CN214656424U - Material conveying device for bridge construction - Google Patents
Material conveying device for bridge construction Download PDFInfo
- Publication number
- CN214656424U CN214656424U CN202120355886.7U CN202120355886U CN214656424U CN 214656424 U CN214656424 U CN 214656424U CN 202120355886 U CN202120355886 U CN 202120355886U CN 214656424 U CN214656424 U CN 214656424U
- Authority
- CN
- China
- Prior art keywords
- pipe
- feed hopper
- bridge construction
- connecting pipe
- screw jack
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000010276 construction Methods 0.000 title claims abstract description 22
- 239000000463 material Substances 0.000 title description 2
- 238000003466 welding Methods 0.000 claims abstract description 4
- 229910000831 Steel Inorganic materials 0.000 claims description 6
- 239000010959 steel Substances 0.000 claims description 6
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 abstract description 7
- 238000000034 method Methods 0.000 description 3
- 239000000701 coagulant Substances 0.000 description 1
Images
Landscapes
- Foundations (AREA)
Abstract
The utility model discloses a feeding device is used in bridge construction, including pile foundation ditch, pipe, feed hopper, connecting pipe, fixing bolt, fixed horizontal pole, screw jack, unable adjustment base, install a plurality of sections pipes in the pile foundation ditch, the pipe top is connected with feed hopper, the welding of feed hopper bottom has the connecting pipe, feed hopper is connected with the pipe through the bottom connecting pipe, and through both ends fixing bolt fixed around the connecting pipe, fixed horizontal pole is all installed at feed hopper left and right sides top, screw jack is all installed to fixed horizontal pole outside bottom in both sides, screw jack bottom all installs on unable adjustment base. The utility model has the advantages of simple structure and reasonable design, use simple to operate, can accomplish pouring of pile foundation ditch concrete under water in bridge construction to accessible both sides lead screw jack promotes along with pouring the progress step by step, and the accessible connecting pipe will rise the pipe replacement get off.
Description
Technical Field
The utility model relates to a feeding device is used in bridge construction.
Background
The underwater concrete is the concrete poured in water, the construction method is determined according to the water depth, when the underwater concrete is shallow, the underwater concrete can be constructed by using a dumping method, when the water depth is deep, the underwater concrete can be poured by using a vertical pipe method, the mixing ratio is generally the same as that of the land concrete, but the underwater concrete is influenced by water and generally has a lower strength grade than the land concrete under the same condition, so that the underwater concrete is improved by one strength grade, and is matched with C30 if the requirement reaches C25. In addition, the method for accelerating the coagulant is reliable, but the cost is high, and the grade of the underwater concrete is not lower than C25.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a feeding device is used in bridge construction to solve the problem that proposes in the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme:
the utility model provides a feeding device for bridge construction, includes pile foundation ditch, pipe, feed hopper, connecting pipe, fixing bolt, fixed horizontal pole, screw jack, unable adjustment base, install a plurality of sections pipes in the pile foundation ditch, the pipe top is connected with feed hopper, feed hopper has the connecting pipe in the welding of bottom, feed hopper is connected with the pipe through the bottom connecting pipe, and both ends fixing bolt is fixed around through the connecting pipe, fixed horizontal pole is all installed at feed hopper left and right sides top, screw jack is all installed to fixed horizontal pole outside bottom in both sides, screw jack bottom all installs on unable adjustment base.
Preferably: the feeding device for bridge construction further comprises a water-proof ball and a steel wire rope, the water-proof ball is installed in the guide pipe, the water-proof ball is matched with the inner diameter of the guide pipe in size, and the steel wire rope is installed at the top of the water-proof ball.
Preferably: the feeding device for bridge construction further comprises connecting threads, the bottom and the top of each guide pipe are provided with the connecting threads, and the connecting threads at the bottom of each guide pipe can be connected with the connecting threads at the top of the next guide pipe.
The utility model has the advantages that: the utility model has the advantages of simple structure and reasonable design, use simple to operate, can accomplish pouring of pile foundation ditch concrete under water in bridge construction to accessible both sides lead screw jack promotes along with pouring the progress step by step, and the accessible connecting pipe will rise the pipe replacement get off.
Drawings
FIG. 1 is a schematic structural view of the feeding device for bridge construction of the present invention;
fig. 2 is the utility model discloses the feeding device for bridge construction's schematic structure.
In the figure: 1. pile foundation ditch, 2, pipe, 3, feed hopper, 4, connecting pipe, 5, fixing bolt, 6, fixed horizontal pole, 7, lead screw jack, 8, unable adjustment base, 9, water proof ball, 10, wire rope, 11, connecting thread.
Detailed Description
The invention will be further elucidated with reference to the following figures and specific embodiments:
as shown in fig. 1-2, a feeding device for bridge construction, including pile foundation ditch 1, pipe 2, feed hopper 3, connecting pipe 4, fixing bolt 5, fixed horizontal pole 6, screw jack 7, unable adjustment base 8, install a plurality of sections pipe 2 in the pile foundation ditch 1, pipe 2 top is connected with feed hopper 3, the welding of 3 bottom of feed hopper has connecting pipe 4, feed hopper 3 is connected with pipe 2 through bottom connecting pipe 4, and just fixes through connecting pipe 4 front and back both ends fixing bolt 5, fixed horizontal pole 6 is all installed at 3 left and right sides tops of feed hopper, screw jack 7 is all installed to 6 outside bottoms of the fixed horizontal pole in both sides, screw jack 7 bottom is all installed on unable adjustment base 8. The feeding device for bridge construction further comprises a water-proof ball 9 and a steel wire rope 10, the water-proof ball 9 is installed in the guide pipe 2, the water-proof ball 9 is matched with the inner diameter of the guide pipe 2 in size, and the steel wire rope 10 is installed at the top of the water-proof ball 9. The feeding device for bridge construction further comprises connecting threads 11, the connecting threads 11 are formed in the bottom and the top of the guide pipe 2, and the connecting threads 11 in the bottom of the guide pipe 2 can be connected with the connecting threads 11 in the top of the next section of guide pipe 2.
The utility model discloses a theory of operation: can accomplish the pouring of pile foundation ditch 1 underwater concrete in bridge construction to accessible both sides lead screw jack 7 promotes along with pouring the progress step by step, and accessible connecting pipe 4 replaces the pipe 2 that has risen.
It is obvious to a person skilled in the art that the invention is not restricted to details of the above-described exemplary embodiments, but that it can be implemented in other specific forms without departing from the spirit or essential characteristics of the invention. The embodiments are therefore to be considered in all respects as illustrative and all changes which come within the meaning and range of equivalency are therefore intended to be embraced therein.
Claims (3)
1. The utility model provides a feeding device for bridge construction, includes pile foundation ditch (1), pipe (2), feed hopper (3), connecting pipe (4), fixing bolt (5), fixed horizontal pole (6), lead screw jack (7), unable adjustment base (8), its characterized in that: install a plurality of sections pipe (2) in pile foundation ditch (1), pipe (2) top is connected with feed hopper (3), feed hopper (3) bottom welding has connecting pipe (4), feed hopper (3) are connected with pipe (2) through bottom connecting pipe (4), and through connecting pipe (4) around both ends fixing bolt (5) fixed, fixed horizontal pole (6) are all installed at feed hopper (3) left and right sides top, lead screw jack (7) are all installed to fixed horizontal pole (6) outside bottom in both sides, lead screw jack (7) bottom is all installed on unable adjustment base (8).
2. The feeding device for bridge construction according to claim 1, wherein: the feeding device for bridge construction is characterized by further comprising a water-proof ball (9) and a steel wire rope (10), wherein the water-proof ball (9) is installed in the guide pipe (2), the water-proof ball (9) is matched with the inner diameter of the guide pipe (2) in size, and the steel wire rope (10) is installed at the top of the water-proof ball (9).
3. The feeding device for bridge construction according to claim 1, wherein: the feeding device for bridge construction further comprises connecting threads (11), the connecting threads (11) are formed in the bottom and the top of the guide pipe (2), and the connecting threads (11) in the bottom of the guide pipe (2) can be connected with the connecting threads (11) in the top of the next guide pipe (2).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202120355886.7U CN214656424U (en) | 2021-02-09 | 2021-02-09 | Material conveying device for bridge construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202120355886.7U CN214656424U (en) | 2021-02-09 | 2021-02-09 | Material conveying device for bridge construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN214656424U true CN214656424U (en) | 2021-11-09 |
Family
ID=78447245
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202120355886.7U Expired - Fee Related CN214656424U (en) | 2021-02-09 | 2021-02-09 | Material conveying device for bridge construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN214656424U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114197879A (en) * | 2021-12-27 | 2022-03-18 | 上海市机械施工集团有限公司 | Device and method for pouring concrete into steel pipe column |
-
2021
- 2021-02-09 CN CN202120355886.7U patent/CN214656424U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114197879A (en) * | 2021-12-27 | 2022-03-18 | 上海市机械施工集团有限公司 | Device and method for pouring concrete into steel pipe column |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206706811U (en) | A kind of offshore wind turbine single-pile foundation | |
CN103205980A (en) | Large-diameter mono-pile foundation of offshore wind turbine and construction method of large-diameter mono-pile foundation | |
CN104389318B (en) | Reinforced concrete-steel structure hybrid gravity foundation for offshore wind power and construction method thereof | |
CN214656424U (en) | Material conveying device for bridge construction | |
CN102220762A (en) | Method and device for disposing underwater pouring concrete pile breaking accident | |
CN204608815U (en) | Raft plate gravity offshore wind turbine foundation | |
CN210341970U (en) | Installation foundation assembly for offshore wind turbine generator system | |
CN204849811U (en) | A aerogenerator basis scour prevention structure for coastal intertidal zone | |
CN204212177U (en) | A kind of double doing in the hole of stand column pile cheats diaphragm wall structure | |
CN211111302U (en) | Ecological floating island spud pile | |
CN204491567U (en) | Prefabricated steel pipe pile wind power generation platform | |
CN106759264A (en) | One kind grouting pipe network and its construction method | |
CN217028329U (en) | Wind-resistant and anti-falling concrete wire pole | |
CN103184738B (en) | Grouting guide pipe restraint ring mounting structure and method for mounting grouting guide pipes by using restraint rings | |
CN215406024U (en) | Engineering pile reinforcement cage structure | |
CN204780928U (en) | Major diameter bored concrete pile concrete first set groundwater increment controlling means | |
CN210086236U (en) | Bearing capacity lifting device of cast-in-place pile and cast-in-place pile | |
CN104695411B (en) | Prefabricated composite structure steel pipe pile wind power generation platform | |
CN209799529U (en) | communication tower prefabricated base convenient for wiring | |
CN208167743U (en) | A kind of concrete sealing bottom magazine attachment | |
CN210459271U (en) | Fan jacket structure for offshore wind power | |
CN210369938U (en) | A can have enough to meet need sleeve for pouring stake core | |
CN209162814U (en) | A kind of novel anchor rod stake | |
CN203222808U (en) | Foundation processing structure for floating sluice | |
CN206706817U (en) | A kind of hollow round table gravity type flexibility blower foundation |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20211109 |
|
CF01 | Termination of patent right due to non-payment of annual fee |