CN214116907U CN202022805480.2U CN202022805480U CN214116907U CN 214116907 U CN214116907 U CN 214116907U CN 202022805480 U CN202022805480 U CN 202022805480U CN 214116907 U CN214116907 U CN 214116907U
Authority
CN
China
Prior art keywords
well
wall
pipe
connecting pipe
well casing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202022805480.2U
Other languages
Chinese (zh)
Inventor
薛海生
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xuzhou Tianyi Plastics Co ltd
Original Assignee
Xuzhou Tianyi Plastics Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xuzhou Tianyi Plastics Co ltd filed Critical Xuzhou Tianyi Plastics Co ltd
Priority to CN202022805480.2U priority Critical patent/CN214116907U/en
Application granted granted Critical
Publication of CN214116907U publication Critical patent/CN214116907U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Sampling And Sample Adjustment (AREA)

Abstract

The utility model discloses an anti-settling plastic inspection well, which comprises an upper connecting pipe, a lower connecting pipe, a first well pipe and a second well pipe, wherein the top of the upper connecting pipe is provided with a well mouth mask, the bottom of the lower connecting pipe is provided with an inspection pipeline, the inner wall of the bottom of the upper connecting pipe is provided with an embedded ring groove, the top of the first well pipe is provided with a convex ring, the upper connecting pipe is connected with the convex ring through the embedded ring groove, the inner wall of the bottom of the first well pipe is provided with an embedded ring groove, the top of the second well pipe is provided with an embedded ring groove, the first well pipe is connected with the convex ring through the embedded ring groove, the inner wall of the bottom of the second well pipe is provided with an embedded ring groove, the second well pipe is connected with the convex ring through the embedded ring groove, the technical field of plastic inspection wells is provided, the anti-settling plastic inspection well relieves the problem that the whole structure is settled by being driven by components below the earth surface after long-time use, the problem that partial structure of the well road area is broken and falls off in advance before sedimentation is solved.

Description

Anti-sedimentation plastic inspection well
Technical Field
The utility model relates to a plastics inspection shaft technical field specifically is an anti plastics inspection shaft that subsides.
Background
The plastic inspection well is commonly called as a plastic inspection well, is a drainage accessory structure which is arranged at the intersection of plastic drainage pipelines, a turning position, a pipe diameter or gradient changing position, a water drop position or a certain distance on a linear pipeline section and is convenient for regularly inspecting, cleaning and dredging the pipelines, but the traditional plastic inspection well still has a plurality of problems in use.
Conventional plastic inspection wells exist: 1. due to different address foundation components, part of the plastic inspection wells can be pressed and driven by the components below the earth surface to generate the problem of overall structure settlement after long-time use. 2. Because the reasons related to the sedimentation of the plastic inspection well are complex, and the sedimentation amplitude is relatively large, the problem that a part of the structure of the well road area is firstly broken and falls off before the sedimentation of the whole structure occurs.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
The utility model provides a not enough to prior art, the utility model provides an anti plastics inspection shaft that subsides has alleviated and has been taken place the problem that overall structure subsided by the following composition drive of earth's surface after long-time the use, has alleviated well way region part structure and has cracked the problem that drops in advance before subsiding.
(II) technical scheme
In order to achieve the above purpose, the utility model discloses a following technical scheme realizes: the utility model provides an anti plastics inspection shaft that subsides, includes even pipe, lower even pipe, first well casing and second well casing, it is equipped with the well head cover to go up even tub of top, even socle portion is equipped with the inspection pipeline down, it is equipped with the gomphosis annular to go up even socle portion inner wall, first well casing top is equipped with the bulge loop, go up even pipe and connect the bulge loop through gomphosis annular gomphosis, first well casing bottom inner wall is equipped with the gomphosis annular, second well casing top is equipped with the bulge loop, even tub of top is equipped with the bulge loop down, the second well casing is connected the bulge loop through gomphosis annular gomphosis, the equal fixedly connected with bracing piece in outer wall both ends of going up even pipe, lower even pipe, first well casing and second well casing, bracing piece top fixedly connected with prevents sinking, inspection pipeline bottom is fixedly connected with the support bar in proper order, the bottom of the supporting bar is fixedly connected with an anti-sinking bottom plate.
Preferably, the outer wall of the bottom of the upper connecting pipe is uniformly provided with connecting bottom blocks around, the outer wall of the bottom of the first well pipe is uniformly provided with connecting bottom blocks around, and the outer wall of the bottom of the second well pipe is uniformly provided with connecting bottom blocks around.
Preferably, first well casing top outer wall a week evenly is equipped with connects the kicking block, second well casing top outer wall a week evenly is equipped with connects the kicking block, even be equipped with down even pipe top outer wall a week and connect the kicking block, it is equipped with the bolt to connect the kicking block, connect the kicking block and pass through bolt threaded connection and connect the kicking block.
Preferably, the outer wall of the bottom of the well mouth mask is welded with a well mouth connecting ring, bolts are arranged at the left end and the right end of the well mouth connecting ring, and the well mouth connecting ring is connected with the upper connecting pipe through the bolts.
Preferably, the outer wall of the top of the inspection pipeline is welded with a pipeline connecting ring, bolts are arranged at the left end and the right end of the pipeline connecting ring, and the pipeline connecting ring is connected with a lower connecting pipe through the bolts.
Preferably, the left end of the inner wall of the well mask is provided with a hinge, the inner wall of the well mask is connected with the well lid through the hinge, and the well lid is connected with the upper connecting pipe through the embedded inner wall of the well mask.
(III) advantageous effects
The utility model provides an anti plastics inspection shaft that subsides. The method has the following beneficial effects:
(1) the anti-settling plastic inspection well is provided with a dustproof bottom plate, a dustproof block, an upper connecting pipe and a lower connecting pipe, wherein the upper connecting pipe is arranged to connect an inspection well region structure with a well mouth structure, the total compression-resistant suit compression-resistant traction capacity of the upper and lower structures is enhanced to prevent the overall structure from settling, the lower connecting pipe is arranged to connect the inspection well region structure with an inspection pipeline region structure, the probability of overall structure settling can be reduced through the large-region heavy-weight structure support of the inspection pipeline region, the contact area between the bottom region structure and the components below the ground can be enhanced through the uniform arrangement of support bars and the anti-settling bottom plate at the bottom of the inspection pipeline, the anti-settling capacity can be enhanced through the increase of the contact area at the bottom, the support bars are connected to two ends of the outer walls of the first well pipe and the second well pipe, and the anti-settling block is fixedly connected to the top end of each support bar, through all being equipped with the bracing piece with the regional outer wall of whole section of inspection shaft and preventing sinking the piece and can strengthen the inspection shaft pipeline when placing with the deep contact point of ground composition, through increasing the peripheral deep contact point, can play self structure and act as the effect of horizontal ground support dynamics, because relevant structure spare part is mutually supported the function, so alleviated after long-time the use and driven the problem that takes place overall structure and subside by the following composition of earth's surface.
(2) This kind of anti plastics inspection shaft that subsides, through being equipped with the connection bottom piece and connecting the kicking block, go up the connecting tube, connecting the pipe down, first well casing and second well casing, go up the connecting tube, connecting the pipe down, all can strengthen the fastening connection intensity of structure through connecting the bottom piece and connecting the kicking block between first well casing and the second well casing, connect the bottom piece and connect the kicking block after the mutual gomphosis of single section region of pipeline is connected, can laminate each other, through driving into the bolt this moment, alright strengthen the fastening with carrying out the reinforcing between two section structures in region, provide many places horizontal anti-drop back strengthening points between two section structures in region, and gomphosis annular and the bulge loop of going deep into the connection also can prevent the fracture pressure problem that drops that brings by side pressure, because relevant structure spare part is mutually supported the operation, so alleviated well way region partial structure and broken off the problem in advance before subsiding.
Drawings
FIG. 1 is an overall structure diagram of the present invention;
FIG. 2 is a partial cross-sectional structure view of the well area of the present invention;
FIG. 3 is a sectional view of the bottom area of the present invention;
fig. 4 is a sectional view of the top area of the present invention.
In the figure: the well comprises an upper connecting pipe-1, a first well pipe-2, a second well pipe-3, a lower connecting pipe-4, a well mask-5, an inspection pipeline-6, a well mouth connecting ring-7, a pipeline connecting ring-8, a supporting bar-9, an anti-sinking bottom plate-10, a supporting bar-11, an anti-sinking block-12, a connecting bottom block-13, a connecting top block-14, a bolt-15, an embedded ring groove-16, a convex ring-17, a well lid-18 and a hinge-19.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-4, an embodiment of the present invention provides a technical solution: the utility model provides an anti plastics inspection shaft that subsides, includes even pipe 1, lower even pipe 4, first well casing 2 and second well casing 3, it is equipped with well gauze mask 5 to go up even 1 top of pipe, can lead to top well opening region and set up the mounting point, even 4 bottoms of pipe are equipped with inspection pipeline 6 down, are equipped with perpendicularly and can make things convenient for the inspection personnel to descend perpendicularly and arrive the inspection area, it is equipped with gomphosis annular 16 to go up even 1 bottom inner wall of pipe, 2 tops of first well casing are equipped with bulge loop 17, it connects bulge loop 17 through 16 gomphosis annular 16 gomphosis to go up even pipe 1, can closely laminate each other and place the resistance to compression of connecting after can promoting a week between even pipe 1 and the first well casing 2 outer wall and cover the ability, 2 bottom inner walls of first well casing are equipped with gomphosis annular 16, 3 tops of second well casing are equipped with bulge loop 17, first well casing 2 passes through 16 gomphosis connection bulge loop 17, can closely laminate each other and place the resistance to compression of a week that can promote after connecting between first well casing 2 and the second well casing 3 outer wall and cover the ability, second well casing 3 bottom inner wall is equipped with gomphosis annular 16, even pipe 4 top is equipped with bulge loop 17 down, second well casing 3 passes through gomphosis annular 16 gomphosis and connects bulge loop 17, can closely laminate each other and place and can promote the resistance to compression of a week between second well casing 3 and the even pipe 4 outer wall of connecting down after connecting, go up even fixedly connected with bracing piece 11 in the outer wall both ends of connecting pipe 1, connecting pipe 4, first well casing 2 and second well casing 3, bracing piece 11 that a week evenly was equipped with can prolong the distance of stretching out of anti-sinking piece 12, reduce the below-ground structure influence of periphery, bracing piece 12 is prevented to bracing piece 11 top fixedly connected with, can place the horizontal ground strong point function that increases the pipeline through stretching out the periphery, 6 bottoms of inspection pipeline are fixedly connected with support bar 9 in proper order, and the support bar 9 that evenly is equipped with can transmit the whole weight dispersion at top, 9 bottoms fixedly connected with of support bar prevent sinking bottom plate 10, can reduce overall structure settlement problem through the transmission of increase area of contact with the regional whole weight in top.
Go up 1 bottom outer wall homogeneous week of connecting pipe and evenly be equipped with and connect bottom block 13, 2 bottom outer walls of first well casing a week evenly is equipped with and connects bottom block 13, 3 bottom outer walls of second well casing a week evenly is equipped with and connects bottom block 13, and every single section regional pipeline bottom outer wall all is equipped with a plurality of connection bottom blocks 13, can accomplish regional structural joint's reinforced connection with connecting the 14 cooperations of kicking block.
2 top outer walls a week of first well casing evenly is equipped with connects kicking block 14, 3 top outer walls a week of second well casing evenly is equipped with connects kicking block 14, 4 top outer walls a week of even pipe are evenly equipped with down and are connected kicking block 14, it is equipped with bolt 15 to connect kicking block 14, connect kicking block 14 and pass through bolt 15 threaded connection and connect kicking block 14, connect end block 13 and even all connect through bolt 15 between the kicking block, can produce a plurality of horizontal fracture prevention in regional pipeline seam crossing and break away from the reinforcing point.
The outer wall of the bottom of the well mask 5 is welded with a well mouth connecting ring 7, bolts 15 are arranged at the left end and the right end of the well mouth connecting ring 7, the well mouth connecting ring 7 is connected with the upper connecting pipe 1 through the bolts 15, the convenient installation between a well mouth area structure and a pipeline can be facilitated, and the connection strength of a seam area can be kept.
The outer wall welding of 6 tops of inspection pipeline has pipeline go-between 8, both ends are equipped with bolt 15 about pipeline go-between 8, pipeline go-between 8 passes through bolt 15 and connects down connecting pipe 4, can make things convenient for the convenient installation between 6 regional structures of inspection pipeline and the inspection shaft pipeline, also can keep the regional joint strength of seam crossing.
5 inner wall left end of well cover mask is equipped with hinge 19, 5 inner walls of well cover mask pass through hinge 19 and connect well lid 18, well lid 18 is connected connecting pipe 1 by 5 inner wall gomphosis of well cover mask, makes things convenient for operating personnel to descend the inspection perpendicularly when opening, can keep the regional seal in inspection shaft top during the closure.
The working principle is as follows: when the inspection well is installed, the multi-section area structure of the inspection well can be moved to the top of an inspection pipeline 6 to be connected, the inspection pipeline 6 can be welded with a pipeline connecting ring 8, the bottom of a lower connecting pipe 4 can be connected through the pipeline connecting ring 8 and a bolt 15, the top of the lower connecting pipe 4 can be placed in an embedded mode through a convex ring 17 and an embedded annular groove 16 arranged on a second well pipe 3, the top of the second well pipe 3 can be placed in an embedded mode through the convex ring 17 and an embedded annular groove 16 arranged on a first well pipe 2, the top of the first well pipe 2 can be placed in an embedded mode through the convex ring 17 and an embedded annular groove 16 arranged on an upper connecting pipe 1, the bottom of a well mask 5 can be connected with the upper connecting pipe 1 through the pipeline connecting ring 8 and the bolt 15 in a matched mode, between the first well pipe 2, the second well pipe 3 and the lower connecting pipe 4, the top block 14 can be connected through a connecting bottom block 13 in an attached mode, then the bolt 15 can be driven in a plurality of transverse anti-falling reinforcing points after installation, support bar 9 and prevent sinking bottom plate 10 can strengthen the area of contact of bottom region structure and below ground composition, through increase bottom area of contact, can strengthen and prevent subsiding the ability, through all being equipped with bracing piece 11 with prevent sinking the piece 12 can strengthen the inspection shaft pipeline when placing with the deep contact point of ground composition with the regional outer wall of inspection shaft, through increasing peripheral deep contact point, can play self structure and act as the effect of horizontal ground support dynamics, the well lid 18 that is equipped with through hinge 19 in well cover 5 can make things convenient for operating personnel to descend the inspection perpendicularly when opening, can keep the regional seal in inspection shaft top during the closure.
The utility model discloses a: the device comprises an upper connecting pipe-1, a first well pipe-2, a second well pipe-3, a lower connecting pipe-4, a well mask-5, an inspection pipeline-6, a well mouth connecting ring-7, a pipeline connecting ring-8, a supporting bar-9, an anti-settling bottom plate-10, a supporting bar-11, an anti-settling block-12, a connecting bottom block-13, a connecting top block-14, a bolt-15, an embedded ring groove-16, a convex ring-17, a well cover-18 and a hinge-19, wherein the components are all universal standard components or components known by technical personnel in the field, the structure and the principle of the components can be known by technical manuals or conventional experimental methods, and the device solves the problem that the traditional plastic inspection well has the problem that due to different address foundation components, part of the plastic inspection well can be pressed and driven by components below the ground surface to generate integral structure settling after being used for a long time, 2. traditional plastics inspection shaft exists because the reason that the plastics inspection shaft subsides and relates is more complicated, and the range of subsiding is also great relatively, so overall structure before subsiding, can take place well way regional partial structure problem that breaks off in advance, the utility model discloses a combination mutually of above-mentioned part has alleviated and has been taken place the problem that overall structure subsided by the following composition drive of earth's surface after long-time the use, has alleviated well way regional partial structure and has broken the problem that drops in advance before subsiding.
The basic principles and the main features of the invention and the advantages of the invention have been shown and described above, it will be evident to those skilled in the art that the invention is not limited to the details of the foregoing illustrative embodiments, but that the invention may be embodied in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.
Furthermore, it should be understood that although the present description refers to embodiments, not every embodiment may contain only a single embodiment, and such description is for clarity only, and those skilled in the art should integrate the description, and the embodiments may be combined as appropriate to form other embodiments understood by those skilled in the art.

Claims (6)

1. An anti-settling plastic inspection well is characterized in that: including last connecting pipe (1), lower connecting pipe (4), first well casing (2) and second well casing (3), it is equipped with well cover (5) to go up connecting pipe (1) top, connecting pipe (4) bottom down and being equipped with inspection pipeline (6), it is equipped with gomphosis annular (16) to go up connecting pipe (1) bottom inner wall, first well casing (2) top is equipped with bulge loop (17), it connects bulge loop (17) through gomphosis annular (16) to go up connecting pipe (1), first well casing (2) bottom inner wall is equipped with gomphosis annular (16), second well casing (3) top is equipped with bulge loop (17), first well casing (2) are connected bulge loop (17) through gomphosis annular (16) gomphosis, second well casing (3) bottom inner wall is equipped with gomphosis annular (16), connecting pipe (4) top is equipped with bulge loop (17) down, second well casing (3) are connected bulge loop (17) through gomphosis annular (16), go up the equal fixedly connected with bracing piece (11) in outer wall both ends of even pipe (1), lower even pipe (4), first well casing (2) and second well casing (3), piece (12) are prevented sinking by bracing piece (11) top fixedly connected with, inspection pipeline (6) bottom fixedly connected with support bar (9) in proper order, support bar (9) bottom fixedly connected with prevents sinking bottom plate (10).
2. The anti-settling plastic manhole as claimed in claim 1, wherein: go up even being equipped with of even pipe (1) bottom outer wall a week and connecting bottom piece (13), first well casing (2) bottom outer wall a week evenly is equipped with and connects bottom piece (13), second well casing (3) bottom outer wall a week evenly is equipped with and connects bottom piece (13).
3. The anti-settling plastic manhole as claimed in claim 1, wherein: first well casing (2) top outer wall a week evenly is equipped with connects kicking block (14), second well casing (3) top outer wall a week evenly is equipped with connects kicking block (14), even pipe (4) top outer wall a week evenly is equipped with connects kicking block (14) down, it is equipped with bolt (15) to connect kicking block (14), connect kicking block (14) through bolt (15) threaded connection kicking block (14).
4. The anti-settling plastic manhole as claimed in claim 1, wherein: the well mouth cover (5) bottom outer wall welding has well mouth go-between (7), both ends are equipped with bolt (15) about well mouth go-between (7), well mouth go-between (7) are through bolt (15) connect upper connecting pipe (1).
5. The anti-settling plastic manhole as claimed in claim 1, wherein: the inspection pipeline (6) is characterized in that a pipeline connecting ring (8) is welded on the outer wall of the top of the inspection pipeline (6), bolts (15) are arranged at the left end and the right end of the pipeline connecting ring (8), and the pipeline connecting ring (8) is connected with a lower connecting pipe (4) through the bolts (15).
6. The anti-settling plastic manhole as claimed in claim 1, wherein: well cover (5) inner wall left end is equipped with hinge (19), well cover (18) are connected through hinge (19) to well cover (5) inner wall, well cover (18) are connected connecting pipe (1) by well cover (5) inner wall gomphosis.
CN202022805480.2U 2020-11-30 2020-11-30 Anti-sedimentation plastic inspection well Active CN214116907U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022805480.2U CN214116907U (en) 2020-11-30 2020-11-30 Anti-sedimentation plastic inspection well

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022805480.2U CN214116907U (en) 2020-11-30 2020-11-30 Anti-sedimentation plastic inspection well

Publications (1)

Publication Number Publication Date
CN214116907U true CN214116907U (en) 2021-09-03

Family

ID=77507646

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022805480.2U Active CN214116907U (en) 2020-11-30 2020-11-30 Anti-sedimentation plastic inspection well

Country Status (1)

Country Link
CN (1) CN214116907U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115218112A (en) * 2022-07-07 2022-10-21 西安热工研究院有限公司 Vertical shaft of gravity compressed air energy storage system for unconsolidated formation and energy storage system

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115218112A (en) * 2022-07-07 2022-10-21 西安热工研究院有限公司 Vertical shaft of gravity compressed air energy storage system for unconsolidated formation and energy storage system
CN115218112B (en) * 2022-07-07 2024-06-11 西安热工研究院有限公司 Vertical shaft of gravity compressed air energy storage system for unconsolidated formation and energy storage system

Similar Documents

Publication Publication Date Title
CN101684650B (en) Cast-in-place concrete thin-walled tooth-shaped tubular pile with large diameter, pile forming device and method for forming pile
CN214116907U (en) Anti-sedimentation plastic inspection well
CN103726497A (en) Pipe-jacking working well mouth reinforcing device
CN205207907U (en) Novel pipeline bracket of tape base plinth
CN201254727Y (en) Bridge stake underwater maintenance and construction cofferdam
CN110863953A (en) Annular steel pipe concrete combined wind turbine generator tower structure
CN105971899B (en) A kind of seawater lift system with skirt component
CN206721868U (en) A kind of drain bar piling machine stake mouth
CN214366192U (en) Mine tunnel roof infiltration drainage device
CN108999428A (en) A kind of method for dismounting of submerged tunnel steel closure door
CN212983931U (en) Assembled reinforced concrete barricade
CN108867757A (en) A kind of prefabricated armored concrete water intaking header structure and its construction method
CN210217354U (en) Building engineering is with stabilizing effectual guardrail
CN210855111U (en) Buried fire hydrant
CN215327632U (en) Load-bearing glass fiber reinforced plastic septic tank
CN210151705U (en) Reinforcing pile for soft soil foundation
CN109610627A (en) A kind of whole stainless steel base of integrated prefabricated pumping plant
CN104404981A (en) Sea bottom construction walkway and cofferdam in seaside rising/falling tide zone
CN212104146U (en) A intercommunication device for water balance inside and outside cofferdam
CN218894478U (en) Large-scale pole setting is with installation fixed knot constructs
CN205445090U (en) High strength wind resistance electric power iron tower
CN220888568U (en) Hydraulic tunnel reinforced by steel lining
CN212772397U (en) Small-size foundation ditch rapid construction structure
CN218373396U (en) Bridge pier stud is with reinforcing apparatus and pier protective structure who forms
CN218292840U (en) Bottom opening connecting grouting guide pipe of caterpillar track type transport vehicle welding funnel

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant