CN210887620U - A waterproof and moisture-proof structure at the junction of the podium roof and the floor and wall of the main building - Google Patents
A waterproof and moisture-proof structure at the junction of the podium roof and the floor and wall of the main building Download PDFInfo
- Publication number
- CN210887620U CN210887620U CN201921508417.3U CN201921508417U CN210887620U CN 210887620 U CN210887620 U CN 210887620U CN 201921508417 U CN201921508417 U CN 201921508417U CN 210887620 U CN210887620 U CN 210887620U
- Authority
- CN
- China
- Prior art keywords
- layer
- wall
- waterproof
- concrete wall
- moisture
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Building Environments (AREA)
Abstract
本实用新型提供一种裙楼屋面与主楼楼板及墙体交界处防水防潮结构,包括有楼板、墙体、找平层、保温层、防潮层、防水附加层、防水层、保护层、保护散水墩、室内地面、止水条、止水带;所述楼板包括有裙楼屋面现浇板和主楼现浇板,裙楼屋面现浇板和主楼现浇板交界处上方修筑有墙体,楼屋面现浇板和主楼现浇板端面连接处横向通长设置有止水带;所述墙体包括有混凝土墙体和砖墙,混凝土墙体修筑在楼板上,混凝土墙体上方砌筑有砖墙,混凝土墙体底部与楼板连接处通长设置有止水条;所述保温层上铺设有防潮层;所述防潮层上铺设有一层防水层,防水层上修筑有一层保护层,保护层靠近混凝土墙体侧上紧贴混凝土墙体修筑有一个保护散水墩。
The utility model provides a waterproof and moisture-proof structure at the junction of the podium roof, the floor slab and the wall of the main building, which comprises a floor slab, a wall, a leveling layer, a thermal insulation layer, a moisture-proof layer, a waterproof additional layer, a waterproof layer, a protective layer, and a protective water pier. , indoor floor, water stop strip, water stop belt; the floor slab includes a podium roof cast-in-situ slab and a main building cast-in-place slab, and a wall is built above the junction of the podium roof cast-in-place slab and the main building cast-in-situ slab, and the building roof A waterstop is arranged horizontally at the connection between the end face of the cast-in-place slab and the cast-in-place slab of the main building; the wall includes a concrete wall and a brick wall, the concrete wall is built on the floor, and a brick wall is built above the concrete wall. , the bottom of the concrete wall and the floor are connected with a water stop strip; a moisture-proof layer is laid on the insulation layer; a layer of waterproof layer is laid on the moisture-proof layer, and a layer of protection layer is built on the waterproof layer, and the protection layer is close to the A protective water pier is built on the side of the concrete wall close to the concrete wall.
Description
技术领域technical field
本实用新型涉及建筑防水领域,尤其涉及一种裙楼屋面与主楼楼板及墙体交界处防水防潮结构。The utility model relates to the field of building waterproofing, in particular to a waterproof and moisture-proof structure at the junction of a podium roof, a floor slab and a wall of a main building.
背景技术Background technique
裙楼一般是指在一个多层、高层、超高层建筑的主体底部,其占地面积大于建筑主体标准层面积的附属建筑体。裙楼屋面工程不仅要满足外部防护,更要注重屋面的防渗漏问题。为了避免主楼与裙楼的沉降量差异,一般施工时,是将主楼钢筋混凝土结构主体封顶后才开始逐步进行四周裙楼的主体施工,这样造成后期裙楼屋面与主楼连接的现浇板处造成不同程度的细微裂缝,容易导致屋面的渗漏,直接在主楼与裙楼屋面上砌筑墙体,墙体室内侧底部容易出现潮湿现象。The podium generally refers to the ancillary buildings at the bottom of the main body of a multi-storey, high-rise or super high-rise building, and its area is larger than the standard floor area of the main building. The podium roofing project must not only meet the external protection, but also pay attention to the anti-leakage problem of the roof. In order to avoid the difference in settlement between the main building and the podium, in general construction, the main construction of the surrounding podiums is gradually carried out after the main body of the reinforced concrete structure of the main building is capped. Different degrees of fine cracks can easily lead to roof leakage. Walls are built directly on the roof of the main building and the podium, and the bottom of the indoor side of the wall is prone to moisture.
实用新型内容Utility model content
本实用新型的目的在于针对现有技术的缺陷和不足,提供一种裙楼屋面与主楼楼板及墙体交界处防水防潮结构,采用本实用新型的结构,墙体下部修筑混凝土墙体,混凝土墙体较砖墙具有更好的抗渗性和防冻性能,在混凝土墙体外设置有防潮层,能够增强建筑防水防潮性能,在混凝土墙体底部与楼板连接处通长设置有止水条,楼屋面现浇板和主楼现浇板端面连接处横向通长设置有止水带,注意了建筑的细部防水,提升了整个屋面工程的质量。The purpose of this utility model is to aim at the defects and deficiencies of the prior art, and to provide a waterproof and moisture-proof structure at the junction of the podium roof, the main floor slab and the wall body. It has better impermeability and anti-freezing performance than brick walls. A moisture-proof layer is arranged outside the concrete wall, which can enhance the waterproof and moisture-proof performance of the building. A water-stop strip is installed throughout the length of the connection between the bottom of the concrete wall and the floor. A waterstop is installed horizontally at the connection between the cast-in-place slab of the roof and the end face of the cast-in-situ slab of the main building, which pays attention to the waterproofing of the details of the building and improves the quality of the entire roofing project.
为实现上述目的,本实用新型采用的技术方案是:一种裙楼屋面与主楼楼板及墙体交界处防水防潮结构,包括有楼板、墙体、找平层、保温层、防潮层、防水附加层、防水层、保护层、保护散水墩、室内地面、止水条、止水带;所述楼板包括有裙楼屋面现浇板和主楼现浇板,裙楼屋面现浇板和主楼现浇板交界处上方修筑有墙体,楼屋面现浇板和主楼现浇板端面连接处横向通长设置有止水带;所述墙体包括有混凝土墙体和砖墙,混凝土墙体修筑在楼板上,混凝土墙体高度控制在700-800mm之间,混凝土墙体上方砌筑有砖墙,混凝土墙体底部与楼板连接处通长设置有止水条;所述主楼现浇板上方为室内地面,裙楼屋面现浇板上修筑有找平层,找平层上方为保温层,保温层上铺设有防潮层,防潮层紧贴混凝土墙体向下延伸至保温层以及找平层端面上;所述防潮层上铺设有一层防水层,该防水层沿混凝土墙体向上延伸至混凝土墙体顶部修筑的凹槽内且防水层靠近混凝土墙体侧与防潮层间还铺设有防水附加层,该防水附加层同防水层固定在凹槽内,防水层上修筑有一层保护层,保护层靠近混凝土墙体侧上紧贴混凝土墙体修筑有一个保护散水墩,该保护散水墩外表面设置成圆弧面。In order to achieve the above-mentioned purpose, the technical scheme adopted by the utility model is: a waterproof and moisture-proof structure at the junction of the podium roof, the main floor slab and the wall, including a floor, a wall, a leveling layer, a thermal insulation layer, a moisture-proof layer, and a waterproof additional layer. , waterproof layer, protective layer, protective water pier, indoor ground, water stop strip, water stop belt; the floor slab includes podium roof cast-in-place slab and main building cast-in-place slab, podium roof cast-in-place slab and main building cast-in-place slab A wall is built above the junction, and a waterstop is arranged horizontally at the connection between the cast-in-place slab of the building and the cast-in-situ slab of the main building; the wall includes a concrete wall and a brick wall, and the concrete wall is built on the floor slab , the height of the concrete wall is controlled between 700-800mm, a brick wall is built on the top of the concrete wall, and a water stop is arranged at the connection between the bottom of the concrete wall and the floor slab; A leveling layer is built on the cast-in-place slab of the podium roof, an insulating layer is placed above the leveling layer, and a moisture-proof layer is laid on the insulating layer. A layer of waterproof layer is laid on it, the waterproof layer extends upward along the concrete wall into the groove built on the top of the concrete wall, and a waterproof additional layer is also laid between the side of the waterproof layer near the concrete wall and the moisture-proof layer, and the waterproof additional layer is the same as The waterproof layer is fixed in the groove, a protective layer is built on the waterproof layer, and a protective water pier is built close to the concrete wall on the side of the protective layer close to the concrete wall, and the outer surface of the protective water pier is set as an arc surface.
作为优选,所述保护散水墩顶部比混凝土墙体顶部低50mm,保护散水墩的高度为300mm,保护散水墩上贴合墙体设置有外墙保温层。Preferably, the top of the protection water pier is 50mm lower than the top of the concrete wall, the height of the protection pier is 300mm, and an outer wall thermal insulation layer is provided on the protection pier to fit the wall.
作为优选,所述凹槽比混凝土墙体顶面低150mm,凹槽距保护层的高度为 250mm。Preferably, the groove is 150mm lower than the top surface of the concrete wall, and the height of the groove from the protective layer is 250mm.
本实用新型的有益效果是:采用本实用新型的结构,墙体下部修筑混凝土墙体,混凝土墙体较砖墙具有更好的抗渗性和防冻性能,在混凝土墙体外设置有防潮层,能够增强建筑防水防潮性能,在混凝土墙体底部与楼板连接处通长设置有止水条,楼屋面现浇板和主楼现浇板端面连接处横向通长设置有止水带,注意了建筑的细部防水,提升了整个屋面工程的质量。The beneficial effects of the present utility model are: adopting the structure of the present utility model, the lower part of the wall body is built with a concrete wall body, the concrete wall body has better impermeability and antifreeze performance than the brick wall, and a moisture-proof layer is arranged outside the concrete wall, It can enhance the waterproof and moisture-proof performance of the building. There is a water stop strip at the connection between the bottom of the concrete wall and the floor slab. The details are waterproof, which improves the quality of the entire roofing project.
附图说明Description of drawings
此处所说明的附图是用来提供对本实用新型的进一步理解,构成本申请的一部分,但并不构成对本实用新型的限定。The accompanying drawings described herein are used to provide a further understanding of the present invention, and constitute a part of the present application, but do not constitute a limitation to the present invention.
图1一种裙楼屋面与主楼楼板及墙体交界处防水防潮结构示意图。Figure 1 is a schematic diagram of the waterproof and moisture-proof structure at the junction of the podium roof, the main floor slab and the wall.
其中:1为楼板、2为墙体、3为找平层、4为保温层、5为防潮层、6为防水附加层、7为防水层、8为保护层、9为保护散水墩、10为室内地面、11为止水条、12为止水带、1-1为裙楼屋面现浇板、1-2为主楼现浇板、2-1为混凝土墙体、2-2为砖墙、2-3为外墙保温层。Among them: 1 is the floor, 2 is the wall, 3 is the leveling layer, 4 is the thermal insulation layer, 5 is the moisture-proof layer, 6 is the waterproof additional layer, 7 is the waterproof layer, 8 is the protective layer, 9 is the protection of the water pier, and 10 is the Indoor floor, 11 water stop strip, 12 water stop belt, 1-1 is the cast-in-place slab of the podium roof, 1-2 is the cast-in-place slab of the main building, 2-1 is the concrete wall, 2-2 is the brick wall, 2- 3 is the outer wall insulation layer.
具体实施方式Detailed ways
结合附图,对本实用新型作进一步的详细说明。In conjunction with the accompanying drawings, the present utility model will be further described in detail.
如图所示,一种裙楼屋面与主楼楼板及墙体交界处防水防潮结构,包括有楼板1、墙体2、找平层3、保温层4、防潮层5、防水附加层6、防水层7、保护层8、保护散水墩9、室内地面10、止水条11、止水带12;所述楼板1包括有裙楼屋面现浇板1-1和主楼现浇板1-2,裙楼屋面现浇板1-1和主楼现浇板 1-2交界处上方修筑有墙体2,楼屋面现浇板1-1和主楼现浇板1-2端面连接处横向通长设置有止水带12;所述墙体2包括有混凝土墙体2-1和砖墙2-2,混凝土墙体2-1修筑在楼板1上,混凝土墙体2-1高度控制在700-800mm之间,混凝土墙体2-1上方砌筑有砖墙2-2,混凝土墙体2-1底部与楼板2连接处通长设置有止水条11;所述主楼现浇板1-2上方为室内地面10,裙楼屋面现浇板1-1 上修筑有找平层3,找平层3上方为保温层4,保温层4上铺设有防潮层5,防潮层5紧贴混凝土墙体2-1向下延伸至保温层4以及找平层3端面上;所述防潮层5上铺设有一层防水层7,该防水层7沿混凝土墙体2-1向上延伸至混凝土墙体2-1顶部修筑的凹槽内且防水层7靠近混凝土墙体侧与防潮层5间还铺设有防水附加层6,该防水附加层6同防水层7固定在凹槽内,防水层7上修筑有一层保护层8,保护层8靠近混凝土墙体2-1侧上紧贴混凝土墙体2-1修筑有一个保护散水墩9,该保护散水墩9外表面设置成圆弧面。As shown in the figure, a waterproof and moisture-proof structure at the junction of the podium roof, the main floor slab and the wall includes a floor 1, a
具体实施时,所述保护散水墩9顶部比混凝土墙体2-1顶部低50mm,保护散水墩9的高度为300mm,保护散水墩9上贴合墙体2设置有外墙保温层2-3。In specific implementation, the top of the protection water-scattering pier 9 is 50 mm lower than the top of the concrete wall 2-1, the height of the protection water-scattering pier 9 is 300 mm, and the outer wall thermal insulation layer 2-3 is provided on the protection water-scattering pier 9 in contact with the
具体实施时,所述凹槽比混凝土墙体2-1顶面低150mm,凹槽距保护层8的高度为250mm。In specific implementation, the groove is 150 mm lower than the top surface of the concrete wall 2-1, and the height of the groove from the protective layer 8 is 250 mm.
Claims (3)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201921508417.3U CN210887620U (en) | 2019-09-10 | 2019-09-10 | A waterproof and moisture-proof structure at the junction of the podium roof and the floor and wall of the main building |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201921508417.3U CN210887620U (en) | 2019-09-10 | 2019-09-10 | A waterproof and moisture-proof structure at the junction of the podium roof and the floor and wall of the main building |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN210887620U true CN210887620U (en) | 2020-06-30 |
Family
ID=71335938
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201921508417.3U Active CN210887620U (en) | 2019-09-10 | 2019-09-10 | A waterproof and moisture-proof structure at the junction of the podium roof and the floor and wall of the main building |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN210887620U (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN114277829A (en) * | 2021-12-31 | 2022-04-05 | 中国建筑第五工程局有限公司 | Integral fall raft foundation and construction method thereof |
| CN119021429A (en) * | 2024-09-27 | 2024-11-26 | 中国建筑第七工程局有限公司 | A waterproof structure for house junction and construction method |
-
2019
- 2019-09-10 CN CN201921508417.3U patent/CN210887620U/en active Active
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN114277829A (en) * | 2021-12-31 | 2022-04-05 | 中国建筑第五工程局有限公司 | Integral fall raft foundation and construction method thereof |
| CN119021429A (en) * | 2024-09-27 | 2024-11-26 | 中国建筑第七工程局有限公司 | A waterproof structure for house junction and construction method |
| CN119021429B (en) * | 2024-09-27 | 2025-09-30 | 中国建筑第七工程局有限公司 | Waterproof structure at house junction and construction method |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN212926506U (en) | Bathroom threshold stone waterproof construction | |
| CN204715638U (en) | A kind of roof covering water-proof structure | |
| CN201495693U (en) | raised wood floor roof | |
| CN209509199U (en) | A kind of up concave type deformation joint of roof | |
| CN209837491U (en) | A parapet anti-seepage node | |
| CN109797875A (en) | A kind of low energy consumption energy saving building system | |
| CN215519565U (en) | A waterproof connection structure between the outer side of the thermal insulation roof parapet and the top of the curtain wall | |
| CN207846692U (en) | A kind of water proof structure of floor and steel pipe column intersection | |
| CN111287311A (en) | A kind of construction method of cold-formed thin-walled light steel structure building | |
| CN212926518U (en) | Water leakage prevention structure at deformation joint of outdoor balcony of building | |
| CN206521812U (en) | A kind of anti-leakage structure of toilet | |
| CN209723415U (en) | A kind of sealed splash guard and waterproof construction for roofing integral waterproofing construction | |
| CN211313111U (en) | Waterproof roof structure | |
| CN209308077U (en) | Anti-subsidence open ditch water structure | |
| CN218234069U (en) | Threshold flashing structure of roof outlet door | |
| CN218970353U (en) | Inside and outside connection structure of bank wall node | |
| CN218437838U (en) | Roofing drain pipe seepage prevention structure | |
| CN217400125U (en) | Porous brick parapet node structure | |
| CN208884859U (en) | A kind of double heat insulation house surface parapet waterproofing node structures of double waterproofs | |
| CN218264280U (en) | Novel balcony drainage structure | |
| CN204826288U (en) | Be applied to shock insulation structure of villages and small towns building | |
| CN211850255U (en) | A kind of balcony waterproof structure with glass curtain wall structure | |
| CN220790134U (en) | A roof horizontal deformation joint embedding structure | |
| CN215484167U (en) | Waterproof connection structure of mouth of a river falls in parapet bottom | |
| CN116378318B (en) | Construction method of inverted roof anti-cracking protective layer structure |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CP01 | Change in the name or title of a patent holder |
Address after: 150000 Workshop on the fourth floor of building 3 # a, No. 10, Hanan 12th Avenue, Nangang District, Harbin City, Heilongjiang Province Patentee after: Heilongjiang meilixin Construction Engineering Co.,Ltd. Address before: 150000 Workshop on the fourth floor of building 3 # a, No. 10, Hanan 12th Avenue, Nangang District, Harbin City, Heilongjiang Province Patentee before: Heilongjiang meilixin waterproof and thermal insulation engineering Co.,Ltd. |
|
| CP01 | Change in the name or title of a patent holder | ||
| TR01 | Transfer of patent right |
Effective date of registration: 20251017 Address after: 518000 Guangdong Province Shenzhen City Fubao Street Futian Bonded Area Changfu Center 3501 Patentee after: Shenzhen Zhending Holding Co.,Ltd. Country or region after: China Address before: 150000 Workshop on the fourth floor of building 3 # a, No. 10, Hanan 12th Avenue, Nangang District, Harbin City, Heilongjiang Province Patentee before: Heilongjiang meilixin Construction Engineering Co.,Ltd. Country or region before: China |
|
| TR01 | Transfer of patent right | ||
| TR01 | Transfer of patent right |
Effective date of registration: 20251212 Address after: 518000 Guangdong Province Shenzhen City Fubao Street Futian Bonded Area Changfu Center 3501 Patentee after: Shenzhen Xinya Construction Engineering Co.,Ltd. Country or region after: China Address before: 518000 Guangdong Province Shenzhen City Fubao Street Futian Bonded Area Changfu Center 3501 Patentee before: Shenzhen Zhending Holding Co.,Ltd. Country or region before: China |
|
| TR01 | Transfer of patent right |