CN214828854U - High altitude pipeline heat preservation construction work platform - Google Patents
High altitude pipeline heat preservation construction work platform Download PDFInfo
- Publication number
- CN214828854U CN214828854U CN202121303271.6U CN202121303271U CN214828854U CN 214828854 U CN214828854 U CN 214828854U CN 202121303271 U CN202121303271 U CN 202121303271U CN 214828854 U CN214828854 U CN 214828854U
- Authority
- CN
- China
- Prior art keywords
- platform
- heat preservation
- steel
- construction work
- sliding
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000010276 construction Methods 0.000 title claims abstract description 50
- 238000004321 preservation Methods 0.000 title claims abstract description 18
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 45
- 239000010959 steel Substances 0.000 claims abstract description 45
- 238000009413 insulation Methods 0.000 claims description 10
- 238000003466 welding Methods 0.000 claims description 5
- 230000001681 protective effect Effects 0.000 claims description 3
- 230000000149 penetrating effect Effects 0.000 claims 1
- 238000004519 manufacturing process Methods 0.000 abstract description 3
- 230000005012 migration Effects 0.000 abstract 1
- 238000013508 migration Methods 0.000 abstract 1
- 238000000034 method Methods 0.000 description 6
- 230000008569 process Effects 0.000 description 3
- 230000004048 modification Effects 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000008859 change Effects 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 230000008520 organization Effects 0.000 description 1
Images
Landscapes
- Emergency Lowering Means (AREA)
Abstract
The utility model provides an aerial duct heat preservation construction work platform, including the track that slides, the slip gyro wheel, operation platform, electric block, horizontal draw gear, the track that slides comprises 2I-steel, and the slip gyro wheel is the two gyro wheels of multiunit, and wire rope is connected operation platform and electric block lifting hook, pulls the vertical migration who realizes operation platform through electric block perpendicularly, and constructor through operation platform pulls wire rope's another, realizes the smooth best operation face of sliding to the needs that carry out the pipeline heat preservation construction of operation platform level. An object of the utility model is to provide an aerial duct heat preservation construction work platform, its simple manufacture, ann tear open convenience, construction cost low, the efficiency of construction is high, do not occupy the aerial duct under the construction operation face, avoided traditional scaffold frame as aerial duct construction work platform's drawback, avoided setting up the potential safety hazard of scaffold frame simultaneously, improved on-the-spot civilized construction current situation.
Description
Technical Field
The utility model relates to a pipeline installation construction technical field especially relates to an aerial duct heat preservation construction work platform.
Background
In recent years, the urbanization process is accelerated, the municipal engineering construction amount is increased year by year, the high-altitude pipeline construction is an important organization part of the municipal engineering, the high-altitude pipeline heat insulation construction is used as an important content of the high-altitude pipeline construction, the high-altitude pipeline heat insulation adopts a traditional floor type scaffold as a construction operation platform, the defects of high construction cost, high potential safety hazard and low construction efficiency of engineering construction operation surfaces below pipelines are overcome, and a simple, efficient and economic high-altitude pipeline heat insulation construction operation platform is urgently needed in a construction site.
SUMMERY OF THE UTILITY MODEL
In view of the above problem, an object of the utility model is to provide an aerial duct heat preservation construction work platform, its simple manufacture, ann tear open convenience, construction cost low, the efficiency of construction is high, do not occupy the aerial duct under the construction operation face, avoided traditional scaffold frame as aerial duct construction work platform's drawback, avoided setting up the potential safety hazard of scaffold frame simultaneously, improved the on-the-spot civilized construction current situation.
The technical scheme of the utility model as follows:
an aerial pipeline heat-insulation construction work platform comprises a sliding rail, a sliding roller, an operation platform, an electric hoist and a horizontal traction device; the sliding track consists of 2I-shaped steels, two ends of the sliding track are placed on the built pipeline concrete support, and the sliding track is welded and fixed on the built pipeline concrete support by utilizing a steel plate and round steel; the sliding rollers are a plurality of groups of double rollers and are respectively positioned on the lower flange of the sliding track, the outer sides of the sliding rollers are provided with a baffle plate and clamping plates, each clamping plate is provided with a bolt connected square tube, and the other end of each square tube is connected with the operating platform; the operation platform consists of a platform base and a protective railing, is connected with an electric hoist lifting hook by using a steel wire rope, and is vertically moved by vertically drawing the electric hoist; the electric hoist is provided with a roller wheel, is connected to the lower flange of the sliding track and can slide; the horizontal traction device is characterized in that a fixed pulley is arranged on a steel plate at one end of the I-shaped steel, the fixed pulley is connected with the sliding roller baffle and the electric hoist through a steel wire rope, and the other end of the steel wire rope is pulled by a constructor on the operation platform, so that the operation platform horizontally and stably slides to the optimal operation surface needing to be subjected to pipeline heat insulation construction.
