CN214695609U - Positioning mechanism for installation of water conservancy construction reinforcement cage - Google Patents
Positioning mechanism for installation of water conservancy construction reinforcement cage Download PDFInfo
- Publication number
- CN214695609U CN214695609U CN202120477690.5U CN202120477690U CN214695609U CN 214695609 U CN214695609 U CN 214695609U CN 202120477690 U CN202120477690 U CN 202120477690U CN 214695609 U CN214695609 U CN 214695609U
- Authority
- CN
- China
- Prior art keywords
- reinforcement cage
- steel reinforcement
- thick bamboo
- mounting groove
- water conservancy
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 230000002787 reinforcement Effects 0.000 title claims abstract description 42
- 238000009434 installation Methods 0.000 title claims abstract description 21
- 238000010276 construction Methods 0.000 title claims abstract description 17
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 title claims abstract description 16
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 38
- 239000010959 steel Substances 0.000 claims abstract description 38
- 235000017166 Bambusa arundinacea Nutrition 0.000 claims abstract description 30
- 235000017491 Bambusa tulda Nutrition 0.000 claims abstract description 30
- 235000015334 Phyllostachys viridis Nutrition 0.000 claims abstract description 30
- 241001330002 Bambuseae Species 0.000 claims abstract description 29
- 239000011425 bamboo Substances 0.000 claims abstract description 29
- 238000005096 rolling process Methods 0.000 claims description 10
- 239000003638 chemical reducing agent Substances 0.000 claims description 3
- 239000007787 solid Substances 0.000 claims description 3
- 230000002093 peripheral effect Effects 0.000 claims description 2
- 238000004804 winding Methods 0.000 abstract description 9
- 229910001294 Reinforcing steel Inorganic materials 0.000 description 3
- 230000003014 reinforcing effect Effects 0.000 description 2
- 241000209128 Bambusa Species 0.000 description 1
- 230000004075 alteration Effects 0.000 description 1
- 238000005259 measurement Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 239000011435 rock Substances 0.000 description 1
- 238000000926 separation method Methods 0.000 description 1
- 238000007493 shaping process Methods 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
- 230000000007 visual effect Effects 0.000 description 1
Images
Abstract
The utility model discloses a positioning mechanism for installing a water conservancy construction steel reinforcement cage, which comprises a limiting cylinder and a steel reinforcement cage, the reinforcement cage is arranged in the limiting cylinder, the top end of the limiting cylinder is uniformly provided with a fixing ring, an inner mounting groove is arranged in the limiting cylinder and close to the inner side part, an outer mounting groove is arranged on the outer side part of the limiting cylinder, a winding motor is arranged on one side in the inner mounting groove, the winding motor is electrically connected with an external power supply, a pull rope is wound on the winding motor, a fixed pulley is arranged between the front side and the rear side of the inner mounting groove, the stay cord passes the fixed pulley and is connected with supporting mechanism, install adjustment mechanism in the outer mounting groove, be provided with the pulley, on the one hand conveniently fix a position the steel reinforcement cage, on the other hand makes more smooth and easy when a spacing section of thick bamboo moves down, has improved the efficiency of installation location, has also improved the precision of installation.
Description
Technical Field
The utility model belongs to the technical field of the steel reinforcement cage installation, specifically be a positioning mechanism of water conservancy construction steel reinforcement cage installation.
Background
At present, in the water conservancy construction, need pile, need hoist and mount steel reinforcement cage after the pile, steel reinforcement cage has great problem when hoist and mount, steel reinforcement cage can rock when hoist and mount, lead to the straightness that hangs down that the uncontrollable steel reinforcement cage transferred, the plane position degree of accuracy when steel reinforcement cage transferred is relatively poor simultaneously, can influence the pouring of later stage concrete like this, also can influence the stability of the concrete column after the shaping simultaneously, current solution mode generally is adjusted it through artificial visual measurement, also can't control the precision like this, lead to the construction quality to reduce, current positioning mechanism to steel reinforcement cage in addition, but current positioning mechanism can not adapt to the stake hole of different diameters, thereby lead to different diameter stake holes to need the positioning mechanism of corresponding different specifications, adaptability is not strong like this. Therefore, a positioning mechanism for installing the water conservancy construction reinforcement cage is provided.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a positioning mechanism of water conservancy construction steel reinforcement cage installation to solve the problem that can not adapt to the stake hole of different diameters that prior art exists.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a positioning mechanism of water conservancy construction steel reinforcement cage installation, includes a spacing section of thick bamboo and steel reinforcement cage, the steel reinforcement cage sets up in a spacing section of thick bamboo, spacing section of thick bamboo top evenly is provided with solid fixed ring, be close to the inside portion in the spacing section of thick bamboo and seted up interior mounting groove, a spacing section of thick bamboo is close to the outside portion and has seted up outer mounting groove, winding motor is installed to one side in the interior mounting groove, winding motor and external power supply electric connection, the last rolling of winding motor has the stay cord, install the fixed pulley between the side around the interior mounting groove, the stay cord passes the fixed pulley and is connected with supporting mechanism, install adjustment mechanism in the outer mounting groove.
Preferably, the supporting mechanism comprises a limiting rod, a second movable groove is uniformly formed between the inner mounting groove and the inner side of the limiting cylinder, a rotating shaft is fixedly connected between the front portion and the rear portion of the second movable groove, the limiting rod is movably sleeved on the periphery of the rotating shaft, and one end of the pull rope is fixedly connected with one end of the limiting rod.
Preferably, a reinforcing steel ring is arranged on the periphery of the reinforcing steel cage, a fixing block is welded on the periphery of the reinforcing steel ring, and the fixing block is matched with the limiting rod.
Preferably, adjustment mechanism includes driving motor, driving motor installs on outer mounting groove top, driving motor and external power supply electric connection, the driving motor output is connected with the lead screw through the speed reducer, the peripheral even threaded connection of lead screw has two screw thread section of thick bamboos, two screw thread section of thick bamboo one end articulates there is the connecting rod, the connecting rod other end articulates there is the fixed plate, install the pulley on the fixed plate, corresponding movable groove one is seted up to spacing section of thick bamboo surface.
Preferably, the left side of the fixed plate is fixedly connected with a limiting plate, two sides of the movable groove are positioned on the limiting cylinder and provided with a limiting groove, and the limiting plate is inserted in the limiting groove.
Preferably, the number of the pulleys is three, each pulley corresponds to two thread cylinders, the two thread cylinders are symmetrical along the pulley, and the screw rod is opposite to the thread direction of the corresponding two thread cylinders.
Preferably, the openings of the top end and the bottom end of the limiting cylinder are provided with arc-shaped openings.
The utility model has the advantages that: the utility model discloses be provided with supporting mechanism, support the fixed block through the gag lever post and make steel reinforcement cage fix, make things convenient for the later stage to tear down spacing section of thick bamboo like this, be provided with the pulley, conveniently fix a position steel reinforcement cage on the one hand, on the other hand makes spacing section of thick bamboo more smooth and easy when moving down, has improved the efficiency of installation location, has also improved the precision of installation, is provided with adjustment mechanism, can adjust the horizontal position of pulley to can be applicable to the stake downthehole of different diameters, adaptability is high.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is an enlarged schematic view of the structure at A of the present invention;
FIG. 3 is an enlarged schematic view of the structure at B of the present invention;
fig. 4 is a schematic view of a side portion structure of the limiting cylinder of the present invention.
In the figure: 1. a limiting cylinder; 2. an arc-shaped opening; 3. a reinforcement cage; 31. a steel bar ring; 32. a fixed block; 4. an inner mounting groove; 5. a winding motor; 6. pulling a rope; 7. a fixed pulley; 8. an outer mounting groove; 9. a limiting rod; 10. a drive motor; 11. a screw rod; 12. a threaded barrel; 13. a connecting rod; 14. a fixing plate; 15. a pulley; 16. a limiting plate; 17. a first movable groove; 171. a limiting groove; 18. a second movable groove; 19. and (4) fixing the ring.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Please refer to fig. 1, a positioning mechanism for water conservancy construction steel reinforcement cage installation, including a spacing section of thick bamboo 1 and steel reinforcement cage 3, steel reinforcement cage 3 sets up in a spacing section of thick bamboo 1, 1 top of a spacing section of thick bamboo evenly is provided with solid fixed ring 19, gu fixed ring 19 is used for the hoist and mount, make things convenient for a spacing section of thick bamboo 1 and lifting rope fixed connection, be close to the inboard portion in a spacing section of thick bamboo 1 and seted up interior mounting groove 4, spacing section of thick bamboo 1 is close to the outside portion and has seted up outer mounting groove 8, one side installs rolling motor 5 in the interior mounting groove 4, rolling motor 5 and external power supply electric connection, the last rolling of rolling motor 5 has stay cord 6, install fixed pulley 7 between the interior mounting groove 4 front and back sides, stay cord 6 passes fixed pulley 7 and is connected with supporting mechanism, install adjustment mechanism in the outer mounting groove 8.
Referring to fig. 2, the supporting mechanism includes a limiting rod 9, a second movable groove 18 is uniformly formed between the inner mounting groove 4 and the inner side of the limiting cylinder 1, a rotating shaft is fixedly connected between the front and the back of the second movable groove 18, the limiting rod 9 is movably sleeved on the periphery of the rotating shaft, one end of the pull rope 6 is fixedly connected with one end of the limiting rod 9, and the winding motor 5 is started to contract the pull rope 6, so that the limiting rod 9 is tilted upwards.
Referring to fig. 1-2, a reinforcing ring 31 is disposed on the periphery of the reinforcement cage 3, a fixing block 32 is welded on the periphery of the reinforcing ring 31, the fixing block 32 is matched with the limiting rod 9, and the limiting rod 9 is always upward toward one end of the fixing block 32 by the pulling force of the pulling rope 6, so as to abut against the fixing block 32 and fix the reinforcement cage 3.
Referring to fig. 3, the adjusting mechanism includes a driving motor 10, the driving motor 10 is installed at the top end of the outer installation groove 8, the driving motor 10 is electrically connected with an external power supply, the output end of the driving motor 10 is connected with a screw rod 11 through a speed reducer, two threaded cylinders 12 are evenly and threadedly connected to the periphery of the screw rod 11, one ends of the two threaded cylinders 12 are hinged to a connecting rod 13, the other end of the connecting rod 13 is hinged to a fixing plate 14, a pulley 15 is installed on the fixing plate 14, a corresponding movable groove one 17 is formed in the surface of the limiting cylinder 1, the driving motor 10 is started to rotate the screw rod 11, so that the two threaded cylinders 12 move in opposite directions or move in opposite directions, and the horizontal position of the pulley 15 can be adjusted.
Referring to fig. 3-4, a limiting plate 16 is fixedly connected to the left side of the fixing plate 14, a limiting groove 171 is formed in the limiting cylinder 1 on two sides of the first movable groove 17, and the limiting plate 16 is inserted into the limiting groove 171, so that the pulley 15 is limited and the pulley 15 is prevented from shaking up and down.
Referring to fig. 3, three pulleys 15 are provided, each pulley 15 corresponds to two thread cylinders 12, the two thread cylinders 12 are symmetrical along the pulley 15, and the thread direction of the screw rod 11 is opposite to that of the corresponding two thread cylinders 12.
Referring to fig. 1, the openings at the top end and the bottom end of the limiting cylinder 1 are provided with arc-shaped openings 2, so that the reinforcement cage 3 can conveniently pass through the limiting cylinder 1.
The working principle is as follows: before use, the steel bar cage 3 is hoisted by the same hoisting rope through the fixing ring 19, the periphery of the steel bar ring 31 on the steel bar cage 3 is welded with the upper fixing block 32, then the limiting cylinder 1 is sleeved on the periphery of the steel reinforcement cage 3 from bottom to top until the limiting rod 9 reaches the position near the fixing block 32, at the moment, the winding motor 5 is started to enable the pull rope 6 to be retracted, the limiting rod 9 is tilted upwards to abut against the fixing block 32, then the limiting cylinder 1 is lifted by external driving equipment and falls into the pile hole, at the moment, the driving motor 10 is started to enable the screw rod 11 to rotate, thereby moving the two screw cylinders 12 towards or away from each other, moving the pulley 15 towards the outside or towards the inside, contacting the pulley 15 with the inner wall of the pile hole, then hang down spacing section of thick bamboo 1 and make steel reinforcement cage 3 move down and install, after the installation finishes, start rolling motor 5 and loosen stay cord 6, hang up spacing section of thick bamboo 1 simultaneously, gag lever post 9 perk and fixed block 32 separation down this moment.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.
Claims (7)
1. The utility model provides a positioning mechanism of water conservancy construction steel reinforcement cage installation, includes a spacing section of thick bamboo (1) and steel reinforcement cage (3), steel reinforcement cage (3) set up in a spacing section of thick bamboo (1), its characterized in that: spacing section of thick bamboo (1) top evenly is provided with solid fixed ring (19), be close to inside part in spacing section of thick bamboo (1) and seted up interior mounting groove (4), outer mounting groove (8) have been seted up near the outside portion to spacing section of thick bamboo (1), rolling motor (5) are installed to one side in interior mounting groove (4), rolling motor (5) and external power supply electric connection, the rolling has stay cord (6) on rolling motor (5), install between interior mounting groove (4) front and back side fixed pulley (7), stay cord (6) pass fixed pulley (7) and are connected with supporting mechanism, install adjustment mechanism in outer mounting groove (8).
2. The positioning mechanism of water conservancy construction steel reinforcement cage installation of claim 1, characterized in that: the supporting mechanism comprises a limiting rod (9), a second movable groove (18) is uniformly formed between the inner mounting groove (4) and the inner side of the limiting cylinder (1), a rotating shaft is fixedly connected between the front side and the rear side in the second movable groove (18), the limiting rod (9) is movably sleeved on the periphery of the rotating shaft, and one end of the pull rope (6) is fixedly connected with one end of the limiting rod (9).
3. The positioning mechanism of water conservancy construction steel reinforcement cage installation of claim 2, characterized in that: the periphery of the steel reinforcement cage (3) is provided with a steel reinforcement ring (31), a fixing block (32) is welded on the periphery of the steel reinforcement ring (31), and the fixing block (32) is matched with the limiting rod (9).
4. The positioning mechanism of water conservancy construction steel reinforcement cage installation of claim 1, characterized in that: adjustment mechanism includes driving motor (10), mounting groove (8) top outside driving motor (10) installation, driving motor (10) and external power supply electric connection, driving motor (10) output is connected with lead screw (11) through the speed reducer, the peripheral even threaded connection of lead screw (11) has two screw thread section of thick bamboo (12), two screw thread section of thick bamboo (12) one end articulates there is connecting rod (13), connecting rod (13) other end articulates there is fixed plate (14), install pulley (15) on fixed plate (14), corresponding movable groove (17) are seted up on spacing section of thick bamboo (1) surface.
5. The positioning mechanism of water conservancy construction steel reinforcement cage installation of claim 4, characterized in that: the left side of the fixing plate (14) is fixedly connected with a limiting plate (16), two sides of the first movable groove (17) are located on the limiting barrel (1) and are provided with limiting grooves (171), and the limiting plate (16) is inserted into the limiting grooves (171).
6. The positioning mechanism of water conservancy construction steel reinforcement cage installation of claim 4, characterized in that: the pulley (15) is provided with three, every pulley (15) corresponds two screw thread section of thick bamboo (12), two screw thread section of thick bamboo (12) are symmetrical along pulley (15), lead screw (11) are opposite with the screw thread direction who corresponds two screw thread section of thick bamboo (12).
7. The positioning mechanism of water conservancy construction steel reinforcement cage installation of claim 1, characterized in that: the top end and the bottom end of the limiting cylinder (1) are provided with arc-shaped openings (2).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202120477690.5U CN214695609U (en) | 2021-03-05 | 2021-03-05 | Positioning mechanism for installation of water conservancy construction reinforcement cage |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202120477690.5U CN214695609U (en) | 2021-03-05 | 2021-03-05 | Positioning mechanism for installation of water conservancy construction reinforcement cage |
Publications (1)
Publication Number | Publication Date |
---|---|
CN214695609U true CN214695609U (en) | 2021-11-12 |
Family
ID=78569691
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202120477690.5U Expired - Fee Related CN214695609U (en) | 2021-03-05 | 2021-03-05 | Positioning mechanism for installation of water conservancy construction reinforcement cage |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN214695609U (en) |
-
2021
- 2021-03-05 CN CN202120477690.5U patent/CN214695609U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN209957260U (en) | Hoisting frame for mechanical equipment | |
CN214879778U (en) | Auxiliary structure is demolishd to tower machine balance arm end attachment piece | |
CN214527783U (en) | Position-adjustable assembled building hoisting device | |
CN214695609U (en) | Positioning mechanism for installation of water conservancy construction reinforcement cage | |
CN213171204U (en) | Construction equipment hoisting device | |
CN217867645U (en) | Steel box girder overhead hoist | |
CN214653048U (en) | Special tool for indoor hoisting of elevator steel structure hoistway | |
CN210366659U (en) | Tower crane | |
CN212269223U (en) | Mobile small-sized crane | |
CN213171122U (en) | Multi-functional hoist device of architectural equipment | |
CN111874798B (en) | Control method and system for blade lifting appliance | |
CN114892526A (en) | Hoisting device for steel box girder construction | |
CN113666274A (en) | Intelligent lifting device for building | |
CN208916655U (en) | A kind of adjustable counter balance lifting device | |
CN220564150U (en) | Overhead hoist is used in boiler installation | |
CN215402728U (en) | Double-machine lifting device | |
CN220467333U (en) | Hoisting device for steam turbine rotor | |
CN116730229B (en) | Environment-friendly energy-saving reciprocating winch based on servo control | |
CN216863453U (en) | Pile feeding winch convenient for lifting and hoisting prestressed pipe pile construction | |
CN219259392U (en) | Hoisting structure | |
CN220485152U (en) | Simple lifting device for assembled plate wall construction | |
CN217377123U (en) | Rotating crane for hydropower station | |
CN219429556U (en) | A outer wall modulization hoisting machine for construction | |
CN218025157U (en) | Synchronous winding mechanism for steel cable of electric hoist | |
CN217996587U (en) | Hoist for PC component convenient to adjust assembly dimension |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20211112 |