CN214170003U - Edge protection structure combined with aluminum film in double-unit staggered-layer construction - Google Patents
Edge protection structure combined with aluminum film in double-unit staggered-layer construction Download PDFInfo
- Publication number
- CN214170003U CN214170003U CN202023149837.2U CN202023149837U CN214170003U CN 214170003 U CN214170003 U CN 214170003U CN 202023149837 U CN202023149837 U CN 202023149837U CN 214170003 U CN214170003 U CN 214170003U
- Authority
- CN
- China
- Prior art keywords
- protective
- aluminum film
- protection
- unit
- double
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Floor Finish (AREA)
Abstract
The utility model discloses an edge-facing protective structure combined with an aluminum film in double-unit staggered floor construction, which belongs to the field of building construction, and comprises a protective bracket and a fixed unit, wherein the protective bracket is provided with a protective net to form temporary protection; the fixing unit is arranged on the outer wall aluminum film, and the protective bracket is arranged on the fixing unit; the outer wall aluminum film is arranged outside the high-rise building, and the protective support can move synchronously with the outer wall aluminum film. The utility model provides a face limit protection structure, the structure sets up rationally, it is big to have solved present high-rise double-unit building aluminium membrane staggered floor height and strides expansion joint position protection setting degree of difficulty, influence the aluminium membrane construction after the protection sets up, easily be demolishd, the problem that the implementation expense is big, once set up the installation alright upwards promote along with the outer wall aluminium membrane is synchronous, the outer wall aluminium membrane installation targets in place and protects promptly and sets in place, the protection disappearance appears in having avoided the work progress, the protection sets up the laggard condition, stop the neutral phase of no protection, ensure construction safety, therefore, the clothes hanger is strong in practicability.
Description
Technical Field
The utility model belongs to the building construction field relates to an face limit protective structure, especially relates to one kind and is arranged in two unit staggered floor construction with the facing limit protective structure that the aluminium membrane combines.
Background
At present, in the construction process of the aluminum mould of the double-unit building of the high-rise residence, because the expansion joint between the double units is smaller, the staggered construction between the double units is needed. However:
1. due to staggered construction, a height difference which is not lower than the height of a single layer at the minimum occurs between the two units, and casualty accidents are caused by high falling of personnel; meanwhile, the wall column steel bars are reserved on the lower layer to be exposed, the risk that the body is punctured by the steel bars when falling is also existed, and the danger is very high.
2. During staggered floor construction, if a traditional pre-buried steel pipe is used for setting protection, the situation that the aluminum mould needs to be dismantled due to the influence of adjacent edge protection when the aluminum mould is lifted upwards exists, so that the hidden danger that the protection is not generated during the period from the installation of the aluminum mould to the completion of concrete pouring is caused; meanwhile, the traditional embedded steel pipe is protected, a plurality of building processes exist, the dismantling and building workload is large, more manpower and material resources are needed, and the danger of the limb operation is large.
3. Except that the installation of traditional pre-buried steel pipe setting protection influence aluminium membrane, when setting up the protection on climbing the frame, not only the installation degree of difficulty is big, and the implementation cost is higher, still exists moreover because of climbing the frame and promote when lagging leading to the protection lag, influence aluminium mould installation scheduling problem.
Therefore, how to provide a standardized border protection structure suitable for high-low span positions in the staggered-floor construction of the aluminum mould of the double-unit building of the high-rise residential building is urgent to overcome the technical problems.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing a high low standardization that strides position and aluminium membrane and combine together when high-rise two unit building aluminium membrane staggered floor construction faces limit protective structure to solve in the present construction staggered floor height and stride the expansion joint position protection set up the degree of difficulty big, influence the aluminium membrane construction, easily be demolishd, implement the big scheduling problem of expense, should face limit protective structure one-time installation and just can promote the installation simultaneously along with the outer wall aluminium membrane, stop the no-protection idle gear.
In order to achieve the above object, the utility model provides a following scheme:
the utility model provides a face limit protective structure that is arranged in two unit staggered floor constructions to combine with the aluminium membrane, include:
the protective bracket is provided with a protective net to form temporary protection;
the fixing unit is arranged on an outer wall aluminum film, and the protective bracket is arranged on the fixing unit; the outer wall aluminum film is installed outside the high floor, and the protective support can move synchronously with the outer wall aluminum film.
Optionally, the protective support comprises a plurality of protective vertical rods and a plurality of protective cross rods, the protective vertical rods are arranged side by side at intervals, and the protective cross rods are arranged on the protective vertical rods at intervals; the bottom end of the protection vertical rod is installed on the fixing unit.
Optionally, each protection upright rod is connected with the outer wall aluminum film through one fixing unit.
Optionally, the protective net is a protective steel plate net.
Optionally, the fixing unit comprises an L-shaped plate and a protection vertical rod clamping and fixing device arranged on the vertical section of the L-shaped plate, and the horizontal section of the L-shaped plate is fixedly mounted on the outer wall aluminum film through a pin and a pin piece.
Optionally, a stiffening plate is connected between the horizontal section and the vertical section of the L-shaped plate.
Optionally, protection pole setting chucking fixing device include pipe fitting and threaded connection in the fastening screw of the lateral wall of pipe fitting, the pipe fitting install in the lateral surface of the vertical section of L template, and the aperture is great in the size of protection pole setting, fastening screw be used for with protection pole setting chucking in the pipe fitting. The side wall of the pipe fitting is welded with a nut, punching is carried out at the welding position of the nut, and the fastening screw can conveniently rotate to enter the fixed protection vertical rod.
Optionally, the distance between adjacent protective vertical rods is not more than 2m, and the height of each protective vertical rod is not less than 1.2 m; the protective net is fixed on the protective vertical rod and the protective cross rod.
The utility model discloses for prior art gain following technological effect:
the utility model provides a face limit protection structure, be one kind and be used for high-rise double-unit building aluminium membrane staggered floor construction crowning low position of striding, and face limit protection structure with the standardization that the aluminium membrane combined together, the structure sets up rationally, it is big to have solved present high-rise double-unit building aluminium membrane staggered floor height and strides expansion joint position protection setting degree of difficulty, influence the aluminium membrane construction after the protection setting, easily be demolishd, the problem that the implementation expense is big, once set up the installation alright upwards promote along with the outer wall aluminium membrane is synchronous, the outer wall aluminium membrane is installed and is protected promptly and set up in place, the protection disappearance has been avoided appearing in the work progress, the protection sets up lagged condition, stop the neutral period of no protection, ensure construction safety, therefore, the clothes hanger is strong in practicability.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required to be used in the embodiments will be briefly described below, and it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to these drawings without creative efforts.
FIG. 1 is a schematic view of the installation of the edge protection structure of the present invention;
FIG. 2 is a schematic structural view of the edge protection structure of the present invention;
fig. 3 is an installation diagram of the fixing unit of the present invention;
fig. 4 is a side view of the fixing unit of the present invention;
fig. 5 is a top view of the fixing unit of the present invention;
fig. 6 is a front view of the fixing unit of the present invention;
wherein the reference numerals are: 100-an edge-facing protection structure combined with an aluminum film in double-unit staggered-layer construction, 1-a protection support, 11-a protection vertical rod, 12-a protection cross rod, 2-a protection net, 3-a fixing unit, 31-an L-shaped plate, 32-a protection vertical rod clamping and fixing device, 321-a pipe fitting, 322-a fastening screw rod, 323-a nut, 33-a stiffening plate, 4-an outer wall aluminum film, 5-a pin and 6-a pin sheet.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
The utility model aims at providing a high low standardization that strides position and aluminium membrane and combine together when high-rise two unit building aluminium membrane staggered floor construction faces limit protective structure to solve in the present construction staggered floor height and stride the expansion joint position protection set up the degree of difficulty big, influence the aluminium membrane construction, easily be demolishd, implement the big scheduling problem of expense, should face limit protective structure one-time installation and just can promote the installation simultaneously along with the outer wall aluminium membrane, stop the no-protection idle gear.
In order to make the above objects, features and advantages of the present invention more comprehensible, the present invention is described in detail with reference to the accompanying drawings and the detailed description.
Example one
As shown in fig. 1 to 6, the embodiment provides an edge-facing protective structure 100 for combining with an aluminum film in double-unit staggered floor construction, which is mainly applied to a high-low span position during staggered floor construction of an aluminum film of a high-rise double-unit building, and mainly comprises a protective support 1 and a fixed unit 3, wherein the protective support 1 comprises a plurality of protective upright posts 11 and a plurality of protective cross bars 12, the protective upright posts 11 and the protective cross bars 12 are vertically connected and installed, and a protective net 2 is further arranged on the protective support 1. Among them, the protection net 2 is preferably a protection steel plate net.
In this embodiment, as shown in fig. 2, the distance between the protective uprights 11 is not greater than 2m, the height of the protective uprights 11 is not less than 1.2m, preferably, three protective crossbars 12 are provided, the distance between each protective crossbar 12 is 60cm, and the protective net 2 is fixed on the protective uprights 11 and the protective crossbars 12. Wherein, the distance between the protection upright stanchions 11 needs to be on site according to the actual distance between the holes on the upper part of the outer wall aluminum film 4.
After the frontier defense setting is completed, the fixing unit 3 is assembled. As shown in fig. 3-6, the fixing unit 3 is mainly composed of an L-shaped plate 31, a stiffening plate 33 and a protective upright rod clamping and fixing device 32. Wherein, set up the hole unanimous with the trompil diameter in outer wall aluminium membrane 4 upper portion on the horizontal segment of L template 31 lower part, conveniently use pin 5 and round pin piece 6 to carry out fixed connection with outer wall aluminium membrane 4 and fixed unit 3. Meanwhile, the stiffener plate 33 is preferably a triangular stiffener plate, and is welded between the horizontal section and the vertical section of the L-shaped plate 31 to enhance the load capacity of the L-shaped plate 31. The protective vertical rod clamping and fixing device 32 is welded on the outer side surface of the vertical section of the L-shaped plate 31. The protection vertical rod clamping and fixing device 32 mainly comprises a pipe 321 larger than the diameter of the protection vertical rod 11, a nut 323 welded on the pipe 321 and a fastening screw rod 322, wherein a hole is punched at the welding position of the nut 323 on the pipe 321, so that the fastening screw rod 322 can be screwed into the fixed protection vertical rod 11 conveniently.
In this embodiment, after the protection part and the fixing unit are completely arranged, the protection part, the fixing unit and the outer wall aluminum film are fixedly connected and installed. As shown in fig. 4, the L-shaped plate 31 of the fixing unit 3 is fixedly connected with the outer wall aluminum film 4 by using the pin 5 and the pin sheet 6; the fixing mode between the bottom end of the protection upright rod 11 of the protection part and the protection upright rod clamping and fixing device 32 is as follows: the protective upright 11 is inserted into a sleeve made of a tube 321 of larger size than the protective upright 11, while the fastening screw 322 is tightened to secure it. The pin 5 and the pin sheet 6 are an existing fixing piece used in combination, and detailed description is omitted.
In this embodiment, preferably, the bottom end of each protection upright rod 11 in the protection bracket 1 is connected with the outer wall aluminum film 4 through a fixing unit 3.
Therefore, the utility model provides a height stride the standardization that position and aluminium membrane combined together and face frontier defense and protect when high-rise double-unit building aluminium membrane staggered floor construction, it sets up the degree of difficulty to have solved the staggered floor height in the present construction and stride the protection of expansion joint position big, influence the aluminium membrane construction, easily be demolishd, the big problem of implementation expense, and the installation just can promote the installation simultaneously along with the outer wall aluminium membrane once, the outer wall aluminium membrane installation targets in place and protects the setting and targets in place, the protection disappearance has appeared in having avoided the work progress, the protection sets up hysteretic condition, stop the neutral period of no protection, ensure construction safety. The installation mode and the lifting principle of the outer wall aluminum film are the prior art, and are not described herein again.
It should be noted that, as is obvious to a person skilled in the art, the invention is not limited to details of the above-described exemplary embodiments, but can be embodied in other specific forms without departing from the spirit or essential characteristics thereof. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein, and any reference signs in the claims are not intended to be construed as limiting the claim concerned.
The utility model discloses a concrete example is applied to explain the principle and the implementation mode of the utility model, and the explanation of the above example is only used to help understand the method and the core idea of the utility model; meanwhile, for the general technical personnel in the field, according to the idea of the present invention, there are changes in the concrete implementation and the application scope. In summary, the content of the present specification should not be construed as a limitation of the present invention.
Claims (8)
1. The utility model provides a face limit protective structure that is arranged in two unit staggered floor constructions to combine with aluminium membrane which characterized in that includes:
the protective bracket is provided with a protective net;
the fixing unit is arranged on an outer wall aluminum film, and the protective bracket is arranged on the fixing unit; the protective support can move synchronously with the outer wall aluminum film.
2. The edge-facing protective structure combined with an aluminum film for double-unit staggered floor construction according to claim 1, wherein the protective support comprises a plurality of protective vertical rods and a plurality of protective cross rods, the protective vertical rods are arranged side by side at intervals, and the protective cross rods are arranged on the protective vertical rods at intervals; the bottom end of the protection vertical rod is installed on the fixing unit.
3. The edge-facing protective structure used for being combined with an aluminum film in double-unit staggered floor construction according to claim 2, wherein each protective upright rod is connected with the outer wall aluminum film through one fixing unit.
4. The edge-facing protective structure used for being combined with an aluminum film in double-unit split-level construction according to claim 1, wherein the protective net is a protective steel plate net.
5. The edge-facing protective structure combined with the aluminum film for double-unit staggered floor construction according to claim 2, wherein the fixing unit comprises an L-shaped plate and a protective vertical rod clamping and fixing device arranged on a vertical section of the L-shaped plate, and a horizontal section of the L-shaped plate is arranged on the aluminum film of the outer wall through a pin and a pin sheet.
6. The edge-facing protective structure combined with the aluminum film for double-unit staggered floor construction according to claim 5, wherein a stiffening plate is connected between the horizontal section and the vertical section of the L-shaped plate.
7. The edge-facing protective structure combined with the aluminum film for double-unit staggered floor construction according to claim 5, wherein the protective vertical rod clamping and fixing device comprises a pipe fitting and a fastening screw rod in threaded connection with the side wall of the pipe fitting, the pipe fitting is installed on the outer side surface of the vertical section of the L-shaped plate, and the fastening screw rod is used for clamping the protective vertical rod in the pipe fitting.
8. The edge-facing protective structure combined with an aluminum film for double-unit split-level construction according to claim 2, wherein the distance between adjacent protective vertical rods is not more than 2 m.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202023149837.2U CN214170003U (en) | 2020-12-24 | 2020-12-24 | Edge protection structure combined with aluminum film in double-unit staggered-layer construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202023149837.2U CN214170003U (en) | 2020-12-24 | 2020-12-24 | Edge protection structure combined with aluminum film in double-unit staggered-layer construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN214170003U true CN214170003U (en) | 2021-09-10 |
Family
ID=77608573
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202023149837.2U Active CN214170003U (en) | 2020-12-24 | 2020-12-24 | Edge protection structure combined with aluminum film in double-unit staggered-layer construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN214170003U (en) |
-
2020
- 2020-12-24 CN CN202023149837.2U patent/CN214170003U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105926764B (en) | A kind of industrialization preprocessing regenerative structural system and its construction method | |
CN107419824A (en) | The full precast shear wall structural system of regenerative steel skeleton and construction method | |
CN205669255U (en) | A kind of industrialization preprocessing regenerative structural system | |
CN106639045A (en) | Prefabricated assembly type steel plate-concrete composite shear wall structure system and construction method thereof | |
CN109162437B (en) | Integral steel platform for multi-cylinder steel plate shear wall and construction method thereof | |
CN213572924U (en) | Novel overhanging bearing scaffold | |
CN214170003U (en) | Edge protection structure combined with aluminum film in double-unit staggered-layer construction | |
CN210766497U (en) | Left and right truss middle flange connection two-side double-column portal frame | |
CN110424601B (en) | Concrete pouring anti-floating device for composite floor slab with fabricated structure and implementation method | |
CN209760968U (en) | Integrated louver-shaped fence | |
CN104213707A (en) | Attaching and climbing device of full steel climbing frame in structure retraction part and installation method thereof | |
CN203499259U (en) | Tool type cantilevered unloading platform | |
CN112723094A (en) | Integrated wall-attached device based on synchronous climbing of light steel platform | |
CN203729852U (en) | Assembled building site gate | |
CN210013444U (en) | Closed cantilever scaffold system | |
CN205676917U (en) | A kind of steel frame basis of tower mast structure | |
CN103225291A (en) | Dam stilling pool prefabricated gallery crowned arch steel template | |
CN214989509U (en) | Integrated wall-attached device based on synchronous climbing of light steel platform | |
CN220621173U (en) | Face limit protection device of assembled building | |
CN213865133U (en) | Tower crane attaches wall and increases formula steel construction system | |
CN205531402U (en) | Steel construction temporary remove lattice column butting positioning device | |
CN216840599U (en) | Ultrahigh independent column frame body structure | |
CN216105700U (en) | Tower crane that easily sets up attaches operation platform for wall | |
CN103114712B (en) | Buckle steel platform support system and construction method thereof | |
CN220620985U (en) | Wall post steel bar binding operation platform convenient to turnover |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |