CN214427812U - SCADA system of spraying workshop - Google Patents

SCADA system of spraying workshop Download PDF

Info

Publication number
CN214427812U
CN214427812U CN202120917471.4U CN202120917471U CN214427812U CN 214427812 U CN214427812 U CN 214427812U CN 202120917471 U CN202120917471 U CN 202120917471U CN 214427812 U CN214427812 U CN 214427812U
Authority
CN
China
Prior art keywords
workstation
communication
output unit
value output
remote terminal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202120917471.4U
Other languages
Chinese (zh)
Inventor
王巍
王坤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Susent Intelligent Technology Suzhou Co ltd
Original Assignee
Susent Intelligent Technology Suzhou Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Susent Intelligent Technology Suzhou Co ltd filed Critical Susent Intelligent Technology Suzhou Co ltd
Priority to CN202120917471.4U priority Critical patent/CN214427812U/en
Application granted granted Critical
Publication of CN214427812U publication Critical patent/CN214427812U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/02Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]

Landscapes

  • Testing And Monitoring For Control Systems (AREA)

Abstract

The utility model discloses a spraying workshop SCADA system. The technical scheme of the utility model is that: the system comprises a main station end, a communication system and a remote terminal system, wherein the main station end comprises a communication front-end system, a real-time database system, an engineer workstation, a production scheduling workstation, a monitoring workstation, a historical database server, a WEB server and an upper application workstation; the communication system is an industrial Ethernet based on a switch; the remote terminal system comprises a communication processing unit, a switching value acquisition unit, a pulse value acquisition unit, an analog value output unit, a switching value output unit and a pulse value output unit. The utility model provides a scheme sets up complete main website end and remote terminal system to this kind of large-scale project in spraying workshop, can effectively guarantee the control in spraying workshop and detect and dispatch the management, has greatly improved the management and the production efficiency in spraying workshop.

Description

SCADA system of spraying workshop
Technical Field
The utility model relates to an automatic monitored control system field, in particular to spraying workshop SCADA system.
Background
The SCADA system is a computer-based automatic monitoring system. The system can monitor and control on-site operating equipment, and can realize the functions of data acquisition, equipment control, measurement, parameter adjustment, various alarms and the like, namely the known 'four remote' function. The method is favorable for improving the transparency degree of enterprise management and production and the working efficiency of enterprise leadership operation analysis and management decision, and lays a solid foundation for intelligent manufacturing factories driven by data. The spraying workshop production line is complex, equipment personnel are numerous, efficient management and control of the spraying workshop production line are problematic, and how to construct an SCADA system aiming at the spraying workshop is a problem to be solved by the inventor.
SUMMERY OF THE UTILITY MODEL
Not enough to prior art exists, the utility model discloses a main aim at provides a large-scale SCADA system to ability spraying workshop.
In order to achieve the above purpose, the utility model provides a following technical scheme: a spraying workshop SCADA system comprises a main station end, a communication system and a remote terminal system, wherein the main station end comprises a communication front-end system, a real-time database system, an engineer workstation, a production scheduling workstation, a monitoring workstation, a historical database server, a WEB server and an upper application workstation; the communication system is an industrial Ethernet based on a switch; the remote terminal system comprises a communication processing unit, a switching value acquisition unit, a pulse value acquisition unit, an analog value output unit, a switching value output unit and a pulse value output unit.
Preferably, the production line dispatching workstation comprises a production line interface unit for displaying workshop production line flow data, and the production line interface unit comprises a paint supply interface unit.
Preferably, the communication front-end system comprises a front-end computer, a serial port pool, a rack, a lightning protection facility and a network interface.
Preferably, the communication front-end system communicates with the engineer workstation, the production scheduling workstation, the monitoring workstation and the upper application workstation through a communication system, and the communication system is an industrial Ethernet based on a switch and adopts a TCP/IP protocol.
The utility model discloses have following advantage for prior art, this scheme sets up complete main website end and remote terminal system to this kind of large-scale project in spraying workshop, can effectively guarantee the control detection and the dispatch management in spraying workshop, has greatly improved the management and the production efficiency in spraying workshop.
Drawings
Fig. 1 is the utility model discloses a structural schematic of spraying workshop SCADA system.
In the figure: 1. a master station end; 2. a communication system; 3. a remote terminal system; 4. a communication front-end system; 5. a real-time database system; 6. an engineer workstation; 7. a production scheduling workstation; 8. a monitoring workstation; 9. a historical database server; 10. a WEB server; 11. an upper application workstation; 12. a communication processing unit; 13. a switching value acquisition unit; 14. a pulse quantity acquisition unit; 15. an analog quantity acquisition unit; 16. an analog quantity output unit; 17. a switching value output unit; 18. and a pulse quantity output unit.
Detailed Description
The present invention will be further explained with reference to the accompanying drawings.
As shown in fig. 1, an SCADA system for a painting workshop includes a main station 1, a communication system 2 and a remote terminal system 3, where the main station 1 includes a communication front-end system 4, a real-time database system 5, an engineer workstation 6, a production scheduling workstation 7, a monitoring workstation 8, a historical database server 9, a WEB server 10 and an upper application workstation 11; the communication system 2 is an industrial Ethernet based on a switch; the remote terminal system 3 comprises a communication processing unit 12, a switching value acquisition unit 13, a pulse value acquisition unit 14, an analog value acquisition unit 15, an analog value output unit 16, a switching value output unit 17 and a pulse value output unit 18.
Preferably, the production line scheduling workstation 7 comprises a production line interface unit for displaying workshop production line flow data, and the production line interface unit comprises a paint supply interface unit.
Preferably, the communication front-end system 4 includes a front-end computer, a serial pool, a rack, a lightning protection facility, and a network interface.
Preferably, the communication front-end system 4 communicates with the engineer workstation 6, the production scheduling workstation 7, the monitoring workstation 8 and the upper application workstation 11 through the communication system 2, and the communication system 2 is an industrial ethernet based on a switch and adopts a TCP/IP protocol.
Wherein the master station is based on an XWINDOWs graphical interface. The communication front-end system 4 is mainly responsible for analyzing various protocols and finishing data processing of communication interfaces, including data forwarding, including a front-end computer, a serial pool or an industrial Ethernet, a rack, lightning protection measures and a network interface. The real-time database system 5 mainly includes a server for running the real-time database. The engineer workstation 6 is responsible for the configuration of the system, the creation of pictures and various maintenance of the system. The production scheduling workstation 7 is a main user of the monitoring system, displays pictures, browses the pictures, realizes various alarms and the like. The various monitoring stations 8 are mainly used for the condition that a particularly large system cannot be monitored by several people, and the various monitoring stations 8 are set up according to the needs, wherein each station has personnel to work. The history database server 9 is a server for storing history data in the SCADA system. The WEB server 10 can access the relevant data of interest as long as the user is provided with browser software and is authorized accordingly. The upper application workstation 11 is mainly used for mining real-time data and historical data.
The communication system 2 uses an industrial ethernet. The communication between the workstations and the computer server uses the TCP/IP protocol, usually over a separate local area network. For small items with relatively little message capacity, process communication and communication between workstations and computer servers can be accomplished using SIMATICNET industrial ethernet.
The remote terminal system 3 includes a communication processing unit 12, a switching value acquisition unit 13, a pulse value acquisition unit 14, an analog value acquisition unit 15, an analog value output unit 16, a switching value output unit 17, a pulse value output unit 18, and the like. The remote terminal system 3 performs interface and protocol conversion work with various devices in addition to data acquisition work and protocol processing of itself.
It is above only the utility model discloses a preferred embodiment, the utility model discloses a scope of protection does not only confine above-mentioned embodiment, the all belongs to the utility model discloses a technical scheme under the thinking all belongs to the utility model discloses a scope of protection. It should be noted that, for those skilled in the art, various modifications and decorations can be made without departing from the principle of the present invention, and these modifications and decorations should also be regarded as the protection scope of the present invention.

Claims (4)

1. A spraying workshop SCADA system which characterized in that: the system comprises a main station end, a communication system and a remote terminal system, wherein the main station end comprises a communication front-end system, a real-time database system, an engineer workstation, a production scheduling workstation, a monitoring workstation, a historical database server, a WEB server and an upper application workstation; the communication system is an industrial Ethernet based on a switch; the remote terminal system comprises a communication processing unit, a switching value acquisition unit, a pulse value acquisition unit, an analog value output unit, a switching value output unit and a pulse value output unit.
2. A paint shop SCADA system according to claim 1, characterized in that: the production line interface unit comprises a paint supply interface unit.
3. A paint shop SCADA system according to claim 1, characterized in that: the communication front-end system comprises a front-end computer, a serial port pool, a rack, a lightning protection facility and a network interface.
4. A paint shop SCADA system according to claim 3, characterized in that: the communication front-end system is communicated with the engineer workstation, the production scheduling workstation, the monitoring workstation and the upper application workstation through a TCP/IP protocol.
CN202120917471.4U 2021-04-29 2021-04-29 SCADA system of spraying workshop Active CN214427812U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120917471.4U CN214427812U (en) 2021-04-29 2021-04-29 SCADA system of spraying workshop

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120917471.4U CN214427812U (en) 2021-04-29 2021-04-29 SCADA system of spraying workshop

Publications (1)

Publication Number Publication Date
CN214427812U true CN214427812U (en) 2021-10-19

Family

ID=78076659

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120917471.4U Active CN214427812U (en) 2021-04-29 2021-04-29 SCADA system of spraying workshop

Country Status (1)

Country Link
CN (1) CN214427812U (en)

Similar Documents

Publication Publication Date Title
CN101551658B (en) Elevator energy consumption monitoring method and device
CN105467961A (en) Equipment operation and maintenance management system applicable to industrial enterprises
CN201548851U (en) Remote monitoring device for oil wells
CN202956644U (en) Power battery production process information monitoring system based on distributed control system (DCS)
CN110995783B (en) Remote monitoring system
CN203465569U (en) Power utilization energy-saving monitoring system
CN105929784A (en) System for remote monitoring running state of continuous casting apparatus based on PLC
CN112643715A (en) Industrial robot remote monitoring and diagnosing system and method based on 5G
CN104954225A (en) Energy monitoring management system
CN103049551B (en) A kind of method of the data point auto-associating of database in configuration software
CN203289488U (en) Power distribution integrated monitoring platform
CN214427812U (en) SCADA system of spraying workshop
CN202758210U (en) Wireless remote monitoring and diagnosing system for hospital clean operating room
CN111556094B (en) Internet of things cloud platform system based on high-pressure water jet robot
CN204669385U (en) A kind of energy monitor management system
CN214067660U (en) Monitoring system based on Internet of things
CN102033537A (en) On-line monitoring and optimizing control system for equipment
CN202003203U (en) Multistage ring-net-controlled framework for sewage-processing plant
CN113110353A (en) SCADA system of spraying workshop
CN202614339U (en) Monitoring system for flow state data of gas gauge flow meters
CN203465826U (en) Remote intelligent monitoring system for flour mill
CN109032064B (en) Online monitoring system for waste gas treatment facilities
CN213585813U (en) Park enterprise end multipotency data acquisition gateway
CN102778865A (en) Preparation process of central centralized control method of plastics production line
CN207557198U (en) A kind of semiconductor crystal wafer workshop gas monitoring system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant