- CN214780417U CN214780417U CN202120242692.6U CN202120242692U CN214780417U CN 214780417 U CN214780417 U CN 214780417U CN 202120242692 U CN202120242692 U CN 202120242692U CN 214780417 U CN214780417 U CN 214780417U
- Authority
- CN
- China
- Prior art keywords
- water pump
- frame
- sewage treatment
- treatment station
- underframe
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Structures Of Non-Positive Displacement Pumps (AREA)
Abstract
The utility model discloses a sewage treatment station pump hoisting frame frock, including last frame, a supporting beam, underframe and water pump, it passes through to go up the frame a supporting beam with underframe fixed connection, it installs on the effluent water sump to go up the frame, be equipped with hoisting device on going up the frame, hoisting device with water pump swing joint, the water pump is placed on the underframe, the underframe is unsettled to be arranged in the effluent water sump. The utility model discloses a hoisting device promotes the water pump, need not the operation personnel and gets into the operation of effluent water sump bottom, and the staff of being convenient for overhauls the water pump, has reduced operation personnel quantity and activity duration simultaneously, has shortened the maintenance time limit for a project of sewage treatment station water pump, has good economic benefits to can also make the water pump unsettled in the effluent water sump, avoid the water pump to adsorb the debris of effluent water sump bottom, thereby prolong the water pump life-span.
Description
Technical Field
The utility model relates to a sewage treatment station auxiliary assembly technical field, concretely relates to sewage treatment station pump hoisting frame frock.
Background
At present, water pumps of industrial and urban sewage treatment stations are generally arranged at the bottom of a sewage pool, and the maintenance mode is mainly that the operation of the sewage treatment station is paused firstly, then sewage media are emptied, and finally, a maintainer enters the bottom of the sewage pool to operate and maintain. However, this method not only makes the sewage treatment station temporarily unavailable, but also increases the drainage pressure, greatly increases the labor and cost, and is inefficient.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing a sewage treatment station pump hoisting frame frock has solved the problem that the water pump maintenance efficiency is low in the sewage treatment station among the prior art, improves the maintenance efficiency of water pump.
The technical scheme of the utility model is realized like this:
the beneficial effects of the utility model reside in that:
the utility model provides a sewage treatment station pump lifting frame frock, includes upper ledge, a supporting beam, underframe and water pump, upper ledge pass through a supporting beam with underframe fixed connection, upper ledge installs on the effluent water sump, be equipped with hoisting device on the upper ledge, hoisting device with water pump swing joint, the water pump is placed on the underframe, the underframe is unsettled to be arranged in the effluent water sump.
The further technical scheme is that reinforcing ribs are arranged at the connecting positions of the supporting beams, the upper frame and the lower frame.
The further technical scheme is that the lifting device comprises a pulley assembly, and the pulley assembly is fixedly connected with the water pump through a rope.
The further technical scheme is that the upper frame is designed to be I-shaped, steel plates are arranged at four corners of the upper frame, and expansion screw holes are formed in two sides of each steel plate.
The technical scheme is that the lower frame is designed to be of a rectangular frame structure, a plurality of fixing rods are arranged in the lower frame at intervals, and the gap between every two adjacent fixing rods is not larger than 10 cm.
The further technical scheme is that rust-proof layers are coated on the upper frame, the supporting beams and the lower frame.
The further technical scheme is that the anti-rust layer is composed of an epoxy zinc-rich bottom coating, an epoxy micaceous iron intermediate coating and a polyurethane outer coating.
The utility model has the advantages that:
1. this device passes through hoisting device and promotes the water pump, need not the operation personnel and gets into the operation of effluent water sump bottom, and the staff of being convenient for overhauls the water pump, has still reduced operation personnel quantity and activity duration simultaneously, has shortened the maintenance time limit for a project of sewage treatment station water pump, has good economic benefits.
2. Through installing the upper frame on the effluent water sump, the water pump is placed on lower frame, and the underframe is unsettled in the effluent water sump again, makes the water pump unsettled in the effluent water sump, avoids the water pump to adsorb the debris of effluent water sump bottom to extension water pump life-span.
3. This device simple structure, simple to operate, and more conventional maintenance mode efficiency promotes greatly and improves.
Drawings
Fig. 1 is a schematic view of the overall structure of embodiment 1 of the present invention;
fig. 2 is a detailed structural schematic diagram of embodiment 1 of the present invention;
fig. 3 is a schematic view of the overall structure of embodiment 2 of the present invention.
In the figure, 1 a water pump, 2 a lower frame, 201 a fixing rod, 3 a supporting beam, 4 an upper frame, 401 an expansion screw hole, 402 a steel plate, 5 a lifting device, 501 a pulley assembly, 502 a rope and 6 reinforcing ribs.
Detailed Description
In order to better understand the technical content of the present invention, the following embodiments are provided, and the present invention is further described with reference to the accompanying drawings.
Example 1
Referring to fig. 1 to 2, a sewage treatment station pump lifting frame tool comprises an upper frame 4, a support beam 3, a lower frame 2 and a water pump 1, wherein the upper frame 4 is designed to be in an i shape, and the upper frame 4 is made of channel steel through welding and has high strength; four corners of the upper frame 4 are provided with steel plates 402, two sides of each steel plate 402 are provided with expansion screw holes 401, and the upper frame 4 is fixedly arranged on a sewage pool bank through the steel plates 402, so that the sewage pool has the characteristics of simple structure and convenience in installation; the lower frame 2 is designed to be in a rectangular frame structure, and the lower frame 2 is made of channel steel in a welded mode and has high strength; a plurality of fixing rods 201 are arranged in the lower frame 2 at intervals, the gap between every two adjacent fixing rods 201 is not more than 10cm, the fixing rods 201 are convenient to bear the water pump 1 due to small gaps, and the operation of the water pump 1 is not influenced; the upper frame 4 is fixedly connected with the lower frame 2 through the support beams 3, wherein two support beams 3 are preferably arranged and are respectively connected with the middle parts of two ends of the upper frame 4 and the lower frame 2, and the upper frame 4, the support beams 3 and the lower frame 2 are connected in a welding mode; the upper frame 4 is provided with a lifting device 5, the lifting device 5 comprises pulley assemblies 501, the pulley assemblies 501 are fixedly connected with the water pump 1 through ropes 502, the pulley assemblies 501 are in the prior art, preferably 2 pulley assemblies 501 are arranged, the ropes 502 are respectively fixedly connected with two ends of the water pump 1, the water pump 1 is lifted in a pulley lifting mode, and the water pump 1 is convenient to overhaul and maintain; the water pump 1 is placed on the lower frame 2, the lower frame 2 is suspended in the sewage pool, the water pump 1 is suspended in the sewage pool, and the water pump 1 is prevented from adsorbing sundries at the bottom of the sewage pool, so that the service life of the water pump 1 is prolonged; the upper frame 4, the supporting beam 3 and the lower frame 2 are coated with anti-rust layers, each anti-rust layer is composed of an epoxy zinc-rich bottom coating, an epoxy micaceous iron intermediate layer coating and a polyurethane outer layer coating, wherein the epoxy zinc-rich bottom coating is coated twice, the polyurethane outer layer coating is coated three times, and the anti-rust layers are coated to prevent the device from rusting easily in water, so that the service life of the device is prolonged.
Example 2
Referring to fig. 3, the present embodiment 2 is different from embodiment 1 in that reinforcing ribs 6 are provided at the joints of the supporting beams 3 with the upper frame 4 and the lower frame 2, and the overall strength and stability of the present device are enhanced by providing the reinforcing ribs 6.
The above description is only a preferred embodiment of the present invention, and should not be taken as limiting the invention, and any modifications, equivalent replacements, improvements, etc. made within the spirit and principle of the present invention should be included in the protection scope of the present invention.
Claims (7)
1. The utility model provides a sewage treatment station pump lifting frame frock, its characterized in that includes upper ledge, a supporting beam, underframe and water pump, upper ledge pass through a supporting beam with underframe fixed connection, upper ledge installs on the effluent water sump, the last hoisting device that is equipped with of upper ledge, hoisting device with water pump swing joint, the water pump is placed on the underframe, the underframe is unsettled to be arranged in the effluent water sump.
2. The sewage treatment station pump lifting frame tool according to claim 1, wherein reinforcing ribs are arranged at the connection parts of the supporting beams, the upper frame and the lower frame.
3. The sewage treatment station pump lifting frame tool according to claim 1, wherein the lifting device comprises a pulley assembly, and the pulley assembly is fixedly connected with the water pump through a rope.
4. The sewage treatment station pump lifting frame tool according to claim 1, wherein the upper frame is designed in an I shape, steel plates are arranged at four corners of the upper frame, and expansion screw holes are formed in two sides of each steel plate.
5. The assembly as claimed in claim 1, wherein the lower frame is configured as a rectangular frame, a plurality of fixing rods are spaced in the lower frame, and the gap between adjacent fixing rods is not greater than 10 cm.
6. The sewage treatment station pump lifting frame tool according to claim 1, wherein an anti-rust layer is coated on the upper frame, the supporting beams and the lower frame.
7. The sewage treatment station pump lifting frame tool according to claim 6, wherein the antirust layer is composed of an epoxy zinc-rich primer, an epoxy micaceous iron intermediate layer paint and a polyurethane outer layer paint.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202120242692.6U CN214780417U (en) | 2021-01-28 | 2021-01-28 | Sewage treatment station pump lifting frame frock |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202120242692.6U CN214780417U (en) | 2021-01-28 | 2021-01-28 | Sewage treatment station pump lifting frame frock |
Publications (1)
Publication Number | Publication Date |
---|---|
CN214780417U true CN214780417U (en) | 2021-11-19 |
Family
ID=78750345
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202120242692.6U Active CN214780417U (en) | 2021-01-28 | 2021-01-28 | Sewage treatment station pump lifting frame frock |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN214780417U (en) |
-
2021
- 2021-01-28 CN CN202120242692.6U patent/CN214780417U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101886468B (en) | Construction method of suspension type template support in high-position conjoined structure | |
CN113719139B (en) | Construction method for hoisting irregular space net rack of stadium | |
CN204418784U (en) | Inner steel cylinder of chimney hydraulic pressure lift construction equipment | |
CN202658590U (en) | Integral assembled drilling platform | |
CN115852843A (en) | Construction method of cable crane main tower cable saddle of long-span railway suspension bridge | |
CN214780417U (en) | Sewage treatment station pump lifting frame frock | |
CN103601078A (en) | Suspension type hoisting equipment | |
CN210459269U (en) | High-order tower trickle post | |
CN104563590A (en) | Hydraulic lifting construction device and method for inner steel barrel of chimney | |
CN116838075A (en) | Integrated electromechanical pipeline mounting platform for steel structure factory building | |
CN206753087U (en) | A kind of lighting roof operating platform structure | |
CN212336763U (en) | Curtain wall installation guide rail device fixed on roof flower frame beam | |
CN210684349U (en) | Assembled gantry crane track foundation | |
CN211949131U (en) | Combined upper-chord corrugated web ribbed secondary beam floor system | |
CN208934392U (en) | Construction mould bases | |
CN202042199U (en) | Integration steel containment ring hanging beam | |
CN213926323U (en) | Bottom section cofferdam hoisting point device | |
CN110685483A (en) | Large-scale coal storage bin top plate prefabricating and assembling method | |
CN210766419U (en) | Bridge hanger structure | |
CN214363802U (en) | Integrated suspension type row-adjusting platform | |
CN220312209U (en) | Frame type high pile construction operation platform | |
CN217201598U (en) | Assembled hollow plate beam lifting appliance considering both box beam and hollow plate beam | |
CN114457699B (en) | Platform device for oversized cable bridge transportation equipment | |
CN213710438U (en) | Regularization platform of unloading | |
CN212453279U (en) | Prefabricated assembled roof boarding |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |