CN214117105U - Peripheral dado of prefabricated lightweight concrete - Google Patents
Peripheral dado of prefabricated lightweight concrete Download PDFInfo
- Publication number
- CN214117105U CN214117105U CN202022312292.6U CN202022312292U CN214117105U CN 214117105 U CN214117105 U CN 214117105U CN 202022312292 U CN202022312292 U CN 202022312292U CN 214117105 U CN214117105 U CN 214117105U
- Authority
- CN
- China
- Prior art keywords
- wall
- prefabricated
- precast
- light
- lightweight concrete
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Load-Bearing And Curtain Walls (AREA)
Abstract
The utility model provides a peripheral dado of prefabricated lightweight concrete, including the precast beam with set up in the light precast wall of precast beam lower extreme, the department of meeting of precast beam and light precast wall separates through the wire net piece, the both ends of light precast wall are all pre-buried to have a plurality of to reserve the nut, the upside of precast beam is provided with the pre-buried dowel of a plurality of and button head and hangs the nail, the downside of light precast wall is provided with the screw thread blind hole with pre-buried dowel one-to-one. The utility model discloses alleviateed the dead weight, it is favorable to building whole antidetonation, practice thrift the hoist and mount cost.
Description
Technical Field
The utility model relates to a prefabricated wallboard technical field especially indicates a peripheral dado of prefabricated lightweight concrete.
Background
Precast concrete surrounding panels are one of the most widely used types of components in fabricated concrete construction. In a traditional cast-in-place concrete shear wall structure, except for a load-bearing shear wall, other enclosure walls are usually built by aerated concrete blocks, and a frame beam is a cast-in-place reinforced concrete beam. The most applied form in the peripheral retaining wall of precast concrete at present is that, the roof beam adopts the coincide roof beam (partly prefabricated, partly cast-in-place), and non-bearing wall adopts the concrete prefabrication, has following problem:
1. because the peripheral retaining wall is poured at one time, the concrete label of the non-bearing part wall body is the same as that of the beam concrete, and the cost is increased more;
2. the non-bearing wall adopts the concrete for the beam, and the density is 2.5t/m3And the volume weight of the traditional aerated concrete masonry is 0.75t/m3The weight of the whole building structure is increased, the earthquake resistance is unfavorable, and the requirements on hoisting and transporting equipment are correspondingly increased;
3. the rigidity of the concrete for the beam is greatly increased compared with that of the aerated concrete building block, and the rigidity is increased to be unfavorable for shock resistance.
SUMMERY OF THE UTILITY MODEL
The utility model provides a peripheral dado of prefabricated lightweight concrete has alleviateed the dead weight, and it is favorable to building whole antidetonation, practices thrift the hoist and mount cost.
The technical scheme of the utility model is realized like this: the utility model provides a peripheral dado of prefabricated lightweight concrete, includes the precast beam and sets up in the light precast wall of precast beam lower extreme, and the department of meeting of precast beam and light precast wall separates through the wire net piece, and pre-buried in the precast beam has the roof beam steel reinforcement cage, and pre-buried in the light precast wall has wall reinforcing bar rack, and in the roof beam steel reinforcement cage was inserted to the upper end of wall reinforcing bar rack, the wire net piece was along vertically setting up in the position department that the wall reinforcing bar rack is close to the roof beam steel reinforcement cage.
Furthermore, a plurality of reserved nuts are pre-embedded at two ends of the light prefabricated wall, a plurality of pre-embedded joint bars and round head hanging nails are arranged on the upper side of the prefabricated beam, and threaded blind holes corresponding to the pre-embedded joint bars in a one-to-one mode are arranged on the lower side of the light prefabricated wall.
Furthermore, beam bottom stress longitudinal bars are arranged in the beam reinforcement cages on two sides of the upper end of the wall reinforcement net rack.
And furthermore, reserved template opposite-pulling holes are formed in the light prefabricated wall and the prefabricated beam on the inner side of the reserved nut.
The utility model has the advantages that:
the utility model discloses alleviateed the dead weight, it is favourable to the whole antidetonation of building, also can reduce the requirement to building site hoisting equipment simultaneously, can practice thrift the hoist and mount cost, material self cost also keeps level with ordinary concrete basically, has great using value.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly described below, it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to these drawings without creative efforts.
Fig. 1 is a schematic structural view of the present invention;
FIG. 2 is a left side view of FIG. 1;
FIG. 3 is a schematic diagram of a wall reinforcement structure;
fig. 4 is a left side view of fig. 3.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without any creative effort belong to the protection scope of the present invention.
As shown in fig. 1-4, a prefabricated lightweight concrete peripheral wall panel comprises a prefabricated beam 1 and a lightweight prefabricated wall 2 arranged at the lower end of the prefabricated beam 1, the connection part of the prefabricated beam 1 and the lightweight prefabricated wall 2 is separated by a steel wire mesh 3, a plurality of reserved nuts 4 are pre-embedded at two ends of the lightweight prefabricated wall 2, reserved template counter-pulling holes 5 are formed in the lightweight prefabricated wall 2 and the prefabricated beam 1 at the inner side of each reserved nut 4, a plurality of pre-embedded joint bars 6 and round head hanging nails 7 are arranged on the upper side of the prefabricated beam 1, threaded blind holes 8 corresponding to the pre-embedded joint bars 6 one by one are formed in the lower side of the lightweight prefabricated wall 2, and inclined support pre-embedded sleeves 15 are arranged on the lightweight prefabricated wall 2 and the prefabricated beam 1.
Pre-buried beam reinforcement cage that has in precast beam 1, beam reinforcement cage include fore-and-aft roof beam waist muscle 9 and vertical beam stirrup 10, and beam stirrup 10 suit is in the outside of roof beam waist muscle 9, and links to each other with roof beam waist muscle 9 through the reinforcing bar drag hook, and the upper end in the beam stirrup 10 is connected with construction reinforcing bar 11.
Wall reinforcing bar net rack is pre-buried in light prefabricated wall 2, and wall reinforcing bar net rack includes vertical distribution muscle 12 and fore-and-aft horizontal distribution muscle 13, and horizontal distribution muscle 13 is located the outside of vertical distribution muscle 12, and links to each other with vertical distribution muscle 12. The upper end of the vertical distribution rib 12 is inserted into the beam stirrup 10, beam bottom stressed longitudinal ribs 14 are connected in beam reinforcement cages on two sides of the upper end of the vertical distribution rib 12, and exposed parts are reserved at two ends of the beam waist rib 9 and the beam bottom stressed longitudinal ribs 14. The steel wire mesh 3 is longitudinally fixed at the position where the vertical distribution rib 12 is close to the beam reinforcement cage.
The system of the present embodimentThe preparation method comprises the following steps: the volume weight of the lightweight concrete can be 0.85t/m3And the 28d strength reaches above C25. The method comprises the steps of installing a beam reinforcement cage and a wall reinforcement net rack in a mold, longitudinally fixing a steel wire mesh 3 at the position, close to the beam reinforcement cage, of the wall reinforcement net rack, installing various parts needing to be embedded, such as a reserved nut 4, embedded reinforcements, round-head hanging nails 7 and the like, then pouring light concrete of a light prefabricated wall 2, wherein the light prefabricated wall 2 is a non-bearing wall, then pouring of a prefabricated beam 1 is conducted before initial setting of the light concrete, the prefabricated beam 1 is made of common concrete, the two kinds of concrete are divided through the steel wire mesh 3, and finally, normally collecting and maintaining.
The above description is only a preferred embodiment of the present invention, and should not be taken as limiting the invention, and any modifications, equivalent replacements, improvements, etc. made within the spirit and principle of the present invention should be included in the protection scope of the present invention.
Claims (4)
1. The utility model provides a peripheral dado of prefabricated lightweight concrete which characterized in that: including precast beam (1) and set up in precast light wall (2) of precast beam (1) lower extreme, the department of meeting of precast beam (1) and precast light wall (2) separates through wire net piece (3), and pre-buried in precast beam (1) has the roof beam steel reinforcement cage, and pre-buried in precast light wall (2) has the wall reinforcing bar rack, and in the roof beam steel reinforcement cage was inserted to the upper end of wall reinforcing bar rack, wire net piece (3) were along vertically setting up in the position department that the wall reinforcing bar rack is close to the roof beam steel reinforcement cage.
2. A prefabricated lightweight concrete peripheral panel as claimed in claim 1, wherein: a plurality of reserved nuts (4) are pre-embedded at two ends of the light prefabricated wall (2), a plurality of pre-embedded joint bars (6) and round head hanging nails (7) are arranged on the upper side of the prefabricated beam (1), and threaded blind holes (8) corresponding to the pre-embedded joint bars (6) one to one are arranged on the lower side of the light prefabricated wall (2).
3. A prefabricated lightweight concrete peripheral panel according to claim 1 or 2, wherein: and beam bottom stressed longitudinal bars (14) are arranged in the beam reinforcement cages on the two sides of the upper end of the wall reinforcement net rack.
4. A prefabricated lightweight concrete peripheral panel as claimed in claim 2, wherein: the light prefabricated wall (2) and the prefabricated beam (1) on the inner side of the reserved nut (4) are provided with reserved template counter-pulling holes (5).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202022312292.6U CN214117105U (en) | 2020-10-16 | 2020-10-16 | Peripheral dado of prefabricated lightweight concrete |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202022312292.6U CN214117105U (en) | 2020-10-16 | 2020-10-16 | Peripheral dado of prefabricated lightweight concrete |
Publications (1)
Publication Number | Publication Date |
---|---|
CN214117105U true CN214117105U (en) | 2021-09-03 |
Family
ID=77498875
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202022312292.6U Active CN214117105U (en) | 2020-10-16 | 2020-10-16 | Peripheral dado of prefabricated lightweight concrete |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN214117105U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115288385A (en) * | 2022-08-26 | 2022-11-04 | 北京市燕通建筑构件有限公司 | Integrated outer enclosure wall |
EE01629U1 (en) * | 2023-08-13 | 2024-04-15 | Hxh Oü | Building from a set of prefabricated concrete elements |
-
2020
- 2020-10-16 CN CN202022312292.6U patent/CN214117105U/en active Active
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115288385A (en) * | 2022-08-26 | 2022-11-04 | 北京市燕通建筑构件有限公司 | Integrated outer enclosure wall |
CN115288385B (en) * | 2022-08-26 | 2024-05-10 | 北京市燕通建筑构件有限公司 | Integrated peripheral retaining wall body |
EE01629U1 (en) * | 2023-08-13 | 2024-04-15 | Hxh Oü | Building from a set of prefabricated concrete elements |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN214117105U (en) | Peripheral dado of prefabricated lightweight concrete | |
CN213709853U (en) | Prefabricated member, structural column, shear wall and semi-fabricated building structure | |
CN106988485A (en) | The construction method of structural transition layer Shaped Steel concrete beam | |
CN113931313A (en) | Super high-rise core tube horizontal structure construction method | |
CN113719005A (en) | Prefabricated wallboard of assembled, floor and connection structure thereof | |
CN115233960A (en) | Integral construction platform structure and method for increasing core tube wall in air | |
CN105347142B (en) | A kind of building hoist is mounted on the threading installation method on basement roof | |
CN112695914B (en) | Assembly type shear wall structure system and construction method thereof | |
CN206956979U (en) | A kind of Linear shear wall with fore-set | |
CN210738091U (en) | Novel reinforcing system for aluminum template | |
CN108978996B (en) | Outrigger added in existing brick-concrete structure and construction method thereof | |
CN106592821A (en) | Side-standing integral forming structure and method of shear steel plates and lateral reinforcement fabric | |
CN217537332U (en) | Connecting structure of assembled type steel reinforced concrete beam and steel-concrete composite board | |
CN110747994A (en) | Ductile node structure of reinforced concrete frame | |
CN214364217U (en) | Assembled shear wall structure system | |
CN108643388A (en) | A kind of construction wall | |
CN211007033U (en) | Vertical wall is whole cast-in-place and prefabricated building structure of horizontal structure | |
CN209025430U (en) | A kind of floor mold being applicable in a variety of reinforcing bar distributions | |
CN212507039U (en) | Wallboard with prefabricated prestressed concrete ribbed cavity | |
CN211920714U (en) | Support system of pull-up and pull-down type external hanging self-climbing tower crane | |
CN208184021U (en) | A kind of construction wall | |
CN205369874U (en) | Elevartor shaft outer wall cantilever frame | |
CN212926449U (en) | Connecting structure of lintel and hanging post of through long large window | |
CN112942679B (en) | Precast concrete frame beam capable of realizing standardization and construction method thereof | |
CN206814241U (en) | A kind of steel construction elevator ready-package corridor |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |