CN219825951U CN202222091134.1U CN202222091134U CN219825951U CN 219825951 U CN219825951 U CN 219825951U CN 202222091134 U CN202222091134 U CN 202222091134U CN 219825951 U CN219825951 U CN 219825951U
Authority
CN
China
Prior art keywords
buckle
bolt
clamping
mounting structure
curtain wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222091134.1U
Other languages
Chinese (zh)
Inventor
胡勇强
胡红刚
吴三保
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan Jinyuanyi Decoration Engineering Co ltd
Original Assignee
Wuhan Jinyuanyi Decoration Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan Jinyuanyi Decoration Engineering Co ltd filed Critical Wuhan Jinyuanyi Decoration Engineering Co ltd
Priority to CN202222091134.1U priority Critical patent/CN219825951U/en
Application granted granted Critical
Publication of CN219825951U publication Critical patent/CN219825951U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00Adapting or protecting infrastructure or their operation
    • Y02A30/24Structural elements or technologies for improving thermal insulation
    • Y02A30/244Structural elements or technologies for improving thermal insulation using natural or recycled building materials, e.g. straw, wool, clay or used tires

Landscapes

  • Load-Bearing And Curtain Walls (AREA)

Abstract

The utility model relates to a hanging and mounting structure of a building stone curtain wall, which relates to the field of building construction and aims to solve the problem of unstable mounting of stone panels. The utility model has the effects that the locking component fixes the position of the positioning rod while the buckle is fixedly arranged with the keel, so that the stone panel is more stably arranged.

Description

Building stone curtain wall hanging and mounting structure
Technical Field
The utility model relates to the field of building construction, in particular to a hanging and mounting structure of a building stone curtain wall.
Background
The building stone curtain wall is generally composed of stone panels and supporting structures, does not bear the load and the action of a main structure, and is generally hung on a steel frame directly by using metal hanging pieces or without grouting and pasting in the construction process.
The utility model provides a stone material curtain hangs mounting structure, include with wall parallel arrangement's fossil fragments, multiunit joint board and connecting piece, fossil fragments are located the horizontal plane, the equal fixed mounting of multiunit joint board is on stone material panel, joint board and fossil fragments joint adaptation have all been seted up the mounting hole on joint board and the fossil fragments, the connecting piece is the screw, make the screw pass the mounting hole on joint board and the fossil fragments, accomplish the fixed mounting to joint board and fossil fragments, simple structure, the workman of being convenient for is to stone material curtain hang the installation.
With respect to the related art in the above, the inventors found that the following drawbacks exist: only through the screw connection, the screw probably takes place not hard up between joint board and the fossil fragments, leads to stone material panel installation unstable, influences stone material curtain's security.
Disclosure of Invention
In order to provide safety of stone curtain walls, the utility model provides a hanging and installing structure of a building stone curtain wall.
The utility model provides a hanging and mounting structure of a building stone curtain wall, which adopts the following technical scheme:
the utility model provides a building stone curtain hangs mounting structure, includes that two sets of levels set up fossil fragments on the wall, still includes installation component, locating lever and locking subassembly, installation component includes two sets of buckles and mounting, two sets of the buckle sets up on stone material panel, the buckle with fossil fragments joint adaptation, through the mounting will buckle fixed mounting in on the fossil fragments, the locating lever set up in on the buckle, a plurality of locating hole has been seted up along the axis direction of fossil fragments on the fossil fragments, the locating lever with the locating hole grafting adaptation, locking subassembly set up in on the fossil fragments, through locking subassembly is right the position of locating lever is fixed.
Through adopting above-mentioned technical scheme, two sets of fossil fragments levels set up on the wall, two sets of buckles set up on stone material panel, remove the locating lever department that corresponds on the fossil fragments with the locating lever on the buckle, make the locating lever insert in the locating hole, fix the position of locating lever through locking component, the buckle carries out the joint simultaneously with fossil fragments, make buckle and fossil fragments fixed mounting through the mounting, thereby accomplish the installation to stone material panel, when buckle and fossil fragments fixed mounting, locking component fixes the position of locating lever, thereby make stone material panel's installation more stable, stone material curtain wall's security has been improved.
Optionally, the locking subassembly includes two sets of grip blocks and elastic component, offered the locking groove on the fossil fragments, the locking groove with the locating hole intercommunication, the grip block is located in the locking groove, two sets of form between the grip block and be used for the centre gripping the space of locating lever, the grip block with locating lever activity butt, the elastic component is located the grip block with between the locking groove, through the elastic component drive the grip block with the locating lever butt.
Through adopting above-mentioned technical scheme, after the locating lever inserts the locating hole, elastic component drive grip block and locating lever butt, two sets of grip blocks press from both sides tightly the locating lever, have increased the frictional force between grip block and the locating lever, make the locating lever be difficult for coming off from the locating hole to stone material panel's installation stability has been improved.
Optionally, the mounting is first bolt, two sets of the buckle is kept away from each other one side and has all been seted up the perforation, offered the joint groove on the fossil fragments, first bolt pass perforation threaded connection in the joint groove.
Through adopting above-mentioned technical scheme, make perforation and joint groove be located same axis, first bolt passes perforation and joint groove threaded connection to accomplish the fixed mounting to buckle and fossil fragments, easy operation has improved workman's installation effectiveness.
Optionally, the clamping groove is communicated with the positioning hole, and the first bolt is movably abutted to the clamping plate.
Through adopting above-mentioned technical scheme, when fixed mounting buckle and fossil fragments, first bolt passes the joint groove and gets into the locating hole, carries out the butt with the grip block, further improves the centre gripping effect of grip block to the locating lever, has improved the position stability of locating lever, has improved stone material panel's installation stability.
Optionally, the slip of joint groove is provided with two sets of joint blocks, and two sets of the slip direction of joint block is all parallel to locating lever axis direction, two sets of the joint block all with the movable butt of first bolt, the joint block with the contact surface of first bolt is the inclined plane, be provided with the driving piece on the joint block, through the driving piece drive the joint block with first bolt butt.
Through adopting above-mentioned technical scheme, rotate first bolt, first bolt gets into the joint inslot and carries out the butt with the joint piece, and the driving piece drive joint piece on the joint piece slides to carry out the butt with the both sides of first bolt, make difficult emergence of first bolt become flexible, further improved the mounting stability of buckle and fossil fragments.
Optionally, the driving piece is the spring, the one end fixed connection of spring in the joint inslot, the other end fixed connection of spring in on the joint piece, the axis direction of spring is parallel to the slip direction of joint piece.
Through adopting above-mentioned technical scheme, when first bolt and joint piece butt, spring compression, because the elasticity effect of spring makes the joint piece support tightly first bolt along the axis direction of spring to make the position of first bolt more stable, do not need manual operation, can further fix the installation of buckle and fossil fragments, improved workman's work efficiency.
Optionally, the stone material panel is last to be offered along perpendicular to fossil fragments axis direction's spout, buckle sliding connection in the spout, be provided with the locating part that is used for fixing its position on the buckle.
Through adopting above-mentioned technical scheme, remove the buckle, make the buckle slide in the spout, after the buckle slides suitable position, fix the position of buckle through the locating part to adjust the distance between two sets of buckles, be convenient for cooperate the distance between two sets of keels to install, improved stone material curtain and hung mounting structure's functionality.
Optionally, the locating part is the second bolt, set up spacing hole on the buckle, the second bolt passes spacing hole with the inner wall activity butt of spout.
Through adopting above-mentioned technical scheme, rotate the second bolt, make the second bolt pass spacing hole on the buckle and the inner wall of spout support tightly, easy operation, the workman of being convenient for fixes the position of buckle, has improved workman's work efficiency.
In summary, the utility model has at least the following beneficial technical effects:
1. the positioning rod on the clamping buckle is inserted into the positioning hole of the keel, the clamping buckle is clamped with the keel, the position of the positioning rod is fixed through the locking assembly, and the clamping buckle and the keel are fixedly installed through the fixing piece, so that the stone panel is installed, the stone panel is installed more stably, and the safety of the stone curtain wall is improved;
2. after the positioning rod is inserted into the positioning hole, the two groups of elastic pieces drive the two groups of clamping plates to clamp the positioning rod, so that the friction force between the clamping plates and the positioning rod is increased, the positioning rod is not easy to fall off from the positioning hole, and the mounting stability of the stone panel is improved;
3. make the buckle slide in the spout, after the buckle slides suitable position, fix the position of buckle through the locating part to adjust the distance between two sets of buckles, be convenient for cooperate the distance between two sets of keels to install, improved stone material curtain and hung mounting structure's functionality.
Drawings
FIG. 1 is a schematic overall structure of an embodiment of the present utility model;
figure 2 is an enlarged schematic view of a keel portion showing an embodiment of the utility model;
FIG. 3 is an enlarged schematic view showing a snap-fit portion according to an embodiment of the present utility model;
fig. 4 is an enlarged schematic view showing the snap-on-keel connection according to an embodiment of the utility model.
Reference numerals: 1. a wall surface; 2. a keel; 21. positioning holes; 22. a locking groove; 23. a clamping groove; 231. a clamping block; 2311. a driving member; 3. a stone panel; 31. a chute; 4. a mounting assembly; 41. a buckle; 411. perforating; 412. a second bolt; 413. a limiting hole; 42. a first bolt; 5. a positioning rod; 6. a locking assembly; 61. a clamping plate; 62. an elastic member.
Detailed Description
The utility model is described in further detail below with reference to fig. 1-4.
The embodiment of the utility model discloses a hanging and mounting structure of a building stone curtain wall.
Referring to fig. 1, a building stone curtain wall suspension installation structure comprises two groups of keels 2 fixedly installed on a wall surface 1 along the horizontal direction, an installation component 4 and a locking component 6, wherein the installation component 4 and the locking component 6 are used for fixedly installing a stone panel 3 on the keels 2, the wall surface 1 and the stone panel 3 are all arranged along the vertical direction, the stone panel 3 is installed on the keels 2 through the installation component 4, the stone panel 3 and the keels 2 are further installed and fixed through the locking component 6, so that the installation stability of the stone panel 3 is improved, and the safety of the building stone curtain wall is improved.
Referring to fig. 2, in order to facilitate installation of the stone panel 3, a plurality of positioning holes 21 along the axial direction of the keels 2 are formed in both sets of keels 2, and in this embodiment, the two sets of keels 2 are fixedly installed on the wall surface 1 by screws.
Referring to fig. 2 and 3, in order to facilitate the installation of the stone panel 3 by matching the distance between the two sets of keels 2, the installation component 4 comprises a buckle 41, a chute 31 along the direction perpendicular to the axis of the keels 2 is formed in the stone panel 3, a metal frame is fixedly installed in the chute 31, the buckle 41 is slidingly connected to the metal frame, so that the friction between the buckle 41 and the metal frame is increased while the position of the buckle 41 is adjusted, the buckle 41 is not easy to fall off, in the embodiment, the chute 31 is a T-shaped groove, the metal frame is of a T shape, a T-shaped block is fixedly connected to the buckle 41, and the T-shaped block is slidingly connected in the T-shaped metal frame, so that the sliding of the buckle 41 is more stable;
referring to fig. 2 and 4, a limiting part is arranged on the buckle 41, in this embodiment, the limiting part is a second bolt 412, a limiting hole 413 is formed in the buckle 41, a plurality of clamping grooves are formed in the metal frame, after two adjacent groups of buckles 41 are moved to a proper position, the second bolt 412 passes through the limiting hole 413 to enter the clamping grooves to be abutted, and meanwhile, the second bolt 412 is clamped with the clamping grooves, so that the positions of the buckles 41 are fixed, the adjustment of the distance between the two groups of buckles 41 is completed, and the stone panel 3 is conveniently installed in cooperation with the distance between the two groups of keels 2.
Referring to fig. 3 and 4, in order to facilitate the fixed installation of the stone panel 3 on the keel 2, the buckle 41 is fixedly connected with the positioning rod 5, the positioning rod 5 is in plug-in fit with the positioning hole 21, the locking component 6 comprises two groups of clamping plates 61 and elastic pieces 62, the keel 2 is provided with a locking groove 22, the two groups of clamping plates 61 are positioned at two sides of the positioning hole 21, the clamping plates 61 are positioned in the locking groove 22, the locking groove 22 is communicated with the positioning hole 21, in the embodiment, the clamping plates 61 are arc plates, the arc plates are arranged towards the direction of the positioning hole 21, a space for clamping the positioning rod 5 is formed between the two groups of clamping plates 61, one end, close to the keel 2, of the positioning rod 5 is fixedly connected with a tip end, so that the positioning rod 5 is conveniently inserted between the two groups of clamping plates 61, and the clamping plates 61 are movably abutted against the peripheral wall of the positioning rod 5;
in this embodiment, the elastic member 62 is a spring, one end of the spring is fixedly connected in the locking groove 22, the other end of the spring is fixedly connected to the clamping plate 61, the axial direction of the spring is perpendicular to the axial direction of the positioning rod 5, when the positioning rod 5 is inserted into the positioning hole 21, the spring contracts, and due to the elastic force, the spring stretches to drive the clamping plate 61 to tightly prop against the positioning rod 5, so that the friction force between the clamping plate 61 and the positioning rod 5 is increased, and the positioning rod 5 is not easy to fall off from the positioning hole 21;
the two groups of buckles 41 are respectively provided with a through hole 411 on one side far away from each other, the keel 2 is provided with a clamping groove 23, the clamping groove 23 is communicated with the locking groove 22, so that the clamping groove 23 is communicated with the positioning hole 21, the mounting assembly 4 further comprises a fixing piece, in the embodiment, the fixing piece is a first bolt 42, the first bolt 42 is in threaded connection fit with the through holes 411 and the clamping groove 23, the first bolt 42 is movably abutted with the clamping plate 61, two groups of clamping blocks 231 are slidably connected in the clamping groove 23, the sliding directions of the two groups of clamping blocks 231 are parallel to the axial direction of the positioning rod 5, the two groups of clamping blocks 231 are positioned on two sides of the first bolt 42, the two groups of clamping blocks 231 are movably abutted with the first bolt 42, and the contact surface of the clamping blocks 231 and the first bolt 42 is an inclined surface;
the clamping block 231 is provided with a driving piece 2311, in this embodiment, the driving piece 2311 is a spring, one end of the spring is fixedly connected in the clamping groove 23, the other end of the spring is fixedly connected to the clamping block 231, and the axis of the spring is parallel to the sliding direction of the clamping block 231;
the first bolt 42 is rotated, the first bolt 42 passes through the through hole 411 to be in threaded connection with the clamping groove 23, two sides of the first bolt 42 are abutted with the two groups of clamping blocks 231, springs on the clamping blocks 231 shrink, the elastic force drives the clamping blocks 231 to be abutted with the first bolt 42, the first bolt 42 is not easy to loose, the first bolt 42 passes through the clamping groove 23 to enter the locking groove 22, the first bolt 42 is abutted with the clamping plate 61, the clamping effect of the clamping plate 61 on the positioning rod 5 is further improved, further fixation of the positioning rod 5 is completed while the clamping buckle 41 and the keel 2 are fixedly installed, the stone panel 3 and the keel 2 are installed more stably, and the safety of the stone curtain wall is improved.
The implementation principle of the embodiment of the utility model is as follows: the two groups of keels 2 are fixedly mounted on the wall surface 1 through screws, the distance between the two groups of buckles 41 is adjusted, the positions of the buckles 41 are fixed through the second bolts 412, the locating rods 5 are inserted into the locating holes 21, meanwhile, the clamping plates 61 are driven by the spring to tightly prop against the locating rods 5, friction force between the clamping plates 61 and the locating rods 5 is increased, the locating rods 5 are not easy to fall off from the locating holes 21, the first bolts 42 are rotated, the first bolts 42 penetrate through the through holes 411 to be connected with the clamping grooves 23 in a threaded mode, the clamping blocks 231 are driven by the spring to tightly prop against the first bolts 42, the first bolts 42 are not easy to loose, the first bolts 42 penetrate through the clamping grooves 23 to enter the locking grooves 22, the first bolts 42 are abutted against the clamping plates 61, clamping effects of the clamping plates 61 on the locating rods 5 are further improved, accordingly, the fixed mounting of the stone panel 3 and the keels 2 is achieved, and safety of the stone curtain wall is improved.
The above embodiments are not intended to limit the scope of the present utility model, so: all equivalent changes in structure, shape and principle of the utility model should be covered in the scope of protection of the utility model.

Claims (8)

1. The utility model provides a building stone curtain hangs mounting structure, includes fossil fragments (2) that two sets of levels set up on wall (1), its characterized in that: still include installation component (4), locating lever (5) and locking subassembly (6), installation component (4) are including two sets of buckles (41) and mounting, two sets of buckle (41) all set up on stone material panel (3), buckle (41) with fossil fragments (2) joint adaptation, through the mounting will buckle (41) fixed mounting in fossil fragments (2), locating lever (5) set up in on buckle (41), a plurality of locating hole (21) have been seted up along the axis direction of fossil fragments (2) on fossil fragments (2), locating lever (5) with locating hole (21) grafting adaptation, locking subassembly (6) set up in fossil fragments (2) are last, through locking subassembly (6) are right the position of locating lever (5) is fixed.
2. The construction stone curtain wall hanging and mounting structure according to claim 1, wherein: locking subassembly (6) are including two sets of grip blocks (61) and elastic component (62), set up locking groove (22) on fossil fragments (2), locking groove (22) with locating hole (21) intercommunication, grip block (61) are located locking groove (22), two sets of form between grip block (61) and be used for the centre gripping locating lever (5) space, grip block (61) with locating lever (5) activity butt, elastic component (62) are located grip block (61) with between locking groove (22), through elastic component (62) drive grip block (61) with locating lever (5) butt.
3. The construction stone curtain wall hanging and mounting structure according to claim 2, wherein: the fixing piece is a first bolt (42), two groups of buckles (41) are respectively provided with a perforation (411) on one side far away from each other, the keel (2) is provided with a clamping groove (23), and the first bolt (42) passes through the perforation (411) to be connected with the inside of the clamping groove (23) in a threaded mode.
4. A construction stone curtain wall suspension mounting structure according to claim 3, wherein: the clamping groove (23) is communicated with the positioning hole (21), and the first bolt (42) is movably abutted with the clamping plate (61).
5. A construction stone curtain wall suspension mounting structure according to claim 3, wherein: two groups of clamping blocks (231) are arranged in the clamping groove (23) in a sliding mode, the sliding directions of the two groups of clamping blocks (231) are parallel to the axial direction of the locating rod (5), the two groups of clamping blocks (231) are movably abutted to the first bolt (42), the contact surface of the clamping blocks (231) and the first bolt (42) is an inclined surface, a driving piece (2311) is arranged on the clamping blocks (231), and the clamping blocks (231) are driven to be abutted to the first bolt (42) through the driving piece (2311).
6. The construction stone curtain wall hanging and mounting structure according to claim 5, wherein: the driving piece (2311) is a spring, one end of the spring is fixedly connected in the clamping groove (23), the other end of the spring is fixedly connected to the clamping block (231), and the axial direction of the spring is parallel to the sliding direction of the clamping block (231).
7. The construction stone curtain wall hanging and mounting structure according to claim 1, wherein: the stone panel (3) is provided with a chute (31) along the direction perpendicular to the axis of the keel (2), the buckle (41) is connected in the chute (31) in a sliding mode, and the buckle (41) is provided with a limiting piece for fixing the position of the buckle.
8. The construction stone curtain wall hanging and mounting structure according to claim 7, wherein: the limiting piece is a second bolt (412), a limiting hole (413) is formed in the buckle (41), and the second bolt (412) penetrates through the limiting hole (413) and is movably abutted to the inner wall of the sliding groove (31).
CN202222091134.1U 2022-08-09 2022-08-09 Building stone curtain wall hanging and mounting structure Active CN219825951U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222091134.1U CN219825951U (en) 2022-08-09 2022-08-09 Building stone curtain wall hanging and mounting structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222091134.1U CN219825951U (en) 2022-08-09 2022-08-09 Building stone curtain wall hanging and mounting structure

Publications (1)

Publication Number Publication Date
CN219825951U true CN219825951U (en) 2023-10-13

Family

ID=88246288

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222091134.1U Active CN219825951U (en) 2022-08-09 2022-08-09 Building stone curtain wall hanging and mounting structure

Country Status (1)

Country Link
CN (1) CN219825951U (en)

Similar Documents

Publication Publication Date Title
CN219825951U (en) Building stone curtain wall hanging and mounting structure
CN214658433U (en) Hanging part system
CN213329629U (en) Light steel keel suspended ceiling
CN214785487U (en) Architectural decoration rail guard
CN213449100U (en) Detachable artistic ceiling
CN216042008U (en) Arc curved surface glass curtain wall structure
CN213258246U (en) Machine tool clamp
CN211143416U (en) Building curtain wall assembled coupling assembling
CN210281505U (en) Steering gear end face nut clamp
CN114607931A (en) Anti-seismic support fastening device
CN112942720A (en) Hanging part system
CN215631002U (en) Ceiling mounting structure for laboratory interior decoration
CN220613727U (en) Assembled smoke blocking vertical wall mounting fixture device
CN220644768U (en) Curtain wall connecting piece
CN220847715U (en) Water-stopping steel plate fixed mounting structure convenient to install and adjust
CN214696343U (en) Safe type pottery board curtain
CN219793680U (en) Bridge hinge joint concrete mills plane device
CN210713875U (en) Tool for improving installation quality of hyperboloid special-shaped curtain wall
CN220882127U (en) Angle steel clamp for electric power iron tower
CN219546499U (en) General aviation paddle comprehensive lifting appliance of polytypic
CN215407138U (en) Mounting structure of dry-hanging veneer for architectural decoration
CN221019337U (en) Welding robot base structure
CN220247313U (en) Novel toughened glass building curtain wall
CN212534689U (en) Fixing frame for mounting building curtain wall
CN219548727U (en) Assembled type combined window capable of being installed rapidly

Legal Events