CN214789466U - Tuber pipe hoist and mount mounting structure - Google Patents

Tuber pipe hoist and mount mounting structure Download PDF

Info

Publication number
CN214789466U
CN214789466U CN202121342884.0U CN202121342884U CN214789466U CN 214789466 U CN214789466 U CN 214789466U CN 202121342884 U CN202121342884 U CN 202121342884U CN 214789466 U CN214789466 U CN 214789466U
Authority
CN
China
Prior art keywords
plate
grip block
mounting bracket
locking
tuber pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202121342884.0U
Other languages
Chinese (zh)
Inventor
郭守涛
李小成
贺元
顾陈辉
宋骏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Kaishen Fire Fighting Equipment Installation Co ltd
Original Assignee
Shanghai Kaishen Fire Fighting Equipment Installation Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Kaishen Fire Fighting Equipment Installation Co ltd filed Critical Shanghai Kaishen Fire Fighting Equipment Installation Co ltd
Priority to CN202121342884.0U priority Critical patent/CN214789466U/en
Application granted granted Critical
Publication of CN214789466U publication Critical patent/CN214789466U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model belongs to the technical field of the technique of fire-fighting engineering and specifically relates to a tuber pipe hoist and mount mounting structure is related to, including the mounting bracket, the tuber pipe body has been placed on the mounting bracket, be provided with installation device on the mounting bracket, installation device is including setting up the fixed plate on the mounting bracket and the side grip block that is used for carrying out spacing processing to the side of tuber pipe body, fixed plate and side grip block set up relatively in the horizontal direction, side grip block sliding fit is on the mounting bracket, be provided with on the side grip block and be used for the locking device between side grip block and the mounting bracket. This application has the effect that promotes the possibility that the mounting bracket can satisfy the user and need install the tuber pipe of unidimensional not.

Description

Tuber pipe hoist and mount mounting structure
Technical Field
The application relates to the technical field of fire engineering, in particular to an air pipe hoisting and mounting structure.
Background
At present, a fire fighting pipeline refers to a pipeline material which is used for connecting fire fighting equipment and equipment in the aspect of fire fighting and used for conveying water, gas or other media for fire fighting, wherein an air pipe is used for conveying air in one of the fire fighting pipelines.
When the existing air pipe is installed, an installation frame is generally needed to be used, the air pipe is installed on the installation frame firstly, and the installation frame is installed on a floor slab with a supporting effect through a connecting piece.
Aiming at the related technologies, the inventor thinks that the mounting rack is generally not adjustable, and only can be used for mounting air pipes with fixed sizes, so that the possibility that users need to mount air pipes with different sizes is low.
SUMMERY OF THE UTILITY MODEL
In order to promote the mounting bracket and can satisfy the user and need carry out the possibility of installing to the tuber pipe of unidimensional, this application provides an tuber pipe hoist and mount mounting structure.
The application provides a tuber pipe hoist and mount mounting structure adopts following technical scheme:
the utility model provides an tuber pipe hoist and mount mounting structure, includes the mounting bracket, the tuber pipe body has been placed on the mounting bracket, be provided with installation device on the mounting bracket, installation device is including setting up the fixed plate on the mounting bracket and the side grip block that is used for carrying out spacing processing to the side of tuber pipe body, fixed plate and side grip block set up relatively in the horizontal direction, side grip block sliding fit is on the mounting bracket, be provided with on the side grip block and be used for the locking device with locking between side grip block and the mounting bracket.
Through adopting above-mentioned technical scheme, be provided with installation device on the mounting bracket, place the back in the installation device with the tuber pipe body, promote the side grip block and extrude the side of tuber pipe body, lock between with side grip block and the mounting bracket through locking device afterwards, accomplish the installation to the tuber pipe body, can promote the mounting bracket and satisfy the user and need carry out the possibility of installing not unidimensional tuber pipe.
Optionally: sliding fit has the top surface grip block that is used for carrying out the centre gripping to the top surface of tuber pipe body on the fixed plate, the top surface grip block sets up with the mounting bracket relatively in the vertical direction, also be provided with locking device on the top surface grip block, locking device is used for carrying out spacing processing with top surface grip block and fixed plate.
Through adopting above-mentioned technical scheme, sliding fit has the top surface grip block on the fixed plate, through the cooperation between top surface grip block and the mounting bracket, carries out spacing processing with the upper and lower surface of tuber pipe body to lock between top surface grip block and the fixed plate through locking device, make the installation of tuber pipe body more firm.
Optionally: the top clamping plate comprises a sliding plate in sliding fit with the fixed plate and an adjusting plate in sliding fit with the side clamping plate, and the adjusting plate is in sliding fit with the sliding plate along the horizontal direction.
Through adopting above-mentioned technical scheme, through the sliding fit between regulating plate and the side grip block, make the side grip block can support the regulating plate, the regulating plate can support the side grip block simultaneously, makes the slip of top surface grip block and side grip block more stable.
Optionally: the locking device comprises a supporting plate arranged on the sliding plate, an adjusting rod arranged in the supporting plate in a penetrating mode and a locking block arranged on the adjusting rod, a locking groove is formed in the side face of the fixing plate, the cross section of the locking groove is T-shaped, and the locking block is clamped with the locking groove.
Through adopting above-mentioned technical scheme, push the latch segment back in the locking groove to make the latch segment and the joint between the locking groove, can realize the locking to the locking groove, realize the locking between fixed plate and the sliding plate.
Optionally: be provided with right-angle face and arcwall face on the latch segment, right-angle face and arcwall face set up on four corners of latch segment at the central axis of regulation pole interval in proper order, right-angle face and locking groove looks joint, arcwall face and locking groove normal running fit.
Through adopting above-mentioned technical scheme, will adjust the pole and rotate, can drive right-angle side and arcwall face simultaneously and rotate, when the lateral wall of arcwall face earlier through the locking groove, the arcwall face can continue to drive the right-angle side and rotate, and after the lateral wall of locking groove was rotated to the right-angle side, the right-angle side and locking groove looks joint realized the locking between latch segment and the locking groove, the simple operation.
Optionally: the adjusting rod is sleeved with a reset elastic piece used for pushing the locking block to abut against the locking groove, and two ends of the reset elastic piece abut against the supporting plate and the locking block respectively.
Through adopting above-mentioned technical scheme, through the setting of the elastic component that resets, behind the latch segment butt in the locking inslot, the elastic component that resets can promote the latch segment butt in the locking inslot, and then makes the joint between latch segment and the locking inslot more stable.
Optionally: the one end of adjusting the pole and keeping away from the latch segment is provided with spacing head.
Through adopting above-mentioned technical scheme, through the setting of spacing head, can avoid adjusting the pole and follow the slippage in the backup pad.
Optionally: the mounting bracket includes the fixed part of butt on the tuber pipe body and sets up the installation department on the fixed part, be provided with the connecting piece on the installation department.
Through adopting above-mentioned technical scheme, through the setting of installation department, penetrate the installation department with the connecting piece in to be connected through connecting piece and floor, can realize simple structure, simple to operate to the installation of mounting bracket.
In summary, the present application includes at least one of the following beneficial technical effects:
1. the installation device is arranged on the installation frame, the side clamping plates are pushed to extrude the side surfaces of the air pipe body after the air pipe body is placed in the installation device, and then the side clamping plates and the installation frame are locked through the locking device, so that the installation of the air pipe body is completed, and the installation frame can be improved to meet the requirement of a user on the possibility of installing air pipes with different sizes;
2. through sliding fit on the fixed plate, the top surface clamping plate is arranged, through the fit between the top surface clamping plate and the mounting frame, the upper surface and the lower surface of the air pipe body are subjected to limiting treatment, and the top surface clamping plate and the fixed plate are locked through the locking device, so that the air pipe body is more firmly mounted.
Drawings
FIG. 1 is a partial cross-sectional view of the present application;
fig. 2 is a partially enlarged view of a portion a in fig. 1.
Reference numerals: 1. a mounting frame; 11. a fixed part; 12. an installation part; 2. an air duct body; 3. a mounting device; 31. a fixing plate; 311. a locking groove; 32. a side clamping plate; 4. a locking device; 41. a support plate; 42. adjusting a rod; 421. a limiting head; 43. a locking block; 431. a right-angled surface; 432. an arc-shaped surface; 5. a top clamping plate; 51. a sliding plate; 52. an adjusting plate; 6. a restoring elastic member; 7. a connecting member.
Detailed Description
The present application is described in further detail below with reference to figures 1-2.
The embodiment of the application discloses tuber pipe hoist and mount mounting structure. Referring to fig. 1 and 2, an air duct hoisting and mounting structure comprises a mounting frame 1, wherein the mounting frame 1 comprises a fixing part 11 abutted to an air duct body 2 and two mounting parts 12 fixedly arranged on the fixing part 11, the fixing part 11 is a concave-shaped plate, the mounting parts 12 are horizontal rectangular plates, the two mounting parts 12 are arranged on the fixing part 11, connecting pieces 7 are arranged on the mounting parts 12 in a penetrating manner, the connecting pieces 7 are vertically arranged, the connecting pieces 7 can be directly formed by bolts, the air duct body 2 is placed on the mounting frame 1, the air duct body 2 is a horizontal rectangular tube, a mounting device 3 is fixedly arranged on the mounting frame 1, when the air duct body 2 needs to be mounted, firstly, the air duct body 2 is inserted into the installation device 3, the air duct body 2 is extruded and locked by the installation device 3, and then fixedly connecting the connecting piece 7 with the floor to finish the installation operation of the air pipe body 2.
Referring to fig. 1 and 2, the mounting device 3 includes a fixing plate 31 fixedly disposed on the mounting frame 1 and a side clamping plate 32 for limiting the side surface of the air duct body 2, the fixing plate 31 and the side clamping plate 32 are vertical rectangular plates, the fixing plate 31 and the side clamping plate 32 are disposed at opposite intervals in the horizontal direction, a sliding groove is formed in the fixing portion 11, the sliding groove is horizontally disposed, the bottom end of the side clamping plate 32 is slidably fitted in the sliding groove, the side clamping plate 32 is slidably fitted on the mounting frame 1, and a locking device 4 for locking the side clamping plate 32 and the mounting frame 1 is fixedly disposed on the side clamping plate 32.
Referring to fig. 1 and 2, a top clamping plate 5 for clamping the top surface of the air duct body 2 is slidably fitted on the fixed plate 31, the top clamping plate 5 is horizontally arranged, the top clamping plate 5 comprises a sliding plate 51 slidably fitted on the fixed plate 31 and an adjusting plate 52 slidably fitted on the side clamping plate 32, the sliding plate 51 is a horizontal rectangular plate, a rectangular groove for sliding the adjusting plate 52 is formed in the sliding plate 51, the adjusting plate 52 is a horizontal rectangular plate, and the adjusting plate 52 is slidably fitted with the sliding plate 51 along the horizontal direction. Top surface grip block 5 and mounting bracket 1 set up relatively in vertical direction at the interval, also fixed locking device 4 that is provided with on the top surface grip block 5, when needing to install tuber pipe body 2, place tuber pipe body 2 in fixed plate 31, fixed part 11, in "returning" style of calligraphy frame that forms between side grip block 32 and the top surface grip block 5, fix top surface grip block 5 and fixed plate 31 through locking device 4 afterwards, fix between side grip block 32 and the fixed part 11, the completion is to the installation of tuber pipe body 2.
Referring to fig. 1 and 2, the locking device 4 includes a supporting plate 41 fixedly disposed on the sliding plate 51, an adjusting rod 42 disposed in the supporting plate 41 in a penetrating manner, and a locking block 43 fixedly disposed at one end of the adjusting rod 42 close to the fixing plate 31, the supporting plate 41 is an "L" shaped plate, the adjusting rod 42 is a horizontal "T" shaped rod, a limiting head 421 is integrally formed at one end of the adjusting rod 42 far from the locking block 43, the limiting head 421 is a vertical circular plate, and the diameter of the limiting head 421 is greater than that of the adjusting rod 42. The side surfaces of the fixing plate 31 and the fixing part 11 are both provided with a locking groove 311, and the cross section of the locking groove 311 is T-shaped.
Referring to fig. 1 and 2, the latch segment 43 is a rectangular segment, the latch segment 43 is provided with right-angle surfaces 431 and arc surfaces 432, the right-angle surfaces 431 and the arc surfaces 432 are sequentially arranged on four corners of the latch segment 43 at intervals by using the central axis of the adjusting rod 42, the right-angle surfaces 431 are arranged in two, the two right-angle surfaces 431 are arranged in opposite angles, the arc surfaces 432 are arranged in two, the two arc surfaces 432 are arranged in opposite angles, the right-angle surfaces 431 are clamped with the locking groove 311, and the arc surfaces 432 are in rotation fit with the locking groove 311.
Referring to fig. 1 and 2, the adjusting rod 42 is sleeved with a reset elastic member 6, the reset elastic member 6 may be directly formed by a reset spring, the reset elastic member 6 is horizontally disposed, and two ends of the reset elastic member 6 are respectively abutted to the supporting plate 41 and the locking block 43.
Referring to fig. 1 and 2, when the air duct body 2 needs to be installed, the adjusting rod 42 moves away from the locking groove 311 to drive the locking block 43 to extrude the elastic restoring member 6, then the side clamping plate 32 and the sliding plate 51 are pushed to move towards the air duct body 2, the sliding plate 51 descends, meanwhile, the adjusting plate 52 slides towards the sliding plate 51 to make the sliding plate 51 abut against the upper surface of the air duct body 2, and after the side clamping plate 32 abuts against the side surface of the air duct body 2 in the width direction, the adjusting rod 42 rotates to make the long edge of the locking block 43 and the length direction of the locking groove 311 arranged in the same direction, then the adjusting rod 42 is released, the elastic restoring member 6 pushes the locking block 43 to abut against the locking groove 311, then the adjusting rod 42 rotates to drive the locking block 43 to rotate, firstly the arc surface 432 rotates towards the right-angle direction of the side wall close to the locking groove 311 to drive the rotation of the surface 431, after the arc-shaped surface 432 abuts against the side wall of the locking groove 311, the arc-shaped surface 432 can continuously rotate to drive the right-angle surface 431 to rotate, after the right-angle surface 431 abuts against the side wall of the locking groove 311, the locking block 43 cannot continuously rotate, the locking block 43 is clamped with the locking groove 311 to lock the side clamping plate 32 and the fixing part 11, then the sliding plate 51 and the fixing plate 31 are locked by the same method, and the air duct body 2 is installed.
The implementation principle of the air pipe hoisting and mounting structure in the embodiment of the application is as follows: when needing to install tuber pipe body 2, insert in installation device 3 tuber pipe body 2 earlier, move latch segment 43 to keeping away from locking groove 311 department after that, promote side grip block 32 and top surface grip block 5 afterwards, make side grip block 32 and top surface grip block 5 all butt on tuber pipe body 2, then through locking device 4, carry out spacing processing with side grip block 32 and top surface grip block 5, will pass through connecting piece 7 fixed mounting on the floor according to installation department 12 at last, the completion is to the installation of tuber pipe body 2.
The above embodiments are preferred embodiments of the present application, and the protection scope of the present application is not limited by the above embodiments, so: all equivalent changes made according to the structure, shape and principle of the present application shall be covered by the protection scope of the present application.

Claims (8)

1. The utility model provides an tuber pipe hoist and mount mounting structure, includes mounting bracket (1), place tuber pipe body (2), its characterized in that on mounting bracket (1): be provided with installation device (3) on mounting bracket (1), installation device (3) are including setting up fixed plate (31) on mounting bracket (1) and side grip block (32) that are used for carrying out spacing processing to the side of tuber pipe body (2), fixed plate (31) and side grip block (32) set up relatively on the horizontal direction, side grip block (32) sliding fit is on mounting bracket (1), be provided with on side grip block (32) and be used for locking device (4) between side grip block (32) and mounting bracket (1).
2. The air pipe hoisting installation structure of claim 1, wherein: sliding fit has top surface grip block (5) that is used for carrying out the centre gripping to the top surface of tuber pipe body (2) on fixed plate (31), top surface grip block (5) set up with mounting bracket (1) relatively in vertical direction, also be provided with locking device (4) on top surface grip block (5), locking device (4) are used for carrying out spacing processing with top surface grip block (5) and fixed plate (31).
3. The air pipe hoisting installation structure of claim 2, wherein: the top clamping plate (5) comprises a sliding plate (51) in sliding fit with the fixed plate (31) and an adjusting plate (52) in sliding fit with the side clamping plate (32), and the adjusting plate (52) is in sliding fit with the sliding plate (51) along the horizontal direction.
4. The air duct hoisting and mounting structure as claimed in claim 3, wherein: the locking device (4) comprises a support plate (41) arranged on the sliding plate (51), an adjusting rod (42) arranged in the support plate (41) in a penetrating mode and a locking block (43) arranged on the adjusting rod (42), a locking groove (311) is formed in the side face of the fixing plate (31), the cross section of the locking groove (311) is T-shaped, and the locking block (43) is connected with the locking groove (311) in a clamping mode.
5. The air duct hoisting and mounting structure as claimed in claim 4, wherein: be provided with right angle face (431) and arcwall face (432) on latch segment (43), right angle face (431) and arcwall face (432) set up on four corners of latch segment (43) with the central axis of adjusting pole (42) interval in proper order, right angle face (431) and locking groove (311) looks joint, arcwall face (432) and locking groove (311) normal running fit.
6. The air duct hoisting and mounting structure as claimed in claim 5, wherein: the adjusting rod (42) is sleeved with a reset elastic piece (6) used for pushing the locking block (43) to abut against the locking groove (311), and two ends of the reset elastic piece (6) abut against the supporting plate (41) and the locking block (43) respectively.
7. The air duct hoisting and mounting structure as claimed in claim 6, wherein: one end of the adjusting rod (42) far away from the locking block (43) is provided with a limiting head part (421).
8. The air pipe hoisting installation structure of claim 1, wherein: mounting bracket (1) is including butt fixed part (11) on tuber pipe body (2) and set up installation department (12) on fixed part (11), be provided with connecting piece (7) on installation department (12).
CN202121342884.0U 2021-06-16 2021-06-16 Tuber pipe hoist and mount mounting structure Active CN214789466U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121342884.0U CN214789466U (en) 2021-06-16 2021-06-16 Tuber pipe hoist and mount mounting structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121342884.0U CN214789466U (en) 2021-06-16 2021-06-16 Tuber pipe hoist and mount mounting structure

Publications (1)

Publication Number Publication Date
CN214789466U true CN214789466U (en) 2021-11-19

Family

ID=78713027

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121342884.0U Active CN214789466U (en) 2021-06-16 2021-06-16 Tuber pipe hoist and mount mounting structure

Country Status (1)

Country Link
CN (1) CN214789466U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114673831A (en) * 2022-05-26 2022-06-28 中国二十二冶集团有限公司 Ventilating pipe hanging and fixing device for building construction

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114673831A (en) * 2022-05-26 2022-06-28 中国二十二冶集团有限公司 Ventilating pipe hanging and fixing device for building construction

Similar Documents

Publication Publication Date Title
CN214789466U (en) Tuber pipe hoist and mount mounting structure
CN211779399U (en) Pipeline fixing device for building water supply and drainage
CN214368233U (en) Heating pipe clamping device with adjustable tension force
CN111946905A (en) Antidetonation support convenient to installation
CN214976894U (en) Stainless steel pipeline support suitable for return bend is fixed
CN215445438U (en) Fixing device for butt joint of gas pipelines
CN210950223U (en) Adjustable anti-seismic support
CN214063999U (en) Warm antidetonation stable form gallows that leads to and purify tuber pipe
CN211073349U (en) Positioning mechanism for assembling tractor gearbox
CN212107222U (en) Connecting device for mounting gas pipe
CN210007291U (en) special cable anti-seismic support for pipe gallery
CN210600448U (en) Position-adjustable support hanger
CN220790232U (en) Arc anodic aluminum oxide plate curtain wall fixing and embedding device
CN220910688U (en) Wall-hanging device for building water supply pipeline
CN216590547U (en) Pipeline positioning support for water supply and drainage engineering
CN213367361U (en) Pipeline fixing device on construction frame
CN220688259U (en) Connecting mechanism for pipeline mounting bracket
CN216201182U (en) Clamping mechanism of special bracket for fire-fighting pipeline
CN216279784U (en) Pipe network support and hanger of spraying system
CN216327910U (en) Special erection equipment of fire engineering
CN214406236U (en) Indoor heating and ventilation installation structure
CN217714120U (en) Multi-angle fire pipeline fixing device convenient to construction
CN216530307U (en) Communication pipeline protection device for intelligent engineering
CN220416466U (en) Pipeline laying frame for fire-fighting construction
CN219825951U (en) Building stone curtain wall hanging and mounting structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant