CN214912786U - Construction is faced and is built board house pole structure of fleing - Google Patents

Construction is faced and is built board house pole structure of fleing Download PDF

Info

Publication number
CN214912786U
CN214912786U CN202120578734.3U CN202120578734U CN214912786U CN 214912786 U CN214912786 U CN 214912786U CN 202120578734 U CN202120578734 U CN 202120578734U CN 214912786 U CN214912786 U CN 214912786U
Authority
CN
China
Prior art keywords
board house
escape
fleing
steel
construction according
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202120578734.3U
Other languages
Chinese (zh)
Inventor
石纪开
百世健
迟骋
尹双越
宋宜洋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Second Engineering Bureau Co Ltd
Original Assignee
China Construction Second Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Second Engineering Bureau Co Ltd filed Critical China Construction Second Engineering Bureau Co Ltd
Priority to CN202120578734.3U priority Critical patent/CN214912786U/en
Application granted granted Critical
Publication of CN214912786U publication Critical patent/CN214912786U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Emergency Lowering Means (AREA)

Abstract

The utility model provides a construction is faced and is built board house pole structure of fleing, relates to the construction field, sets up in the stair outside of facing the board house, including setting up subaerial buffer base, the vertical pole setting of fleing of fixing on buffer base, cup joint the steel lantern ring at pole top of fleing, connect the steel lantern ring with face the board house steel structure frame between attach the wall pole and the welding the enclosure propaganda baffle on facing the every layer of passageway guard bar outside of building the board house. The buffer base comprises an external fixing ring, a fine stone layer poured on the inner lower part of the external fixing ring and a fine sand layer placed on the fine stone layer. The utility model provides a construction face build board house and flee the problem that the measure has the potential safety hazard under emergency.

