CN214941179U - Building wall CL heated board integration pouring device - Google Patents

Building wall CL heated board integration pouring device Download PDF

Info

Publication number
CN214941179U
CN214941179U CN202120568770.1U CN202120568770U CN214941179U CN 214941179 U CN214941179 U CN 214941179U CN 202120568770 U CN202120568770 U CN 202120568770U CN 214941179 U CN214941179 U CN 214941179U
Authority
CN
China
Prior art keywords
caliber
hopper
small
conduit
heated board
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202120568770.1U
Other languages
Chinese (zh)
Inventor
车海宝
杨绍锐
张令南
刘宁宁
邓祥
岳鑫辉
范智浩
王翠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Xinjiang Construction Engineering Group First Construction Engineering Co Ltd
Original Assignee
China Construction Xinjiang Construction Engineering Group First Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Xinjiang Construction Engineering Group First Construction Engineering Co Ltd filed Critical China Construction Xinjiang Construction Engineering Group First Construction Engineering Co Ltd
Priority to CN202120568770.1U priority Critical patent/CN214941179U/en
Application granted granted Critical
Publication of CN214941179U publication Critical patent/CN214941179U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The utility model discloses a device is pour in building wall CL heated board integration, heavy-calibre pipe and small-bore pipe are being connected to trapezoidal hopper bottom surface, the rigid coupling is rings on the suitable for reading of hopper, the suitable for reading size of hopper is 800X 800mm, hopper bottom surface size is 500X 500mm, the height of hopper is 500X 550mm, the cross-sectional area of heavy-calibre pipe is 100X 100mm, the cross-sectional area of small-bore pipe is 30X 100mm, it is big, the length of small-bore pipe is 1500mm, when pouring the concrete, the hopper is located the top of outer wall cavity, the small-bore pipe is located the CL heated board outside in the outer wall cavity, the heavy-calibre pipe is located CL inboard in the outer wall cavity. The utility model discloses it is rational in infrastructure, can avoid the poor, the exerted phenomenon of heated board outside concrete placement quality, guarantee that the difference in height of the outside concrete surface is less in the heated board, guarantee concrete placement quality.

Description

Building wall CL heated board integration pouring device
Technical Field
The utility model belongs to building engineering external wall insulation integration field, especially a device is pour in building wall CL heated board integration.
Background
In the construction of external wall heat preservation, the better heat preservation mode of heat preservation effect is that the outer concrete of heated board pours together with the outer wall concrete, guarantees the wholeness of heated board well, and the heat preservation effect is better. In the concrete pouring process, the concrete surfaces on the inner side and the outer side of the heat insulation plate are easy to form small height difference, so that the concrete pouring effect is influenced.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a building wall CL heated board integration pouring device, its is rational in infrastructure, can avoid heated board outside concrete placement quality poor, the exerted phenomenon of heated board, guarantees that the heated board inside and outside concrete face difference of height is less, guarantees concrete placement quality.
The purpose of the utility model is realized like this: an integrated pouring device for a CL heat-insulation board of a building wall body comprises an outer wall cavity which is formed by templates and is used for pouring concrete, the CL heat-insulation board is arranged in the cavity of the outer wall, the large through hole and the small through hole which are arranged on the bottom surface of the trapezoidal hopper are respectively connected with the large-caliber guide pipe and the small-caliber guide pipe, the upper opening of the hopper is fixedly connected with symmetrical hanging rings, wherein the size of the upper opening of the hopper is 800 x 800mm, the size of the bottom surface of the hopper is 500 x 500mm, the height of the hopper is 500 x 550mm, the cross section area of the large-caliber conduit is 100 x 100mm, the cross section area of the small-caliber conduit is 30 x 100mm, the length of the large-caliber conduit and the small-caliber conduit is 1500mm, the distance between the large-caliber conduit and the small-caliber conduit is matched with the thickness of the CL heat preservation plate, when concrete is poured, the hopper is located the top of outer wall cavity, and small-bore pipe is located the outer side of the CL heated board in the outer wall cavity, and the heavy-calibre pipe is located the inner side of CL heated board in the outer wall cavity.
The utility model discloses a place on the concrete outer wall that will pour, the small-bore pipe is placed by the heated board outside, and the heavy-calibre pipe is placed at the heated board inboardly. Concrete in the hopper is shunted through the large-caliber guide pipe and the small-caliber guide pipe, so that the height difference of the concrete surface on the inner side and the outer side of the heat-insulating plate is small, and the concrete pouring quality is guaranteed. The cross sectional area of the two guide pipes is slightly larger than the area of the discharge port of the pump truck, so that the concrete does not overflow from the upper opening of the hopper when the concrete is poured. The upper surface of the hopper can be additionally welded with a hanging ring.
The utility model discloses it is rational in infrastructure, avoided the heated board outside concrete placement quality poor, the exerted phenomenon of heated board, guaranteed that the heated board inside and outside concrete face difference of height is less, guaranteed concrete placement quality.
Drawings
The present invention will be further described with reference to the accompanying drawings, wherein fig. 1 is a schematic front view structure, fig. 2 is a schematic right view structure of fig. 1, and fig. 3 is a schematic top view structure of fig. 1.
Detailed Description
An integrated pouring device for a building wall CL heat insulation plate comprises an outer wall cavity to be poured with concrete, wherein the outer wall cavity is formed by a template, the CL heat insulation plate is installed in the outer wall cavity, a large-caliber conduit 3 and a small-caliber conduit 4 are respectively connected to large through holes and small through holes arranged on the bottom surface of a trapezoid hopper 1, symmetrical lifting rings 5 are fixedly connected to the upper opening of the hopper 1, the size of the upper opening of the hopper 1 is 800mm, the size of the bottom surface of the hopper is 500mm, the height of the hopper 1 is 500mm and 550mm, the cross-sectional area of the large-caliber conduit 3 is 100mm, the cross-sectional area of the small-caliber conduit 4 is 30 mm and 100mm, the lengths of the large-caliber conduit 3 and the small-caliber conduit 4 are 1500mm, the distance between the large-caliber conduit 3 and the small-caliber conduit 4 is matched with the thickness of the CL heat insulation plate, when the concrete is poured, the hopper 1 is positioned above the outer wall cavity, the small-caliber guide pipe 4 is located on the outer side of the CL heat insulation board in the outer wall cavity, and the large-caliber guide pipe 3 is located on the inner side of the CL heat insulation board in the outer wall cavity. The distance between the large and small caliber conduits 3, 4 is 100 mm. The bottom surface of the hopper and the outer side surface of the large-caliber conduit 3 and the small-caliber conduit 4 are respectively provided with a reinforcing rib 2 which is bent at a right angle, wherein one right-angle side of the reinforcing rib 2 which is bent at a right angle is fixedly connected with the bottom surface of the hopper, and the other right-angle side is fixedly connected with the outer side surface of the corresponding large-caliber conduit 3 and the outer side surface of the corresponding small-caliber conduit 4. The reinforcing rib 2 is composed of reinforcing steel bars with the diameter of 8mm, and the lengths of two right-angle sides of the reinforcing rib 2 bent at a right angle are both 100-120 mm. The hopper 1 is made of a steel plate having a thickness of 3mm, and the large and small- diameter pipes 3 and 4 are made of steel pipes having a thickness of 2 mm.

Claims (5)

1. The utility model provides a device is pour in building wall CL heated board integration, includes the outer wall cavity that is waiting to pour the concrete that constitutes by the template, is installing CL heated board, characterized by in the outer wall cavity: the large and small through holes arranged on the bottom surface of the trapezoidal hopper (1) are respectively connected with a large-caliber conduit (3) and a small-caliber conduit (4), the upper opening of the hopper (1) is fixedly connected with symmetrical hoisting rings (5), wherein the size of the upper opening of the hopper (1) is 800mm, the size of the bottom surface of the hopper is 500mm, the height of the hopper (1) is 500mm and 550mm, the cross section area of the large-caliber conduit (3) is 100mm, the cross section area of the small-caliber conduit (4) is 30 mm and 100mm, the lengths of the large-caliber conduit (3) and the small-caliber conduit (4) are 1500mm, the distance between the large-caliber conduit (3) and the small-caliber conduit (4) is matched with the thickness of the CL heat preservation plate, when concrete is poured, hopper (1) are located the top of outer wall cavity, and small-bore pipe (4) are located the outer side of CL heated board in the outer wall cavity, and heavy-calibre pipe (3) are located the CL heated board inboard in the outer wall cavity.
2. The building wall CL insulation board integrated pouring device of claim 1, characterized in that: the distance between the large-caliber conduit and the small-caliber conduit (3, 4) is 100 mm.
3. The building wall CL insulation board integrated pouring device of claim 1, characterized in that: reinforcing ribs (2) which are bent at right angles are respectively arranged on the bottom surface of the hopper and the outer side surfaces of the large-caliber conduits and the small-caliber conduits (3 and 4), wherein one right-angle side of each reinforcing rib (2) which is bent at right angles is fixedly connected with the bottom surface of the hopper, and the other right-angle side is fixedly connected with the outer side surfaces of the corresponding large-caliber conduits and the small-caliber conduits (3 and 4).
4. The building wall CL insulation board integrated pouring device of claim 3, characterized in that: the reinforcing rib (2) is composed of reinforcing steel bars with the diameter of 8mm, and the lengths of two right-angle sides of the reinforcing rib (2) bent at a right angle are both 100mm and 120 mm.
5. The building wall CL insulation board integrated pouring device of claim 1, characterized in that: the hopper (1) is made of a steel plate with a thickness of 3mm, and the large and small-caliber conduits (3, 4) are made of steel pipes with a thickness of 2 mm.
CN202120568770.1U 2021-03-19 2021-03-19 Building wall CL heated board integration pouring device Active CN214941179U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120568770.1U CN214941179U (en) 2021-03-19 2021-03-19 Building wall CL heated board integration pouring device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120568770.1U CN214941179U (en) 2021-03-19 2021-03-19 Building wall CL heated board integration pouring device

Publications (1)

Publication Number Publication Date
CN214941179U true CN214941179U (en) 2021-11-30

Family

ID=79041480

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120568770.1U Active CN214941179U (en) 2021-03-19 2021-03-19 Building wall CL heated board integration pouring device

Country Status (1)

Country Link
CN (1) CN214941179U (en)

Similar Documents

Publication Publication Date Title
CN203878615U (en) Light combined type set-shaped steel formwork for inspection well
CN105937302B (en) A kind of application of curved wall template system in concreting
CN206233596U (en) Building block exterior wall constructional column concrete casting device
CN214941179U (en) Building wall CL heated board integration pouring device
CN103882992B (en) Band ring-type rebar connector
CN208056127U (en) A kind of basement shear wall post-cast strip prefabricated board
CN206753040U (en) The box-like external corner building template of tool group
CN210770662U (en) Regularization utility tunnel water supply pipe buttress steel form
CN209633378U (en) With model multi-pipe-diameter well mold
CN104908150B (en) A kind of piping shaft making template and the method based on factorial praluction piping shaft
CN214090252U (en) A customization template for construction of rain sewage inspection shaft chute
CN206753034U (en) The box-like inner corner trim overlap joint building template of tool group
CN206233381U (en) A kind of structure roof discharge jacket pipe reserved opening blocks system
CN207144496U (en) Concrete filled steel tubular column concrete lift-up device for casting
CN213745297U (en) Socket pre-buried inner steel ring jacking pipe
CN206109283U (en) Put out repairing structure of interior ringwall of stove futilely
CN206123902U (en) A light -duty side form system for precast concrete wall panel production
CN217270227U (en) Tunnel chamfer construction formwork device
CN221021525U (en) Just, tear prefabricated T roof beam end form device open
CN205331696U (en) Ground sewer pipe of built -in toper chamfer piece current -limiting
CN214272452U (en) Built-in heat preservation composite wall insulation board
CN213918824U (en) Aluminum alloy pipe gallery bellmouth mould
CN214725202U (en) Simple and easy prefabricating device of porous no sand concrete pipe
CN217517653U (en) Prefabricated inspection well structure based on non-excavation directional drilling trombone slide construction
CN213952982U (en) Corner connecting node structure of door opening shaping template

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant