CN214329513U - Roof is used in large-span parking area - Google Patents

Roof is used in large-span parking area Download PDF

Info

Publication number
CN214329513U
CN214329513U CN202022548668.3U CN202022548668U CN214329513U CN 214329513 U CN214329513 U CN 214329513U CN 202022548668 U CN202022548668 U CN 202022548668U CN 214329513 U CN214329513 U CN 214329513U
Authority
CN
China
Prior art keywords
layer
fixedly connected
roof
span
concrete layer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202022548668.3U
Other languages
Chinese (zh)
Inventor
田召亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Xinshuang New Building Materials Co ltd
Original Assignee
Shandong Xinshuang New Building Materials Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Xinshuang New Building Materials Co ltd filed Critical Shandong Xinshuang New Building Materials Co ltd
Priority to CN202022548668.3U priority Critical patent/CN214329513U/en
Application granted granted Critical
Publication of CN214329513U publication Critical patent/CN214329513U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The utility model discloses a large-span parking lot roof, which comprises upright posts, wherein an anchorage device is fixedly arranged on one side of the upper end of each upright post, a roof main body is fixedly connected between the upright posts, a supporting beam is fixedly connected with the lower end of the roof main body, the roof main body is sequentially provided with a reinforcing layer, a concrete layer, a waterproof layer and a soil covering layer from bottom to top, a reinforcing supporting rod is fixedly arranged inside the reinforcing layer, channel steel is fixedly arranged inside the concrete layer, prestressed ribs are fixedly arranged between the channel steel, anchorage device fixing grooves are respectively arranged at two ends of the concrete layer, a pull rod is fixedly arranged inside the soil covering layer, and a tension pull plate is fixedly connected with the upper end of the pull rod. The cost is effectively reduced.

