CN214117496U - Combined template for prefabricated building construction - Google Patents

Combined template for prefabricated building construction Download PDF

Info

Publication number
CN214117496U
CN214117496U CN202023221520.5U CN202023221520U CN214117496U CN 214117496 U CN214117496 U CN 214117496U CN 202023221520 U CN202023221520 U CN 202023221520U CN 214117496 U CN214117496 U CN 214117496U
Authority
CN
China
Prior art keywords
module frame
construction
plate
template
building construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202023221520.5U
Other languages
Chinese (zh)
Inventor
李恩云
刘金华
王桂慧
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202023221520.5U priority Critical patent/CN214117496U/en
Application granted granted Critical
Publication of CN214117496U publication Critical patent/CN214117496U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a prefabricated building construction combined template, including the module frame I and module frame II of alloy construction, the template main part of the alloy construction of cooperation construction locating module frame I and module frame II inside, the both ends of the relative both sides of module frame I and module frame II are equipped with slot and picture peg respectively, one side of module frame I is equipped with the installation trench, the inboard of arm-tie corresponds the installation trench inside and integrative is equipped with rubber construction and has the inserted post of barb; one side that module frame two corresponds with the installation trench is equipped with the protruding position that corresponds with the installation trench, the end correspondence of protruding position is inserted the post and is equipped with the jack, module frame two-pass is through the picture peg and the slot corresponds with the slot and the picture peg of module frame one side and is connected to correspond through the jack and insert that the post corresponds the cartridge and fix. This prefabricated built-up plate for construction possesses and is convenient for to equipment between the template, improves the fastness of packaging efficiency and equipment, convenient to detach reuse's advantage.

Description

Combined template for prefabricated building construction
Technical Field
The utility model relates to a construction technical field specifically is a prefabricated built-up plate for construction.
Background
The building structure of China is mainly a brick-concrete structure, the template used for building construction is mainly a wood template, "replacing wood with steel" since the 20 th century 80 s, various new structure systems continuously appear, the reinforced concrete structure is rapidly increased, the steel template begins to prevail in the building construction, since the 20 th century 90 s, the building structure system of China has been greatly developed, along with the large-scale infrastructure construction, the construction of highways, railways, urban rail transit, high-rise buildings, super high-rise buildings and large public buildings, new requirements are provided for the template and scaffold construction technology, the pattern mainly comprising the combined steel template of China is broken and gradually changed into a pattern with various templates, the novel template is rapidly developed, the building template is a temporary supporting structure and is manufactured according to the design requirements, so that the concrete structure and the members are manufactured according to the specified positions, The geometric dimension is formed, the correct position of the building template is kept, the self weight of the building template and the external load acting on the building template are borne, the aim of template engineering is fulfilled, the quality and the construction safety of a concrete engineering are guaranteed, the construction progress is accelerated, and the engineering cost is reduced;
traditional building templates all uses plank sheathing or steel wood template preparation to form, the aluminum alloy has the used repeatedly many times, the high advantage of retrieval value, present more and more use aluminum alloy building templates, aluminum alloy building templates needs mosaic structure to connect when using, current aluminum alloy template is when doing the house wall body, the assembly of module and part predetermined in advance, still it is loaded down with trivial details still to need to cooperate fixed step through the bolt, influence the efficiency of construction, and it is comparatively inconvenient when dismantling used repeatedly.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a prefabricated built-up plate for construction possesses and is convenient for to the equipment between the template, improves the fastness of packaging efficiency and equipment, and convenient to detach reuse's advantage has solved current aluminum alloy template when doing house wall, and the assembly of predetermined module and part has in advance, still needs to be loaded down with trivial details through the fixed step of bolt fit, influences the efficiency of construction, and comparatively inconvenient problem when dismantling used repeatedly.
In order to achieve the above object, the utility model provides a following technical scheme: a prefabricated building construction combined template comprises a first module frame and a second module frame of alloy structures and a template main body of the alloy structures, wherein the template main body is matched with and constructed in the first module frame and the second module frame, the first module frame and the second module frame are arranged according to the size required by building construction, two ends of two opposite sides of the first module frame and the second module frame are respectively provided with a slot and an inserting plate, and the slots and the inserting plates arranged on the first module frame and the second module frame are opposite;
one side of the first module frame is provided with a mounting groove position, a pulling plate is arranged in the first module frame corresponding to the mounting groove position through a return spring, and a rubber structure and an inserting column with a barb are integrally arranged in the pulling plate corresponding to the mounting groove position;
one side of the second module frame corresponding to the installation groove position is provided with a convex position corresponding to the installation groove position, the tail end of the convex position is provided with an inserting hole corresponding to the inserting column, and the second module frame is correspondingly connected with the inserting hole and the inserting plate on one side of the module frame through the inserting plate and the inserting groove and is correspondingly inserted and fixed with the inserting column through the inserting hole;
the template main body is fixed inside the first module frame and the second module frame according to construction requirements.
Furthermore, a plurality of groups of the first module frame and the second module frame are arranged according to building construction requirements, and the first module frame and the second module frame are assembled by adopting insertion columns and insertion slots and insertion columns and insertion holes in a matched mode.
Furthermore, the first module frame and the second module frame are provided with concave clamping grooves at the installation positions corresponding to the first module frame and the second module frame, and the two ends of the first module frame and the two ends of the second module frame are slidably installed with the first module frame and the second module frame through the clamping grooves.
Furthermore, the outer side end face of the pulling plate is sunken into the inner walls of the first module frame and the second module frame, and the end face of the pulling plate and the inner side surfaces of the first module frame and the second module frame are on the same plane.
Compared with the prior art, the beneficial effects of the utility model are as follows:
1. the utility model discloses module frame one and module frame two are through inserting post and slot and inserting post and jack cooperation equipment, when module frame two is assembled with module frame one, module frame two need be connected one side with module frame one through inserting post and slot and inserting post and slot corresponding grafting of module frame one outside, and when module frame one is inserted with module frame two, the inserting post of the inboard of arm-tie is inserted inside the jack that module frame two set up the convex position, realize through inserting the pin joint of inserting post and jack, improve the fastness and the convenience of module frame one and module frame two combination installation, when needing to dismantle module frame one and module frame two, make power and module frame one separate to module frame two, make inserting post and slot and jack separation or through pulling the arm-tie, the arm-tie pulls the installation trench through reset spring inside, the arm-tie pulls inserting post and jack separation, the first module frame and the second module frame are loosely assembled, and the convenience of disassembling the first module frame and the second module frame is improved.
Drawings
FIG. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is an enlarged schematic view of part A of the present invention;
fig. 3 is a schematic structural diagram of the first module frame and the second module frame of the present invention after combination.
In the figure: 1. a first module frame; 2. a second module frame; 3. a template body; 4. a slot; 5. installing a slot position; 6. a return spring; 7. pulling a plate; 8. inserting a column; 9. protruding positions; 10. inserting plates; 11. a jack; 12. a clamping groove.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-3, a prefabricated building construction composite template comprises a module frame i 1 and a module frame ii 2 of an alloy structure, and a template main body 3 of the alloy structure arranged inside the module frame i 1 and the module frame ii 2 in a matched construction manner, wherein the module frame i 1 and the module frame ii 2 are arranged according to the size required by building construction, two ends of two opposite sides of the module frame i 1 and the module frame ii 2 are respectively provided with a slot 4 and an inserting plate 10, and the slot 4 and the inserting plate 10 arranged on the module frame i 1 and the module frame ii 2 are opposite;
one side of the module frame I1 is provided with an installation groove position 5, a pulling plate 7 is arranged in the module frame I1 corresponding to the installation groove position 5 through a return spring 6, and a rubber structure and an inserting column 8 with barbs are integrally arranged in the pulling plate 7 corresponding to the installation groove position 5;
one side of the second module frame 2, corresponding to the installation slot position 5, is provided with a convex position 9 corresponding to the installation slot position 5, the tail end of the convex position 9 is provided with an insertion hole 11 corresponding to the insertion column 8, and the second module frame 2 is correspondingly connected with the insertion hole 4 and the insertion plate 10 on the side of the first module frame 1 through the insertion plate 10 and the insertion hole 4 and is correspondingly inserted and fixed with the insertion column 8 through the insertion hole 11;
the template main body 3 is fixed inside the module frame I1 and the module frame II 2 according to construction requirements.
Specifically, module frame 1 and module frame two 2 set up the multiunit according to the building construction needs, and all adopt picture peg 10 and slot 4 and insert post 8 and jack 11 cooperation equipment between module frame 1 and the module frame two 2.
Specifically, the installation positions of the first module frame 1 and the second module frame 2 corresponding to the template main body 3 are provided with concave clamping grooves 12, and the two ends of the template main body 3 are slidably installed with the first module frame 1 and the second module frame 2 through the clamping grooves 12.
Specifically, the outer end surface of the pulling plate 7 sinks into the inner walls of the first module frame 1 and the second module frame 2, and the end surface of the pulling plate 7 and the inner side surfaces of the first module frame 1 and the second module frame 2 are on the same plane.
When the module frame I1 and the module frame II 2 are assembled by matching the inserting plate 10 and the inserting slot 4 as well as the inserting column 8 and the inserting hole 11, when the module frame II 2 is assembled with the module frame I1, one side of the module frame II 2, which is required to be connected with the module frame I1, is correspondingly inserted with the inserting slot 4 and the inserting plate 10 on the outer side of the module frame I1 through the inserting plate 10 and the inserting slot 4, when the module frame I1 and the module frame II 2 are inserted, the inserting column 8 on the inner side of the pull plate 7 is inserted into the inserting hole 11 of the module frame II 2, which is provided with the convex position 9, so that the inserting pin installation of the inserting column 8 and the inserting hole 11 is realized, the firmness and the convenience of the assembly of the module frame I1 and the module frame II 2 are improved, when the module frame I1 and the module frame II 2 are required to be disassembled, the force is separated from the module frame I2, the inserting plate 10 and the inserting column 8 are separated from the inserting slot 4 and the inserting hole 11 or the pull plate 7, inside the mounting trench 5 was pulled out through reset spring 6 to arm-tie 7, arm-tie 7 pulling inserted post 8 and jack 11 separation, made loose the dress between module frame 1 and the module frame two 2, improved and dismantled the convenience to module frame 1 and module frame two 2.

Claims (4)

1. The utility model provides a prefabricated built-up plate for construction, includes module frame (1) and module frame two (2), the inside template main part (3) of alloy construction of module frame (1) and module frame two (2) are located in the cooperation construction of alloy construction, its characterized in that: the module frame I (1) and the module frame II (2) are arranged according to the size required by building construction, two ends of two opposite sides of the module frame I (1) and the module frame II (2) are respectively provided with a slot (4) and an inserting plate (10), and the slot (4) and the inserting plate (10) arranged on the module frame I (1) and the module frame II (2) are opposite;
one side of the module frame I (1) is provided with an installation slot position (5), a pulling plate (7) is arranged in the module frame I (1) corresponding to the installation slot position (5) through a return spring (6), and an insertion column (8) which is of a rubber structure and provided with a barb is integrally arranged in the inner side of the pulling plate (7) corresponding to the installation slot position (5);
one side of the second module frame (2) corresponding to the installation slot position (5) is provided with a convex position (9) corresponding to the installation slot position (5), the tail end of the convex position (9) is provided with an insertion hole (11) corresponding to the insertion column (8), and the second module frame (2) is correspondingly connected with the insertion hole (4) and the insertion plate (10) on the side of the first module frame (1) through the insertion plate (10) and the insertion hole (4) and is correspondingly inserted and fixed with the insertion column (8) through the insertion hole (11);
the template main body (3) is fixed inside the first module frame (1) and the second module frame (2) according to construction requirements.
2. The prefabricated building construction composite formwork of claim 1, wherein: the module frame I (1) and the module frame II (2) are provided with a plurality of groups according to building construction requirements, and the module frame I (1) and the module frame II (2) are assembled in a matching mode through inserting plates (10), inserting grooves (4), inserting columns (8) and inserting holes (11).
3. The prefabricated building construction composite formwork of claim 1, wherein: the installation positions of the first module frame (1) and the second module frame (2) corresponding to the template main body (3) are provided with concave clamping grooves (12), and the two ends of the template main body (3) are slidably installed with the first module frame (1) and the second module frame (2) through the clamping grooves (12).
4. The prefabricated building construction composite formwork of claim 1, wherein: the outer side end face of the pull plate (7) is sunk into the inner walls of the first module frame (1) and the second module frame (2), and the end face of the pull plate (7) and the inner side surfaces of the first module frame (1) and the second module frame (2) are on the same plane.
CN202023221520.5U 2020-12-28 2020-12-28 Combined template for prefabricated building construction Expired - Fee Related CN214117496U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202023221520.5U CN214117496U (en) 2020-12-28 2020-12-28 Combined template for prefabricated building construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202023221520.5U CN214117496U (en) 2020-12-28 2020-12-28 Combined template for prefabricated building construction

Publications (1)

Publication Number Publication Date
CN214117496U true CN214117496U (en) 2021-09-03

Family

ID=77486718

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202023221520.5U Expired - Fee Related CN214117496U (en) 2020-12-28 2020-12-28 Combined template for prefabricated building construction

Country Status (1)

Country Link
CN (1) CN214117496U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114250967A (en) * 2021-12-27 2022-03-29 中建二局第一建筑工程有限公司 Combined pouring template
CN115492366A (en) * 2022-10-19 2022-12-20 陈梦君 Novel aluminum alloy template
EP4407111A1 (en) 2022-11-10 2024-07-31 Wood Core House Sp. z o.o. Set of prefabricated construction elements

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114250967A (en) * 2021-12-27 2022-03-29 中建二局第一建筑工程有限公司 Combined pouring template
CN114250967B (en) * 2021-12-27 2023-08-04 中建二局第一建筑工程有限公司 Combined pouring template
CN115492366A (en) * 2022-10-19 2022-12-20 陈梦君 Novel aluminum alloy template
CN115492366B (en) * 2022-10-19 2024-04-05 安徽九为新材料有限公司 Aluminum alloy template
EP4407111A1 (en) 2022-11-10 2024-07-31 Wood Core House Sp. z o.o. Set of prefabricated construction elements

Similar Documents

Publication Publication Date Title
CN214117496U (en) Combined template for prefabricated building construction
CN217480405U (en) Assembled steel construction building
CN212105094U (en) Foldable building templates
CN211114233U (en) Vertical connection structure of assembled shear force wall
CN102121308A (en) Template for buildings
CN215920833U (en) Prefabricated planking wall combination mould
CN211899810U (en) Reinforced supporting structure for constructional engineering
CN214144114U (en) Combined light steel truss with strong wind resistance
CN211228877U (en) I-shaped aluminum connection structure of aluminum alloy room
CN212534130U (en) Steel shotcrete movable end structure
CN221590375U (en) Aluminum film plate with mortise and tenon structure
CN220704833U (en) Assembled wall
CN217175301U (en) Assembly structure of super high-rise building outer wall
CN110593407A (en) I-shaped aluminum connection structure of aluminum alloy room
CN221194252U (en) Butt joint structure of steel template
CN218374821U (en) Assembled prefabricated staircase
CN220036282U (en) Coupling assembling and assembled steel construction iron tower
CN219825721U (en) Assembled indoor wall building structure
CN213329416U (en) Modularization steel structure beam column node structure that can install fast
CN217500525U (en) Mobile box house with excellent anti-seismic effect
CN213868558U (en) High-stability prefabricated wallboard
CN216076213U (en) Cantilever formwork platform mounting structure
CN220958040U (en) Lighting and light collecting device for energy conservation of steel structure building
CN218292021U (en) Prefabricated assembled electric power inverter box basis
CN221702702U (en) Anti-seismic building structure node connecting device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210903