Furthermore, the sliding track is composed of 2 No. 20I-steel, the thickness of the steel plate and the diameter of the round steel are both 10mm, and the sliding track is fixed on the built pipeline concrete support.
Further, the sliding rollers adopt 4 groups of double rollers with the diameter of 60 mm.
Further, the platform base primary and secondary roof beams of operation platform adopt 50x50 square tube welding, the interval is 600mm, the platform size is 2500mmx3000mm, the steel basketry piece is laid on platform upper portion, its protection railing adopts the pipe of external diameter 25mm, welding height 1200mm, wear the pole mode through the bolt and be connected with the platform base, protection railing lower part sets up 180mm high fender sole to fully hang close mesh safety net.
Furthermore, the electric hoist adopts 2 electric hoists with the specification of 1 ton.
Further, horizontal draw gear adopts and takes 100 mm's in the U type pulley in the side.
The invention has the advantages that:
the utility model is suitable for a high altitude pipeline heat preservation construction, construction cost is low, and the potential safety hazard is little, does not influence pipeline below engineering construction operation face, and the efficiency of construction is high, simple manufacture, and the ann tears the convenience open.
Drawings
The present invention will be described in further detail with reference to the accompanying drawings.
FIG. 1 is a schematic structural view of an aerial pipeline thermal insulation construction work platform;
FIG. 2 is a schematic structural view of a sliding track of an aerial pipeline heat-preservation construction work platform;
FIG. 3 is a schematic structural view of a sliding roller of the aerial pipeline thermal insulation construction work platform;
FIG. 4 is a schematic structural view of an operating platform of the aerial pipeline heat-preservation construction operating platform;
FIG. 5 is a schematic structural view of an electric hoist of the aerial pipeline heat-preservation construction work platform;
FIG. 6 is a schematic structural view of a horizontal traction device of an aerial pipeline heat-preservation construction work platform;
shown in the figure: the method comprises the following steps of 1-sliding track, 2-sliding roller, 3-operating platform, 4-electric hoist and 5-horizontal traction device.
Detailed Description
For the purpose of the present invention, technical solutions and advantages will be more clearly understood from the following detailed description of the present invention with reference to the accompanying drawings, wherein the exemplary embodiments and descriptions of the present invention are used to explain the present invention, but not as limitations of the present invention.
The following description is provided for illustrative purposes, and other advantages and features of the present invention will become apparent to those skilled in the art from the following detailed description.
It should be understood that the drawings of the present application are only used to match the contents disclosed in the specification, so as to be known and read by those skilled in the art, and not to limit the practical limitations of the present invention, so that the present application does not have any technical significance, and any modification of the structure, change of the ratio relationship, or adjustment of the size should still fall within the scope of the present application without affecting the function and the achievable purpose of the present application. Meanwhile, the terms such as "upper", "lower", "left", "right", "middle", and the like used in the present specification are for convenience of description, and are not intended to limit the scope of the present invention, and changes or adjustments of the relative relationship thereof may be considered as the scope of the present invention without substantial changes in the technical content.
In the description of the present invention, it is to be noted that, unless otherwise explicitly specified or limited, the terms "connected" and "connected" are to be interpreted broadly, and may be, for example, fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; may be directly connected or indirectly connected through an intermediate. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art.
As shown in fig. 1-6, the utility model relates to an aerial pipeline thermal insulation construction work platform, which comprises a sliding track 1, a sliding roller 2, an operation platform 3, an electric hoist 4 and a horizontal traction device 5; the sliding track 1 consists of 2I-shaped steels, two ends of the sliding track are placed on the built pipeline concrete support, and the sliding track is welded and fixed on the built pipeline concrete support by utilizing a steel plate and round steel; the sliding rollers 2 are a plurality of groups of double rollers and are respectively positioned on the lower flange of the sliding rail 1, the outer sides of the sliding rollers 2 are provided with a baffle plate and clamping plates, each clamping plate is provided with a bolt connecting square tube, and the other end of each square tube is connected with the operating platform 3; the operating platform 3 consists of a platform base and a protective railing, the operating platform 3 is connected with a lifting hook of the electric hoist 4 by using a steel wire rope, and the vertical movement of the operating platform 3 is realized by the vertical traction of the electric hoist 4; the electric hoist 4 is provided with a roller and is connected to the lower flange of the sliding track 1 and can slide; the horizontal traction device 5 is characterized in that a fixed pulley is arranged on a steel plate at one end of the I-shaped steel, the fixed pulley is connected with the sliding roller 2 baffle and the electric hoist 4 through a steel wire rope, and the other end of the steel wire rope is pulled by a constructor on the operation platform 3, so that the operation platform 3 can horizontally and stably slide to the optimal operation surface needing to be subjected to pipeline heat insulation construction.
In one embodiment, 2 pieces of 20# I-steel are placed on a built pipeline concrete support, a steel plate with the thickness of 10mm is used for being cushioned between the I-steel and the concrete support, the I-steel and the steel plate are welded together by using round steel with the thickness of 10mm to complete the construction of a sliding track 1, a sliding roller 2 is arranged on the lower flange of the I-steel on the sliding track 1, 4 groups of 60mm double rollers are adopted for the sliding roller 2, a baffle plate and a clamping plate are arranged on the outer side of the roller, each clamping plate is connected with a 40 x 40 square tube by a bolt, the other end of the square tube is welded with an operation platform (3), the rollers on 2 electric hoists 4 with the specification of 1 ton are arranged on the lower flange of the I-steel on the sliding track 1, the operation platform 3 is connected with a lifting hook of the electric hoist 4 by using a steel wire rope, and the vertical movement of the operation platform 3 is realized by the vertical traction of the electric hoist 4, so that the operation platform can be conveniently installed, Dismantle, operation platform 3 comprises platform base and protection railing, platform base primary and secondary roof beam adopts 50x50 side's pipe welding interval to be 600mm, the platform size is 2500mmx3000mm, steel basketry piece is laid on platform upper portion, its protection railing adopts the pipe of external diameter 25mm, weld height 1200mm, wear the pole mode through the bolt and be connected with the platform base, the protection railing lower part sets up 180mm high fender footboard, and hang densely-meshed safety net fully, horizontal draw gear 5 adopts in 100 mm's U type pulley, fix on the steel sheet of I-steel tip, utilize wire rope to be connected pulley and sliding roller 2's splint and electric hoist 4, operation platform's constructor carries out operation platform's horizontal steady movement through the other end that pulls wire rope.
It is to be noted that the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
The protection scope of the present invention is not limited to the technical solution disclosed in the specific embodiment, and all the modifications, equivalent replacements, improvements, etc. made by the technical entity of the present invention to the above embodiments all fall into the protection scope of the present invention.
Claims (6)
1. The utility model provides an aerial duct heat preservation construction work platform which characterized in that: comprises a sliding track (1), a sliding roller (2), an operating platform (3), an electric hoist (4) and a horizontal traction device (5); the sliding track (1) consists of 2I-shaped steels, two ends of the sliding track are placed on the built pipeline concrete support, and the sliding track is fixed on the built pipeline concrete support by welding steel plates and round steel; the sliding rollers (2) are a plurality of groups of double rollers and are respectively located on the lower flange of the sliding rail (1), the outer side of each sliding roller (2) is provided with a baffle and a clamping plate, each clamping plate is provided with a bolt connected square tube, and the other end of each square tube is connected with the operating platform (3); the operation platform (3) consists of a platform base and a protective railing, the operation platform (3) is connected with a lifting hook of the electric hoist (4) by using a steel wire rope, and the operation platform (3) vertically moves by vertically drawing the electric hoist (4); the electric hoist (4) is provided with rollers, is connected to the lower flange of the sliding track (1) and can slide; the horizontal traction device (5) is characterized in that a fixed pulley is arranged on a steel plate at one end of an I-shaped steel, the fixed pulley is connected with a sliding roller (2) baffle and an electric block (4) through a steel wire rope, and the other end of the steel wire rope is pulled by a constructor on the operation platform (3), so that the operation platform (3) can horizontally and stably slide to the optimal operation surface needing to be subjected to pipeline heat insulation construction.
2. The aerial pipeline heat preservation construction work platform of claim 1, characterized in that: the sliding track (1) is composed of 2 No. 20I-steel, and the thickness of the steel plate and the diameter of the round steel are both 10 mm.
3. The aerial pipeline heat preservation construction work platform of claim 1, characterized in that: the sliding roller (2) adopts 4 groups of double rollers with the diameter of 60 mm.
4. The aerial pipeline heat preservation construction work platform of claim 1, characterized in that: the platform base primary and secondary beams of the operating platform (3) are welded by adopting 50x50 square tubes, the distance is 600mm, the size of the platform is 2500mmx3000mm, a steel fence sheet is laid on the upper portion of the platform, a round tube with the outer diameter of 25mm is adopted as a protection railing of the platform, the welding height is 1200mm, the platform base is connected with the protection railing in a bolt penetrating mode, a 180mm high-stop foot plate is arranged on the lower portion of the protection railing, and a dense mesh safety net is fully hung.
5. The aerial pipeline heat preservation construction work platform of claim 1, characterized in that: the electric hoist (4) adopts 2 electric hoists with the specification of 1 ton.
6. The aerial pipeline heat preservation construction work platform of claim 1, characterized in that: horizontal draw gear (5) adopt and take 100 mm's in the U type pulley in.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202121303271.6U CN214828854U (en) | 2021-06-11 | 2021-06-11 | High altitude pipeline heat preservation construction work platform |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202121303271.6U CN214828854U (en) | 2021-06-11 | 2021-06-11 | High altitude pipeline heat preservation construction work platform |
Publications (1)
Publication Number | Publication Date |
---|---|
CN214828854U true CN214828854U (en) | 2021-11-23 |
Family
ID=78805199
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202121303271.6U Expired - Fee Related CN214828854U (en) | 2021-06-11 | 2021-06-11 | High altitude pipeline heat preservation construction work platform |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN214828854U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113135534A (en) * | 2021-06-11 | 2021-07-20 | 中国建筑第四工程局有限公司 | High altitude pipeline heat preservation construction work platform |
-
2021
- 2021-06-11 CN CN202121303271.6U patent/CN214828854U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113135534A (en) * | 2021-06-11 | 2021-07-20 | 中国建筑第四工程局有限公司 | High altitude pipeline heat preservation construction work platform |
CN113135534B (en) * | 2021-06-11 | 2024-05-24 | 中国建筑第四工程局有限公司 | High-altitude pipeline heat preservation construction operation platform |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN111021251B (en) | Construction method for assembling steel box girder above tramcar | |
CN101899905A (en) | Hoisting slide devices and hoisting slide equipment | |
CN214828854U (en) | High altitude pipeline heat preservation construction work platform | |
CN102190249B (en) | Method for hoisting equipment positioned at bottom of multilayer frame platform | |
CN105888227B (en) | Superelevation is tubaeform steel structure exterior finish operation platform and its building method | |
CN203961317U (en) | Slip list Pin and many truss structures moulding bed | |
CN206554524U (en) | A kind of construction discharging platform | |
CN110747307B (en) | Large steam drum hoisting method in converter energy-saving and environment-friendly reconstruction | |
CN208858135U (en) | A kind of integral lifting construction of lift well job platform | |
CN201857761U (en) | Hoisting and sliding device and hoisting and sliding equipment | |
CN208732486U (en) | Roofing monorail crane | |
CN208299744U (en) | Factory roof photovoltaic battery panel cleaning platform | |
CN113135534A (en) | High altitude pipeline heat preservation construction work platform | |
CN207158647U (en) | A kind of Lift-on/Lift-off System for sound barrier panel | |
CN214834922U (en) | Super-long-distance transportation device for roof color steel plates | |
CN103375029A (en) | Prestressed dome hoisting cantilever crane | |
CN204954201U (en) | Blast furnace stove outer covering outer wall welding platform | |
CN214696959U (en) | High-altitude large-caliber pipeline sliding device | |
CN213738242U (en) | Horizontal installation utility tool for internal parts of large tower | |
CN209741592U (en) | Rail device of smoke prevention and dust control vehicle on top of coke oven | |
CN210237035U (en) | Telescopic movable operation platform in heat absorption tower | |
CN206888522U (en) | A kind of form removable device | |
CN209383344U (en) | A kind of steel column horizontal transport and lifting device | |
CN207078915U (en) | A kind of medium and small steel beam lifting special hanger | |
CN206784366U (en) | A kind of quick detachable, no-welding steel sheet pile safe spacing frame |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20211123 |