Description

Roof is used in large-span parking area
Technical Field
The utility model relates to a building engineering technical field specifically is a roof is used in large-span parking area.
Background
With the increasing of private cars in the current society, urban development land is increasingly expensive, the greening rate requirement of residential districts is improved, and the phenomenon that a garage roof is used as a planting roof is common. And in order to consider the bearing capacity of the garage roof at the civil engineering structure, often can restrict the weight of earthing on the garage roof to need the thickness of restriction earthing, but need compromise the elevation of greenery patches when the design, the elevation that often can appear greenery patches is greater than the earthing thickness of restriction with the distance of garage roof, and when current garage roof realizes the large-span installation, generally adopt to increase roof thickness and realize, but this kind of mode not only increases the roof dead weight and has increased the cost.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a large-span roof for parking area to solve the problem that proposes among the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: the novel anchor fixing device comprises stand columns, an anchor is fixedly mounted on one side of the upper end of each stand column, a roof main body is fixedly connected between the stand columns, a supporting beam is fixedly connected to the lower end of the roof main body, an enhancement layer, a concrete layer, a waterproof layer and a soil covering layer are sequentially arranged from bottom to top of the roof main body, an enhancement supporting rod is fixedly mounted inside the enhancement layer, channel steel is fixedly mounted inside the concrete layer, prestressed ribs are fixedly mounted between the channel steel, anchor fixing grooves are formed in two ends of the concrete layer, pull rods are fixedly mounted inside the soil covering layer, and tension pull plates are fixedly connected to the upper ends of the pull rods.
Furthermore, one end of the anchorage device penetrates through the upper end of the upright post and is fixedly connected with an anchorage device fixing groove in the concrete layer.
Furthermore, the supporting beam is provided with a plurality of groups, and is uniformly and fixedly connected to the lower end of the top plate main body.
Furthermore, the reinforcing support rods are provided with a plurality of groups and are fixed inside the reinforcing layer in a triangular structure.
Further, the channel-section steel is provided with the multiunit, and evenly is fixed in inside the concrete layer, the prestressing tendons is provided with the multiunit, and is fixed that X appears, the prestressing tendons is fixed in the letter of the channel-section steel that links to each other.
Further, the lower end of the pull rod is fixedly connected with the concrete layer, and the tension pull plate is fixedly installed inside the upper end of the covering soil layer and is fixed.
Compared with the prior art, the beneficial effects of the utility model are that:
1. the utility model discloses a channel-section steel that sets up inside concrete layer to connect it fixedly through the prestressing tendons, make the structure more stable after pouring the concrete, make tension stronger, and carry out fixed connection with the stand through ground tackle and ground tackle fixed slot, make the installation that can realize the large-span;
2. the utility model can support the concrete layer in the using process through the reinforcing support bar arranged in the reinforcing layer, and the whole structure is more stable because the reinforcing support bar is of a triangular structure, thereby effectively avoiding deformation;
3. the pull rod is arranged in the soil covering layer, and the tension pull plate is fixedly arranged at the upper end of the pull rod, so that the garage top plate can be pulled after the building is built and backfilled, the garage top plate and the upper surface can form tension, and the structure is more stable;
4. the utility model discloses simple structure, the modern design, can be better when the garage carries out the large-span construction stabilize it, guarantee the security when the formation uses to reduce the dead weight of garage roof, the effectual cost that has reduced.
Drawings
FIG. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is a schematic view of the main structure of the top plate of the present invention;
fig. 3 is the concrete layer structure schematic diagram of the utility model.
In FIGS. 1-3: 1-upright column; 2-an anchorage device; 3-a top plate body; 4-a support beam; 5-a reinforcing layer; 6-concrete layer; 7-waterproof layer; 8-covering a soil layer; 9-reinforcing the support rod; 10-a pull rod; 11-tension pulling plate; 12-channel steel; 13-prestressed tendons; 14-anchor fixing groove.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-3, the present invention provides a technical solution: including stand 1, 1 upper end one side fixed mounting of stand has ground tackle 2, fixedly connected with roof main part 3 between the stand 1, 3 lower extreme fixedly connected with supporting beam 4 of roof main part, roof main part 3 is from supreme enhancement layer 5, concrete layer 6, waterproof layer 7 and the overburden 8 of having set gradually down, the inside fixed mounting of enhancement layer 5 has strengthening support bar 9, the inside fixed mounting of concrete layer 6 has channel-section steel 12, fixed mounting has prestressing tendons 13 between the channel-section steel 12, ground tackle fixed slot 14 has all been seted up at 6 both ends of concrete layer, the inside fixed mounting of overburden 8 has pull rod 10, pull rod 10 upper end fixedly connected with tension arm-tie 11.
Furthermore, one end of the anchorage device 2 penetrates through the upper end of the upright post 1 and is fixedly connected with an anchorage device fixing groove 14 in the concrete layer 6.
Furthermore, the supporting beam 4 is provided with a plurality of groups, and is uniformly and fixedly connected to the lower end of the top plate main body 3.
Furthermore, the reinforcing support rods 9 are provided with a plurality of groups and are fixed inside the reinforcing layer 5 in a triangular structure.
Further, the channel-section steel 12 is provided with the multiunit, and evenly is fixed in inside concrete layer 6, prestressing tendons 13 is provided with the multiunit, and is fixed that X appears, prestressing tendons 13 is fixed in the letter of the channel-section steel 12 that links to each other.
Further, the lower end of the pull rod 10 is fixedly connected with the concrete layer 6, and the tension pull plate 11 is fixedly installed inside the upper end of the soil covering layer 8 and is fixed.
The working principle is as follows: when the device is used, the device is fixedly connected with the upright post 1 through the anchorage device 2 and the anchorage device fixing groove 14, so that the installation of a large span can be realized, then the channel steel 12 is placed inside the concrete layer 6, and the device is fixedly connected through the prestressed tendons 13, so that the structure is more stable after the concrete is poured, the tension is stronger, meanwhile, the concrete layer 6 can be supported in the using process through the reinforcing support rods 9 arranged inside the reinforcing layer 5, the integral structure is more stable due to the fact that the reinforcing support rods 9 are of a triangular structure, the deformation can be effectively avoided, when the device is used after construction is completed, the pull rod 10 is arranged inside the covering soil layer 8, and the tension pull plate 11 is fixedly arranged at the upper end of the covering soil layer, so that the garage top plate can be pulled after the construction is backfilled, and the tension can be formed between the garage top plate and the upper surface, the structure is more stable.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a large-span roof board for parking area, includes stand (1), its characterized in that: stand (1) upper end one side fixed mounting has ground tackle (2), fixedly connected with roof main part (3) between stand (1), roof main part (3) lower extreme fixedly connected with props up supporting beam (4), supreme enhancement layer (5), concrete layer (6), waterproof layer (7) and cover soil layer (8) have set gradually down in roof main part (3), the inside fixed mounting of enhancement layer (5) has strengthening support bar (9), the inside fixed mounting of concrete layer (6) has channel-section steel (12), fixed mounting has prestressing tendons (13) between channel-section steel (12), ground tackle fixed slot (14) have all been seted up at concrete layer (6) both ends, the inside fixed mounting of cover soil layer (8) has pull rod (10), pull rod (10) upper end fixedly connected with tension arm-tie (11).
2. The roof panel for a large-span parking lot according to claim 1, characterized in that: one end of the anchorage device (2) penetrates through the upper end of the upright post (1) and is fixedly connected with an anchorage device fixing groove (14) in the concrete layer (6).
3. The roof panel for a large-span parking lot according to claim 1, characterized in that: the supporting beams (4) are provided with a plurality of groups and are uniformly and fixedly connected to the lower end of the top plate main body (3).
4. The roof panel for a large-span parking lot according to claim 1, characterized in that: the reinforcing support rods (9) are provided with a plurality of groups and are fixed in the reinforcing layer (5) in a triangular structure.
5. The roof panel for a large-span parking lot according to claim 1, characterized in that: the channel-section steel (12) are provided with the multiunit, and evenly are fixed in inside concrete layer (6), prestressing tendons (13) are provided with the multiunit, and are that X shape is fixed, prestressing tendons (13) are fixed in the letter of continuous channel-section steel (12).
6. The roof panel for a large-span parking lot according to claim 1, characterized in that: the lower end of the pull rod (10) is fixedly connected with the concrete layer (6), and the tension pull plate (11) is fixedly arranged inside the upper end of the soil covering layer (8) and is fixed.
CN202022548668.3U 2020-11-06 2020-11-06 Roof is used in large-span parking area Active CN214329513U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022548668.3U CN214329513U (en) 2020-11-06 2020-11-06 Roof is used in large-span parking area

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022548668.3U CN214329513U (en) 2020-11-06 2020-11-06 Roof is used in large-span parking area

Publications (1)

Publication Number Publication Date
CN214329513U true CN214329513U (en) 2021-10-01

Family

ID=77894164

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022548668.3U Active CN214329513U (en) 2020-11-06 2020-11-06 Roof is used in large-span parking area

Country Status (1)

Country Link
CN (1) CN214329513U (en)

Similar Documents

Publication Publication Date Title
CN205647362U (en) Large -span prestressing force cable photovoltaic support
CN109098201A (en) A kind of super plane area portions prestressed concrete well foundation and its construction method
CN208650258U (en) A kind of outer hoop assembled connecting node for the light steel increasing layer mixed structure of RC-
CN208122027U (en) A kind of prefabricated PC frame core wall structure
CN102235030B (en) Extra-large-span cross-section-variable pre-stressed normally placed evacuating quadrangular pyramid space grid and manufacturing method thereof
CN214329513U (en) Roof is used in large-span parking area
CN113737936A (en) Connecting structure and construction method of prefabricated combined duplex balcony
CN100422468C (en) Large-span large-column distance quasi-ribbed floor type prestressed steel grid roof structure
CN211498430U (en) Stayed-cable steel truss through-center type arch bridge
CN206015882U (en) The steel structure of housing system that a kind of lateral resisting and antigravity separate
CN2923870Y (en) Large-span large-pillar-distance quasi-rib type building-cover type prestress steel-grid roofing
CN208604795U (en) A kind of huge column frame supported shear wall structure of metro depot upper cover exploitation
CN204715223U (en) A kind of abutment prestressed reinforcement structure
CN110029685A (en) A kind of pile drawing anchor barricade fabricated construction
CN216109354U (en) Conversion layer steel column mounting structure
CN112144548B (en) Semi-embedded multifunctional frame supporting structure and construction method thereof
CN214035078U (en) Light prefabricated enclosure wall
CN209323553U (en) A kind of steady type house foundation
CN211080271U (en) General type foundation structure of distribution device building of transformer substation
CN210067010U (en) Anti-seismic low-carbon building structure
CN210917010U (en) Tube-in-tube bridge tower of space mixed cable net suspension bridge with parabolic arched tower cap
CN211395960U (en) Multilayer large-span improved concrete honeycomb-shaped space grid box type structure
CN210597363U (en) Pile bearing anchor retaining wall assembly type structure
CN208717919U (en) A kind of road based on contrary sequence method changes bridge section foundation pit supporting construction
CN210946890U (en) Floor system comprising box-shaped beams

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant