CN214783041U - Ground kerbstone for plantation of garden plants - Google Patents

Ground kerbstone for plantation of garden plants Download PDF

Info

Publication number
CN214783041U
CN214783041U CN202121184220.6U CN202121184220U CN214783041U CN 214783041 U CN214783041 U CN 214783041U CN 202121184220 U CN202121184220 U CN 202121184220U CN 214783041 U CN214783041 U CN 214783041U
Authority
CN
China
Prior art keywords
fixedly connected
block
hole
sand layer
arc
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202121184220.6U
Other languages
Chinese (zh)
Inventor
王义廷
赵明
林建仁
谷昕
朱广辉
刘文龙
谢芳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Motple New Materials Research Shanghai Co ltd
Original Assignee
Fujian Meiyi New Material Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujian Meiyi New Material Technology Co ltd filed Critical Fujian Meiyi New Material Technology Co ltd
Priority to CN202121184220.6U priority Critical patent/CN214783041U/en
Application granted granted Critical
Publication of CN214783041U publication Critical patent/CN214783041U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00Adapting or protecting infrastructure or their operation
    • Y02A30/60Planning or developing urban green infrastructure

Landscapes

  • Road Paving Structures (AREA)

Abstract

The utility model belongs to the curb field, specific ground curb is used in plantation plant species cultivation that says so, including the kicking block, the right side fixedly connected with sloping block of kicking block, the middle part fixedly connected with brick body of sloping block, the middle part fixedly connected with running surface of brick body, the top fixedly connected with non slipping spur of running surface, the middle part fixedly connected with hole of permeating water of non slipping spur, the middle part fixedly connected with planting hole of permeating water, planting hole includes glide plane, boss, first arc post, sill pillar; through the structural design of kicking block, sloping block, the face that flows, the hole of permeating water, planting hole, restriction hole, coarse sand layer and fine sand layer, realized carrying out the percolating water fast, can avoid the function of inside soil erosion and water loss simultaneously, it is slow to have solved original curb infiltration rate, causes the problem of the loss of soil easily, has improved the efficiency of operation use for inside velocity of water flow simultaneously, can not cause the loss to the soil simultaneously.

Description

Ground kerbstone for plantation of garden plants
Technical Field
The utility model relates to a ground curb field specifically is a garden plant plants and uses ground curb.
Background
The kerbstone is a monument which is arranged between a road surface and other structures, kerbstones are generally required to be arranged between a partition strip and the road surface of an urban road and between a sidewalk and the road surface, kerbstones are generally required to be arranged at the edge of a central partition strip of a highway, the edge of the right side of a traffic lane or the edge of the outer edge of a road shoulder, the existing kerbstones generally have two forms, one is prefabricated by common concrete, the other is processed by stone materials which are all waterproof materials, the foundation under the kerbstone is generally fine concrete and is also waterproof material, because the bottom layer of the road surface is a tamping basic layer with larger thickness and is a waterproof layer, the kerbstone and the lower foundation are not permeable to water, water in the road surface layer cannot seep down or be discharged through the kerbstones and the foundation, the water in the road surface structure layer and the interface between the road surface layer and the basic layer cannot smoothly discharge out of the road surface, and is one of the inducement for early damage of the road surface, based on a patent technique, a novel concrete curb has been designed, and novel curb can discharge the inside water of surface course, and is little with the curb of adopting usually in the cost difference.
The protruding blocks on two sides are butted and installed when the stone is used, the installation speed can be increased, the stone is connected more closely, the stone is convenient to replace and use in the later period, and the operation time and the manual work can be saved.
When the existing kerbstone is used, because the whole kerbstone is not provided with the water permeable holes, the kerbstone is difficult to discharge when water is accumulated, so that the material is soaked for a long time, the service life is greatly reduced, and the kerbstone has the defect of low practicability because no planting groove is arranged inside the kerbstone;
therefore, a ground curb for garden plant cultivation is proposed to solve the above problems.
SUMMERY OF THE UTILITY MODEL
In order to compensate prior art's not enough, solve the curb when using, because whole not have the hole of permeating water, be difficult to discharge when meetting ponding, lead to the material to soak for a long time, lead to life greatly reduced, do not plant the groove through inside, problem that the practicality is not strong enough, the utility model provides a ground curb is planted to garden plant.
The utility model provides a technical scheme that its technical problem adopted is: a ground curb is used in plantation plant, including the kicking block, the right side fixedly connected with sloping block of kicking block, the middle part fixedly connected with brick body of sloping block, the middle part fixedly connected with face that flows of the brick body, the top fixedly connected with non slipping spur of face that flows, the middle part fixedly connected with hole of permeating water of non slipping spur, the middle part fixedly connected with in hole of permeating water has the planting hole, the planting hole includes glide plane, boss, first arc post, foundation column, flow groove and second arc post, the middle part fixedly connected with boss of glide plane, the first arc post of middle part fixedly connected with of boss, the below fixedly connected with foundation column of first arc post, the middle part fixedly connected with flow groove of foundation column, the right side fixedly connected with second arc post of flow groove.
The right side fixedly connected with restriction hole of planting the hole, the restriction hole includes outstanding piece, connecting block and recess, the right side fixedly connected with connecting block of outstanding piece, the middle part fixedly connected with recess of connecting block, the inside fixedly connected with coarse sand layer in restriction hole, the middle part fixedly connected with leakage layer on coarse sand layer, the middle part fixedly connected with fine sand layer on leakage layer, the utility model discloses a kicking block, sloping block, the face that flows, the hole of permeating water, planting hole, restriction hole, coarse sand layer and fine sand layer's structural design has realized carrying out the percolating water fast, can avoid the function of inside soil erosion and water loss simultaneously, and it is slow to have solved original curb infiltration rate, causes the problem of the loss of soil easily, has improved the efficiency of operation use for inside velocity of water simultaneously, can not cause the loss to the soil simultaneously.
Preferably, closely laminate between the slope piece and the brick body, and coincide mutually between the axis of the brick body and the face that flows, accelerate the surperficial rivers speed of flowing through the slope piece of both sides.
Preferably, the non-slip blocks and the holes of permeating water form a penetrating structure, the holes of permeating water are symmetrical with the central axis of the planting holes, and the non-slip blocks improve the contact and generate friction force to prevent slipping.
Preferably, closely laminate between glide plane and the boss, and coincide mutually between the axis of boss and first arc post, can carry out the plant species in inside through the glide plane, improve the operation practicality.
Preferably, the bottom pillar is tightly attached to the flow groove, the flow groove coincides with the central axis of the second arc-shaped pillar, water flows through the flow groove, and the internal soil loss is avoided.
Preferably, constitute the coating structure between restriction hole and the coarse sand layer, and identical between the external dimension on coarse sand layer and the internal dimension on leakage layer, accelerate the velocity of water flow through the coarse sand layer, make the volume on leakage layer not receive the impact of rivers destruction simultaneously.
Preferably, closely laminate between outstanding piece and the connecting block, and coincide mutually between the axis of connecting block and recess, carry out the butt joint between the brick through the connecting block, improve connection stability.
Preferably, the thickness ratio of the leakage layer to the fine sand layer is two to one, a coating structure is formed between the fine sand layer and the leakage layer, and the fine leakage of water flow is carried out through the fine sand layer, so that the damage can be reduced.
The utility model discloses an useful part lies in:
1. the utility model realizes the rapid water leakage through the structural design of the jacking block, the inclined block, the flow surface, the water permeable hole, the planting hole, the limiting hole, the coarse sand layer and the fine sand layer, and simultaneously can avoid the internal water and soil loss, solves the problems of the prior kerbstone that the permeation speed is slow and the soil is easy to run off, improves the efficiency of operation and use, accelerates the internal water flow speed, and simultaneously can not run off the soil;
2. the utility model discloses a brick body, glide plane, boss, first arc post, foundation column, flowing groove and the structural design of second arc post have realized that inside can carry out plant species and plant, improve the function that the stone material used the variety, have solved original stone material and only can place the problem of use, have improved the adaptability of installation and use.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings needed to be used in the description of the embodiments or the prior art will be briefly described below, it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to the drawings without inventive exercise.
Fig. 1 is a schematic view of a front perspective structure of the present invention;
FIG. 2 is an enlarged view of the planting hole structure of the present invention;
FIG. 3 is an enlarged view of the limiting hole structure of the present invention;
fig. 4 is an enlarged view of the structure at a in fig. 1 according to the present invention;
fig. 5 is a structural anatomy diagram at B in fig. 1 according to the present invention.
In the figure: 1. a top block; 2. an inclined block; 3. a brick body; 4. a flow surface; 5. anti-skid blocks; 6. water permeable holes; 7. planting holes; 701. a sliding surface; 702. a reinforcing block; 703. a first arc-shaped column; 704. a bottom pillar; 705. a flow channel; 706. a second arc-shaped column; 8. a limiting aperture; 801. a protruding block; 802. connecting blocks; 803. a groove; 9. a coarse sand layer; 10. a leakage layer; 11. a fine sand layer.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative efforts belong to the protection scope of the present invention.
Referring to fig. 1-5, a ground curb for plantation of plants in a garden comprises a top block 1, an inclined block 2 fixedly connected to the right side of the top block 1, a brick body 3 fixedly connected to the middle of the inclined block 2, a flowing surface 4 fixedly connected to the middle of the brick body 3, an anti-slip block 5 fixedly connected to the upper side of the flowing surface 4, a water permeable hole 6 fixedly connected to the middle of the anti-slip block 5, a planting hole 7 fixedly connected to the middle of the water permeable hole 6, the planting hole 7 comprising a sliding surface 701, a reinforcing block 702 and a first arc-shaped column 703, the bottom pillar 704, the flow groove 705 and the second arc-shaped pillar 706, the middle part of the sliding surface 701 is fixedly connected with a reinforcing block 702, the middle part of the reinforcing block 702 is fixedly connected with a first arc-shaped pillar 703, the lower part of the first arc-shaped pillar 703 is fixedly connected with the bottom pillar 704, the middle part of the bottom pillar 704 is fixedly connected with the flow groove 705, and the right side of the flow groove 705 is fixedly connected with the second arc-shaped pillar 706.
The right side of the planting hole 7 is fixedly connected with a limiting hole 8, the limiting hole 8 comprises a protruding block 801, a connecting block 802 and a groove 803, the right side of the protruding block 801 is fixedly connected with the connecting block 802, the middle of the connecting block 802 is fixedly connected with the groove 803, the inside of the limiting hole 8 is fixedly connected with a coarse sand layer 9, the middle of the coarse sand layer 9 is fixedly connected with a leakage layer 10, and the middle of the leakage layer 10 is fixedly connected with a fine sand layer 11; the during operation, the utility model discloses a kicking block 1, sloping block 2, the face of flowing 4, the hole of permeating water 6, plant hole 7, restriction hole 8, coarse sand layer 9 and fine sand layer 11's structural design, realized carrying out the percolating water fast, can avoid the function of inside soil erosion and water loss simultaneously, it is slow to have solved original curb infiltration rate, causes the problem of the loss of soil easily, has improved the efficiency of operation and use, accelerates inside velocity of water simultaneously, can not cause the loss to the soil simultaneously.
The inclined block 2 is tightly attached to the brick body 3, and the brick body 3 is overlapped with the central axis of the flowing surface 4; when the water-saving device works, the flow speed of water flow on the surface is accelerated through the inclined blocks 2 on the two sides.
A penetrating structure is formed between the antiskid blocks 5 and the water permeable holes 6, and the water permeable holes 6 are symmetrical with the central axis of the planting holes 7; when the anti-slip device works, the anti-slip blocks 5 improve the friction force generated during contact and prevent slipping.
The sliding surface 701 is tightly attached to the reinforcing block 702, and the reinforcing block 702 is overlapped with the central axis of the first arc-shaped column 703; during operation, can carry out the plant species inside through glide plane 701, improve the operation practicality.
The bottom column 704 is tightly attached to the flow groove 705, and the flow groove 705 is overlapped with the central axis of the second arc-shaped column 706; during operation, water flows through the flow grooves 705, and the internal soil loss is avoided.
A coating structure is formed between the limiting holes 8 and the coarse sand layer 9, and the external dimension of the coarse sand layer 9 is matched with the internal dimension of the leakage layer 10; when the water leakage prevention device works, the water flow speed is accelerated through the coarse sand layer 9, and meanwhile, the volume of the leakage layer 10 cannot be damaged by water flow impact.
The protruding block 801 is tightly attached to the connecting block 802, and the connecting block 802 is overlapped with the central axis of the groove 803; during operation, the butt joint between the bricks is carried out through the connecting block 802, and the connecting stability is improved.
The thickness ratio of the leakage layer 10 to the fine sand layer 11 is two to one, and a coating structure is formed between the fine sand layer 11 and the leakage layer 10; during operation, the fine sand layer 11 is used for tiny leakage of water flow, and damage can be reduced.
The theory of operation, the kicking block 1 through both sides docks with recess 803, and inside can form the groove, permeates the ponding on road surface out, and the inside carries out rivers infiltration through coarse sand layer 9 simultaneously, carries out slow seepage through inside fine sand layer 11, docks the installation with carrying out between the brick simultaneously, after fixed connection, can operate the completion.
In the description herein, references to the description of "one embodiment," "an example," "a specific example," etc., mean that a particular feature, structure, material, or characteristic described in connection with the embodiment or example is included in at least one embodiment or example of the invention. In this specification, the schematic representations of the terms used above do not necessarily refer to the same embodiment or example. Furthermore, the particular features, structures, materials, or characteristics described may be combined in any suitable manner in any one or more embodiments or examples.
The foregoing shows and describes the general principles, essential features, and advantages of the invention. It will be understood by those skilled in the art that the present invention is not limited to the above embodiments, and that the foregoing embodiments and descriptions are provided only to illustrate the principles of the present invention without departing from the spirit and scope of the present invention.

Claims (8)

1. The utility model provides a ground curb is planted with garden plant which characterized in that: the water-permeable brick comprises a top block (1), wherein the right side of the top block (1) is fixedly connected with an inclined block (2), the middle part of the inclined block (2) is fixedly connected with a brick body (3), the middle part of the brick body (3) is fixedly connected with a flowing surface (4), an anti-slip block (5) is fixedly connected above the flowing surface (4), the middle part of the anti-slip block (5) is fixedly connected with a water permeable hole (6), the middle part of the water permeable hole (6) is fixedly connected with a planting hole (7), the planting hole (7) comprises a sliding surface (701), a reinforcing block (702), a first arc-shaped column (703), a bottom column (704), a flowing groove (705) and a second arc-shaped column (706), the middle part of the sliding surface (701) is fixedly connected with the reinforcing block (702), the middle part of the reinforcing block (702) is fixedly connected with the first arc-shaped column (703), and the bottom column (704) is fixedly connected below the first arc-shaped column (703), the middle part of the bottom column (704) is fixedly connected with a flowing groove (705), and the right side of the flowing groove (705) is fixedly connected with a second arc-shaped column (706);
the right side fixedly connected with of planting hole (7) limits hole (8), limit hole (8) and include outstanding piece (801), connecting block (802) and recess (803), the right side fixedly connected with connecting block (802) of outstanding piece (801), the middle part fixedly connected with recess (803) of connecting block (802), the inside fixedly connected with coarse sand layer (9) of limit hole (8), middle part fixedly connected with leakage layer (10) of coarse sand layer (9), the middle part fixedly connected with fine sand layer (11) of leakage layer (10).
2. A ground curb for garden plant cultivation as claimed in claim 1, wherein: the inclined block (2) is tightly attached to the brick body (3), and the brick body (3) is overlapped with the central axis of the flowing surface (4).
3. A ground curb for garden plant cultivation as claimed in claim 1, wherein: the antiskid blocks (5) and the water permeable holes (6) form a penetrating structure, and the water permeable holes (6) are symmetrical with the central axis of the planting holes (7).
4. A ground curb for garden plant cultivation as claimed in claim 1, wherein: the sliding surface (701) is tightly attached to the reinforcing block (702), and the reinforcing block (702) is overlapped with the central axis of the first arc-shaped column (703).
5. A ground curb for garden plant cultivation as claimed in claim 1, wherein: the bottom column (704) is tightly attached to the flow groove (705), and the flow groove (705) is coincided with the central axis of the second arc-shaped column (706).
6. A ground curb for garden plant cultivation as claimed in claim 1, wherein: a coating structure is formed between the limiting holes (8) and the coarse sand layer (9), and the external dimension of the coarse sand layer (9) is matched with the internal dimension of the leakage layer (10).
7. A ground curb for garden plant cultivation as claimed in claim 1, wherein: the protruding block (801) is tightly attached to the connecting block (802), and the connecting block (802) is overlapped with the central axis of the groove (803).
8. A ground curb for garden plant cultivation as claimed in claim 1, wherein: the thickness ratio of the leakage layer (10) to the fine sand layer (11) is two to one, and a coating structure is formed between the fine sand layer (11) and the leakage layer (10).
CN202121184220.6U 2021-05-28 2021-05-28 Ground kerbstone for plantation of garden plants Active CN214783041U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121184220.6U CN214783041U (en) 2021-05-28 2021-05-28 Ground kerbstone for plantation of garden plants

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121184220.6U CN214783041U (en) 2021-05-28 2021-05-28 Ground kerbstone for plantation of garden plants

Publications (1)

Publication Number Publication Date
CN214783041U true CN214783041U (en) 2021-11-19

Family

ID=78698974

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121184220.6U Active CN214783041U (en) 2021-05-28 2021-05-28 Ground kerbstone for plantation of garden plants

Country Status (1)

Country Link
CN (1) CN214783041U (en)

Similar Documents

Publication Publication Date Title
CN108999262B (en) Sunken greenbelt structure for sponge city
CN210458853U (en) Town road paves road surface structure that permeates water
CN213740419U (en) Light road structure of permeating water
CN210216254U (en) Concrete guardrail structure
CN214783041U (en) Ground kerbstone for plantation of garden plants
CN211815297U (en) Permeable asphalt pavement
CN211522732U (en) Permeable pavement structure
CN210066404U (en) A central separation area curb for highway
CN211815262U (en) Brick permeates water convenient to drainage
CN108411728A (en) Surface drainage
CN109423939A (en) Ecological garden all-purpose road
CN208250846U (en) Surface drainage
CN2589499Y (en) Concave water collection pavement
CN111501683A (en) Method for treating Feng river by using hydraulic steel dam gate
CN217438596U (en) Pavement interlayer drainage structure
CN212670179U (en) Concrete that permeates water fast flat curbstone
CN216404950U (en) Be applied to concrete construction structure that permeates water of ecological green project of dam
CN204959546U (en) Cobblestone water conservancy diversion road
CN220150485U (en) Urban seepage-promoting floor drain device
CN218373113U (en) Town road structure based on sponge city
CN214271561U (en) Road structure permeates water with curbstone
CN214938945U (en) Sponge formula permeable pavement
CN216404943U (en) Road structure for relieving urban drainage
CN211420747U (en) Municipal works infiltration concrete layer lays road bed
CN209194668U (en) A kind of highway Rainwater Resources suitable for Loess Plateau utilize system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20221226

Address after: 200135 Room 203, Floor 2, No. 15, Lane 218, Haiji 6th Road, Nanhui New City, Pudong New Area, Shanghai

Patentee after: Motple New Materials Research (Shanghai) Co.,Ltd.

Address before: Guanshan Industrial Zone, Wu'an Town, Changtai County, Zhangzhou City, Fujian Province 363999

Patentee before: Fujian Meiyi New Material Technology Co.,Ltd.

TR01 Transfer of patent right