CN214615428U - Hoisting template structure for pouring steel reinforced concrete beam - Google Patents

Hoisting template structure for pouring steel reinforced concrete beam Download PDF

Info

Publication number
CN214615428U
CN214615428U CN202120340305.2U CN202120340305U CN214615428U CN 214615428 U CN214615428 U CN 214615428U CN 202120340305 U CN202120340305 U CN 202120340305U CN 214615428 U CN214615428 U CN 214615428U
Authority
CN
China
Prior art keywords
bottom plate
rods
rod
pouring
section steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202120340305.2U
Other languages
Chinese (zh)
Inventor
冯琳
宋红
王振宇
韩存金
赵哲
林昱悰
刘成
孙自彬
徐传良
刘洪志
何薇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing International Construction Group Co ltd
Original Assignee
Beijing International Construction Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing International Construction Group Co ltd filed Critical Beijing International Construction Group Co ltd
Priority to CN202120340305.2U priority Critical patent/CN214615428U/en
Application granted granted Critical
Publication of CN214615428U publication Critical patent/CN214615428U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The application relates to the technical field of building construction structures, in particular to a hoisting template structure for pouring a section steel concrete beam, which comprises a bottom plate, side plates and fixing assemblies, wherein the bottom plate is arranged at the lower end of a section steel beam; the mounting assembly comprises a U-shaped hanging rod fixedly arranged on a section steel beam, the opening of the U-shaped hanging rod is arranged towards the ground, a first mounting rod used for supporting the bottom plate is arranged at the lower end of the U-shaped hanging rod, the first mounting rod is horizontally arranged, and the first mounting rod is mounted at two ends of the U-shaped hanging rod through a fixing piece. The device has the advantages of simple structure and convenience in installation.

Description

Hoisting template structure for pouring steel reinforced concrete beam
Technical Field
The application relates to the technical field of building construction structures, in particular to a hoisting template structure for pouring a steel reinforced concrete beam.
Background
The steel reinforced concrete structure combines the advantages of high strength and ductility of a steel structure, good rigidity of the concrete structure and low unit price, can effectively improve bearing capacity and earthquake-resistant ductility, and meets the requirements of building functions. The reinforced concrete beam refers to a beam made of a reinforced concrete material. The reinforced concrete beam has various forms, is the most basic bearing member in engineering structures such as house buildings, bridge buildings, subway construction and the like, and has extremely wide application range. The reinforced concrete beam may be divided into a rectangular beam, a T-beam, an i-beam, a channel beam and a box beam according to its sectional form.
When the section steel needs to be poured, a U-shaped hanging rod is required to be manufactured to surround the section steel beam in the traditional structure, then concrete is poured into the U-shaped hanging rod, a supporting vertical rod is arranged at the lower end of the section steel by the U-shaped hanging rod, and the installation of the supporting vertical rod wastes time and labor; or, the U-shaped hanging rod is hung upside down on the floor slab at the upper end of the section steel beam, and the lower end of the U-shaped hanging rod extends to the lower end of the section steel beam.
SUMMERY OF THE UTILITY MODEL
To the not enough of prior art existence, the aim at of this application provides a shaped steel concrete beam pours with hoist and mount template structure, and the device has simple structure, easy to assemble's advantage.
The technical purpose of the application is realized by the following technical scheme:
the hoisting template structure for pouring the steel reinforced concrete beam comprises a bottom plate, side plates and fixing assemblies, wherein the bottom plate is installed at the lower end of a section steel beam, the side plates are installed on two sides of the section steel beam, the fixing assemblies are used for fixing the side plates, the longitudinal sections of the two side plates and the bottom plate are arranged in a U shape, the hoisting template structure further comprises a plurality of groups of mounting assemblies arranged on the section steel beam, and the mounting assemblies are used for fixing the bottom plate;
the mounting assembly comprises a U-shaped hanging rod fixedly arranged on a section steel beam, the opening of the U-shaped hanging rod is arranged towards the ground, a first mounting rod used for supporting the bottom plate is arranged at the lower end of the U-shaped hanging rod, the first mounting rod is horizontally arranged, and the first mounting rod is mounted at two ends of the U-shaped hanging rod through a fixing piece.
Through adopting above-mentioned technical scheme, the shaped steel roof beam is fixed with U type peg, and the lower extreme of rethread U type peg is fixed with first installation pole, installs the bottom plate in the upper surface of first installation pole, consequently, it is fixed with U type peg through the shaped steel roof beam, can conveniently be to the installation of U type peg to, can shorten the length of the montant of U type peg, thereby save mounting material, and then save installation cost. Therefore, the application has the advantages of simple structure and convenience in installation.
Preferably, the U-shaped peg includes two L type installation poles, and the through-hole that the level set up is seted up to the lower extreme of shaped steel roof beam riser, one of them L type installation pole wear to locate in the through-hole with another L type installation pole passes through the connecting piece and connects, and the diaphragm of shaped steel roof beam lower extreme is located two between the montant of L type installation pole.
Through adopting above-mentioned technical scheme, through two L type installation poles, can constitute U type peg to can realize passing the mounting hole with an L type installation pole to the installation of first installation pole, thereby can install L type installation pole in the lower extreme of shaped steel roof beam, and, can be through the support of shaped steel roof beam's lower diaphragm to L type installation pole, thereby increase the stability of L type installation pole.
Preferably, the connecting piece includes a sleeve, two ends of the inner peripheral surface of the sleeve are respectively provided with internal threads in opposite directions, one ends of the two L-shaped mounting rods, which are close to each other, are both provided with external threads, and the two L-shaped mounting rods are respectively in threaded connection with two ends of the sleeve in the sleeve.
Through adopting above-mentioned technical scheme, through telescopic setting, can install into U type peg with two L type installation poles to, through the threaded connection between sleeve and the L type installation pole, can finely tune the distance between two L type installation poles, thereby can guarantee that the distance between two montants of the U type peg of every group is the same.
Preferably, one side of the first mounting rod, which is close to the section steel beam, is provided with a plurality of first supporting rods for supporting the bottom plate, the first supporting rods are horizontally arranged, the first supporting rods and the first mounting rod are vertically arranged, the cross sections of the first supporting rods are arranged in a square shape, and the bottom plate is abutted to the first supporting rods.
Preferably, the first supporting rod is made of wood.
Through adopting above-mentioned technical scheme, through the setting of square first bracing piece, the stability of first bracing piece itself is strong, prevents that first bracing piece self from rocking, and then realizes the support to the bottom plate to, through the setting of wood system material, can alleviate the weight of first bracing piece, thereby alleviate the weight that bears to U type peg.
Preferably, the fixing member is a first butterfly card.
Through adopting above-mentioned technical scheme, through the setting of first butterfly card, can be fixed in on the montant of two L type installation poles with first installation pole.
Preferably, the curb plate butt in the upper surface of bottom plate, fixed subassembly includes a plurality of through-put screws that wear to locate the riser middle part of shaped steel roof beam, to wearing the screw level setting, the both ends of wearing the screw have set firmly the second installation pole respectively, the vertical setting of second installation pole, the second installation pole is used for the fastening the curb plate.
Through adopting above-mentioned technical scheme, wear to locate on the shaped steel roof beam to wearing the screw rod, then fixed with the second installation pole through the both ends of wearing the screw rod to, realize the fixed to the curb plate through the second installation pole.
Preferably, a plurality of second supporting rods are arranged between the side plate and the second mounting rod, the second supporting rods and the second mounting rod are vertically arranged, and the cross sections of the second supporting rods are arranged in a square shape.
Preferably, the second supporting rod is made of wood.
Through adopting above-mentioned technical scheme, the square setting of transversal personally submitting of second bracing piece can increase the stability of second bracing piece self, and then realizes the support to the curb plate to, through the setting of wood system material, can alleviate the weight of second bracing piece, thereby the convenience is installed the second bracing piece.
In summary, the present application has the following beneficial effects:
1. according to the U-shaped hanging rod, the U-shaped hanging rod is arranged at the lower end of the section steel beam, the U-shaped hanging rod can be conveniently arranged, the length of a vertical rod of the U-shaped hanging rod can be shortened, and therefore installation materials and installation cost are saved;
2. in this application, connect into U type peg through the sleeve with two L type installation poles, can finely tune the distance between two L type installation poles to can guarantee that the distance between two montants of the U type peg of every group is the same.
Drawings
Fig. 1 is a schematic structural diagram of the present application.
In the figure: 1. a base plate; 2. a side plate; 3. a U-shaped groove; 4. mounting the component; 41. a U-shaped hanging rod; 411. an L-shaped mounting bar; 4111. a first butterfly card; 412. a sleeve; 42. a first mounting bar; 421. a first support bar; 5. a fixing assembly; 51. oppositely penetrating a screw rod; 511. a second butterfly card; 52. a second mounting bar; 53. a second support bar; 6. a section steel beam.
Detailed Description
The present application is described in further detail below with reference to the attached drawings.
Referring to fig. 1, the hoisting formwork structure for casting a steel reinforced concrete beam disclosed in the present application includes a bottom plate 1 installed at a lower end, side plates 2 installed at both sides of a section steel beam 6, and a plurality of sets of installation assemblies 4 and a plurality of sets of fixing assemblies 5 installed on the section steel beam 6. The mounting component 4 is mounted at the lower end of the section steel beam 6, and the mounting component 4 is used for fixing the bottom plate 1; fixed subassembly 5 is used for installing two curb plates 2, and shaped steel beam 6 is located between two curb plates 2, fixed connection between bottom plate 1 and two curb plates 2, and the longitudinal section of bottom plate 1 and two curb plates 2 is the U-shaped setting, forms U type groove 3 between bottom plate 1 and two curb plates 2, then pours the concrete into U type groove 3.
The mounting assembly 4 comprises a U-shaped hanging rod 41 and a first mounting rod 42, the opening of the U-shaped hanging rod 41 is arranged in an orientation mode, and two ends of the first mounting rod 42 are mounted at the lower ends of two vertical rods of the U-shaped hanging rod 41; first U type peg 41 includes two L type installation poles 411 and sleeve 412, set up the through-hole that a plurality of levels set up on the riser of shaped steel roof beam 6, the through-hole is located the lower extreme of shaped steel roof beam 6 riser, one of them L type installation pole 411 passes the through-hole, and connect on another L type installation pole 411, thereby realize the installation to two L type installation poles 411 through shaped steel roof beam 6, and, through the mounting means of this application, can shorten the montant length of L type installation pole 411, in practical application, the material cost that significantly reduces. The outer peripheral face of the one end that two L type installation poles 411 are close to each other is provided with the external screw thread, the both ends of sleeve 412 inner peripheral surface are provided with opposite direction's internal thread, two L type installation poles 411 are respectively in the both ends threaded connection of sleeve 412 in the both ends of sleeve 412, sleeve 412 butt in shaped steel roof beam 6 upper surface of diaphragm down, the montant of two L type installation poles 411 is located the both sides of shaped steel roof beam 6 diaphragm down respectively, setting through sleeve 412, can finely tune the distance between two L type installation poles 411, thereby can guarantee that the distance between two montants of the U type peg 41 of every group is the same.
First installation pole 42 is located the lower extreme level setting of shaped steel roof beam 6, and first installation pole 42 in this embodiment is 48cm 3.5 cm's steel pipe, and the lower extreme of the montant of L type installation pole 411 fastens first installation pole 42 through first butterfly card 4111 to realize first installation pole 42 and the fixed between the L type installation pole 411. A plurality of first bracing pieces 421 have been placed to the upper surface of first installation pole 42, first bracing piece 421 is 5cm 10 cm's square timber, first bracing piece 421 and the perpendicular setting of individual first installation pole 42, the lower surface butt of bottom plate 1 in the upper surface of first bracing piece 421, and offer the perforation that the montant that is used for L type installation pole 411 to pass through on the bottom plate 1, first bracing piece 421 is the setting of wood system material, can alleviate the weight of first bracing piece 421, thereby alleviate the bearing weight to U type peg 41, and, through the setting of first bracing piece 421, can increase the holding power to bottom plate 1.
The fixing component 5 comprises a plurality of through screws 51 penetrating through the vertical plates of the section steel beam 6, a second support rod 53 abutting against one side of the side plate 2 far away from the section steel beam 6, and a second mounting rod 52 mounted on the through screws 51. The through screw rods 51 in the same group are arranged at intervals along the vertical direction of the vertical plate of the section steel beam 6, the through screw rods 51 penetrate through the side plate 2, and two ends of each through screw rod 51 are positioned at the outer side of the U-shaped groove 3; the second mounting rod 52 is vertically arranged, the threaded screw 51 fixes the second mounting rod 52 through a second butterfly clamp 511, and the second mounting rod 52 is a steel pipe with the length of 48cm by 3.5 cm; second bracing piece 53 is 5cm 10 cm's square timber, and second bracing piece 53 is located between second installation pole 52 and curb plate 2, and second bracing piece 53 level sets up, and second bracing piece 53 with to wearing screw rod 51 perpendicular setting, through to wearing screw rod 51's setting, can fasten curb plate 2.
The specific working principle in this application: firstly, an L-shaped mounting rod 411 penetrates through a section steel beam 6, two L-shaped mounting rods 411 are connected through a sleeve 412, so that a U-shaped hanging rod 41 with a downward opening is formed, a bottom plate 1 penetrates through the L-shaped mounting rods 411, then a first mounting rod 42 is fastened, and a first supporting rod 421 is mounted between the first mounting rod 42 and the bottom plate 1, so that the bottom plate 1 is supported, and the firmness of the bottom plate 1 is improved; then through to wearing screw 51 with second installation pole 52 fastening to install second bracing piece 53 between second installation pole 52 and curb plate 2, thereby realize the support to curb plate 2, increase the fastness of curb plate 2.
The embodiments of the present invention are preferred embodiments of the present application, and the scope of protection of the present application is not limited by the embodiments, so: all equivalent changes made according to the structure, shape and principle of the present application shall be covered by the protection scope of the present application.

Claims (9)

1. The hoisting template structure for pouring the steel reinforced concrete beam comprises a bottom plate (1) arranged at the lower end of a section steel beam (6), side plates (2) arranged on two sides of the section steel beam (6) and a fixing assembly (5) used for fixing the side plates (2), wherein the longitudinal sections of the two side plates (2) and the bottom plate (1) are arranged in a U shape, and the hoisting template structure is characterized by further comprising a plurality of groups of mounting assemblies (4) arranged on the section steel beam (6), wherein the mounting assemblies (4) are used for fixing the bottom plate (1);
the installation component (4) is including setting firmly U type peg (41) on shaped steel roof beam (6), U type peg (41) opening sets up towards ground, the lower extreme of U type peg (41) is provided with and is used for supporting first installation pole (42) of bottom plate (1), first installation pole (42) level sets up, first installation pole (42) through the mounting install in the both ends of U type peg (41).
2. The hoisting formwork structure for pouring the steel reinforced concrete beam as claimed in claim 1, wherein the U-shaped hanging rod (41) comprises two L-shaped mounting rods (411), the lower ends of the vertical plates of the section steel beam (6) are provided with through holes horizontally arranged, one of the L-shaped mounting rods (411) is arranged in the through holes in a penetrating manner and connected with the other L-shaped mounting rod (411) through a connecting piece, and the transverse plate at the lower end of the section steel beam (6) is located between the vertical rods of the two L-shaped mounting rods (411).
3. The hoisting formwork structure for pouring the steel reinforced concrete beam as claimed in claim 2, wherein the connecting member comprises a sleeve (412), two ends of the inner circumferential surface of the sleeve (412) are respectively provided with internal threads in opposite directions, one ends of the two L-shaped mounting rods (411) close to each other are respectively provided with external threads, and the two L-shaped mounting rods (411) are respectively in threaded connection with two ends of the sleeve (412) in the sleeve (412).
4. The hoisting formwork structure for pouring the steel reinforced concrete beam as claimed in claim 3, wherein a plurality of first supporting rods (421) for supporting the bottom plate (1) are installed on one side of the first installation rod (42) close to the section steel beam (6), the first supporting rods (421) are horizontally arranged, the first supporting rods (421) and the first installation rod (42) are vertically arranged, the cross section of each first supporting rod (421) is arranged in a square shape, and the bottom plate (1) is abutted to the first supporting rods (421).
5. The hoisting formwork structure for pouring the steel reinforced concrete beam as claimed in claim 4, wherein the first support bar (421) is made of wood.
6. A profiled steel concrete beam pouring suspended formwork structure according to claim 5, characterized in that the fixture is a first butterfly card (4111).
7. A hoisting formwork structure for casting a section steel concrete beam according to any one of claims 1-6, characterized in that the side plate (2) abuts against the upper surface of the bottom plate (1), the fixing component (5) comprises a plurality of through screws (51) penetrating through the middle of the vertical plate of the section steel beam (6), the through screws (51) are horizontally arranged, second mounting rods (52) are respectively and fixedly arranged at two ends of the through screws (51), the second mounting rods (52) are vertically arranged, and the second mounting rods (52) are used for fastening the side plate (2).
8. The hoisting formwork structure for pouring the steel reinforced concrete beam as claimed in claim 7, wherein a plurality of second supporting rods (53) are arranged between the side plate (2) and the second mounting rods (52), the second supporting rods (53) and the second mounting rods (52) are vertically arranged, and the cross section of each second supporting rod (53) is arranged in a square shape.
9. The hoisting formwork structure for pouring the steel reinforced concrete beam as claimed in claim 8, wherein the second support rod (53) is made of wood.
CN202120340305.2U 2021-02-05 2021-02-05 Hoisting template structure for pouring steel reinforced concrete beam Active CN214615428U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120340305.2U CN214615428U (en) 2021-02-05 2021-02-05 Hoisting template structure for pouring steel reinforced concrete beam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120340305.2U CN214615428U (en) 2021-02-05 2021-02-05 Hoisting template structure for pouring steel reinforced concrete beam

Publications (1)

Publication Number Publication Date
CN214615428U true CN214615428U (en) 2021-11-05

Family

ID=78441284

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120340305.2U Active CN214615428U (en) 2021-02-05 2021-02-05 Hoisting template structure for pouring steel reinforced concrete beam

Country Status (1)

Country Link
CN (1) CN214615428U (en)

Similar Documents

Publication Publication Date Title
CN201627362U (en) Suspended formwork support device for construction of steel structured concrete slabs
CN113502980A (en) Adjustable energy dissipation prefabricated wall column
CN214615428U (en) Hoisting template structure for pouring steel reinforced concrete beam
CN211037272U (en) Connecting joint of oblique-pulling concrete beam column
CN212080347U (en) Antidetonation support convenient to installation
CN211898896U (en) General shaped steel mixes building system
JP3827907B2 (en) Solid foundation construction method
CN220117460U (en) Damping support for vertical connection of prefabricated shear wall
CN214220083U (en) Prefabricated shear wall of assembled
CN221143630U (en) Supporting clamp for mounting assembled concrete laminated slab
CN219587206U (en) Assembly structure supporting system
CN219653936U (en) Outdoor comprehensive bridge connection structure
CN216840706U (en) Quick adjustment frock of assembled trompil steel sheet shear force wall
CN217079742U (en) Shear force wall construction light reinforcing bar fixture is built in room
CN213926982U (en) Prefabricated coincide floor node structure in board area falls
CN217815391U (en) Internal support type assembly supporting and hanging frame suitable for electromechanical installation of wood structure
CN218116138U (en) Horizontal reinforced structure of hollow slab beam bridge slab
CN109162354A (en) Assembled connected node of two brackets
CN216196520U (en) I-steel positioning and clamping device
CN214461390U (en) A earthquake-resistant structure for architectural design
CN220487178U (en) Building floor sound insulation reinforcing apparatus
CN220336224U (en) Mounting structure of multifunctional integrated assembly type suspended ceiling plate
CN218520888U (en) Assembled floor supporting tool
CN215977359U (en) Adjustable pre-buried support
CN221168696U (en) High and large formwork support connection structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant