- CN221021525U CN221021525U CN202322630149.5U CN202322630149U CN221021525U CN 221021525 U CN221021525 U CN 221021525U CN 202322630149 U CN202322630149 U CN 202322630149U CN 221021525 U CN221021525 U CN 221021525U
- Authority
- CN
- China
- Prior art keywords
- mounting plate
- prefabricated
- mounting
- mounting panel
- beam end
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000009434 installation Methods 0.000 claims abstract description 26
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 9
- 239000010959 steel Substances 0.000 claims abstract description 9
- 230000003014 reinforcing effect Effects 0.000 claims description 30
- 238000004140 cleaning Methods 0.000 abstract description 4
- 230000000694 effects Effects 0.000 abstract description 3
- 238000009435 building construction Methods 0.000 abstract description 2
- 238000000034 method Methods 0.000 description 5
- 229910001294 Reinforcing steel Inorganic materials 0.000 description 2
- 238000010276 construction Methods 0.000 description 2
- 238000001035 drying Methods 0.000 description 2
- 239000002344 surface layer Substances 0.000 description 2
- 238000009423 ventilation Methods 0.000 description 2
- 235000003283 Pachira macrocarpa Nutrition 0.000 description 1
- 241001083492 Trapa Species 0.000 description 1
- 235000014364 Trapa natans Nutrition 0.000 description 1
- 230000006978 adaptation Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000002349 favourable effect Effects 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 235000009165 saligot Nutrition 0.000 description 1
- 238000007711 solidification Methods 0.000 description 1
- 230000008023 solidification Effects 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Landscapes
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
The application discloses a prefabricated T beam end die device convenient to detach, which relates to the technical field of building construction and comprises a first transversely extending mounting plate and a second longitudinally extending mounting plate, wherein the first mounting plate and the second mounting plate are respectively provided with a steel bar reserved hole and a pipeline opening for passing steel bars and corrugated pipes, the edges of the first mounting plate and the second mounting plate are respectively provided with a circle of baffle plates to form a groove shape, and the top of the second mounting plate is fixed with the bottom of the first mounting plate through bolts. The application has the effect of convenient disassembly, the steel bar passes through the steel bar reserved hole during the installation, the corrugated pipe passes through the pipeline port, then the corrugated pipe is installed with other templates through bolts, concrete is poured after the installation is finished, and the other bolts are removed after the installation is finished, so that the first mounting plate and the second mounting plate can be removed, the structure is simple, the disassembly is quick, and the subsequent concrete cleaning is convenient.
Description
Technical Field
The application relates to the technical field of building construction, in particular to a prefabricated T beam end die device convenient to disassemble.
Background
The prefabricated T beam is a common component in bridge engineering, and the construction of the large-span prefabricated T beam is a very complex procedure, such as controlling the camber of the beam, the construction of a template, hoisting and the like, and plays a very important role in the appearance quality of the prefabricated T beam concrete.
And pouring concrete after installing the template, when the strength of the beam body concrete is not lower than 25MPa, and the temperature difference between the core part and the surface layer of the beam body concrete and between the surface layer and the environment is less than 15 ℃, and when the water chestnut can be kept complete, the template needs to be disassembled, and after the template is disassembled, the concrete stained on the template needs to be cleaned immediately for the next use.
Aiming at the related technology, the end mould of the template in the prior art is more complicated to dismantle, so that the stay time of the concrete on the template is longer, and the subsequent cleaning is more troublesome.
Disclosure of utility model
In order to facilitate the subsequent cleaning of concrete, the application provides a convenient-to-detach prefabricated T beam end mold device.
The application provides a convenient-to-disassemble prefabricated T beam end die device which adopts the following technical scheme:
The utility model provides a just, tear prefabricated T roof beam end form device open, includes the first mounting panel of horizontal extension and the second mounting panel of vertical extension, reinforcing bar preformed hole and the pipeline mouth that are used for reinforcing bar and bellows to pass through are all seted up to first mounting panel and second mounting panel, first mounting panel and second mounting panel edge all are equipped with round baffle and form the slot form, second mounting panel top and first mounting panel bottom bolt fastening.
Through adopting above-mentioned technical scheme, second mounting panel top and first mounting panel bottom fixed connection constitute the end mould body, and the reinforcing bar passes from the reinforcing bar preformed hole during the installation, and the bellows passes from the pipeline mouth, then installs through bolt and other templates, pours the concrete after the installation is accomplished, pulls down other bolts after the end, can pull down first mounting panel and second mounting panel, and simple structure, it is quick to dismantle, makes things convenient for follow-up concrete clearance.
Optionally, the first mounting plate is fixedly provided with a plurality of reinforcing plates.
By adopting the technical scheme, the reinforcing plate is arranged for improving the structural strength of the first mounting plate, and the template has enough strength and rigidity to bear the pouring pressure and vibration force of the concrete.
Optionally, the reinforcing plate is fixedly arranged at two sides of the pipeline opening.
Through adopting above-mentioned technical scheme, the pressure that pipeline mouth both sides received needs to be partial bigger, and the fixed stability of setting when being used for guaranteeing to pour the concrete in pipeline mouth both sides of reinforcing plate to guarantee to pour the effect.
Optionally, the reinforcing plate adopts a thickened steel plate.
Optionally, a plurality of elliptical through holes are formed below the second mounting plate.
Through adopting above-mentioned technical scheme, set up oval through-hole and can provide ventilation and drainage channel when concrete maintenance, be favorable to the drying and the solidification of concrete, improve the intensity and the durability of concrete.
Optionally, the inboard dismantlement of second mounting panel is connected with the installation box, the circular through-hole relative with the pipeline mouth has been seted up at the installation box center.
Through adopting above-mentioned technical scheme, circular through-hole and pipeline mouth can wear to establish simultaneously to the bellows, sets up the shutoff after detachable installation box can conveniently pour, and can dismantle clearance back reuse, can need not to carry out the secondary simultaneously and seal the anchor, practices thrift the process, reduce cost.
Optionally, the side wall of the installation box body is obliquely arranged inwards.
By adopting the technical scheme, the inclination of the side wall of the mounting box body can help control the fluidity of concrete. Through setting up the lateral wall slope, can make the concrete flow more evenly in pouring the in-process, reduce the heap volume and the heap pressure of concrete to improve the quality and the work efficiency of concrete.
Optionally, the mounting box both sides are equipped with the extension board, the bolt hole is seted up to the extension board, the mounting box both sides all are equipped with fixing bolt, and adjacent two mounting box offsets.
Through adopting above-mentioned technical scheme, pass the installation of installing the box and dismantle through fixing bolt's bolt hole second mounting panel of extension plate simultaneously, convenient reuse.
In summary, the present application includes at least one of the following beneficial technical effects:
1. The top of the second mounting plate is fixedly connected with the bottom of the first mounting plate to form an end die body, reinforcing steel bars pass through the reinforcing steel bar reserved holes during mounting, corrugated pipes pass through the pipeline openings and are then mounted with other templates through bolts, concrete is poured after the mounting is completed, and the other bolts are removed after the mounting is completed, so that the first mounting plate and the second mounting plate can be removed, the structure is simple, the removal is rapid, and the subsequent concrete cleaning is convenient; 2. providing a reinforcing plate for improving the structural strength of the first mounting plate, the form should have sufficient strength and rigidity to withstand the pouring pressure and vibration force of the concrete;
3. the inclination of the side walls of the mounting box can help control the fluidity of the concrete. Through setting up the lateral wall slope, can make the concrete flow more evenly in pouring the in-process, reduce the heap volume and the heap pressure of concrete to improve the quality and the work efficiency of concrete.
Drawings
Fig. 1 is a schematic overall structure of an embodiment of the present application.
Fig. 2 is a schematic view showing the overall structure of the mounting case according to the embodiment of the present application.
Reference numerals illustrate:
1. A first mounting plate; 11. a reinforcing plate; 2. a second mounting plate; 21. an elliptical through hole; 3. a steel bar preformed hole; 4. pipeline opening; 5. a baffle; 6. installing a box body; 61. a circular through hole; 62. an extension plate; 63. and (5) installing a bolt.
Detailed Description
The present application will be described in further detail below with reference to the accompanying drawings.
The embodiment of the application discloses a convenient-to-disassemble prefabricated T beam end die device.
Referring to fig. 1, a prefabricated T beam end form device convenient to detach includes transversely extending's first mounting panel 1 and longitudinally extending's second mounting panel 2, first mounting panel 1 and second mounting panel 2 have all been seted up and have been used for reinforcing bar and bellows to pass through reinforcing bar preformed hole 3 and pipeline mouth 4, reinforcing bar preformed hole 3 evenly set up in being close to first mounting panel 1 and second mounting panel 2 edge, with prefabricated T beam's reinforcing bar adaptation, pipeline mouth 4 is used for the bellows to pass through, quantity and position set up according to actual service conditions, second mounting panel 2 top passes through the bolt fastening with first mounting panel 1 bottom, second mounting panel 2 top and first mounting panel 1 bottom fixed connection constitute end form body, reinforcing bar passes from reinforcing bar preformed hole 3 during the installation, the bellows passes through pipeline mouth 4, then pass through bolt and other template installation, pour concrete after the installation is accomplished, pull down other bolts after the end, can be torn down first mounting panel 1 and second mounting panel 2, simple structure, dismantle fast, convenient follow-up concrete clearance.
Referring to fig. 1, the edges of the first mounting plate 1 and the second mounting plate 2 are provided with a circle of baffle plates 5 to form a groove shape, the baffle plates 5 can be fixed with the edges of the first mounting plate 1 and the second mounting plate 2 through bolts or welding, the first mounting plate 1 is fixedly provided with a plurality of reinforcing plates 11, two ends of each reinforcing plate 11 are welded and fixed with the baffle plates 5, each reinforcing plate 11 is made of thickened steel plates, the reinforcing plates 11 are fixedly and vertically arranged on two sides of the opening of the pipeline opening 4, the reinforcing plates 11 are used for improving the structural strength of the first mounting plate 1, the second mounting plate 2 can be provided with the reinforcing plates 11 which extend transversely, and the template should have enough strength and rigidity to bear the pouring pressure and vibration force of concrete.
Referring to fig. 1, a plurality of oval through holes 21 are formed below the second mounting plate 2, and a row of oval through holes 21 can provide ventilation and drainage channels during concrete curing, thereby facilitating drying and curing of concrete and improving strength and durability of concrete.
Referring to fig. 1 and 2, the inboard detachable connection of second mounting panel 2 has installation box 6, installation box 6 is the steel case, installation box 6 lateral wall inwards inclines to set up, installation box 6 both sides are equipped with rectangular extension board 62, two bolt holes are seted up to extension board 62, installation box 6 center has been seted up the through-hole installation box 6 both sides relative with pipeline mouth 4 all are equipped with mounting bolt 63, and adjacent two installation box 6's extension board 62 offsets, circular through-hole 61 and pipeline mouth 4 can be worn to establish simultaneously to the bellows, set up detachable installation box 6 and can conveniently pour the back shutoff, pass the installation of extension board 62's bolt hole second mounting panel 2 realization installation box 6 simultaneously and dismantle through fixing bolt, convenient reuse, can not need to carry out secondary simultaneously and seal the anchor, save the process, reduce cost.
The embodiment of the application provides an easy-to-disassemble prefabricated T beam end die device, which has the implementation principle that: the second mounting panel 2 top constitutes the end mould body with first mounting panel 1 bottom fixed connection, and the reinforcing bar passes from reinforcing bar preformed hole 3 during the installation, then passes through mounting bolt 63 fixed mounting box 6, and the bellows passes through from pipeline mouth 4 and circular through-hole 61, then installs the device with other templates through the bolt, pours the concrete after the installation is accomplished, all bolts are torn down after the end, can tear first mounting panel 1 and second mounting panel 2 down, and simple structure dismantles fast, makes things convenient for subsequent concrete clearance.
The above embodiments are not intended to limit the scope of the present application, so: all equivalent changes in structure, shape and principle of the application should be covered in the scope of protection of the application.
Claims (8)
1. Just, tear prefabricated T roof beam end form device open, its characterized in that: including transversely extending's first mounting panel (1) and longitudinally extending's second mounting panel (2), reinforcing bar preformed hole (3) and pipeline mouth (4) that are used for reinforcing bar and bellows to pass through are all seted up to first mounting panel (1) and second mounting panel (2), first mounting panel (1) and second mounting panel (2) edge all are equipped with round baffle (5) and form the slot form, second mounting panel (2) top and first mounting panel (1) bottom bolt fastening.
2. The ready-to-detach prefabricated T-beam end form device of claim 1, wherein: the first mounting plate (1) is fixedly provided with a plurality of reinforcing plates (11).
3. The ready-to-detach prefabricated T-beam end form device of claim 2, wherein: the reinforcing plates (11) are fixedly arranged at two sides of the pipeline opening (4).
4. The ready-to-detach prefabricated T-beam end form device of claim 2, wherein: the reinforcing plate (11) is made of thickened steel plates.
5. The ready-to-detach prefabricated T-beam end form device of claim 1, wherein: a plurality of elliptical through holes (21) are formed below the second mounting plate (2).
6. The ready-to-detach prefabricated T-beam end form device of claim 1, wherein: the inner side of the second mounting plate (2) is detachably connected with a mounting box body (6), and a circular through hole (61) opposite to the pipeline opening (4) is formed in the center of the mounting box body (6).
7. The easy-to-disassemble prefabricated T-beam end form device of claim 6, wherein: the side wall of the installation box body (6) is arranged in an inward inclined mode.
8. The easy-to-disassemble prefabricated T-beam end form device of claim 6, wherein: the two sides of the mounting box body (6) are provided with extension plates (62), the extension plates (62) are provided with bolt holes, the two sides of the mounting box body (6) are provided with mounting bolts (63), and the two adjacent mounting box bodies (6) are propped against each other.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202322630149.5U CN221021525U (en) | 2023-09-26 | 2023-09-26 | Just, tear prefabricated T roof beam end form device open |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202322630149.5U CN221021525U (en) | 2023-09-26 | 2023-09-26 | Just, tear prefabricated T roof beam end form device open |
Publications (1)
Publication Number | Publication Date |
---|---|
CN221021525U true CN221021525U (en) | 2024-05-28 |
Family
ID=91183292
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202322630149.5U Active CN221021525U (en) | 2023-09-26 | 2023-09-26 | Just, tear prefabricated T roof beam end form device open |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN221021525U (en) |
-
2023
- 2023-09-26 CN CN202322630149.5U patent/CN221021525U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2021228189A1 (en) | Reusable post-cast strip support replacement force transfer device and construction method therefor | |
CN111730738A (en) | Prefabricated box girder diaphragm plate connecting structure and construction method thereof | |
CN221021525U (en) | Just, tear prefabricated T roof beam end form device open | |
CN112459472A (en) | Construction method of constructional column after secondary masonry structure is finished | |
CN107060173B (en) | Early demoulding construction method in clear-water concrete wafer board structure hole | |
CN101063332B (en) | Opening box for concrete structure | |
CN209190965U (en) | A kind of adjustable prefabricated board die | |
CN204001212U (en) | Band ring-type rebar connector | |
CN210770662U (en) | Regularization utility tunnel water supply pipe buttress steel form | |
CN210738077U (en) | Waterproof reverse-edge aluminum alloy hanging die | |
CN211775746U (en) | Sewage treatment pond cone basis steel form and matrix connection structure thereof | |
CN109914571B (en) | Basement drainage ditch formwork system, pouring system and construction method | |
CN209976019U (en) | Sink tank template assembly for toilet | |
CN112627570A (en) | Repairing tool for repairing large gap of door opening and construction method thereof | |
CN206957201U (en) | Early form removal in clear-water concrete wafer board structure hole | |
CN217379762U (en) | A construction structures for constructional column is pour | |
CN204728698U (en) | The closed formwork structure of a kind of concrete suspension bridging piece | |
CN219825119U (en) | Aqueduct pouring construction template | |
CN213114905U (en) | Pipe gallery escape canal built-up plate of easily installing and dismantling | |
CN214303107U (en) | Die for integral gas distribution and water distribution filter beam plate construction | |
CN216042635U (en) | Novel anti-bank is pour fixedly device | |
CN220100301U (en) | Shear force wall semicircular pipeline reservation groove construction structures | |
CN221001294U (en) | Assembled formwork-free channel structure | |
CN205918114U (en) | Super large area roofing watershed line design steel mould device | |
CN219138103U (en) | Pre-buried box mounting structure of building templates |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |