CN214734214U - Brick moving device for building construction - Google Patents

Brick moving device for building construction Download PDF

Info

Publication number
CN214734214U
CN214734214U CN202022724113.XU CN202022724113U CN214734214U CN 214734214 U CN214734214 U CN 214734214U CN 202022724113 U CN202022724113 U CN 202022724113U CN 214734214 U CN214734214 U CN 214734214U
Authority
CN
China
Prior art keywords
brick
fragment
type splint
cylinder
fixed plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202022724113.XU
Other languages
Chinese (zh)
Inventor
吴丽青
孙春钢
杨琦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anji Jufeng Construction Co ltd
Original Assignee
Anji Jufeng Construction Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anji Jufeng Construction Co ltd filed Critical Anji Jufeng Construction Co ltd
Priority to CN202022724113.XU priority Critical patent/CN214734214U/en
Application granted granted Critical
Publication of CN214734214U publication Critical patent/CN214734214U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Furnace Housings, Linings, Walls, And Ceilings (AREA)

Abstract

The utility model provides a brick carrying device for building construction, which comprises a carrier body, wherein a lifting support is fixedly arranged on the carrier body, a fixed plate is arranged on one side of the lifting support in a sliding manner, a first chute is arranged on one side of the fixed plate, the first chute is connected with a T-shaped clamping plate in a sliding manner through a first slider, and a connecting arm is fixedly arranged on the fixed plate; this brick device is removed with removing to construction passes through the setting of carrier body, make the staff need not consume a large amount of physical power again and remove the brick, and the transport speed is fast, the transport efficiency is high, with the one end and the T type splint mid portion fixed mounting of cylinder, make splint mechanism the inclined to center position of pressure of cylinder to T type splint when pressing from both sides the fragment of brick, and the bottom is provided with the collet, when the effectual transport fragment of brick of having guaranteed, the stability of fragment of brick in the T type splint, avoid the fragment of brick to drop and influence the quality of fragment of brick, the effectual work efficiency who improves the staff.

Description

Brick moving device for building construction
Technical Field
The utility model relates to a construction technical field especially relates to a construction is with removing brick device.
Background
Along with rapid improvement of economy and science and technology, the building industry is rapidly developed, so that a large number of bricks are used in a building construction site, the bricks are traditional masonry materials, the size is small, the number of the bricks in a unit area is large, the density of common bricks is large, common bricks are transported to a transport vehicle from a production place, the transport vehicle is driven to a specified place, and then constructors in the place can store the bricks in a centralized manner so as to meet the subsequent building work requirement;
at present, the method of artifical transport is still adopted mostly in the transport of brick when the building construction, not only consumes a large amount of physical power, and transport speed is slow, and the fragment of brick of transport is put untiely, and occupation space is big, leads to the damage of brick moreover easily, greatly reduced staff's work efficiency, consequently the utility model provides a building construction is with removing the problem that brick device exists in order to solve prior art.
SUMMERY OF THE UTILITY MODEL
To the above problem, the utility model provides a construction is with removing brick device, this construction is with removing brick device passes through the setting of carrier body, makes the staff need not consume a large amount of physical power again and removes the brick, and the transport speed is fast, and handling efficiency is high, and when the effectual transport fragment of brick of having guaranteed, the stability of fragment of brick in the T type splint avoids the fragment of brick to drop and influences the quality of fragment of brick, and takes up an area of the space for a short time, the effectual work efficiency who improves the staff.
In order to solve the problem, the utility model provides a construction is with removing brick device, including the carrier body, the fixed lifting support that is provided with on the carrier body, one side of lifting support slides and is provided with the fixed plate, first spout has been seted up to one side of fixed plate, first spout is through first slider and T type splint sliding connection, fixed mounting has the linking arm on the fixed plate, one side of linking arm is fixed to be equipped with the cylinder, the bottom fixed mounting of T type splint has the collet, lifting support's interior roof is seted up slottedly, the inslot is provided with the motor, the motor passes through output shaft and threaded rod linkage, the outside threaded connection of threaded rod has the thread bush, the lateral wall of thread bush and one side fixed connection of fixed plate.
The further improvement lies in that: the back central point of fixed plate puts and thread bush fixed connection, the left and right sides position at the fixed plate back all is fixed to be equipped with the second slider, the second spout has been seted up to one side of lifting support, the second spout with the quantity of second slider is two, just the shape size of second spout all matches each other with the shape size of second slider.
The further improvement lies in that: the assembly groove has been seted up to lifting support's bottom, the top fixedly connected with spacing ring of assembly groove, the bottom of threaded rod is provided with the block, the shape size of spacing ring with the shape size of assembly groove with the shape size of block all matches each other, through the effectual stable form that increases the threaded rod when rotating of spacing ring, block and assembly groove that sets up.
The further improvement lies in that: t type splint pass through cylinder and linking arm fixed connection, and the one end of cylinder is located the central point of T type splint and puts to it is even to make T type splint receive the pressure of cylinder, the effectual stability of guaranteeing the fragment of brick between T type splint.
The further improvement lies in that: the slipmat has been laid to the inboard of T type splint, through the slipmat that sets up, effectively increases the fragment of brick at the stability of T type splint, plays the effect that the shock attenuation and protection fragment of brick do not harm simultaneously.
The utility model has the advantages that: this brick device is moved with removing to construction passes through the setting of carrier body, make the staff need not consume a large amount of physical power again and remove the brick, and the transport speed is fast, the transport efficiency is high, with the one end and the T type splint mid portion fixed mounting of cylinder, make splint mechanism cylinder to the eccentric position of pressure of T type splint when pressing from both sides the fragment of brick, and the bottom is provided with the collet, when effectual assurance transport the fragment of brick, the stability of fragment of brick in the T type splint, avoid the fragment of brick to drop and influence the quality of fragment of brick, the fragment of brick of this fragment of brick handling device transport is put neatly, and it is little to take up an area of the space, the effectual work efficiency that has improved the staff, bring great facility for staff's transport work.
Drawings
Fig. 1 is a schematic view of an assembly structure of a lifting bracket and a clamping plate mechanism.
Fig. 2 is a schematic structural view of the clamping mechanism.
Fig. 3 is a schematic view of the assembly structure of the threaded rod and the threaded sleeve.
Fig. 4 is a rear view of the fixed plate structure.
Fig. 5 is a front view of the present invention.
Wherein: 1-a truck body, 2-a lifting bracket, 3-a fixing plate, 4-a first sliding groove, 5-a first sliding block, 6-a T-shaped clamping plate, 7-a connecting arm, 8-an air cylinder, 9-a bottom support, 10-a motor, 11-a threaded rod, 12-a threaded sleeve, 13-a second sliding block, 14-a second sliding groove, 15-an assembling groove, 16-a limiting ring, 17-a clamping block and 18-an anti-slip pad.
Detailed Description
In order to deepen the understanding of the present invention, the following embodiments will be combined to make the present invention do further details, and the present embodiment is only used for explaining the present invention, and does not constitute the limitation of the protection scope of the present invention.
Referring to fig. 1, 2, 3, 4 and 5, the present embodiment provides a brick carrying device for building construction, which comprises a carrying vehicle body 1, a lifting bracket 2 is fixedly arranged on the carrier body 1, a fixing plate 3 is arranged on one side of the lifting bracket 2 in a sliding way, one side of the fixed plate 3 is provided with a first sliding chute 4, the first sliding chute 4 is connected with a T-shaped clamping plate 6 in a sliding way through a first sliding block 5, a connecting arm 7 is fixedly arranged on the fixed plate 3, one side of the connecting arm 7 is fixedly provided with a cylinder 8, the bottom of the T-shaped splint 6 is fixedly provided with a bottom support 9, the inner top wall of the lifting bracket 2 is provided with a groove, a motor 10 is arranged in the groove, the motor 10 is linked with a threaded rod 11 through an output shaft, the outer side of the threaded rod 11 is connected with a threaded sleeve 12 in a threaded manner, and the outer side wall of the threaded sleeve 12 is fixedly connected with one side of the fixed plate 3.
The back central point of fixed plate 3 puts and threaded sleeve 12 fixed connection, the left and right sides position at the fixed plate 3 back all fixed assembly has second slider 13, second spout 14 has been seted up to one side of lifting support 2, second spout 14 with the quantity of second slider 13 is two, just the shape size of second spout 14 all matches each other with the shape size of second slider 13.
The bottom of lifting support 2 has seted up assembly groove 15, assembly groove 15's top fixedly connected with spacing ring 16, the bottom of threaded rod 11 is provided with block 17, the shape size of spacing ring 16 with assembly groove 15's shape size with block 17's shape size all matches each other, through the effectual stable form that increases threaded rod 11 when rotating of spacing ring 16, block 17 and assembly groove 15 that set up.
T type splint 6 passes through cylinder 8 and linking arm 7 fixed connection, and the one end of cylinder 8 is located the central point of T type splint 6 and puts to it is even to make T type splint 6 receive the pressure of cylinder 8, the effectual stability of guaranteeing the fragment of brick between T type splint 6.
The anti-slip mat 18 has been laid to the inboard of T type splint 6, through the anti-slip mat 18 that sets up, effectively increases the stability of fragment of brick at T type splint 6, plays the effect that the shock attenuation is not harmd with the protection fragment of brick simultaneously.
This brick device is moved with removing to construction passes through setting of carrier body 1, make the staff need not consume a large amount of physical power again and remove the brick, and the transport speed is fast, the handling efficiency is high, with the one end of cylinder 8 and 6 central part fixed mounting of T type splint, make splint mechanism cylinder 8 put the inclined to one side central point of pressure of T type splint 6 when pressing from both sides the fragment of brick, and the bottom is provided with collet 9, when the effectual transport fragment of brick of having guaranteed, the stability of fragment of brick in the T type splint 6, avoid the fragment of brick to drop and influence the quality of fragment of brick, the fragment of brick of this fragment of brick handling device transport is put neatly, and take up an area of the space for a short time, the effectual work efficiency who has improved the staff, bring great facility for staff's transport work.
During the use, the staff drives the fragment of brick department that carrier body 1 carried to needs, opens motor 10, rotates through motor 10 and drives threaded rod 11 and rotate to make thread bush 12 and the splint mechanism on the threaded rod 11 reciprocate, put two T type splint 6 respectively in the both sides of fragment of brick, collet 9 is located the bottom of fragment of brick, adjust cylinder 8 extrudees cylinder 8 to inside, makes two T type splint 6 clip the fragment of brick, adjusts the height of splint mechanism and shifts carrier body 1 to the assigned position, and adjust cylinder 8 makes two T type splint 6 separation, it can to put down the fragment of brick.
The foregoing illustrates and describes the principles, general features, and advantages of the present invention. It will be understood by those skilled in the art that the present invention is not limited to the above embodiments, and that the foregoing embodiments and descriptions are provided only to illustrate the principles of the present invention without departing from the spirit and scope of the present invention. The scope of the invention is defined by the appended claims and equivalents thereof.

Claims (5)

1. The utility model provides a construction is with removing brick device which characterized in that: comprises a carrier body (1), a lifting bracket (2) is fixedly arranged on the carrier body (1), a fixed plate (3) is arranged on one side of the lifting bracket (2) in a sliding way, a first sliding chute (4) is arranged on one side of the fixed plate (3), the first sliding chute (4) is connected with the T-shaped clamping plate (6) in a sliding way through a first sliding block (5), a connecting arm (7) is fixedly arranged on the fixing plate (3), a cylinder (8) is fixedly arranged on one side of the connecting arm (7), a bottom support (9) is fixedly assembled at the bottom of the T-shaped clamping plate (6), a groove is formed on the inner top wall of the lifting bracket (2), a motor (10) is arranged in the groove, the motor (10) is linked with a threaded rod (11) through an output shaft, the outer side of the threaded rod (11) is in threaded connection with a threaded sleeve (12), and the outer side wall of the threaded sleeve (12) is fixedly connected with one side of the fixing plate (3).
2. The brick carrying device for building construction according to claim 1, wherein: the back central point of fixed plate (3) puts and thread bush (12) fixed connection, the left and right sides position at the fixed plate (3) back all fixed assembly has second slider (13), second spout (14) have been seted up to one side of lifting support (2), second spout (14) with the quantity of second slider (13) is two, just the shape size of second spout (14) all matches each other with the shape size of second slider (13).
3. The brick carrying device for building construction according to claim 1, wherein: assembly groove (15) have been seted up to the bottom of lifting support (2), the top fixedly connected with spacing ring (16) of assembly groove (15), the bottom of threaded rod (11) is provided with block piece (17), the shape size of spacing ring (16) with the shape size of assembly groove (15) with the shape size of block piece (17) all matches each other, through spacing ring (16), block piece (17) and assembly groove (15) that set up effectual increased the stable form when threaded rod (11) rotate.
4. The brick carrying device for building construction according to claim 1, wherein: t type splint (6) are through cylinder (8) and linking arm (7) fixed connection, and the one end of cylinder (8) is located the central point of T type splint (6) and puts to it is even to make T type splint (6) receive the pressure of cylinder (8), the effectual stability of guaranteeing the fragment of brick between T type splint (6).
5. The brick carrying device for building construction according to claim 1, wherein: non-slip mat (18) have been laid to the inboard of T type splint (6), through non-slip mat (18) that set up, effectively increase the stability of fragment of brick at T type splint (6), play the effect that the shock attenuation is not harm with the protection fragment of brick simultaneously.
CN202022724113.XU 2020-11-23 2020-11-23 Brick moving device for building construction Expired - Fee Related CN214734214U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022724113.XU CN214734214U (en) 2020-11-23 2020-11-23 Brick moving device for building construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022724113.XU CN214734214U (en) 2020-11-23 2020-11-23 Brick moving device for building construction

Publications (1)

Publication Number Publication Date
CN214734214U true CN214734214U (en) 2021-11-16

Family

ID=78618171

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022724113.XU Expired - Fee Related CN214734214U (en) 2020-11-23 2020-11-23 Brick moving device for building construction

Country Status (1)

Country Link
CN (1) CN214734214U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114635555A (en) * 2022-03-22 2022-06-17 山西六建集团有限公司 Based on construction is with quantitative feed mechanism

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114635555A (en) * 2022-03-22 2022-06-17 山西六建集团有限公司 Based on construction is with quantitative feed mechanism

Similar Documents

Publication Publication Date Title
CN214734214U (en) Brick moving device for building construction
CN206751289U (en) Oil drum overturns car
CN201490021U (en) Automatic rubber coating machine of capacitor
CN207602537U (en) For the robot integrated platform of chip package
CN205732934U (en) Balance equipment is sheared in the splicing docked with die casting machine
CN207127512U (en) A kind of bicycle shaft's stereo bent pipe machine
CN207956990U (en) Sorting machine people is used in a kind of production of plank
CN201261640Y (en) Automatic plate loader
CN206502395U (en) One kind rotation blank-clamping machine
CN216189181U (en) Plastic slab loading attachment
CN106166909A (en) A kind of nib combing robot feed mechanism
CN106601525A (en) Key automatic assembly line
CN206335466U (en) A kind of stationary fixture of mobile phone metalwork deburring
CN208409566U (en) A kind of magnetic core collection automatic blanking row's blanking device
CN208682872U (en) A kind of raw material transporting device of the municipal administration bridge construction convenient for discharging
CN107627663A (en) Automatic waste discharge machine
CN209740231U (en) Edible mushroom bag pouring mechanism
CN210214065U (en) Ring hole loading attachment
CN207592966U (en) A kind of chasing bar of automobile high-strength nut
CN207030406U (en) A kind of water pump leading portion material feed mechanism
CN207791669U (en) A kind of profiling machine bamboo block blank self-feeding device for discharging
CN207357837U (en) A kind of equipment that can bend copper pipe automatically
CN218658375U (en) Piston moving and carrying mechanism of piston honing machine
CN205060919U (en) A lift trigger for block production line
CN212384309U (en) Sizing machine

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20211116