagram, 1 is a metal right-angle triangle body 2, a metal cuboid 3 and a rope sleeving groove.
Fig. 2 is an installation layout diagram of a hoisting rope blocking lug for a barracks of a field construction team, and in the diagram, 1 is a metal right-angle triangle body 2, a metal cuboid 3 and a rope sleeving groove.
Detailed Description
In the embodiment 1, one end of the hoisting rope stopping lug is a metal right-angle triangle 1, the other end of the hoisting rope stopping lug is a metal cuboid 2, and the metal right-angle triangle and the metal cuboid are integrated.
Example 2 the metal right triangle 1 has a bevel angle of 30 degrees for ease of fixation.
Embodiment 3, the centre of metal cuboid 2 is provided with a noose groove 3, and its noose groove is the type of falling U to the noose is convenient for.
In embodiment 4, one side of the metal rectangular parallelepiped 2 is a straight side of the metal rectangular parallelepiped 1, and the other side of the metal rectangular parallelepiped 2 is open, and a rope-sleeving groove 3 is formed in the opening.
In example 5, the thicknesses of the metal right triangle 1 and the metal rectangular parallelepiped 2 are both 16-20mm, and the total length of the bottom sides of the two is 150-200 mm.
Claims (3)
1. The utility model provides an open-air construction team barracks hoist and mount rope lug, characterized by: one end of the metal rectangular triangle body is a metal rectangular triangle body (1), the other end of the metal rectangular triangle body is a metal cuboid (2), and the metal rectangular triangle body and the metal cuboid are integrated; a rope sleeving groove (3) is formed in the middle of the metal cuboid (2) and is in an inverted U shape so as to facilitate rope sleeving; one side of the metal cuboid (2) is a straight edge of the metal right-angle triangle (1), the other side of the metal cuboid (2) is in an opening shape, and a rope sleeving groove (3) is formed in the opening.
2. The hoisting rope stopping lug for the barracks of the field construction crew according to claim 1, which is characterized in that: the oblique angle of the metal right-angle triangle body (1) is 30 degrees, so that the metal right-angle triangle body is convenient to fix.
3. The hoisting rope stopping lug for the barracks of the field construction crew according to claim 1, which is characterized in that: the thicknesses of the metal right-angle triangular body (1) and the metal cuboid (2) are both 16-20mm, and the total length of the bottom edges of the metal right-angle triangular body and the metal cuboid (2) is 150-200 mm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202120430734.9U CN215107441U (en) | 2021-02-28 | 2021-02-28 | Open-air construction team barracks hoist and mount and keep off rope ear |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202120430734.9U CN215107441U (en) | 2021-02-28 | 2021-02-28 | Open-air construction team barracks hoist and mount and keep off rope ear |
Publications (1)
Publication Number | Publication Date |
---|---|
CN215107441U true CN215107441U (en) | 2021-12-10 |
Family
ID=79336277
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202120430734.9U Expired - Fee Related CN215107441U (en) | 2021-02-28 | 2021-02-28 | Open-air construction team barracks hoist and mount and keep off rope ear |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN215107441U (en) |
-
2021
- 2021-02-28 CN CN202120430734.9U patent/CN215107441U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201713215U (en) | Flange pipe hanger | |
CN215107441U (en) | Open-air construction team barracks hoist and mount and keep off rope ear | |
CN206590757U (en) | A kind of pile tube vertical lifting device | |
CN206187284U (en) | Pitching pile formula safety railing | |
CN202828367U (en) | Hoisting box | |
CN204732808U (en) | A kind of cable testing bridge laying apparatu | |
CN202988556U (en) | Special lifting appliance for angle-steel type frame body | |
CN207296361U (en) | A kind of regularization assembled overhanging protection canopy | |
CN205603080U (en) | Multipurpose combination formula weight | |
CN205822750U (en) | Hoistway operation platform | |
CN211169776U (en) | Electric screw type well lid hoisting device | |
CN205116854U (en) | Coal scuttle is portable platform for aggregate erection | |
CN208111252U (en) | A kind of auxiliary device of oil-immersed transformer | |
CN208218292U (en) | Portable high-rise hoisting machine tool | |
CN213015343U (en) | Safety device for high-rise building outer wall maintenance | |
CN205061177U (en) | Wire winding pile of installation ladder frame | |
CN206457791U (en) | A kind of dam monitoring instrument embedding protection device | |
CN204022267U (en) | Steel trestle tool special for hoisting | |
CN214958346U (en) | Flexible cable hoisting device applied to live working | |
CN205445132U (en) | Curtain wall penel | |
CN205892490U (en) | A special lifting device for concrete pipe pile hoist and mount | |
CN205973582U (en) | Simple and easy hoisting accessory of cable cover plate | |
CN205077723U (en) | Interim plugging device of steel core concrete column | |
CN217867720U (en) | Steel construction promotes node fixing device | |
CN211569853U (en) | Lifting device for hoisting plate girder |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20211210 |
|
CF01 | Termination of patent right due to non-payment of annual fee |