CN214091698U - Hard slope anchor rod drilling operation platform - Google Patents

Hard slope anchor rod drilling operation platform Download PDF

Info

Publication number
CN214091698U
CN214091698U CN202023030720.2U CN202023030720U CN214091698U CN 214091698 U CN214091698 U CN 214091698U CN 202023030720 U CN202023030720 U CN 202023030720U CN 214091698 U CN214091698 U CN 214091698U
Authority
CN
China
Prior art keywords
vertical pipes
frame
drilling machine
slope
drilling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202023030720.2U
Other languages
Chinese (zh)
Inventor
张如涛
赵永锋
郝振华
马雷
张晓伟
高鹏辉
郭二刚
王鹏刚
刘培强
孟明华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway No 3 Engineering Group Co Ltd
Third Engineering Co Ltd of China Railway No 3 Engineering Group Co Ltd
Original Assignee
China Railway No 3 Engineering Group Co Ltd
Third Engineering Co Ltd of China Railway No 3 Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway No 3 Engineering Group Co Ltd, Third Engineering Co Ltd of China Railway No 3 Engineering Group Co Ltd filed Critical China Railway No 3 Engineering Group Co Ltd
Priority to CN202023030720.2U priority Critical patent/CN214091698U/en
Application granted granted Critical
Publication of CN214091698U publication Critical patent/CN214091698U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Earth Drilling (AREA)

Abstract

The utility model belongs to the technical field of roadbed slope auxiliary anchor rod drilling, in particular to a hard slope anchor rod drilling operation platform; the device comprises a winch arranged at the top of a side slope and a drilling machine carrying trolley arranged on the slope surface of the side slope, wherein the front part of the drilling machine carrying trolley is connected with the winch; the drilling machine carrying trolley comprises a square frame, wheels are arranged on the frame, a front shaft of the frame is connected with two first vertical pipes through universal fasteners, a rear shaft of the frame is connected with two second vertical pipes through universal fasteners, a tripod body is formed by the first vertical pipes, the second vertical pipes and the frame, first cross rods are distributed on the first vertical pipes, and supporting plates are arranged on the first cross rods in a lap joint mode to form a drilling machine mounting surface. The utility model has the characteristics of easy operation, labour saving and time saving, work efficiency are high, and the preparation is convenient, use cost is low.

Description

Hard slope anchor rod drilling operation platform
Technical Field
The utility model belongs to the technical field of the drilling of the affiliated stock of road bed side slope, concretely relates to stereoplasm side slope stock drilling operation platform.
Background
When the slope stock was under construction, the efficiency of stock drilling is directly restricting the construction progress of grout, and the drilling efficiency of stock depends on operation platform and sets up whether reasonable: 1) whether the drilling requirements of different positions of the same side slope can be met or not; 2) whether the operation platform moves conveniently between different slopes or not; 3) whether the operation platform is disassembled and assembled quickly or not.
In the conventional hard slope anchor rod drilling construction, the operation platform is erected by adopting a scaffold and a fastener to be assembled and installed, and a bamboo plywood manufacturing worker standing platform is placed at a proper height. And a platform is arranged at the position of each row of the whole slope surface needing drilling. Because every time a row of drilling holes are finished, the scaffold needs to be disassembled once, and a lot of time is wasted virtually. Meanwhile, in the repeated installation of the scaffold, the safety and the reliability of each erection are difficult to guarantee, and the construction risk is increased. In conclusion, in the traditional hard slope anchor rod drilling construction, the traditional operation platform is long in building time consumption, the number of used scaffolds is large, and the safety risk is high when the scaffold is unstable. Time and material are wasted. When the drilling machine is adopted, the operation is simple for workers, one operation platform can be repeatedly used, and the drilling machine is economical and practical and has high drilling efficiency.
Chinese utility model patent No. 201620806032.5 discloses a side slope stock frame beam drilling auxiliary device. Need in this patent in advance to spread the walking track on the side slope, increased work load and construction cost, drilling machine angle adjustment mechanism is the hierarchical formula, and accommodation area is little, poor with side slope adaptability, and does not design workman's platform of standing on the drilling machine transport dolly, and when the slope is great, the inconvenient operation of standing of workman.
SUMMERY OF THE UTILITY MODEL
The utility model discloses a construction platform builds when solving traditional side slope stock drilling and wastes time and energy, and construction cost is high, the progress is slow, and the technical problem that the drilling straightness that hangs down is difficult to guarantee provides a stereoplasm side slope stock drilling operation platform.
The utility model adopts the following technical scheme: a hard side slope anchor rod drilling operation platform comprises a winch arranged at the top of a side slope and a drilling machine carrying trolley arranged on the slope surface of the side slope, wherein the front part of the drilling machine carrying trolley is connected with the winch; the drilling machine carrying trolley comprises a square frame overlapped by steel pipes, wheels are arranged on the frame, a front shaft of the frame is connected with two first vertical pipes through universal fasteners, a rear shaft of the frame is connected with two second vertical pipes through universal fasteners, the first vertical pipes and the second vertical pipes are connected in a cross mode through universal fasteners, the first vertical pipes, the tripod body is formed by the second vertical pipe and the frame, the first cross rods are arranged between the first vertical pipes along the pipe length direction, the support plates are arranged on the plane formed by the first cross rods to form a drilling machine installation surface, the longitudinal beam of the frame is connected with the second cross rods through universal fasteners, the second vertical pipe is connected with the third cross rods through the universal fasteners, one side of each third cross rod extends out of the second vertical pipe, sleeves are inserted into the lengths of the third cross rods extending out of the second vertical pipe, pedals are connected onto the sleeves, the other sides of the pedals are arranged on the second cross rods in an overlapping mode, and the pedals are located in wheel intervals of the frame.
Furthermore, a horizontal pipe is connected between the second vertical pipes, and the horizontal pipe is connected with the first vertical pipe through a universal fastener.
Furthermore, rotatable connecting rods are inserted into the front shaft and the rear shaft of the frame, and two ends of each connecting rod are fixedly connected with wheels.
Furthermore, a sleeve fixed in the circumferential direction is arranged on the connecting rod, stop rods are distributed on the sleeve around the axis of the sleeve, a lock body is fixed on the front shaft and the rear shaft, a lock tongue is rotatably connected to the lock body, the lock tongue extends into a gap between the stop rods, a torsion spring is arranged between the lock tongue and the lock body, a stop block is arranged in the spring-out direction of the lock tongue on the lock body, and a pull wire is connected to the lock tongue.
Compared with the prior art, the utility model has the advantages that:
the utility model provides a stereoplasm side slope stock drilling operation platform, after the installation of rig carrying trolley, can use always, need not dismantle many times, install, and rig carrying trolley installation form is triangle-shaped, has stability, and factor of safety is high;
the drilling machine carrying trolley is provided with four wheels, can run on a slope surface with any gradient by matching with a winch, and can meet the drilling requirements at different heights; meanwhile, when the drilling machine is used in a transition place, the wheels also reduce the difficulty of transferring the drilling machine carrying trolley. The time is saved and the construction efficiency is improved;
due to the simplicity of the operating platform, the requirement on the number of construction personnel in anchor rod drilling construction is reduced, 2 personnel are matched to complete all drilling procedures, the construction cost is reduced, and the economic benefit is improved;
the drilling machine carrying trolley is provided with an automatic locking structure, so that the drilling machine carrying trolley can be prevented from sliding down a slope when climbing, and the use safety is further improved.
Drawings
Fig. 1 is a schematic structural diagram of the present invention.
Fig. 2 is a schematic structural view of a carrying trolley of the drilling machine.
Fig. 3 is a schematic structural view of a frame part.
Fig. 4 is a right side view of fig. 2.
Fig. 5 is a schematic structural view of the sleeve and the stop lever.
In the figure: 1-side slope; 2-a winch; 3-a drilling machine; 4-front axle; 5-rear axle; 6-longitudinal beam; 7-a first riser; 8-a second riser; 9-horizontal pipe; 10-a first cross-bar; 11-a support plate; 12-a second cross bar; 13-a third cross bar; 14-a foot pedal; 15-a cannula; 16-hanging hooks; 17-a connecting rod; 18-a lock body; 19-a stopper; 20-a bolt; 21-a stop lever; 22-a sleeve; 23-guide rod.
Detailed Description
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly described below, it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to these drawings without creative efforts.
As shown in fig. 1; the hard side slope anchor rod drilling operation platform comprises a winch 2 arranged at the top of a side slope 1 and a drilling machine carrying trolley arranged on the slope surface of the side slope 1, wherein the front part of the drilling machine carrying trolley is connected with the winch 2. And the winch 2 pulls the drilling machine carrying trolley to move upwards along the slope surface, and the drilling machine is started after the drilling machine reaches the drilling position.
Different from the drilling machine carrying trolley in the background art, the drilling machine carrying trolley in the embodiment does not need to build a walking track, and large-size wheels, namely the wheels of the common trolley in a construction site, can easily walk on an uneven slope surface. As shown in fig. 2, 3, 4;
the drilling machine carrying trolley comprises a square frame overlapped by steel pipes, wheels are arranged on the frame, a rotatable connecting rod 17 is inserted into a front shaft and a rear shaft of the frame, two ends of the connecting rod 17 are fixedly connected with the wheels, and the left wheel and the right wheel which are coaxial rotate synchronously.
The front axle 4 of frame is connected with two first risers 7 through universal fastener, and the rear axle 5 of frame is connected with two second risers 8 through universal fastener, is connected with horizontal pipe 9 between the second riser 8, is connected through universal fastener between horizontal pipe 9 and the first riser 7, and the tripod automobile body is constituteed to first riser 7, second riser 8 and frame. Namely, the loosening horizontal pipe 9 and the first vertical pipe 7 slide on the pipe body of the first vertical pipe 7 through a universal fastener, and then the included angle between the first vertical pipe 7 and the slope surface is adjusted. The universal fasteners are adopted at the connecting nodes among the first vertical pipe 7, the second vertical pipe 8, the front shaft 4 and the rear shaft 5, and the overall stability is improved by adopting a tripod vehicle body.
First cross rods 10 are arranged between the first vertical pipes 7 along the pipe length direction, a support plate 11 is arranged on the plane formed by the first cross rods 10 to form a drilling machine installation surface, and the drilling machine 3 is fixed on the support plate 11. A second cross rod 12 is connected to a longitudinal beam 6 of the frame through a universal fastener, a third cross rod 13 is connected between the second vertical pipes 8 through the universal fastener, one side of the third cross rod 13 extends out of the second vertical pipe 8, a sleeve 15 is inserted into the length of the third cross rod 13 extending out of the second vertical pipe 8, a pedal plate 14 is connected to the sleeve 15, the other side of the pedal plate 14 is arranged on the second cross rod 12 in a lapping mode, and the pedal plate 14 is located in the wheel interval of the frame. And after the slope of the slope body 1 is changed, the inclination angle of the first vertical pipe 7 is adjusted, then the universal fasteners among the second vertical pipe 8, the third cross rod 13, the longitudinal beam 6 and the second cross rod 12 are loosened, and the position of the pedal 14 is adjusted to be horizontal, so that the operator can stand conveniently.
When the drilling machine carrying trolley is used for climbing and drilling, the drilling machine carrying trolley is used for further preventing the trolley from sliding and safely operating. The connecting rod 17 is provided with a sleeve 22 fixed in the circumferential direction, the sleeve 22 is distributed with stop levers 21 around the axis thereof, the front and rear shafts are fixed with a lock body 18, the lock body 18 is rotatably connected with a lock tongue 20, the lock tongue 20 extends into the gap between the stop levers 21, a torsion spring is arranged between the lock tongue 20 and the lock body 18, the lock body 18 is provided with a stop block 19 in the ejecting direction of the lock tongue 20, and the lock tongue 20 is connected with a pull wire. When the connecting rod 17 rotates, the stop lever 21 toggles the bolt 20, the bolt 20 rebounds due to the torsion spring, the bolt 20 gradually enters the neutral position of the next connecting rod 17, when the connecting rod 17 rotates reversely, the connecting rod 17 toggles the bolt 20 reversely, the rotation of the bolt 20 is stopped by the stop block 19, namely, the rotation of the connecting rod 17 is limited, so that the wheels of the carrying trolley of the drilling machine can rotate when climbing a slope and can be locked when reversing. When the drilling machine carries the trolley to go downhill, the pulling wire is pulled to force the bolt 20 to overcome the elasticity of the torsion spring to retract, namely the braking on the wheels is lost. The front shaft 4 is provided with a guide rod 23 extending forwards for reversing the stay wire. The second vertical pipe 8 is welded with a hook 16, the stay wire is connected with a pull ring, and the pull ring is hung on the hook 16 when the drilling machine carrying trolley normally climbs.
The utility model provides a during side slope stock drilling, the workman moves when the lower hole because of having bored a hole, and work efficiency is low takes a lot of work hard, the hang down straightness precision of pore-forming is not high, the hole site hangs down the straightness and guarantees not have the scheduling problem. Therefore, compared with the prior art, the utility model has the characteristics of easy operation, labour saving and time saving, work efficiency are high, the pore-forming precision is high.
The previous description of the disclosed embodiments is provided to enable any person skilled in the art to make or use the present invention. Various modifications to these embodiments will be readily apparent to those skilled in the art, and the generic principles defined herein may be applied to other embodiments without departing from the spirit or scope of the invention. Thus, the present invention is not intended to be limited to the embodiments shown herein but is to be accorded the widest scope consistent with the principles and novel features disclosed herein.

Claims (4)

1. A hard side slope anchor rod drilling operation platform comprises a winch (2) arranged at the top of a side slope (1), and a drilling machine carrying trolley arranged on the slope surface of the side slope (1), wherein the front part of the drilling machine carrying trolley is connected with the winch (2); the method is characterized in that: the drilling machine carrying trolley comprises a square frame overlapped by steel pipes, wheels are arranged on the frame, a front shaft (4) of the frame is connected with two first vertical pipes (7) through universal fasteners, a rear shaft (5) of the frame is connected with two second vertical pipes (8) through universal fasteners, the first vertical pipes (7) and the second vertical pipes (8) are in cross connection through universal fasteners, the first vertical pipes (7), the second vertical pipes (8) and the frame form a tripod body, first cross rods (10) are arranged between the first vertical pipes (7) along the pipe length direction, a support plate (11) is arranged on a plane formed by the first cross rods (10) to form a drilling machine mounting surface, a second cross rod (12) is connected onto a longitudinal beam (6) of the frame through universal fasteners, a third cross rod (13) is connected between the second vertical pipes (8) through universal fasteners, one side of the third cross rod (13) extends out of the second vertical pipes (8), sleeves (15) are inserted into the lengths of the third cross rods (13) extending out of the second vertical pipes (8), foot pedals (14) are connected to the sleeves (15), the other sides of the foot pedals (14) are placed on the second cross rods (12), and the foot pedals (14) are located in the wheel spacing of the frame.
2. The hard slope anchor drilling operation platform of claim 1, wherein: and a horizontal pipe (9) is connected between the second vertical pipes (8), and the horizontal pipe (9) is connected with the first vertical pipe (7) through a universal fastener.
3. The hard slope anchor drilling operation platform of claim 2, wherein: rotatable connecting rods (17) are inserted into the front shaft and the rear shaft of the frame in a penetrating manner, and two ends of each connecting rod (17) are fixedly connected with wheels.
4. A hard side slope anchor drilling operation platform according to claim 3, wherein: the lock is characterized in that a sleeve (22) fixed in the circumferential direction is arranged on the connecting rod (17), stop rods (21) are distributed on the sleeve (22) around the axis of the sleeve, lock bodies (18) are fixed on the front shaft and the rear shaft, lock tongues (20) are connected on the lock bodies (18) in a rotating mode, the lock tongues (20) stretch into gaps between the stop rods (21), torsion springs are arranged between the lock tongues (20) and the lock bodies (18), stop blocks (19) are arranged on the lock bodies (18) in the spring-out direction of the lock tongues (20), and pull wires are connected on the lock tongues (20).
CN202023030720.2U 2020-12-16 2020-12-16 Hard slope anchor rod drilling operation platform Active CN214091698U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202023030720.2U CN214091698U (en) 2020-12-16 2020-12-16 Hard slope anchor rod drilling operation platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202023030720.2U CN214091698U (en) 2020-12-16 2020-12-16 Hard slope anchor rod drilling operation platform

Publications (1)

Publication Number Publication Date
CN214091698U true CN214091698U (en) 2021-08-31

Family

ID=77428236

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202023030720.2U Active CN214091698U (en) 2020-12-16 2020-12-16 Hard slope anchor rod drilling operation platform

Country Status (1)

Country Link
CN (1) CN214091698U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113585965A (en) * 2021-07-29 2021-11-02 中铁一局集团(广州)建设工程有限公司 Roadbed high slope anchor rod frame beam moving drilling platform
CN114777594A (en) * 2022-05-26 2022-07-22 临沂会宝岭铁矿有限公司 Portable mine is with blasting charging means
CN115821951A (en) * 2022-12-10 2023-03-21 中国建筑第四工程局有限公司 Portable operation platform of side slope stock construction
CN116122741A (en) * 2023-04-18 2023-05-16 射阳县高新科技创业园有限公司 Civil engineering building foundation pile construction equipment

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113585965A (en) * 2021-07-29 2021-11-02 中铁一局集团(广州)建设工程有限公司 Roadbed high slope anchor rod frame beam moving drilling platform
CN113585965B (en) * 2021-07-29 2023-03-14 中铁一局集团(广州)建设工程有限公司 Roadbed high slope anchor rod frame beam movable drilling platform
CN114777594A (en) * 2022-05-26 2022-07-22 临沂会宝岭铁矿有限公司 Portable mine is with blasting charging means
CN114777594B (en) * 2022-05-26 2023-08-18 临沂会宝岭铁矿有限公司 Mobile mine blasting charging device
CN115821951A (en) * 2022-12-10 2023-03-21 中国建筑第四工程局有限公司 Portable operation platform of side slope stock construction
CN116122741A (en) * 2023-04-18 2023-05-16 射阳县高新科技创业园有限公司 Civil engineering building foundation pile construction equipment

Similar Documents

Publication Publication Date Title
CN214091698U (en) Hard slope anchor rod drilling operation platform
CN104831911A (en) Plastering machine provided with folding stand rails
CN104533460B (en) Support replacement formula formwork jumbo and the construction method of underpass concreting
CN105673048B (en) A kind of self-propelled hydraulic box culvert chassis
CN212079327U (en) Hydraulic pressure regulation formula side wall template platform truck
CN106869947B (en) Preliminary bracing stand operates trolley after a kind of tunnel tunnel face excavates
CN111140169B (en) Method for assembling small-sized drilling equipment for climbing slope
CN110043023A (en) A kind of bidirectional hydraulic for unilateral formwork frame body is from servo support device
CN101943004B (en) Hydraulic self-running inclined-hole ordinary-state concrete casting trolley
CN113152166B (en) Straddle type monorail track beam sliding erection tool
CN213173364U (en) Municipal bridge building support frame
CN206655698U (en) Preliminary bracing stand operation chassis after a kind of tunnel tunnel face excavates
CN211819422U (en) Lifting walking template trolley suitable for construction of curve tunnel
CN204552039U (en) A kind of dismountable moving scaffolding platform
CN204780925U (en) City gate hole type inclined shaft slipform platform truck pulls removal structure
CN218621893U (en) Trackless triangular hanging basket
CN202023151U (en) Movable exterior projecting operation platform
CN104675094A (en) Detachable type movable scaffold platform
CN212670341U (en) Steel-concrete composite beam intersegment prefabricated bridge deck installation device
CN104948206B (en) Slip form trolley for concrete casting of arched inclined shaft
CN115613478A (en) Continuous beam cantilever casting method
CN201802410U (en) Hydraulic self-traveling normal concrete casting trolley for an inclined tunnel
CN206987847U (en) Splash guard lays chassis automatically
CN218150714U (en) Fast moving type climbing vehicle
CN210712936U (en) Die carrier sliding trolley

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant