CN214656038U - Structure for solving different height walking and horizontal transportation of trailers before and after shield starting - Google Patents

Structure for solving different height walking and horizontal transportation of trailers before and after shield starting Download PDF

Info

Publication number
CN214656038U
CN214656038U CN202121177161.XU CN202121177161U CN214656038U CN 214656038 U CN214656038 U CN 214656038U CN 202121177161 U CN202121177161 U CN 202121177161U CN 214656038 U CN214656038 U CN 214656038U
Authority
CN
China
Prior art keywords
walking
trailer
tenon
board
lane
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202121177161.XU
Other languages
Chinese (zh)
Inventor
王振飞
王玉祥
夏站辉
赵旭
张耿
谢松波
范韬
赵自力
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Tunnel Stock Co Ltd
Original Assignee
China Railway Tunnel Stock Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Tunnel Stock Co Ltd filed Critical China Railway Tunnel Stock Co Ltd
Priority to CN202121177161.XU priority Critical patent/CN214656038U/en
Application granted granted Critical
Publication of CN214656038U publication Critical patent/CN214656038U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a solve shield structure of trailer difference height walking and horizontal transport around starting to solve the current trailer track structure construction degree of difficulty big, consuming time long, the technical problem of extravagant raw materials is demolishd in later stage. The utility model discloses an arc section of track, lane board stand, type of falling T support piece down, type of falling T support piece includes lane board, mid-board, longeron, spliced pole, the mid-board support in the bottom intermediate position of lane board, the longeron set up in the both sides of lane board, the spliced pole is fixed in the below of longeron, lane board stand top is equipped with the tenon that corresponds down, the spliced pole bottom is equipped with the tenon that corresponds. The utility model has the advantages of: the manufacturing difficulty is reduced, the time consumption is short, and raw materials are not wasted.

Description

Structure for solving different height walking and horizontal transportation of trailers before and after shield starting
Technical Field
The utility model relates to a shield constructs quick-witted technical field that starts, concretely relates to solve shield structure that trailer is high walking and horizontal transport not together around starting.
Background
When a shield starts, a sinking section can be arranged on a main structure of a connecting section of a foundation pit, so that a trailer at the back and the front are different in height, the trailer at the back cannot normally cross the sinking section forward, and in order to meet the requirement that the shield starts the walking of a plurality of trailers at the back and the horizontal transportation of duct pieces and internal structure prefabricated parts, the traditional method is to adopt a mode of pouring an arc guide platform 1 (shown in figure 1) and stacking an internal opening sub-part 2 of a shield interval at a lower position to heighten the sinking section of the main structure of the foundation pit so as to solve the driving and horizontal transportation of the plurality of trailers at the back.
However, in practical application of the method, the maximum elevation allowed by the arc-shaped guide platform for traveling of No. 1 trailer wheels and transportation of duct pieces is met, a concrete layer of about 25cm is still required to be additionally paved on the arc-shaped guide platform 1 before stacking the opening sub-components 2 to be as high as the height of a constructed roadway plate, the concrete is required to be as strong as the height of the constructed roadway plate after pouring concrete, the construction period is greatly influenced, and a large amount of concrete and waste opening sub-components are required to be chiseled when the roadway plate and the partition wall are constructed in the later period, so that waste of resources and cost is caused.
Disclosure of Invention
The utility model provides a solve shield structure of trailer walking and horizontal transport of different heights around starting to solve the current trailer track structure construction degree of difficulty big, consuming time long, the technical problem of extravagant raw materials is demolishd in later stage.
In order to solve the technical problem, the utility model adopts the following technical scheme:
the utility model provides a solve structure that trailer is high walking and horizontal transportation not around shield structure originated, includes arc track panel, lane board lower column, type of falling T support piece includes lane board, mid-board, longeron, spliced pole, the mid-board support in the bottom intermediate position of lane board, the longeron set up in the both sides of lane board, the spliced pole is fixed in the below of longeron, lane board lower column top is equipped with the tenon, the spliced pole bottom is equipped with the tenon that corresponds.
Further, the width of the lane plate is larger than the distance between the No. 2 trailer wheels so that the trailer can smoothly pass through the lane plate.
Further, a sheet feeder is arranged on the arc-shaped track panel, and the sum of the heights of the arc-shaped track panel and the sheet feeder for conveying the duct pieces is smaller than the bottom height of the No. 1 trailer.
Furthermore, 10mm intervals are arranged between the four sides of the tenon and the mortise.
Furthermore, a butyronitrile cork rubber gasket is adhered between the bottom of the tenon and the tenon, and a steel gasket is filled between the side surface of the tenon and the tenon.
Furthermore, the inverted T-shaped support piece comprises a plurality of sections which are connected end to end, and two adjacent sections of the inverted T-shaped support piece are fixed by the aid of a tensioning device.
Furthermore, the top of the lower upright post of the roadway plate is provided with an embedded steel plate for installing a trailer walking track beam.
Compared with the prior art, the utility model discloses a main beneficial technological effect lies in:
1. the utility model discloses the platform is led to the arc that need not to execute to can simplify arc section of track auxiliary device's structure, only remain its middle part satisfy feeding machine transportation section of jurisdiction can, the platform is led to the cancellation arc, accomplishes the shield with the help of foundation ditch major structure's permanent structures and begins, resources are saved, practice thrift the cost, practice thrift the time limit for a project.
2. The utility model discloses a face the design theory that combines forever, stand under the lane board with the help of former design, set up the longeron and satisfy No. 1 trailer walking, erect type of falling T support piece again in the top, this support piece makes lane board and foundation ditch structure interior improvement of spliced pole of both sides implement lane board highly uniform on the one hand, the normal current and the horizontal transport of trailer at the back have been guaranteed, on the other hand this type of falling T support piece continue to implement as a part of foundation ditch major structure and do both sides structure and lane board upper portion mid-board can, no longer need demolish, and the raw materials are saved, and the time limit for a project can be shortened.
Drawings
Fig. 1 is a schematic view showing a structure of a trailer walking in the prior art.
Fig. 2 is a schematic structural diagram of the walking of the sheet feeder of the present invention.
Fig. 3 is a schematic structural view of the utility model No. 1 trailer walking.
Fig. 4 is a schematic structural view of the following trailer of the present invention.
Fig. 5 is the utility model discloses the structural schematic diagram of type of falling T support piece concatenation.
Fig. 6 is the utility model discloses the structural schematic diagram of foundation ditch main part construction.
In the figure, an arc guide platform 1, a square part 2, a sheet feeder 3, an arc track panel middle part 4, a No. 1 trailer 5, an A upright post 6, a No. 2 trailer 7, a middle partition wall 8, a connecting post 9, a lane plate 10 and a longitudinal beam 11.
Detailed Description
The following embodiments are only intended to illustrate the present invention in detail, and do not limit the scope of the present invention in any way.
In the description of the present application, it is to be understood that the terms "upper", "lower", "front", "rear", "left", "right", "top", "bottom", "inner", "outer", and the like, indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, are merely for convenience in describing the present application and simplifying the description, and do not indicate or imply that the device or element being referred to must have a particular orientation, be constructed in a particular orientation, and be operated, and thus, should not be construed as limiting the present application. References to "first," "second," etc. in this application are intended to distinguish between similar items and not necessarily to describe a particular order or sequence.
Example 1: a structure for solving the problem of different height walking and horizontal transportation of trailers before and after shield starting is disclosed, and comprises an arc-shaped track row middle part 4, an A-block upright post 6 and an inverted T-shaped supporting piece, wherein a sheet feeding machine 3 passes through the arc-shaped track row middle part 4, the sum of the heights of the arc-shaped track row middle part 4 and the sheet feeding machine 3 is smaller than the bottom surface height of the trailer, and a No. 1 trailer 5 and the sheet feeding machine 3 can be ensured to advance vertically and parallelly.
Need prepare type of falling T support piece after 1 number trailer 5 passes through, it includes lane board 10, mid wall 8, longeron 11, spliced pole 9, mid wall 8 supports in the bottom intermediate position of lane board 10, longeron 11 sets up in the both sides of lane board, spliced pole 9 is fixed in the below of longeron, make lane board 10 and the foundation ditch major structure in the effect of spliced pole 9 in the lane board highly uniform that has accomplished, guarantee 2 number trailer 7 can steadily through this section of sinking.
The A upright posts 6 and the inverted T-shaped supporting pieces are spliced and installed in a tenon-and-mortise mode, and splicing margins of 10mm are reserved at the front, the rear, the left and the right (according to the specific situation of the project). Before installation, a butyronitrile cork rubber gasket is adhered to the bottom of the joint of the inverted T-shaped supporting piece and the A upright post 6, and a seam is filled; and gaps in the vertical direction around the joint are wedged tightly by steel gaskets. To accommodate the passage of trailer number 2, the width of the lane plates 10 is increased as necessary to be greater than the spacing of the trailer wheels. A piece of stand 6 that satisfies 1 trailer walking can cast-in-place completion when the major structure is under construction, and pre-buried steel sheet is in order to install trailer walking track roof beam. The A upright columns 6, the longitudinal beams 11, the roadway plates 10 and the partition walls 8 need to be prefabricated in blocks and sections, after a plurality of trailer sections move to the distance, the inverted T-shaped part is assembled, the first section needs to be fixed with the bottom plate, and in order to ensure the stability of the whole structure, every two adjacent sections can be fixed by adopting a tensioning device in an auxiliary mode.
This embodiment adopts the following structural optimization method who faces the combination forever, cancel the arc guide table under No. 1 trailer, the arc section of track below the feeding machine only remains the mid portion, satisfy the transportation of section of jurisdiction under No. 1 trailer, the walking of No. 1 trailer is provided by A piece stand 6 under the guidance tape, the walking of trailer at the back is provided by prefabricated type of falling T support piece, because the trailer wheel interval of several sections differs around, need enlarge the stand size after the axis interval contrast with A piece stand 6, for guaranteeing construction quality and later stage operation safety, can suitably encrypt the stand.
While the present invention has been described in detail with reference to the drawings and examples, it will be understood by those skilled in the art that various changes in the specific parameters of the embodiments described above may be made or equivalents may be substituted for elements, structures or materials thereof without departing from the spirit of the invention to form various embodiments, which are intended to be part of the scope of the invention and not be described in detail herein.

Claims (7)

1. The utility model provides a solve structure that trailer is high walking and horizontal transport not together around shield structure originated, its characterized in that includes arc track panel, lane board stand, type of falling T support piece down, type of falling T support piece includes lane board, mid-board, longeron, spliced pole, the mid-board support in the bottom intermediate position of lane board, the longeron set up in the both sides of lane board, the spliced pole is fixed in the below of longeron, lane board stand top is equipped with the tenon, the spliced pole bottom is equipped with the tenon that corresponds.
2. The structure for solving the problem of different height walking and horizontal transportation of trailers before and after shield starting according to claim 1, wherein the width of the lane boards is larger than the distance between the wheels of the rear trailer so that the rear trailer can pass through smoothly.
3. The structure for solving the problem of different height walking and horizontal transportation of trailers before and after shield starting according to claim 1, wherein the height of the bottom surface of the front trailer walking on the lower upright post of the roadway plate is greater than the height of the lower rail row of the trailer and the height of the transportation duct piece of the feeding machine.
4. The structure for solving the problem of different height walking and horizontal transportation of trailers before and after shield start-up according to claim 1, wherein a space of 10mm is provided between the four sides of the tenon and the mortise.
5. The structure for solving the problem of different height walking and horizontal transportation of trailers before and after shield tunneling start according to claim 4, wherein a butyronitrile cork rubber gasket is adhered between the bottom of the tenon and the tenon, and a steel gasket is filled between the side surface of the tenon and the tenon.
6. The structure for solving the problem of different height walking and horizontal transportation of trailers before and after shield starting according to claim 1, wherein the inverted T-shaped supporting member comprises a plurality of sections which are connected end to end, and two adjacent sections of the inverted T-shaped supporting member are fixed by a tensioning device in an auxiliary mode.
7. The structure for solving the problem of different height walking and horizontal transportation of trailers before and after shield starting according to claim 1, wherein the top of the lower upright post of the roadway plate is provided with a pre-buried steel plate for installing a walking track beam of the trailer.
CN202121177161.XU 2021-05-28 2021-05-28 Structure for solving different height walking and horizontal transportation of trailers before and after shield starting Active CN214656038U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121177161.XU CN214656038U (en) 2021-05-28 2021-05-28 Structure for solving different height walking and horizontal transportation of trailers before and after shield starting

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121177161.XU CN214656038U (en) 2021-05-28 2021-05-28 Structure for solving different height walking and horizontal transportation of trailers before and after shield starting

Publications (1)

Publication Number Publication Date
CN214656038U true CN214656038U (en) 2021-11-09

Family

ID=78486972

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121177161.XU Active CN214656038U (en) 2021-05-28 2021-05-28 Structure for solving different height walking and horizontal transportation of trailers before and after shield starting

Country Status (1)

Country Link
CN (1) CN214656038U (en)

Similar Documents

Publication Publication Date Title
CN105568866A (en) Incremental launching construction method for large-span steel box girder spanning constructed road
JP2009243046A (en) Block for foundation
CN205295953U (en) Long span steel case back of strideing across existing road pushes away system
JP5367297B2 (en) Bridge with precast cross girder and precast girder and its construction method
CN109139049B (en) Construction method for secondary lining buckling arch of underground excavation station of subway
KR101638093B1 (en) Rahmen using hinge type pc wall and method for constructing the same
CN110805305A (en) Climbing and shifting method for high-rise building
JP4540632B2 (en) Erection girder
JP6374353B2 (en) How to build a bridge
KR20150062284A (en) Rail Track Structure Using Beam having Embedded Rail and Supporting Pile, and Constructing Method of Rail Track Structure
CN214656038U (en) Structure for solving different height walking and horizontal transportation of trailers before and after shield starting
KR101187282B1 (en) Railway bridge constructing method using 2 post type abutment structure
CN109778700B (en) Cast-in-place trough beam three-point sliding pushing construction method for crossing existing road
JP4136959B2 (en) "How to build underground structures and installation girder"
US8459570B2 (en) Supporting arrangement
CN103967332A (en) Construction method of building site barrier
CN205061417U (en) What narrow regional building deep basal pit was under construction puies forward soil series all
KR102100692B1 (en) Construction method of concrete ballast in tunnel
CN209816676U (en) Ox leg type hoop
GB2497274A (en) Vehicle station platform system
CN103437252A (en) Track bed structure and construction method for same
JP2010168844A (en) Road widening structure
CN218953323U (en) Tunnel vault formwork construction trolley
CN219010959U (en) Multistage bridge construction platform in V-shaped valley hard rock area
CN217325021U (en) Bridge girder erection machine transverse support for erecting T beam of basket type steel box arch bridge

Legal Events

Date Code Title Description
GR01 Patent grant