Description

Construction is faced and is built board house pole structure of fleing
Technical Field
The utility model relates to a construction field, in particular to construction face and build board house pole structure of fleing.
Background
In the construction process of constructional engineering, the temporary board house is an indispensable part for temporary rooms such as offices, lodging and the like. The temporary building board house needs to be arranged and installed according to actual conditions of a construction site, and the requirement of setting escape stairs cannot be met when an escape passage is usually set. Therefore, potential safety hazards exist in escape measures of the temporary building board house in building construction. Therefore, an escape rod structure of a temporary building plank house in building construction is urgently needed to solve the problem of escape of the temporary building plank house in an emergency.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing a construction is faced and is built board house pole structure of fleing solves the construction under emergency and is faced and build the problem that board house flees the measure and has the potential safety hazard.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the utility model provides a construction is faced and is built board house pole structure of fleing, sets up in the stair outside of facing the board house of building, including setting up subaerial buffer base, the vertical pole setting of fleing of fixing on buffer base, cup joint the steel lantern ring at pole setting top of fleing, connect the steel lantern ring and face the fender propaganda baffle on the board house steel structure outside of building on the wall pole and welding between the steel lantern ring and the every layer of passageway protection railing outside of facing the board house.
Further preferred technical solution: the buffer base comprises an external fixing ring, a fine stone layer poured on the inner lower part of the external fixing ring and a fine sand layer placed on the fine stone layer.
Further preferred technical solution: the thickness of the fine stone layer is 2/3 the height of the outer retainer ring.
Further preferred technical solution: the top of the escape upright rod is connected in the steel sleeve ring in a penetrating way, and the bottom end of the escape upright rod is fixed in the buffer base.
Further preferred technical solution: the top end of the escape upright stanchion is arranged below the cornice of the temporary building board house.
Further preferred technical solution: the enclosure propaganda baffle comprises a rectangular cylindrical three-dimensional frame and propaganda cloth adhered to the periphery of the rectangular cylindrical three-dimensional frame.
Further preferred technical solution: the escape upright stanchion is connected in the rectangular cylindrical three-dimensional frame in a penetrating way.
Further preferred technical solution: one end of the wall-attached rod is welded with the steel lantern ring, and the other end of the wall-attached rod is welded with the steel structure frame of the board house under construction.
Further preferred technical solution: the two wall attaching rods are arranged on the same horizontal plane.
Further preferred technical solution: the included angle between the two wall attaching rods is 45-60 degrees.
Compared with the prior art, the utility model has the following characteristics and beneficial effect:
1, the utility model discloses set up the pole setting of fleing, the pole setting of fleing is fixed through with the fixed drawknot system in upper portion and buffering base from top to bottom, makes the pole setting of fleing have the function of fleing, forms enclosure propaganda baffle through welding rectangle tube-shape space frame and pasting publicity cloth, reaches the mesh that flees personnel's temporary maintenance and use propaganda guide.
2, the utility model has simple structure and convenient manufacture; escape can be effectively organized, and potential safety hazards are solved; the manufacturing cost is saved and can be recycled.
Drawings
FIG. 1 shows the present invention
FIG. 2 shows the present invention
Reference numerals: 1-steel lantern ring, 2-attaches wall pole, 3-pole of fleing for one's life, 4-enclosure propaganda baffle, 5-buffering base.
Detailed Description
Referring to fig. 1 and 2, the escape rod structure of the board building constructed in the building construction is arranged on the outer side of the stairs of the board building constructed in the building construction, and comprises a buffer base 5 arranged on the ground, an escape upright rod 3 vertically fixed on the buffer base 5, a steel sleeve ring 1 sleeved on the top of the escape upright rod 3, a wall attaching rod 2 connected between the steel sleeve ring 1 and a steel structure frame of the board building constructed in the building construction, and an enclosure propaganda baffle plate 4 welded on the outer side of each channel guard rail of the board building constructed in the building construction.
The buffer base 5 comprises an external fixing ring, a fine stone layer poured on the inner lower part of the external fixing ring and a fine sand layer placed on the fine stone layer; the thickness of the fine stone layer is 2/3 of the height of the outer fixing ring; the external fixing ring is made of a rubber tire with the outer diameter not smaller than 600mm, the escape vertical rod 3 is placed in the center of the inner portion of the rubber tire, C20 fine stones are poured in the 2/3 space of the inner lower portion of the rubber tire, fine sand is placed in all the remaining upper portion spaces, and the escape vertical rod 3 is fixed in the rubber tire.
The escape upright stanchion 3 is made of steel pipes with the specification of DN80mm and phi 89x4mm, the vertical height is from the ground to the lower part of the cornice of the board house under construction, and the top of the escape upright stanchion 3 is connected in the steel lantern ring 1 in a penetrating way; the bottom of the upright rod of the escape upright rod 3 is fixed by pouring C20 fine stone concrete inside the rubber tire, and fine sand is placed on the upper part of the rubber tire to serve as an escape buffering device.
The steel lantern ring 1 is made by full welding of 18mm diameter round steel, and the steel lantern ring 1 internal diameter is 90 mm.
The enclosure propaganda baffle plate 4 comprises a rectangular cylindrical three-dimensional frame and propaganda cloth adhered to the periphery of the rectangular cylindrical three-dimensional frame; the rectangular cylindrical three-dimensional frame is formed by welding square steel pipes, and has the dimensions of length, width and height of 1000x900x1100 mm; the propaganda cloth is spray-painted cloth with relevant guidance image-text marks of the escape upright stanchion; the rectangular tubular three-dimensional frame is welded on the outer side of each layer of the channel protective railing of the temporary building board house, the escape upright stanchion 3 is wrapped in the center by the rectangular tubular three-dimensional frame, and propaganda cloth which is relevant to guidance of the escape upright stanchion is pasted and sprayed on the outer side of the rectangular tubular three-dimensional frame, so that residents can know the using method and attention of the escape upright stanchion in living areas conveniently, and the attractive effect is achieved.
The wall attaching rod 2 is made of L40x4mm angle steel, one end of the wall attaching rod is welded with the steel lantern ring 1, and the other end of the wall attaching rod is welded with the steel structure frame of the board house to be built; the two wall attaching rods 2 are welded on the outer side of the steel lantern ring 1 at intervals, the two wall attaching rods 2 are located on the same horizontal plane, and the included angle between the two wall attaching rods 2 is 45-60 degrees. The life zone escape upright stanchion 3 forms a fixed drawknot system at the upper part of the life zone escape upright stanchion through the steel lantern ring 1 and the wall-attached pole 2.
The escape upright rod 3 is fixed with the upper fixed drawknot system and the upper end and the lower end of the buffer base 5, so that the escape upright rod has an escape function, and the purpose of temporary maintenance and use propaganda guidance of escape personnel is achieved by welding the rectangular cylindrical three-dimensional frame and pasting propaganda cloth to form the enclosure propaganda baffle plate 4.
The utility model has simple structure and convenient manufacture; escape can be effectively organized, and potential safety hazards are solved; the manufacturing cost is saved and can be recycled.
The utility model discloses preparation and application method of construction is faced and is built board house pole structure of fleing, including following step:
step one, measuring and positioning the position of the escape upright stanchion 3 and paying off.
And step two, cutting out 282mm long round steel with the diameter of 18mm, and manufacturing the steel bushing ring 1 with the inner diameter of 90 mm.
And step three, positioning and measuring according to the escape upright stanchion 3, intercepting two L40x4 angle steels with proper lengths as the auxiliary wall rods 2, separating the two auxiliary wall rods 2 by an included angle of 45-60 degrees, reliably welding the acute angle ends of the two auxiliary wall rods with the steel sleeve ring 1, and reliably welding the other ends of the two auxiliary wall rods with the steel structure frame at the top end of the temporary building board house.
And step four, positioning according to the escape upright stanchion 3, and placing a rubber tire with the outer diameter not less than 600mm under the steel grommet 1.
And fifthly, measuring the height from the ground to the lower part of the cornice of the board house to be built according to the positioning, cutting out a steel pipe DN80mm and phi 89x4mm according to the measured size to be used as an escape upright rod 3, installing the escape upright rod 3, penetrating the upper end of the escape upright rod into the steel bushing ring 1, and penetrating the lower end of the escape upright rod into the rubber tire.
And sixthly, pouring C20 fine stone concrete in the space of the 2/3 at the upper part in the rubber tire, and placing fine sand in the remaining space at the upper part.
And seventhly, welding a rectangular cylindrical three-dimensional frame with the length, the width and the height of 1000x900x1100mm on the outer side of each layer of channel protective barrier of the temporary building board room, wrapping the escape upright stanchion 3 in the middle by the rectangular cylindrical three-dimensional frame, and adhering and spraying spray-painting cloth related to the escape upright stanchion on the outer side of the rectangular cylindrical three-dimensional frame, so that residents can know the use method and the attention points of the escape upright stanchion 3 in the living area conveniently.
Step eight, when a safety accident happens, the personnel can go down to the ground safety position along the escape upright stanchion 3 to quickly escape.
It is obvious to a person skilled in the art that the invention is not restricted to details of the above-described exemplary embodiments, but that it can be implemented in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.
Furthermore, it should be understood that although the present description refers to embodiments, not every embodiment may contain only a single embodiment, and such description is for clarity only, and those skilled in the art should integrate the description, and the embodiments may be combined as appropriate to form other embodiments understood by those skilled in the art.

Claims (10)

1. The utility model provides a construction is faced and is built board house pole structure of fleing which characterized in that: the stair outer side of setting in facing building board house, including setting up buffer base (5) subaerial, vertical pole setting (3) of fleing of fixing on buffer base (5), cup joint in the steel lantern ring (1) of pole setting (3) top of fleing, connect the steel lantern ring (1) and face building board house steel structural framework between enclose wall pole (2) and weld enclosure propaganda baffle (4) on facing building board house every layer of passageway guard rail outside.
2. The escape bar structure for the board house in building construction according to claim 1, characterized in that: the buffer base (5) comprises an external fixing ring, a fine stone layer poured on the inner lower part of the external fixing ring and a fine sand layer placed on the fine stone layer.
3. The escape bar structure for the board house in building construction according to claim 2, characterized in that: the thickness of the fine stone layer is 2/3 the height of the outer retainer ring.
4. The escape bar structure for the board house in building construction according to claim 1, characterized in that: the top of the escape upright rod (3) is connected in the steel lantern ring (1) in a penetrating way, and the bottom end of the escape upright rod is fixed in the buffer base (5).
5. The escape bar structure for the board house in building construction according to claim 1, characterized in that: the top end of the escape upright stanchion (3) is arranged below the cornice of the board house under construction.
6. The escape bar structure for the board house in building construction according to claim 1, characterized in that: the enclosure propaganda baffle plate (4) comprises a rectangular cylindrical three-dimensional frame and propaganda cloth adhered to the periphery of the rectangular cylindrical three-dimensional frame.
7. The escape bar structure for the board house in building construction according to claim 6, wherein: the escape upright stanchion (3) is connected in the rectangular cylindrical three-dimensional frame in a penetrating way.
8. The escape bar structure for the board house in building construction according to claim 1, characterized in that: one end of the wall attaching rod (2) is connected with the steel lantern ring (1) in a welding mode, and the other end of the wall attaching rod is welded with the steel structure frame of the board house to be built.
9. The escape bar structure for the temporary building board house for building construction according to any one of claims 1 to 8, wherein: the two wall attaching rods (2) are arranged, and the two wall attaching rods (2) are positioned on the same horizontal plane.
10. The escape bar structure for the board house in building construction according to claim 9, wherein: the included angle between the two wall attaching rods (2) is 45-60 degrees.
CN202120578734.3U 2021-03-22 2021-03-22 Construction is faced and is built board house pole structure of fleing Active CN214912786U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120578734.3U CN214912786U (en) 2021-03-22 2021-03-22 Construction is faced and is built board house pole structure of fleing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120578734.3U CN214912786U (en) 2021-03-22 2021-03-22 Construction is faced and is built board house pole structure of fleing

Publications (1)

Publication Number Publication Date
CN214912786U true CN214912786U (en) 2021-11-30

Family

ID=79041799

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120578734.3U Active CN214912786U (en) 2021-03-22 2021-03-22 Construction is faced and is built board house pole structure of fleing

Country Status (1)

Country Link
CN (1) CN214912786U (en)

Similar Documents

Publication Publication Date Title
CN209942196U (en) Cantilever support system for large-volume concrete structure
JP5701435B1 (en) Temporary partition structure that can be diverted to a permanent partition structure or a structure having other functions
WO2015025565A1 (en) High-rise building and maintenance method therefor
CN211286943U (en) Rail guard device for high-rise building construction
CN214912786U (en) Construction is faced and is built board house pole structure of fleing
TWI673418B (en) External wall cantilever construction platform and its assembly method
CN213268816U (en) Assembled shaped steel horizontal protection platform of encorbelmenting
CN112854233A (en) Deep foundation pit up-down stairs and telescopic support part and suspension part for stairs
CN213269278U (en) Construction guardrail of noise reduction
CN213328818U (en) Steel guardrail
CN210947825U (en) Protective bracket for building construction
CN211872617U (en) Permanent isolation guardrail for urban bridge
CN215369073U (en) Anti-climbing airport guardrail for vertical wall surface
CN219316470U (en) Assembled construction safety barrier
KR200340325Y1 (en) Bridge inspection
CN219451701U (en) Green guardrail for building engineering
CN210020895U (en) Escape device of prefabricated house
CN220247019U (en) PHC tubular pile body straightness automatic monitoring device that hangs down
CN220100747U (en) Telescopic floor edge guard rail
NZ336959A (en) Scaffolding
CN218779913U (en) Operating platform for pouring operators
CN219246479U (en) Simple transformer protection structure
CN212802412U (en) Tower type scaffold for artificial passage
CN210152417U (en) Construction enclosure
CN218815503U (en) Temporary building house with escape facility

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant