CN214413579U - Percolation soil pit structure capable of improving planting survival rate of shrubs - Google Patents

Percolation soil pit structure capable of improving planting survival rate of shrubs Download PDF

Info

Publication number
CN214413579U
CN214413579U CN202021314912.3U CN202021314912U CN214413579U CN 214413579 U CN214413579 U CN 214413579U CN 202021314912 U CN202021314912 U CN 202021314912U CN 214413579 U CN214413579 U CN 214413579U
Authority
CN
China
Prior art keywords
soil
main part
hole
drain pipe
survival rate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202021314912.3U
Other languages
Chinese (zh)
Inventor
王焱
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Shanshui Garden Construction Co ltd
Original Assignee
Shanghai Shanshui Garden Construction Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Shanshui Garden Construction Co ltd filed Critical Shanghai Shanshui Garden Construction Co ltd
Priority to CN202021314912.3U priority Critical patent/CN214413579U/en
Application granted granted Critical
Publication of CN214413579U publication Critical patent/CN214413579U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Cultivation Of Plants (AREA)
  • Cultivation Receptacles Or Flower-Pots, Or Pots For Seedlings (AREA)

Abstract

The utility model relates to a can improve infiltration soil tree hole structure of undershrub planting survival rate, including the main part, main part inner chamber bottom is equipped with basic soil, and main part inner chamber is equipped with nutrition soil at basic soil top, is equipped with the drain pipe in the main part, and drain pipe inner chamber is equipped with the rubble granule, and the main part is equipped with the geotechnological cloth that permeates water at nutrition soil top, the utility model discloses the beneficial effect who reaches is: be equipped with the drain pipe and drain pipe inner chamber through being equipped with in the main part and be equipped with the rubble granule, be convenient for along the unnecessary moisture of drain pipe discharge, be equipped with the geotechnological cloth that permeates water and the main part is equipped with the connecting hole at the geotechnological cloth top of permeating water through the main part at nutrition soil top, it disinfects or insecticide to be convenient for add, it has exhaust duct to peg graft through cultivation hole one end, the last through-hole that is equipped with of exhaust duct, be convenient for discharge unnecessary carbon dioxide and let in oxygen, be connected with the end cover on the exhaust duct, get into excessive rainwater when preventing to rain, lead to little bush root system to produce anaerobic respiration and lead to the root system rotten.

Description

Percolation soil pit structure capable of improving planting survival rate of shrubs
Technical Field
The utility model relates to a shrub is planted and is used plant hole structure, in particular to infiltration soil hole structure that can improve shrub and plant survival rate belongs to the shrub and plants and use the plant hole field.
Background
Along with the concern of the country to environmental protection, the afforestation also receives people's concern more and more as important component part in the urban environment, and various greening engineering develops in succession, and original plant pit technique generally only has a backfill soil in the plant pit, does not have any structure, and the undershrub is planted soil ball and is had the problem that various drainage is not smooth, ventilative not smooth, influences the survival rate that the bush was planted when serious greatly, the event the utility model relates to a can improve undershrub and plant infiltration soil plant pit structure of survival rate.
SUMMERY OF THE UTILITY MODEL
The utility model provides a can improve infiltration soil pit structure of undershrub planting survival rate, be equipped with drain pipe and drain pipe inner chamber through the main part and be equipped with the rubble granule, be convenient for along the unnecessary water content of drain pipe discharge, it is equipped with the geotechnological cloth and the main part is equipped with the connecting hole at the geotechnological cloth top of permeating water to be equipped with at the soil top of nourishing through the main part, be convenient for add to disinfect or the medicament for the insecticidal, it has exhaust duct to peg graft through cultivation hole one end, the last through-hole that is equipped with of exhaust duct, be convenient for discharge unnecessary carbon dioxide and let in oxygen, be connected with the end cover on the exhaust duct, get into excessive rainwater when preventing to rain, lead to undershrub root system to produce anaerobic respiration and lead to the root system rotten.
In order to solve the technical problem, the utility model provides a following technical scheme:
the utility model relates to a can improve infiltration soil tree hole structure of undershrub planting survival rate, comprising a main body, main part inner chamber bottom is equipped with foundation soil, the main part inner chamber is equipped with nutrition soil at the foundation soil top, be equipped with the drain pipe in the main part, the drain pipe inner chamber is equipped with the rubble granule, the main part is equipped with the geotechnological cloth that permeates water at nutrition soil top, the main part is equipped with the cultivation hole at the geotechnological cloth top that permeates water, cultivation hole one end is pegged graft and is had exhaust duct, the last through-hole that is equipped with of exhaust duct, the last end cover that is connected with of exhaust duct, the connecting hole has been seted up to geotechnological cloth top one end that permeates water, be connected with the medicine bottle on the connecting hole.
As an optimized technical scheme of the utility model, the foundation soil is mainly former soil, nutrition soil includes former soil, yellow sand, grass peat, fertilizer, pearlite.
As a preferred technical scheme of the utility model, drain pipe quantity is four and is in inside the main part, the rubble granule includes pearlite and vermiculite.
As an optimal technical scheme of the utility model, the geotechnological cloth that permeates water is fixed at the nutrition soil top, the medicine bottle is pegged graft on the connecting hole.
As the utility model discloses a preferred technical scheme, exhaust duct one end slant is pegged graft at cultivation hole, the exhaust duct other end protrusion is at cultivation hole top, exhaust duct has seted up exhaust duct in cultivation hole one end.
As an optimal technical scheme of the utility model, the end cover bottom seted up the external screw thread and with exhaust duct internal thread interconnect.
The utility model discloses the beneficial effect who reaches is: be equipped with the drain pipe and drain pipe inner chamber through being equipped with in the main part and be equipped with the rubble granule, be convenient for along the unnecessary moisture of drain pipe discharge, be equipped with the geotechnological cloth that permeates water and the main part is equipped with the connecting hole at the geotechnological cloth top of permeating water through the main part at nutrition soil top, it disinfects or insecticide to be convenient for add, it has exhaust duct to peg graft through cultivation hole one end, the last through-hole that is equipped with of exhaust duct, be convenient for discharge unnecessary carbon dioxide and let in oxygen, be connected with the end cover on the exhaust duct, get into excessive rainwater when preventing to rain, lead to little bush root system to produce anaerobic respiration and lead to the root system rotten.
Drawings
The accompanying drawings are included to provide a further understanding of the invention, and are incorporated in and constitute a part of this specification, illustrate embodiments of the invention, and together with the description serve to explain the invention and not to limit the invention. In the drawings:
fig. 1 is a schematic front structural view of the present invention;
FIG. 2 is a schematic top view of the present invention;
FIG. 3 is a schematic view of the structure of the exhaust duct of the present invention;
fig. 4 is a schematic side view of the present invention.
In the figure: 1. a main body; 2. base soil; 3. nutrient soil; 4. a drain pipe; 5. crushed stone particles; 6. water-permeable geotextile; 7. cultivating holes; 8. an exhaust duct; 9. a through hole; 10. an end cap; 11. connecting holes; 12. And (6) a medicine bottle.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Example (b): as shown in fig. 1-4, the utility model relates to a can improve infiltration soil pit structure of undershrub planting survival rate, including main part 1, main part 1 inner chamber bottom is equipped with foundation soil 2, main part 1 inner chamber is equipped with nutrition soil 3 at foundation soil 2 tops, be equipped with drain pipe 4 in the main part 1, drain pipe 4 inner chamber is equipped with rubble granule 5, main part 1 is equipped with geotechnological cloth 6 that permeates water at 3 tops of nutrition soil, main part 1 is equipped with cultivation hole 7 at geotechnological cloth 6 tops that permeates water, it has exhaust duct 8 to peg graft to cultivate hole 7 one end, be equipped with through-hole 9 on the exhaust duct 8, be connected with end cover 10 on the exhaust duct 8, connecting hole 11 has been seted up to geotechnological cloth 6 top one end that permeates water, be connected with medicine bottle 12 on connecting hole 11.
The base soil 2 is mainly original soil, and the nutrient soil 3 comprises original soil, yellow sand, turf, organic fertilizer and perlite, so that shrubs can be conveniently cultivated; the four drain pipes 4 are arranged in the main body 1, and the crushed stone particles 5 comprise perlite and vermiculite, so that redundant water can be conveniently discharged, and the water permeability and the air permeability are improved; the permeable geotextile 6 is fixed on the top of the nutrient soil 3, and the medicine bottle 12 is inserted into the connecting hole 11, so that the medicine bottle 12 can conveniently add the sterilization and insecticidal liquid into the permeable geotextile 6; one end of the exhaust pipeline 8 is obliquely inserted into the cultivation hole 7, the other end of the exhaust pipeline 8 protrudes out of the top of the cultivation hole 7, and the exhaust pipeline 8 is arranged at one end of the cultivation hole 7, so that carbon dioxide can be discharged and oxygen can be added conveniently; the bottom of the end cover 10 is provided with external threads and is mutually connected with the internal threads of the exhaust pipeline 8, so that the exhaust pipeline 8 is conveniently plugged in the rainy days, and the root system of the shrub is prevented from being rotten due to a large amount of rainwater.
Specifically, the utility model discloses during the use, at first insert drain pipe 4 in main part 1, add basic soil 2 again, and to placing rubble granule 5 in drain pipe 4, put into nutrition soil 3 on basic soil 2 after that, insert drain pipe 4 and put into rubble granule 5, then place the geotechnological cloth 6 that permeates water on 3 tops of nutrition soil, insert cultivation hole 7 with the one end that exhaust duct 8 was equipped with through-hole 9 in, plant the undershrub in cultivation hole 7, insert at last and disinfect or insecticidal fluid in medicine bottle 12, and insert medicine bottle 12 in the connecting hole 11 that geotechnological cloth 6 top one end was seted up that permeates water, kill the worm or disinfect for the undershrub, improve undershrub's survival efficiency.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. An infiltration soil pit structure capable of improving the survival rate of planting shrubs is characterized by comprising a main body (1), the bottom of the inner cavity of the main body (1) is provided with base soil (2), the top of the base soil (2) in the inner cavity of the main body (1) is provided with nutrient soil (3), a drain pipe (4) is arranged in the main body (1), gravel particles (5) are arranged in the inner cavity of the drain pipe (4), the main body (1) is provided with a permeable geotextile (6) on the top of the nutrient soil (3), the main body (1) is provided with a cultivation hole (7) on the top of the permeable geotextile (6), an exhaust pipeline (8) is inserted at one end of the cultivation hole (7), a through hole (9) is arranged on the exhaust pipeline (8), the air exhaust pipeline (8) is connected with an end cover (10), a connecting hole (11) is formed in one end of the top of the permeable geotextile (6), and a medicine bottle (12) is connected to the connecting hole (11).
2. The percolating soil pit structure for increasing the survival rate of planted shrubs as claimed in claim 1, wherein the base soil (2) is mainly original soil, and the nutrient soil (3) comprises original soil, yellow sand, peat, organic fertilizer and perlite.
3. An infiltration soil pit structure for increasing the survival rate of shrubs planted according to claim 1, wherein the number of said drainage pipes (4) is four and is located inside the main body (1), and said crushed stone particles (5) comprise perlite and vermiculite.
4. An infiltration soil pit structure for increasing the survival rate of planted shrubs as claimed in claim 1, wherein said permeable geotextile (6) is fixed on top of the nutrient soil (3), and said medicine bottle (12) is inserted into the connection hole (11).
5. An infiltration soil pit structure for improving the survival rate of shrubs planted according to claim 1, wherein one end of the exhaust pipe (8) is obliquely inserted into the planting hole (7), the other end of the exhaust pipe (8) protrudes from the top of the planting hole (7), and the exhaust pipe (8) is opened at one end of the planting hole (7).
6. An infiltration soil pit structure for increasing the survival rate of planted shrubs as claimed in claim 1, wherein the bottom of said end cap (10) is externally threaded and interconnected with the internal thread of the exhaust pipe (8).
CN202021314912.3U 2020-07-07 2020-07-07 Percolation soil pit structure capable of improving planting survival rate of shrubs Expired - Fee Related CN214413579U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021314912.3U CN214413579U (en) 2020-07-07 2020-07-07 Percolation soil pit structure capable of improving planting survival rate of shrubs

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021314912.3U CN214413579U (en) 2020-07-07 2020-07-07 Percolation soil pit structure capable of improving planting survival rate of shrubs

Publications (1)

Publication Number Publication Date
CN214413579U true CN214413579U (en) 2021-10-19

Family

ID=78058139

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021314912.3U Expired - Fee Related CN214413579U (en) 2020-07-07 2020-07-07 Percolation soil pit structure capable of improving planting survival rate of shrubs

Country Status (1)

Country Link
CN (1) CN214413579U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115349376A (en) * 2022-09-02 2022-11-18 北京正和恒基国际城市规划设计有限公司 Planting hole structure and construction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115349376A (en) * 2022-09-02 2022-11-18 北京正和恒基国际城市规划设计有限公司 Planting hole structure and construction method

Similar Documents

Publication Publication Date Title
CN1172575C (en) Economic forest root-base water-saving cultivation series technique
CN102771363B (en) Special culture medium for Lilium spp. and Lilium spp. culture method
CN206423241U (en) A kind of sandy soil device for raising seedlings
CN109168391A (en) A kind of method of iron tailings soil
CN211745549U (en) Half pot-type planting structure of nursery stock in sandy soil area
CN106688802A (en) Nursery stock rejuvenation method for border trees
CN109006150A (en) A method of improving transplanting survival rate of nursery stocks
CN107046841A (en) A kind of method of saline land greening afforestation
CN214413579U (en) Percolation soil pit structure capable of improving planting survival rate of shrubs
CN106962120A (en) A kind of seedling planting method in alkaline land
CN208908741U (en) Big tree high-survival rate complete crown transplants ecologic planting structure
CN106069619A (en) Slight irrigation underground heat with straw agricultural crop straw as carrier and ventilation water-saving system
CN205961804U (en) Morning and evening tides formula irrigation system
CN201131202Y (en) Water conservation and maintenance soil plant breeding device
CN108541514B (en) Method for cultivating orange Rumex Lactarius mycorrhiza seedlings
CN216795866U (en) Planting device for saline-alkali soil improvement
CN215223338U (en) Ventilative drainage device in road green area planting cave
CN203708815U (en) Directional water and fertilizer supplying device for planting trees and shrubs in mines and waste mountains
CN216164151U (en) Seedling growing device for cultivating deep-root drought-resistant seedlings
CN2529508Y (en) Microporous infiltrating irragation appts.
CN107912211A (en) Salt-soda soil method for cultivating nursery stock with and application
CN201629995U (en) Plant nutrition storage device
CN211267826U (en) Large-basin-edge greening device for drip irrigation of saline-alkali soil
CN107258509A (en) A kind of cultivation matrix suitable for liana
CN100334934C (en) Dune fixing method of ion-beam modified vegetation, absorbent and Ramaria linked cultured plant

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20211019

CF01 Termination of patent right due to non-payment of annual fee