CN214656424U - Material conveying device for bridge construction - Google Patents

Material conveying device for bridge construction Download PDF

Info

Publication number
CN214656424U
CN214656424U CN202120355886.7U CN202120355886U CN214656424U CN 214656424 U CN214656424 U CN 214656424U CN 202120355886 U CN202120355886 U CN 202120355886U CN 214656424 U CN214656424 U CN 214656424U
Authority
CN
China
Prior art keywords
pipe
feed hopper
bridge construction
connecting pipe
screw jack
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202120355886.7U
Other languages
Chinese (zh)
Inventor
陈继军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202120355886.7U priority Critical patent/CN214656424U/en
Application granted granted Critical
Publication of CN214656424U publication Critical patent/CN214656424U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Foundations (AREA)

Abstract

The utility model discloses a feeding device is used in bridge construction, including pile foundation ditch, pipe, feed hopper, connecting pipe, fixing bolt, fixed horizontal pole, screw jack, unable adjustment base, install a plurality of sections pipes in the pile foundation ditch, the pipe top is connected with feed hopper, the welding of feed hopper bottom has the connecting pipe, feed hopper is connected with the pipe through the bottom connecting pipe, and through both ends fixing bolt fixed around the connecting pipe, fixed horizontal pole is all installed at feed hopper left and right sides top, screw jack is all installed to fixed horizontal pole outside bottom in both sides, screw jack bottom all installs on unable adjustment base. The utility model has the advantages of simple structure and reasonable design, use simple to operate, can accomplish pouring of pile foundation ditch concrete under water in bridge construction to accessible both sides lead screw jack promotes along with pouring the progress step by step, and the accessible connecting pipe will rise the pipe replacement get off.

Description

Material conveying device for bridge construction
Technical Field
The utility model relates to a feeding device is used in bridge construction.
Background
The underwater concrete is the concrete poured in water, the construction method is determined according to the water depth, when the underwater concrete is shallow, the underwater concrete can be constructed by using a dumping method, when the water depth is deep, the underwater concrete can be poured by using a vertical pipe method, the mixing ratio is generally the same as that of the land concrete, but the underwater concrete is influenced by water and generally has a lower strength grade than the land concrete under the same condition, so that the underwater concrete is improved by one strength grade, and is matched with C30 if the requirement reaches C25. In addition, the method for accelerating the coagulant is reliable, but the cost is high, and the grade of the underwater concrete is not lower than C25.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a feeding device is used in bridge construction to solve the problem that proposes in the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme:
the utility model provides a feeding device for bridge construction, includes pile foundation ditch, pipe, feed hopper, connecting pipe, fixing bolt, fixed horizontal pole, screw jack, unable adjustment base, install a plurality of sections pipes in the pile foundation ditch, the pipe top is connected with feed hopper, feed hopper has the connecting pipe in the welding of bottom, feed hopper is connected with the pipe through the bottom connecting pipe, and both ends fixing bolt is fixed around through the connecting pipe, fixed horizontal pole is all installed at feed hopper left and right sides top, screw jack is all installed to fixed horizontal pole outside bottom in both sides, screw jack bottom all installs on unable adjustment base.
Preferably: the feeding device for bridge construction further comprises a water-proof ball and a steel wire rope, the water-proof ball is installed in the guide pipe, the water-proof ball is matched with the inner diameter of the guide pipe in size, and the steel wire rope is installed at the top of the water-proof ball.
Preferably: the feeding device for bridge construction further comprises connecting threads, the bottom and the top of each guide pipe are provided with the connecting threads, and the connecting threads at the bottom of each guide pipe can be connected with the connecting threads at the top of the next guide pipe.
The utility model has the advantages that: the utility model has the advantages of simple structure and reasonable design, use simple to operate, can accomplish pouring of pile foundation ditch concrete under water in bridge construction to accessible both sides lead screw jack promotes along with pouring the progress step by step, and the accessible connecting pipe will rise the pipe replacement get off.
Drawings
FIG. 1 is a schematic structural view of the feeding device for bridge construction of the present invention;
fig. 2 is the utility model discloses the feeding device for bridge construction's schematic structure.
In the figure: 1. pile foundation ditch, 2, pipe, 3, feed hopper, 4, connecting pipe, 5, fixing bolt, 6, fixed horizontal pole, 7, lead screw jack, 8, unable adjustment base, 9, water proof ball, 10, wire rope, 11, connecting thread.
Detailed Description
The invention will be further elucidated with reference to the following figures and specific embodiments:
as shown in fig. 1-2, a feeding device for bridge construction, including pile foundation ditch 1, pipe 2, feed hopper 3, connecting pipe 4, fixing bolt 5, fixed horizontal pole 6, screw jack 7, unable adjustment base 8, install a plurality of sections pipe 2 in the pile foundation ditch 1, pipe 2 top is connected with feed hopper 3, the welding of 3 bottom of feed hopper has connecting pipe 4, feed hopper 3 is connected with pipe 2 through bottom connecting pipe 4, and just fixes through connecting pipe 4 front and back both ends fixing bolt 5, fixed horizontal pole 6 is all installed at 3 left and right sides tops of feed hopper, screw jack 7 is all installed to 6 outside bottoms of the fixed horizontal pole in both sides, screw jack 7 bottom is all installed on unable adjustment base 8. The feeding device for bridge construction further comprises a water-proof ball 9 and a steel wire rope 10, the water-proof ball 9 is installed in the guide pipe 2, the water-proof ball 9 is matched with the inner diameter of the guide pipe 2 in size, and the steel wire rope 10 is installed at the top of the water-proof ball 9. The feeding device for bridge construction further comprises connecting threads 11, the connecting threads 11 are formed in the bottom and the top of the guide pipe 2, and the connecting threads 11 in the bottom of the guide pipe 2 can be connected with the connecting threads 11 in the top of the next section of guide pipe 2.
The utility model discloses a theory of operation: can accomplish the pouring of pile foundation ditch 1 underwater concrete in bridge construction to accessible both sides lead screw jack 7 promotes along with pouring the progress step by step, and accessible connecting pipe 4 replaces the pipe 2 that has risen.
It is obvious to a person skilled in the art that the invention is not restricted to details of the above-described exemplary embodiments, but that it can be implemented in other specific forms without departing from the spirit or essential characteristics of the invention. The embodiments are therefore to be considered in all respects as illustrative and all changes which come within the meaning and range of equivalency are therefore intended to be embraced therein.

Claims (3)

1. The utility model provides a feeding device for bridge construction, includes pile foundation ditch (1), pipe (2), feed hopper (3), connecting pipe (4), fixing bolt (5), fixed horizontal pole (6), lead screw jack (7), unable adjustment base (8), its characterized in that: install a plurality of sections pipe (2) in pile foundation ditch (1), pipe (2) top is connected with feed hopper (3), feed hopper (3) bottom welding has connecting pipe (4), feed hopper (3) are connected with pipe (2) through bottom connecting pipe (4), and through connecting pipe (4) around both ends fixing bolt (5) fixed, fixed horizontal pole (6) are all installed at feed hopper (3) left and right sides top, lead screw jack (7) are all installed to fixed horizontal pole (6) outside bottom in both sides, lead screw jack (7) bottom is all installed on unable adjustment base (8).
2. The feeding device for bridge construction according to claim 1, wherein: the feeding device for bridge construction is characterized by further comprising a water-proof ball (9) and a steel wire rope (10), wherein the water-proof ball (9) is installed in the guide pipe (2), the water-proof ball (9) is matched with the inner diameter of the guide pipe (2) in size, and the steel wire rope (10) is installed at the top of the water-proof ball (9).
3. The feeding device for bridge construction according to claim 1, wherein: the feeding device for bridge construction further comprises connecting threads (11), the connecting threads (11) are formed in the bottom and the top of the guide pipe (2), and the connecting threads (11) in the bottom of the guide pipe (2) can be connected with the connecting threads (11) in the top of the next guide pipe (2).
CN202120355886.7U 2021-02-09 2021-02-09 Material conveying device for bridge construction Expired - Fee Related CN214656424U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120355886.7U CN214656424U (en) 2021-02-09 2021-02-09 Material conveying device for bridge construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120355886.7U CN214656424U (en) 2021-02-09 2021-02-09 Material conveying device for bridge construction

Publications (1)

Publication Number Publication Date
CN214656424U true CN214656424U (en) 2021-11-09

Family

ID=78447245

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120355886.7U Expired - Fee Related CN214656424U (en) 2021-02-09 2021-02-09 Material conveying device for bridge construction

Country Status (1)

Country Link
CN (1) CN214656424U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114197879A (en) * 2021-12-27 2022-03-18 上海市机械施工集团有限公司 Device and method for pouring concrete into steel pipe column

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114197879A (en) * 2021-12-27 2022-03-18 上海市机械施工集团有限公司 Device and method for pouring concrete into steel pipe column

Similar Documents

Publication Publication Date Title
CN206706811U (en) A kind of offshore wind turbine single-pile foundation
CN103205980A (en) Large-diameter mono-pile foundation of offshore wind turbine and construction method of large-diameter mono-pile foundation
CN104389318B (en) Reinforced concrete-steel structure hybrid gravity foundation for offshore wind power and construction method thereof
CN214656424U (en) Material conveying device for bridge construction
CN102220762A (en) Method and device for disposing underwater pouring concrete pile breaking accident
CN204608815U (en) Raft plate gravity offshore wind turbine foundation
CN210341970U (en) Installation foundation assembly for offshore wind turbine generator system
CN204849811U (en) A aerogenerator basis scour prevention structure for coastal intertidal zone
CN204212177U (en) A kind of double doing in the hole of stand column pile cheats diaphragm wall structure
CN211111302U (en) Ecological floating island spud pile
CN204491567U (en) Prefabricated steel pipe pile wind power generation platform
CN106759264A (en) One kind grouting pipe network and its construction method
CN217028329U (en) Wind-resistant and anti-falling concrete wire pole
CN103184738B (en) Grouting guide pipe restraint ring mounting structure and method for mounting grouting guide pipes by using restraint rings
CN215406024U (en) Engineering pile reinforcement cage structure
CN204780928U (en) Major diameter bored concrete pile concrete first set groundwater increment controlling means
CN210086236U (en) Bearing capacity lifting device of cast-in-place pile and cast-in-place pile
CN104695411B (en) Prefabricated composite structure steel pipe pile wind power generation platform
CN209799529U (en) communication tower prefabricated base convenient for wiring
CN208167743U (en) A kind of concrete sealing bottom magazine attachment
CN210459271U (en) Fan jacket structure for offshore wind power
CN210369938U (en) A can have enough to meet need sleeve for pouring stake core
CN209162814U (en) A kind of novel anchor rod stake
CN203222808U (en) Foundation processing structure for floating sluice
CN206706817U (en) A kind of hollow round table gravity type flexibility blower foundation

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20211109

CF01 Termination of patent right due to non-payment of annual fee