CN214305964U - Double-deck formula equipment foundation - Google Patents
Double-deck formula equipment foundation Download PDFInfo
- Publication number
- CN214305964U CN214305964U CN202022576212.8U CN202022576212U CN214305964U CN 214305964 U CN214305964 U CN 214305964U CN 202022576212 U CN202022576212 U CN 202022576212U CN 214305964 U CN214305964 U CN 214305964U
- Authority
- CN
- China
- Prior art keywords
- base
- layer
- basement
- equipment
- double
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000010276 construction Methods 0.000 claims abstract description 8
- 239000011248 coating agent Substances 0.000 claims abstract description 7
- 238000000576 coating method Methods 0.000 claims abstract description 7
- 229920002635 polyurethane Polymers 0.000 claims abstract description 7
- 239000004814 polyurethane Substances 0.000 claims abstract description 7
- RYGMFSIKBFXOCR-UHFFFAOYSA-N Copper Chemical compound [Cu] RYGMFSIKBFXOCR-UHFFFAOYSA-N 0.000 claims abstract description 5
- 229910052802 copper Inorganic materials 0.000 claims abstract description 5
- 239000010949 copper Substances 0.000 claims abstract description 5
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 4
- 239000007787 solid Substances 0.000 claims abstract description 4
- 229910001220 stainless steel Inorganic materials 0.000 claims abstract description 4
- 239000010935 stainless steel Substances 0.000 claims abstract description 4
- 239000010959 steel Substances 0.000 claims abstract description 4
- 238000002360 preparation method Methods 0.000 claims abstract description 3
- 239000010410 layer Substances 0.000 claims description 20
- 239000011241 protective layer Substances 0.000 claims description 10
- 239000000758 substrate Substances 0.000 claims description 7
- 230000000694 effects Effects 0.000 abstract description 4
- 239000000463 material Substances 0.000 abstract description 3
- 238000013016 damping Methods 0.000 abstract description 2
- 238000005253 cladding Methods 0.000 abstract 1
- 238000007789 sealing Methods 0.000 description 2
- 230000035939 shock Effects 0.000 description 2
- 238000009825 accumulation Methods 0.000 description 1
- 239000011083 cement mortar Substances 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000002372 labelling Methods 0.000 description 1
- 230000002035 prolonged effect Effects 0.000 description 1
Images
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
The utility model discloses a two-layer equation equipment foundation, including basement and base, the basement is cuboid solid construction, the basement sets up on roofing structure bottom plate, basement from interior to exterior is the filling layer that gathers materials for light in proper order, the concrete closed layer, polyurethane waterproof coating and waterproof layer, the cuboid frame construction of base for adopting the I-steel preparation, the base is fixed at the basement top surface, the clearance has between base and the basement, do benefit to the inside rainwater of base and discharge, the waterproof layer of basement top surface looks for the slope along the axis direction both sides of basement, be equipped with cable testing bridge and copper pipe crane span structure on the inside bottom surface of base, the lateral surface cladding of base is equipped with the stainless steel skin, make its side seal. The double-layer equipment foundation can be used as a foundation for various equipment needing to be connected with pipelines and cables, after the equipment is arranged on the base, the matched bridge, pipelines and the like are arranged at the lower part of the equipment, so that the space is saved, the double-layer equipment foundation is more attractive, and meanwhile, the double-layer equipment foundation also has a damping effect.
Description
Technical Field
The utility model relates to a building engineering technical field especially relates to a double-deck equipment foundation, as the basis of various equipment that need with pipeline, cable junction.
Background
Air conditioners and other equipment are generally installed on a roof balcony, and when the equipment is installed in rows, bridges and pipelines which are installed in a matched mode need to be arranged around the equipment, so that a large amount of space is occupied, the appearance is not attractive, and the overhaul work of the equipment is influenced.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to prior art current situation, provide a two-layer equation equipment foundation, with equipment fixing after on the base, supporting crane span structure, pipeline etc. install in the lower part of equipment, have not only practiced thrift the space, still more for pleasing to the eye, also have the shock attenuation effect simultaneously concurrently.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the utility model provides a two-layer equation equipment foundation, includes basement and base, the basement is cuboid solid construction, and the basement setting is on roofing structure bottom plate, and basement from interior to exterior is light filling layer, concrete seal, polyurethane waterproof coating and waterproof layer of gathering materials in proper order, the cuboid frame construction of base for adopting the I-steel preparation, and the base is fixed at the basement top surface, and the base is used for erection equipment.
Further, a gap is formed between the base and the base, so that rainwater in the base can be drained conveniently.
Furthermore, the waterproof protective layer on the top surface of the substrate inclines towards two sides along the central axis of the substrate.
Furthermore, a cable bridge and a copper pipe bridge are arranged on the bottom surface inside the base.
Furthermore, the outer side surface of the base is coated with a stainless steel sheet, so that the side surface of the base is sealed.
The utility model has the advantages that:
the double-layer equipment foundation can be used as a foundation for various equipment needing to be connected with pipelines and cables, after the equipment is arranged on the base, the matched bridge, pipelines and the like are arranged at the lower part of the equipment, so that the space is saved, the double-layer equipment foundation is more attractive, and meanwhile, the double-layer equipment foundation also has a damping effect.
Drawings
Fig. 1 is a schematic structural diagram of the present invention.
Description of the labeling: 1. roofing structure bottom plate, 2, base, 3, light aggregate filling layer, 4, concrete seal coat, 5, waterproof layer, 6, cable testing bridge, 7, copper pipe testing bridge.
Detailed Description
The present invention will be further explained with reference to the accompanying drawings.
Referring to fig. 1, a double-layer equipment foundation includes a base and a base 2, the base is a cuboid solid structure, the base is disposed on a floor 1 of a roof structure, the base 2 is a cuboid frame structure made of i-steel, the base 2 is fixed on the top surface of the base, and the base 2 is used for installing equipment, such as an air conditioner.
The base is sequentially provided with a light aggregate filling layer 3, a concrete sealing layer 4, a polyurethane waterproof coating (the thickness is generally thinner and not shown in the figure) and a waterproof protective layer 5 from inside to outside, wherein after the polyurethane waterproof coating is constructed, the waterproof protective layer 5 is constructed immediately, the polyurethane waterproof coating is protected from being damaged in time, and the service life is prolonged. The common practice of the waterproof protective layer 5 includes the following steps: block material surface course protective layer, cement mortar protective layer, fine aggregate concrete protective layer. During actual construction, the concrete sealing layer 4 and the waterproof protective layer 5 are both made of C15 concrete with the thickness of 50mm, and the polyurethane waterproof coating is 5mm thick.
And a cable bridge 6 and a copper pipe bridge 7 are arranged on the bottom surface inside the base 2 and used for cable and pipeline wiring. The outer side surface of the base 2 is coated with a stainless steel sheet, so that the side surface is sealed.
Above-mentioned technical scheme, as preferred, have the clearance between base 2 and the basement, do benefit to the rainwater drainage with base 2 inside. Furthermore, the waterproof protective layer 5 on the top surface of the substrate inclines towards two sides along the central axis of the substrate, so that rainwater accumulation is avoided, and the slope rate is 1% during actual construction.
This double-deck formula equipment foundation can be used as the basis of various equipment that need with pipeline, cable junction, with equipment fixing on base 2 after, supporting crane span structure, pipeline etc. install in the lower part of equipment, also be base 2 insidely, have not only practiced thrift the space, still more pleasing to the eye, this double-deck formula equipment foundation also has the shock attenuation effect concurrently simultaneously.
Of course, the above is only the preferred embodiment of the present invention, and the application range of the present invention is not limited thereto, so all the equivalent changes made in the principle of the present invention should be included in the protection scope of the present invention.
Claims (5)
1. A two-layer equation equipment basis which characterized in that: including basement and base, the basement is cuboid solid construction, and the basement sets up on roofing structure bottom plate, and basement from interior to exterior is light aggregate filling layer, concrete seal, polyurethane waterproof coating and waterproof layer in proper order, the cuboid frame construction of base for adopting the I-steel preparation, the base is fixed at the basement top surface, and the base is used for erection equipment.
2. A two-layer machine foundation according to claim 1, wherein: a gap is formed between the base and the substrate, so that rainwater in the base can be drained conveniently.
3. A two-layer machine foundation according to claim 2, wherein: the waterproof protective layer on the top surface of the substrate inclines towards two sides along the central axis of the substrate.
4. A two-layer apparatus foundation according to any one of claims 1 to 3, wherein: and a cable bridge and a copper pipe bridge are arranged on the bottom surface inside the base.
5. A two-layer apparatus foundation according to any one of claims 1 to 3, wherein: the outer side surface of the base is coated with a stainless steel sheet, so that the side surface of the base is sealed.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202022576212.8U CN214305964U (en) | 2020-11-09 | 2020-11-09 | Double-deck formula equipment foundation |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202022576212.8U CN214305964U (en) | 2020-11-09 | 2020-11-09 | Double-deck formula equipment foundation |
Publications (1)
Publication Number | Publication Date |
---|---|
CN214305964U true CN214305964U (en) | 2021-09-28 |
Family
ID=77841427
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202022576212.8U Expired - Fee Related CN214305964U (en) | 2020-11-09 | 2020-11-09 | Double-deck formula equipment foundation |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN214305964U (en) |
-
2020
- 2020-11-09 CN CN202022576212.8U patent/CN214305964U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
SA520412648B1 (en) | Prefabricated insulated building panel with at least one cured cementitious layer bonded to insulation | |
CN110219458A (en) | A kind of waterproof integrated equipment room floor construction method of sound insulation and noise reducing | |
CN111926910A (en) | Installation method of fabricated building | |
CN107227870A (en) | Transformer substation building spliced by prefabricated parts | |
CN113605740B (en) | Waterproof construction method for hydropower station workshop | |
CN214305964U (en) | Double-deck formula equipment foundation | |
CN206428874U (en) | The waterproof construction and building of roof deformation joint | |
CN106939699B (en) | Construction method for galvanized steel sheet waterproof layer on inner side of open type ceramic plate curtain wall | |
CN206635786U (en) | Prefabricated assembled transformer substation foundation structure | |
CN210887620U (en) | Waterproof and moistureproof structure for junction of skirt building roof, main building floor and wall | |
CN213268014U (en) | Corrugated cover plate mounting structure for advanced construction of roof post-cast strip | |
CN214402329U (en) | Curtain wall structure | |
CN209053348U (en) | A kind of Lightweight metal plant gable parapet waterproofing node | |
CN115198878A (en) | Environment-friendly wall assembled building and construction method thereof | |
CN213086880U (en) | Be used for utility tunnel shutter bottom connected node structure | |
CN112761245A (en) | Assembled reinforced concrete building main body structure and installation construction method thereof | |
KR20180129229A (en) | Complex waterproof structure for rooftop of the building and construction method for thereof | |
CN113605581A (en) | Unit plate glass curtain wall roof and construction method thereof | |
CN113323396A (en) | Integrated construction method for external wall of fabricated building | |
CN112411903A (en) | Special-shaped combined expansion joint cover plate for reducing roof cold bridge phenomenon and installation method | |
CN101603342B (en) | Construction method of steel structure heat-insulating water-proofing inverted accessible roof | |
CN219732555U (en) | Built-in heat-insulation parapet wall structure of ultralow energy consumption building | |
CN110714483A (en) | Assembled underground comprehensive pipe gallery and waterproof layer construction method thereof | |
CN213926689U (en) | Install waterproof corridor bridge construction of elevator additional | |
CN214364034U (en) | Assembled reinforced concrete building major structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||