CN214828569U - Portable internal climbing tower crane spandrel girder hoisting device - Google Patents

Portable internal climbing tower crane spandrel girder hoisting device Download PDF

Info

Publication number
CN214828569U
CN214828569U CN202121136308.0U CN202121136308U CN214828569U CN 214828569 U CN214828569 U CN 214828569U CN 202121136308 U CN202121136308 U CN 202121136308U CN 214828569 U CN214828569 U CN 214828569U
Authority
CN
China
Prior art keywords
tower crane
spandrel girder
climbing tower
lifting device
longitudinal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202121136308.0U
Other languages
Chinese (zh)
Inventor
罗红党
陆启宏
曹醒
蒋怡
王海金
吕洪刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Fourth Engineering Division Corp Ltd
Original Assignee
China Construction Fourth Engineering Division Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Fourth Engineering Division Corp Ltd filed Critical China Construction Fourth Engineering Division Corp Ltd
Priority to CN202121136308.0U priority Critical patent/CN214828569U/en
Application granted granted Critical
Publication of CN214828569U publication Critical patent/CN214828569U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Jib Cranes (AREA)

Abstract

The utility model discloses a tower crane spandrel girder hoisting device climbs in portable, including work platform, connecting piece, lifting means, work platform includes first longeron, crossbeam, first longeron forms the work platform of "II" shape or "well" shape with the crossbeam vertical cross fixation, the crossbeam sets up respectively in the both sides of climbing tower crane upper portion standard festival in first longeron bottom, the connecting piece saves detachable fixed connection with crossbeam and standard respectively, lifting means's main lifting means detachable is fixed to be set up in the at least one end of first longeron, be provided with the first rigging of being connected with the spandrel girder that needs to promote on the main lifting means. The utility model discloses a set up detachable workstation and lifting means on the standard festival on climbing tower crane upper portion including, realize self spandrel girder's self-lifting, avoided traditional spandrel girder to promote collision risk and height and weigh down the problem that the risk is big, the promotion work efficiency is low, complex operation, be fit for all the promotion of climbing tower crane spandrel girder in.

Description

Portable internal climbing tower crane spandrel girder hoisting device
Technical Field
The utility model belongs to the technical field of construction machinery, concretely relates to tower crane spandrel girder hoisting device is climbed in portable.
Background
The inner climbing tower crane is a tower crane installed in an elevator shaft or a staircase in a building, and can climb upwards gradually along with the construction process. Because the internal climbing tower crane is arranged in the middle of the building, the internal climbing tower crane does not occupy the construction site and has small amplitude of extending out of the building, is suitable for the engineering with narrow site and can effectively avoid surrounding obstacles, sidewalks and the like; tracks do not need to be laid, and a reinforced concrete foundation does not need to be specially manufactured, so that construction preparation is simple (holes only need to be reserved), and cost is saved; the construction requirements can be met only by a small number of standard sections without a plurality of anchoring devices and complex attachment operation, the one-time investment is low, and the economic benefit is remarkable. Therefore, the internal climbing tower crane can be widely applied to the construction of high-rise buildings.
The climbing of the tower crane is the key work of super high-rise construction, and the climbing process of the tower crane requires the aerial disintegration of a bearing beam of the tower crane, the transportation to a preset floor and the installation, thereby realizing the climbing of the tower crane. As shown in fig. 1, the lifting of the traditional bearing beam needs to be performed by means of other nearby tower cranes for matched construction, and because the lifting of the bearing beam is performed in a high altitude and narrow space, not only are operators without reliable protective measures and the operation complicated, but also the collision risk between the tower cranes is large during the operation, the high falling risk in the lifting process is large, and the whole operation process has large potential safety hazards; in addition, the promotion of traditional spandrel girder needs about 2 hours, and the tower crane that climbs and cooperate the tower crane can not carry out normal hoist and mount work during whole promotion operation, greatly reduced tower crane utilization ratio and efficiency of construction.
In order to solve the problems of the traditional spandrel girder lifting method, an auxiliary lifting device is arranged on a tower crane turntable in the prior art, the spandrel girder lifting in each direction is realized through the rotation of the tower crane turntable, but the cooperation of the tower crane turntable is needed when the spandrel girder is lifted, so that the normal lifting work of a tower crane cannot be carried out during the lifting, and the utilization rate of the tower crane is influenced; and the carousel structure of tower crane is complicated and lower part bearing structure is more, and auxiliary hoisting device can only use single armed formula structure and mounted position comparatively to limit, in order to guarantee the intensity of single armed formula structure, must cause the connection structure weight great with the tower crane carousel, influences the security of tower crane. In addition, because the auxiliary lifting device adopts a single-arm structure and is positioned on the tower crane turntable, the auxiliary lifting device is far away from the bearing beam which needs to be lifted at the lower part, and is lifted by a single point, the bearing beam is difficult to accurately position and inhibit swinging, and the construction efficiency of the bearing beam is seriously influenced. Therefore, it is very necessary to develop a convenient internal climbing tower crane spandrel girder lifting device which has no collision risk, small high falling risk, high lifting efficiency, convenient operation and cyclic utilization.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a but collision risk, high weight risk little, promote work efficiency height, simple operation, cyclic utilization's portable internal climbing tower crane spandrel girder hoisting device.
The purpose of the utility model is realized like this: including work platform, connecting piece, lifting means, work platform includes first longeron, crossbeam, the fixed work platform that forms "II" shape or "well" shape of first longeron and the perpendicular cross of crossbeam, the crossbeam sets up respectively in the both sides of climbing tower crane upper portion standard festival in the first longeron bottom, the connecting piece saves detachable fixed connection with crossbeam and standard respectively, lifting means's main lifting means detachable is fixed to be set up in the at least one end of first longeron, be provided with the first rigging of being connected with the spandrel girder that needs to promote on the main lifting means.
The utility model has the advantages that:
1. the utility model discloses a set up detachable workstation and lifting means on the standard festival on tower crane upper portion including climbing, realize self spandrel girder from promoting, both avoided traditional spandrel girder to promote the problem that the in-process collision risk and height weigh down the risk greatly, set up the protection network and prevent the railing at work platform moreover, for operating personnel provides the protection guarantee and has avoided the high altitude thing that weighs down, eliminated the potential safety hazard.
2. The utility model discloses set up on the standard section of interior tower crane of climbing, still do not influence the normal hoist and mount work of tower crane when promoting the spandrel girder, the promotion of spandrel girder only needs about 30 minutes moreover, and the utilization ratio of tower crane and the lifting efficiency of spandrel girder are higher.
3. The utility model realizes the lifting of the bearing beams at the two sides of the standard section of the tower crane through the main lifting devices arranged at the two ends of the first longitudinal beam, the lifting process does not need the rotation of the tower crane, and the lifting operation is simpler and more convenient; and the workstation passes through crossbeam detachable to be fixed in tower crane standard festival both sides, and the better and firm in connection of stability of workstation does not need complicated connection structure, and whole weight is lighter and the installation with demolish conveniently, both have higher fail safe nature, but and cyclic utilization, be fit for all promotion of climbing the tower crane spandrel girder in.
4. The working platform of the utility model is arranged on the standard section below the tower crane turntable, which can effectively shorten the distance between the lifting device and the pre-lifting bearing beam; simultaneously through setting up the second longeron in the crossbeam outside to be provided with electric block respectively at the lower part or the top at second longeron both ends, thereby can promote the border part of tower crane alone through electric block, also can assist the spandrel girder to form the multiple spot and promote moreover, the accurate positioning of the spandrel girder of being convenient for and restrain the swing, effectively improved the hoisting efficiency of spandrel girder.
To sum up, the utility model has the characteristics of no collision risk, high risk of falling are little, promote that the work efficiency is high, simple operation, cyclic utilization.
Drawings
FIG. 1 is a schematic diagram of a conventional internal climbing tower crane;
FIG. 2 is an application schematic diagram of the inner climbing tower crane of the utility model;
FIG. 3 is a schematic illustration of FIG. 2 reaching a target operating condition;
FIG. 4 is a schematic view of the present invention;
FIG. 5 is a second schematic structural view of the present invention;
FIG. 6 is a top view of FIG. 5;
in the figure: 1-a working platform, 1-1-a first longitudinal beam, 1-2-a cross beam, 1-3-a second longitudinal beam, 1-3A-a lug plate, 1-4-a protective net, 1-5-a protective railing, 2-a connecting piece, 2-1-a clamping plate, 2-2-a supporting plate, 3-a lifting device, 3-1-a main lifting device, 3-2-a first rigging, 3-3-an electric hoist, 3-4-a second rigging, 3-5-a guide wheel, 4-a standard knot, 5-a bearing beam, 6-a bolt, 7-a building main body structure, 8-a tower crane hole and 9-an internal climbing tower crane.
Detailed Description
The present invention is further described with reference to the following drawings and examples, but the present invention is not limited thereto in any way, and any modification or improvement based on the teaching of the present invention is within the protection scope of the present invention.
As shown in fig. 2 to 6, the utility model discloses a work platform 1, connecting piece 2, lifting means 3, work platform 1 includes first longeron 1-1, crossbeam 1-2, first longeron 1-1 forms "II" shape or "well" shape work platform 1 with crossbeam 1-2 vertical cross fixation, crossbeam 1-2 sets up respectively in the both sides of climbing tower crane upper portion standard festival 4 in first longeron 1-1 bottom, connecting piece 2 respectively with crossbeam 1-2 and standard festival 4 detachable fixed connection, the fixed at least one end that sets up in first longeron 1-1 of main lifting means 3-1 detachable of lifting means 3, be provided with the first rigging 3-2 of being connected with the spandrel girder 5 that needs to promote on the main lifting means 3-1.
As shown in fig. 5 and 6, two ends of a cross beam 1-2 of the well-shaped working platform 1 are fixedly provided with a second longitudinal beam 1-3 in parallel, the lower part or the top end of the two ends of the second longitudinal beam 1-3 is respectively provided with an electric hoist 3-3, and the electric hoist 3-3 is provided with a second rigging 3-4.
As shown in fig. 4, the main lifting device 3-1 of the lifting device 3 is detachably and fixedly arranged at one end of the first longitudinal beam 1-1, and the other end of the first longitudinal beam 1-1 is provided with a guide wheel 3-5 capable of passing through the first rigging 3-2.
As shown in fig. 5 and 6, the main lifting devices 3-1 of the lifting device 3 are respectively and fixedly arranged at two ends of the first longitudinal beam 1-1 in a detachable manner.
The lower parts of the two ends of the second longitudinal beam 1-3 are fixedly provided with lug plates 1-3A, and the electric hoist 3-3 is hung on the lug plates 1-3A.
The top end or the bottom end of the working platform 1 is fixedly provided with protective nets 1-4, the outer side of the top end of the working platform 1 is also fixedly provided with protective railings 1-5, and the cross beams 1-2 are respectively and fixedly connected with the first longitudinal beam 1-1 and the second longitudinal beam 1-3 through bolts 6.
The first longitudinal beams 1-1 respectively penetrate through the standard sections 4 in parallel or are arranged on two sides of the standard sections 4 in parallel and extend outwards, and the main lifting equipment 3-1 is respectively arranged on the upper parts of two ends between the first longitudinal beams 1-1 through bolts 6.
The connecting piece 2 comprises a clamping plate 2-1 and a supporting plate 2-2, the clamping plate 2-1 is detachably and fixedly clamped on two sides of a connecting rod of the standard joint 4, one side of the supporting plate 2-2 is vertically and fixedly connected with the outer wall of the clamping plate 2-1 on the outer side of the standard joint 4, and the upper side of the supporting plate 2-2 is detachably and fixedly connected with the cross beam 1-2.
The supporting plate 2-2 is of a T-shaped structure, one side of a lower longitudinal plate of the supporting plate 2-2 is vertically welded with the outer wall of the clamping plate 2-1, an upper transverse plate of the supporting plate 2-2 is fixedly connected with the cross beam 1-2 through a bolt 6, and the clamping plate 2-1 is fixedly clamped on two sides of a connecting rod of the standard joint 4 through the bolt 6.
The first longitudinal beam 1-1, the second longitudinal beam 1-3 and the cross beam 1-1 are made of 300X 200X 10X 15I-shaped steel, and the clamping plate 2-1 is fixedly clamped on two sides of a connecting rod of the standard joint 4 through a 10.9-grade high-strength bolt 6.
The working platform 1 and/or the inner climbing tower crane cockpit are/is provided with a control device, and the main lifting equipment 3-1 and the electric hoist 3-3 are respectively and electrically connected with the control device.
The main lifting equipment 3-1 is a winch with the lifting capacity of at least 3 tons, and the electric hoist 3-3 has the lifting capacity of at least 3 tons.
The utility model discloses dismouting and working process are as follows:
as shown in figures 2, 3 and 5, 6, according to site operation drawing and tower crane service description, the tower crane climbing working condition and principle are analyzed, and the tower crane installation and dismantling scheme are considered, the utility model discloses a load to do not influence tower crane safety and service function and as the prerequisite, design and make first longeron 1-1, second longeron 1-3 and crossbeam 1-2 that workstation 1 corresponds, process connecting piece 2 in the mill simultaneously.
During installation, firstly, a connecting piece 2 is installed on a standard section 4 of the tower crane on the ground through a high-strength bolt 6 with the diameter of 25mm, then a cross beam 1-2 and the connecting piece 2 are fixed through the bolt 6, then a first longitudinal beam 1-1 and a second longitudinal beam 1-3 are respectively connected above the cross beam 1-2 through the bolt 6, a winch 3-1 is respectively fixed at two ends of the first longitudinal beam 1-1 through common bolts 6 with the diameter of 20mm, and meanwhile, electric hoists 3-3 are respectively hung on lug plates 1-3A below the top ends of the second longitudinal beams 1-3 at four corners of a workbench 1; finally, a punching net with the aperture of 20mm and the thickness of 1.5mm is used as a protective net 1-4 to be horizontally and fully paved on the workbench 1 and is connected with the first longitudinal beam 1-1, the second longitudinal beam 1-3 and the cross beam 1-2 in a welding way to prevent objects from falling from the air; rectangular steel pipes of 40mm multiplied by 2.5mm are adopted, and bolts 6 and the first longitudinal beam 1-1, the second longitudinal beam 1-3 and the cross beam 1-2 are respectively connected to the edge of the workbench 1 to be used as protective railings 1-5; finally, the electric hoist 3-3 and the winch 3-1 are electrically connected with a control device arranged on the workbench 1; will install the utility model discloses a 4 synchronous installations on the tower crane of standard festival to consider to check and accept along with tower crane itself in step, accomplish the utility model discloses the installation.
When the hoisting device is used, the winch 3-1 is controlled to release cables and tighten the gravity center of the pre-hoisting bearing beam 5, then the electric hoists 3-3 on the two sides are controlled to release cables and tighten the two sides of the pre-hoisting bearing beam 5, the bearing beam 5 is disassembled in the air, meanwhile, the winch 3-1 and the electric hoists 3-3 are controlled to retract cables and hoist, after the electric hoists reach a preset position, the installation position of the bearing beam 5 can be accurately adjusted by finely adjusting the electric hoists 3-3 on one side, the binding of the first rigging 3-2 and the second rigging 3-4 is removed after the installation of the bearing beam 5 is completed, and the winch 3-1 and the electric hoists 3-3 are controlled to retract cables to complete the hoisting process of the bearing beam 5. After the use is finished, the working platform 1 is closed, and the operation of non-operators is forbidden.
And when the standard section is removed, the standard section is taken into consideration for synchronous removal.
The above description is only for the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any changes or substitutions that can be easily conceived by those skilled in the art within the technical scope of the present invention should be covered by the protection scope of the present invention. Therefore, the protection scope of the present invention shall be subject to the protection scope of the claims.

Claims (10)

1. The portable inner climbing tower crane bearing beam lifting device is characterized by comprising a working platform (1), a connecting piece (2) and a lifting device (3), wherein the working platform (1) comprises a first longitudinal beam (1-1) and a cross beam (1-2), the first longitudinal beam (1-1) and the cross beam (1-2) are vertically crossed and fixed to form the working platform (1) in the shape of II or well, the cross beam (1-2) is respectively arranged on two sides of an upper standard knot (4) of an inner climbing tower crane at the bottom end of the first longitudinal beam (1-1), the connecting piece (2) is respectively and fixedly connected with the cross beam (1-2) and the standard knot (4) in a detachable manner, and a main lifting device (3-1) of the lifting device (3) is fixedly arranged on at least one end of the first longitudinal beam (1-1), the main lifting equipment (3-1) is provided with a first rigging (3-2) connected with a bearing beam (5) to be lifted.
2. The portable internal climbing tower crane spandrel girder lifting device according to claim 1, wherein second longitudinal beams (1-3) are fixedly arranged at two ends of a cross beam (1-2) of the 'well' -shaped working platform (1) in parallel, electric hoists (3-3) are respectively arranged at the lower parts or the top ends of the two ends of the second longitudinal beams (1-3), and second rigging (3-4) are arranged on the electric hoists (3-3).
3. The portable internal climbing tower crane spandrel girder hoisting device according to claim 2, wherein the lower parts of the two ends of the second longitudinal beam (1-3) are fixedly provided with lug plates (1-3A), and the electric block (3-3) is hung on the lug plates (1-3A).
4. The portable internal climbing tower crane spandrel girder lifting device according to claim 2, wherein the main lifting device (3-1) of the lifting device (3) is detachably and fixedly arranged at one end of the first longitudinal beam (1-1), and the other end of the first longitudinal beam (1-1) is provided with a guide wheel (3-5) which can pass through the first rigging (3-2).
5. The portable internal climbing tower crane spandrel girder lifting device according to claim 2, wherein the main lifting devices (3-1) of the lifting device (3) are respectively detachably and fixedly arranged at two ends of the first longitudinal beam (1-1).
6. The portable internal climbing tower crane spandrel girder hoisting device according to claim 2, characterized in that a protective net (1-4) is fixedly arranged at the top end or the bottom end of the working platform (1), a protective railing (1-5) is further fixedly arranged on the outer side of the top end of the working platform (1), and the cross beam (1-2) is fixedly connected with the first longitudinal beam (1-1) and the second longitudinal beam (1-3) through bolts (6).
7. The portable internal climbing tower crane spandrel girder hoisting device of claim 2, characterized in that the first longitudinal beams (1-1) respectively pass through the standard knot (4) in parallel or are arranged on both sides of the standard knot (4) in parallel and extend outwards, and the main hoisting equipment (3-1) is respectively arranged on the upper parts of both ends between the first longitudinal beams (1-1) through bolts (6).
8. The portable internal climbing tower crane bearing beam lifting device according to claim 2, wherein the connecting piece (2) comprises a clamping plate (2-1) and a supporting plate (2-2), the clamping plate (2-1) is detachably and fixedly clamped on two sides of a connecting rod of the standard joint (4), one side of the supporting plate (2-2) is fixedly connected with the outer wall of the clamping plate (2-1) on the outer side of the standard joint (4) in a vertical manner, and the upper side of the supporting plate (2-2) is fixedly connected with the beam (1-2) in a detachable manner.
9. The portable internal climbing tower crane spandrel girder hoisting device of claim 8, characterized in that backup pad (2-2) is "T" shape structure, lower part longitudinal plate one side and splint (2-1) outer wall vertical welding of backup pad (2-2), the upper portion diaphragm and crossbeam (1-2) of backup pad (2-2) pass through bolt (6) fixed connection, splint (2-1) pass through the fixed centre gripping in the connecting rod both sides of standard festival (4) of bolt (6).
10. The portable internal-climbing tower crane spandrel girder lifting device according to any one of claims 2 to 9, wherein the working platform (1) and/or the internal-climbing tower crane cockpit are provided with a control device, and the main lifting equipment (3-1) and the electric hoist (3-3) are respectively electrically connected with the control device.
CN202121136308.0U 2021-05-26 2021-05-26 Portable internal climbing tower crane spandrel girder hoisting device Active CN214828569U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121136308.0U CN214828569U (en) 2021-05-26 2021-05-26 Portable internal climbing tower crane spandrel girder hoisting device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121136308.0U CN214828569U (en) 2021-05-26 2021-05-26 Portable internal climbing tower crane spandrel girder hoisting device

Publications (1)

Publication Number Publication Date
CN214828569U true CN214828569U (en) 2021-11-23

Family

ID=78776672

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121136308.0U Active CN214828569U (en) 2021-05-26 2021-05-26 Portable internal climbing tower crane spandrel girder hoisting device

Country Status (1)

Country Link
CN (1) CN214828569U (en)

Similar Documents

Publication Publication Date Title
CN202706503U (en) Electric lifting discharging platform for main building construction
CN103711301A (en) Construction method and device for two-track movable electric basket and lifting hoist
CN207294093U (en) A kind of large span steel truss integral lifting apparatus
CN107575018A (en) A kind of special-shaped chimney hydraulic mould lifting device
CN103967263B (en) Hydraulic automatic jumping discharging platform
CN203143872U (en) Mobile platform for elevator installation construction
CN201458583U (en) Liftable and detachable lifting platform
CN203947758U (en) Novel hydraulic automatic climbing discharging platform
CN204626930U (en) Integrated lifting frame operating platform
CN212532065U (en) Gantry crane capable of being used in different height difference places
CN214828569U (en) Portable internal climbing tower crane spandrel girder hoisting device
CN209873572U (en) Interim navigation lifting station of adjustable vertical lift height
CN203794505U (en) Internal climbing steel beam conveying device of internal climbing movable arm tower crane
CN215167846U (en) Elevator shaft construction work platform
CN212562551U (en) Pull rod type rear support section steel overhanging discharging platform
RU190781U1 (en) CONSOLE CRANE FOR INSTALLATION OF WOODEN SUPPLEMENTS FROM THE SAWN FOREST
CN110359756A (en) 750kV booster stations framework installation method
CN204402001U (en) For the mobile operating platform system that structure for steel structure roof inner slab is installed
CN204185146U (en) Construction of Steel Structure overhang crane between skyscraper two tall buildings
CN209482687U (en) A kind of Super High exterior frame column construction operation platform
CN102733612B (en) Mounting method of electric hoist orbit
CN206844680U (en) Steel gallery ground assembly load transfer device
CN206328690U (en) A kind of big discrepancy in elevation, large span stiff skeleton external wrapping concrete template construction equipment
CN213571548U (en) Movable operation platform for bridge deck
CN110748140A (en) Track beam hanging basket special for stepped curtain wall

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant