CN206987847U - Splash guard lays chassis automatically - Google Patents
Splash guard lays chassis automatically Download PDFInfo
- Publication number
- CN206987847U CN206987847U CN201720951033.3U CN201720951033U CN206987847U CN 206987847 U CN206987847 U CN 206987847U CN 201720951033 U CN201720951033 U CN 201720951033U CN 206987847 U CN206987847 U CN 206987847U
- Authority
- CN
- China
- Prior art keywords
- door frame
- steel wire
- arc track
- splash guard
- wire rope
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
The utility model discloses a kind of splash guard to lay chassis automatically, including:Door frame;Walking mechanism;Two arc tracks, it is arranged on the top of door frame;Subarch frame, it is between two arc tracks;Two hoist engines, it is arranged on the top of door frame;More support bars, it is arranged between door frame and arc track;Multiple hydraulic cylinders, it is arranged between door frame and subarch frame;Two gliders, it is separately positioned on two arc tracks, and first through hole is provided with glider;Axis, it passes through two first through hole;Multiple fixtures, it is arranged on axis;Two first steel wire ropes, one end of the first steel wire rope are connected with a glider, and the other end is wrapped on a hoist engine;Two second steel wire ropes, one end of the second steel wire rope are connected with another glider, and the other end is wrapped on another hoist engine.The utility model substantially increases the laying efficiency of splash guard, has saved cost by setting up arc track, trailer system and jacking system.
Description
Technical field
It the utility model is related to tunnel-liner equipment technical field.More specifically, it the utility model is related to a kind of waterproof
Plate lays chassis automatically.
Background technology
, it is necessary to lay non-woven fabrics and splash guard at twice on the section in tunnel during constructing tunnel, to prevent rock
Layer in water into tunnel seepage.
In China's constructing tunnel, the splash guard laying of lining cutting is all to take artificial laying welding, and less efficient, work is strong
Degree is big, and personnel are that security incident easily occurs for work high above the ground.Splash guard laying efficiency how is improved, ensures safe matter
Amount, it is the important topic that current tunnel-liner splash guard construction faces.
Utility model content
The purpose of this utility model is to provide a kind of splash guard and lays chassis automatically, by increasing curved track on chassis
Road, trailer system and hydraulic lifting system, the laying efficiency of splash guard is substantially increased, has saved cost.
In order to realize according to these purposes of the present utility model and further advantage, there is provided a kind of splash guard lays platform automatically
Car, including:
Door frame;
Walking mechanism, it is arranged on the bottom of the door frame;
Two arc tracks, it is disposed on the top of the door frame, the radian and tunnel initial-stage of the arc track
Supporting profile is parallel;
Subarch frame, it is arranged on the top of the door frame, and between two arc tracks, the radian of the subarch frame
Parallel with Tunnel profile, the height of the lowest part of the subarch frame is higher than the height of the lowest part of the arc track
Degree;
Two hoist engines, it is disposed on the center at the top of the door frame;
More support bars, it is arranged between the door frame and the arc track, one end of every support bar with it is described
Door frame is fixedly connected, and the other end is connected with the arc track;
Multiple hydraulic cylinders, it is arranged between the door frame and the subarch frame, the both ends of each hydraulic cylinder respectively with institute
State door frame and the subarch frame is hinged;
Two gliders, it is separately positioned on two arc tracks, and the glider is slided with the arc track
It is dynamic to connect, it is provided with a first through hole on each glider;
Axis, it is horizontally disposed, and passes through two first through hole;
Multiple fixtures, it is removably disposed on the axis;
Two first steel wire ropes, corresponding first steel wire rope of glider, one end of the first steel wire rope and right with it
The glider connection answered, the other end extend to an angle of arc track along arc track, then along the door with its same side
Frame is wound wherein after upwardly extending on a hoist engine;
Two second steel wire ropes, corresponding second steel wire rope of glider, one end of the second steel wire rope and right with it
The glider connection answered, the other end extend to another angle of arc track along arc track, then along with its same side
Door frame is wrapped in after upwardly extending on another hoist engine, the second steel wire rope on another hoist engine around to first
Steel wire rope on a hoist engine around to difference.
Preferably, described splash guard is laid in chassis automatically, in addition to:
Splash guard stringer, it is arranged on the side of subarch frame, and splash guard stringer includes:
Two pieces of connecting plates, it is parallel to each other, and is arranged on the lower section of the subarch frame, and one end of every piece of connecting plate is and institute
State door frame to be fixedly connected, the other end is through the lower section of the subarch frame and equal away from the subarch frame, the top of every piece of connecting plate
First fixed block is provided with, second through hole is provided with every piece of first fixed block;
Supporting plate, it is arranged between the other end of two pieces of connecting plates, and is integrally formed with two pieces of connecting plates;
More supporting legs, it is disposed on the lower section of two pieces of connecting plates, and supporting leg is hinged with connecting plate, and selects
Contacted with ground to property;
Boom, it passes through two the second through holes, and parallel with the supporting plate and the axis.
Preferably, described splash guard is laid in chassis automatically, and the supporting plate is the circular arc of inner hollow.
Preferably, described splash guard is laid in chassis automatically, in addition to:
More connecting rods, one end of every connecting rod are fixedly connected with connecting plate, the other end and with its same side, and be located at
The support bar connection of bottom.
Preferably, described splash guard is laid in chassis automatically, and the arc track is made up of I-steel bending;
The glider includes:
First plate body, its head clearance are provided with two otic placodes and second fixed block, and the second fixed block is located at two
Between otic placode, and two otic placodes and the second fixed block are arranged along arc track, and it is logical that described first is provided with the second fixed block
Hole;
Two piece of second plate body, it is parallel to each other, and is arranged at intervals, and two piece of second plate body hangs down with first plate body respectively
Directly, and with the bottom of the first plate body it is fixedly connected, a roller is respectively arranged with two piece of second plate body, two rollers distinguishes position
In the inner side of two piece of second plate body, and in the groove of arc track;
Wherein, the concrete mode that one end of the first steel wire rope and one end of the second steel wire rope are connected with glider respectively is:
One end of first steel wire rope and one end of the second steel wire rope are connected with two otic placodes respectively.
Preferably, described splash guard is laid in chassis automatically, and interval is set on the door frame and the arc track
Multiple directive wheels are equipped with, first steel wire rope and second steel wire rope are arranged on the multiple directive wheel, the arc
Directive wheel on track is arranged to:When the glider is sliding on arc track, the directive wheel on arc track can pass through
The region that the arc track, the first plate body and two the second plate bodys surround.
Preferably, described splash guard is laid in chassis automatically, and the number of the hydraulic cylinder is eight, wherein four liquid
Cylinder pressure is arranged at four angles at the top of door frame, and withstands the subarch frame upwards, and four additional hydraulic cylinder is arranged on door frame
Both sides, and be inclined upwardly.
Preferably, described splash guard is laid in chassis automatically, and the boom is by first body of rod and multigroup lug boss
Composition, first body of rod are cylindrical, and multigroup projection is arranged at intervals with along its axis direction on first body of rod
Portion, every group of lug boss are made up of multiple lug bosses, and circumferencial direction of the multiple lug boss along the boom is arranged at intervals, institute
Lug boss is stated as sector, the internal diameter of the lug boss is equal with the external diameter of first body of rod, the inwall of the lug boss and institute
The outer wall for stating first body of rod is fixedly connected.
The utility model comprises at least following beneficial effect:
1st, chassis running gear (mechanism) is automatically walk system, and chassis positioning is fast, auxiliary without any plant equipment
Help, improve production efficiency.
2nd, glider, splash guard stringer and fixture are supported the use so that laying is evenly, overall more straight, protects
The laying quality of splash guard is demonstrate,proved.
3rd, using two hoist engines from the system that rises, laying cyclization only needs 8min for splash guard lifting laying, and two people, which coordinate, is
It can complete, operating efficiency improves 2.5 times, and labour's input reduces 50%, greatlys save cost input.
4th, subarch frame is jacked by hydraulic cylinder, splash guard one-time laying cyclization can be realized, reduce operational procedure.
5th, trolley structure is using lower longeron, end door frame, middle door frame, column, crossbeam, brace, operating platform, link etc.
Composition, part are connected using connecting plate, can be with Reusability, generally triangle fixed structure, it is ensured that construction safety.
Further advantage, target and feature of the present utility model embody part by following explanation, and part will also pass through
Research of the present utility model and practice are understood by the person skilled in the art.
Brief description of the drawings
Fig. 1 is the structural representation that splash guard described in the utility model lays chassis automatically;
Fig. 2 is the dimensional structure diagram of glider described in the utility model;
Fig. 3 is the side view of glider described in the utility model;
Fig. 4 is the structural representation of roller described in the utility model;
Fig. 5 is two pieces of connecting plates described in the utility model and the structural representation of supporting plate;
Fig. 6 is the structural representation of boom described in the utility model;
Fig. 7 is the structural representation of lug boss described in the utility model.
Embodiment
The utility model is described in further detail below in conjunction with the accompanying drawings, to make those skilled in the art with reference to explanation
Book word can be implemented according to this.
It should be noted that in description of the present utility model, term " transverse direction ", " longitudinal direction ", " on ", " under ", " preceding ",
The orientation or position relationship of the instruction such as " rear ", "left", "right", " vertical ", " level ", " top ", " bottom ", " interior ", " outer " be based on
Orientation shown in the drawings or position relationship, are for only for ease of description the utility model and simplify and describe, and are not instruction or dark
Show that the device of meaning or element there must be specific orientation, with specific azimuth configuration and operation, thus it is it is not intended that right
Limitation of the present utility model.
Chassis is laid automatically as Fig. 1 to Fig. 7 the utility model provides a kind of splash guard, including:
Door frame 100, as shown in figure 1, it has certain width with fore-and-aft direction in left-right direction;
Walking mechanism 110, it is arranged on the bottom of the door frame 100, and walking mechanism 110 is of the prior art any one
Kind structure, it can drive door frame 100 to be moved along track;
Two arc tracks 120, it is disposed on the top of the door frame 100, the radian of the arc track 120 with
Tunnel profile is parallel;Arc track 120 is arranged at intervals along the longitudinal direction.
Subarch frame 130, it is arranged on the top of the door frame 100, and between two arc tracks 120, the pair
The radian of bow member 130 and Tunnel profile are parallel, and the height of the lowest part of the subarch frame 130 is higher than the curved track
The height of the lowest part in road 120, so when glider 170 is located at lowest part (at two angles) of arc track 120, axis
180 without limitation on subarch frame 130 jacking;Arc track 120, subarch frame 130, the left side of door frame 100 and right side mirror image each other.
Two hoist engines 140, it is disposed on the center at the top of the door frame 100, each one of left and right;One elevator
Machine 140 puts two first steel wire ropes 190 simultaneously, and another hoist engine 140 can receive two second steel wire ropes 200 simultaneously, and one
Platform hoist engine 140 receives two first steel wire ropes 190 simultaneously, and another hoist engine 140 can put two second steel wire ropes 200 simultaneously.
More support bars 150, it is disposed between the door frame 100 and the arc track 120, every support bar
150 one end is fixedly connected with the door frame 100, and the other end is connected with the arc track 120, passes through more support bars 150
Make to establish contact between door frame 100 and arc track 120, and arc track 120 is supported with this, when making the movement of door frame 100, drive arc
Shape track 120 moves, and support bar 150 only needs stably support arc track 120 when setting, its specific number
Amount and set location are configured according to being actually needed, such as support bar 150 has eight, four, the top of door frame 100, left side with
Front and rear each one of right side;
Multiple hydraulic cylinders 160, it is arranged between the door frame 100 and the subarch frame 130, each hydraulic cylinder 160
Both ends are be hinged with the door frame 100 and the subarch frame 130 respectively, and subarch frame 130 is supported by multiple hydraulic cylinders 160, and will
Subarch frame 130 is jacked, hydraulic cylinder 160 set when, only need to subarch frame 130 jacking before, jacking during and jacking after,
Subarch frame 130 is in stable state, such as hydraulic cylinder 160 has eight, four, the top of door frame 100, left side and
Front and rear each one of right both sides;
Two gliders 170, it is separately positioned on two arc tracks 120, the glider 170 and the arc
Shape track 120 is slidably connected, and a first through hole 171 is provided with each glider 170;In use, two gliders 170
Relatively, it is and highly identical, so that the axis 180 through first through hole can be horizontal.
Axis 180, it is horizontally disposed, and passes through two first through hole 171;
Multiple fixtures, it is removably disposed on the axis 180, and fixture is that any one of the prior art can incite somebody to action
Cloth is fixed on the element on axle, such as clip;
Two first steel wire ropes 190, corresponding first steel wire rope 190 of a glider 170, the first steel wire rope 190
One end and corresponding glider 170 connect, and the other end extends to an angle of arc track 120 along arc track 120,
Again along the door frame 100 with its same side upwardly extend after wind wherein on a hoist engine 140;For any one first
Steel wire rope 190, for example, as shown in figure 1, glider 170 at left side, one end of the first steel wire rope 190 and a left side for glider 170
Inferior horn connects, and the other end extends to the lower left corner of arc track 120, then the door along left side along the left side of arc track 120
After frame 100 upwardly extends, winding is wherein on (left side) hoist engine 140
Two second steel wire ropes 200, corresponding second steel wire rope 200 of a glider 170, the second steel wire rope 200
One end and corresponding glider 170 connect, and the other end extends to another of arc track 120 along arc track 120
Angle, then along the door frame 100 with its same side upwardly extend after be wrapped on another hoist engine 140, the second steel wire rope 200 exists
On another hoist engine 140 around to the first steel wire rope 190 on a hoist engine 140 around to difference.It is right
In any one second steel wire rope 200, for example, as shown in figure 1, glider 170 at left side, one end of the second steel wire rope 200
It is connected with the upper right corner of glider 170, the other end extends to the lower right corner of arc track 120 along the right side of arc track 120,
After the door frame 100 along right side upwardly extends again, it is wrapped on another (right side) hoist engine 140.
This programme provide splash guard lay chassis automatically, when in use, lay track first, and keep track centre and
Tunnel medium line error is no more than 100mm, and chassis then is moved into Specific construction position.After chassis is in place, waterproof cloth is set up
Good, it is constantly rotated with the stretching of termination, (specific erection method and the stringer used are prior art
Any one of), fixture is removed, the termination of splash guard (geotextiles) is extracted out, termination is wound into several circles on axis 180, it
Termination is clamped with fixture afterwards, it is fixed on axis 180, then waterproof cloth is straight, afterwards two hoist engines of synchronous averaging
140, as shown in figure 1, the hoist engine 140 on right side constantly tightens up the second steel wire rope 200, while the hoist engine 140 in left side is constantly loose
Open the first steel wire rope 190, both tighten up with unclamp length it is identical, thus can make glider 170 stably towards the lower right corner move
It is dynamic so that waterproof cloth is constantly laid on subarch frame 130, and after glider 170 is moved to the lower right corner, waterproof cloth is in subarch frame
Ring is laid on 130, then starts each hydraulic cylinder 160, subarch frame 130 is jacked to tunnel Chu Zhi faces, operator upwards
Complete nailing fixed operation one by one on the operational platform.Before next setting is moved to, by the pressure release of hydraulic cylinder 160, subarch frame 130
Original position is down to, then is supported by hydraulic cylinder 160, also can be further advanced by column, inclined support bar is supported, column, tiltedly
The respective one end of support bar is fixedly connected with door frame 100, and the respective other end withstands (or contact) subarch frame 130, so can
Subarch frame 130 is supported, and without limitation on the lifting of subarch frame 130.
Described splash guard is laid in chassis automatically, in addition to:
Splash guard stringer 210, it is arranged on the side of subarch frame 130 (as shown in figure 1, the left side for subarch frame 130
Side), splash guard stringer 210 includes:
Two pieces of connecting plates 211, it is parallel to each other, and is arranged on the lower section of the subarch frame 130, every piece of connecting plate 211
One end is fixedly connected with the door frame 100 and (can so support stringer 210), and the other end passes through the subarch frame 130
Lower section is simultaneously provided with first fixed block away from the certain distance of subarch frame 130, the top of every piece of connecting plate 211, often
Second through hole 213 is provided with the fixed block of block first;
Supporting plate 212, it is arranged between the other end of two pieces of connecting plates 211, and with the one of two pieces of connecting plates 211 into
Type;
More supporting legs, it is disposed on the lower section of two pieces of connecting plates 211, and supporting leg is be hinged with connecting plate 211,
And optionally contacted with ground;
Boom 240, it passes through two the second through holes 213, and parallel with the supporting plate 212 and the axis 180.
Splash guard stringer 210, when in use, supporting leg is turned to and contacted with ground, by a roll of splash guard put to
In supporting plate 212, make boom 240 afterwards through two the second through holes 213 and the Kong Xin of splash guard so that splash guard can turn
It is dynamic, when such glider 170 drives the termination movement of splash guard, it can constantly extract splash guard out.Before next setting is moved to, take
Lower splash guard, supporting leg is turned to and not contacted with ground, you can and it is mobile trolley used, if the connection foot of connecting plate 211 and door frame 100
It is enough stable, it can not also remove splash guard.
Described splash guard is laid in chassis automatically, and the supporting plate 212 is the circular arc of inner hollow, so by a roll
After splash guard is put to supporting plate 212, splash guard is placed just in the groove of the circular arc of supporting plate 212, can so be prevented
Splash guard rolls, and lifts splash guard afterwards, penetrates boom 240 in the hole in-core of splash guard, make splash guard and the phase of supporting plate 212
At a certain distance, so that when driving the termination movement of splash guard, splash guard can be rotated constantly glider 170.
Described splash guard is laid in chassis automatically, in addition to:
More connecting rods 220, one end of every connecting rod 220 are fixedly connected with connecting plate 211, the other end and same with it
Side, and connected positioned at the support bar 150 of bottom.So after supporting leg goes to and do not contacted with ground, connecting rod 220 can enter one
Splash guard stringer 210 is fixed to step, thus splash guard need not be removed, when chassis is moved to next setting, then will
Supporting leg turns to be contacted with ground.
Described splash guard is laid in chassis automatically, and the arc track 120 is made up of I-steel bending;
The glider 170 includes:
First plate body 172, its head clearance are provided with two otic placodes and second fixed block, and the second fixed block is located at two
Between individual otic placode, and two otic placodes and the second fixed block are arranged along arc track 120, and described is provided with the second fixed block
One through hole 171;
Two piece of second plate body 173, it is parallel to each other, and be arranged at intervals, two piece of second plate body 173 respectively with first plate
Body 172 is vertical, and is fixedly connected with the bottom of the first plate body 172, and a roller is respectively arranged with two piece of second plate body 173
174, two rollers 174 are located in the groove of arc track 120 respectively positioned at the inner side of two piece of second plate body 173;
Wherein, the tool that one end of the first steel wire rope 190 and one end of the second steel wire rope 200 are connected with glider 170 respectively
Body mode is:
One end of first steel wire rope 190 and one end of the second steel wire rope 200 are connected with two otic placodes respectively.That is the first steel wire
The part relative with arc track 120 is extended along arc track 120 on the steel wire rope 200 of rope 190 and second.
Described splash guard is laid in chassis automatically, is arranged at intervals with the door frame 100 and the arc track 120
Multiple directive wheels 230, first steel wire rope 190 and second steel wire rope 200 are arranged on the multiple directive wheel 230,
The extension path of the first steel wire rope 190 and the second steel wire rope 200 can so be limited, make its shunk on fixed path and pine
Open, the directive wheel 230 on the arc track 120 is arranged to:When the glider 170 is sliding on arc track 120, arc
Directive wheel 230 on shape track 120 can surround through the arc track 120, the first plate body 172 and two piece of second plate body 173
Region.Directive wheel 230 is arranged on the top of arc track 120, can so prevent directive wheel 230 from limiting the fortune of glider 170
It is dynamic.
Described splash guard is laid in chassis automatically, and the number of the hydraulic cylinder 160 is eight, wherein four hydraulic cylinders
160 are arranged at four angles at the top of door frame 100, and withstand the subarch frame 130 upwards, and four additional hydraulic cylinder 160 is set
Put the both sides of door frame 100 (before and after the left side of door frame 100 and right side each one of fore-and-aft direction, that is, with being spaced 90 degree
Ring gate frame 100 is set), and be inclined upwardly.So when jacking subarch frame 130, more balance.
Described splash guard is laid in chassis automatically, and the boom 240 is by integrally formed first body of rod 241 and multigroup
Lug boss 242 forms, and first body of rod 241 is cylindrical, is arranged at intervals on first body of rod 241 along its axis direction
There is multigroup lug boss 242, every group of lug boss 242 is made up of multiple lug bosses 242, and the multiple lug boss 242 is along described
The circumferencial direction of boom 240 is arranged at intervals, and the lug boss 242 is fan-shaped, the internal diameter of the lug boss 242 and described first
The external diameter of the body of rod 241 is equal, and the inwall of the lug boss 242 is fixedly connected with the outer wall of first body of rod 241.Lug boss
Certain interval between 242 outer wall and the Kong Xin of splash guard being present, such waterproof cloth could be rotated constantly with termination constantly movement,
By setting multigroup lug boss 242, the frictional force between the Kong Xin of waterproof cloth and boom 240 can be reduced, can also splash guard is existed
It is more steady during rotation.
Although embodiment of the present utility model is disclosed as above, it is not restricted in specification and embodiment
Listed utilization, it can be applied to various suitable fields of the present utility model completely, for those skilled in the art,
Other modification is easily achieved, therefore under the universal limited without departing substantially from claim and equivalency range, this reality
Specific details is not limited to new and shown here as the legend with description.
Claims (8)
1. a kind of splash guard lays chassis automatically, it is characterised in that including:
Door frame;
Walking mechanism, it is arranged on the bottom of the door frame;
Two arc tracks, it is disposed on the top of the door frame, the radian and Tunnel of the arc track
Profile is parallel;
Subarch frame, it is arranged on the top of the door frame, and between two arc tracks, the radian and tunnel of the subarch frame
Road preliminary bracing profile is parallel, and the height of the lowest part of the subarch frame is higher than the height of the lowest part of the arc track;
Two hoist engines, it is disposed on the center at the top of the door frame;
More support bars, it is arranged between the door frame and the arc track, one end of every support bar and the door frame
It is fixedly connected, the other end is connected with the arc track;
Multiple hydraulic cylinders, it is arranged between the door frame and the subarch frame, the both ends of each hydraulic cylinder respectively with the door
Frame and the subarch frame are hinged;
Two gliders, it is separately positioned on two arc tracks, and the glider slides with the arc track to be connected
Connect, a first through hole is provided with each glider;
Axis, it is horizontally disposed, and passes through two first through hole;
Multiple fixtures, it is removably disposed on the axis;
Two first steel wire ropes, corresponding first steel wire rope of glider, one end of the first steel wire rope and corresponding
Glider connects, and the other end extends to an angle of arc track along arc track, then along the door frame with its same side to
Wound after upper extension wherein on a hoist engine;
Two second steel wire ropes, corresponding second steel wire rope of glider, one end of the second steel wire rope and corresponding
Glider connects, and the other end extends to another angle of arc track along arc track, then along the door frame with its same side
Be wrapped in after upwardly extending on another hoist engine, the second steel wire rope on another hoist engine around to the first steel wire
Rope on a hoist engine around to difference.
2. splash guard as claimed in claim 1 lays chassis automatically, it is characterised in that also includes:
Splash guard stringer, it is arranged on the side of subarch frame, and splash guard stringer includes:
Two pieces of connecting plates, it is parallel to each other, and is arranged on the lower section of the subarch frame, one end of every piece of connecting plate with the door
Frame is fixedly connected, and the other end passes through the lower section of the subarch frame and the remote subarch frame, is respectively provided with the top of every piece of connecting plate
There is first fixed block, second through hole is provided with every piece of first fixed block;
Supporting plate, it is arranged between the other end of two pieces of connecting plates, and is integrally formed with two pieces of connecting plates;
More supporting legs, it is disposed on the lower section of two pieces of connecting plates, and supporting leg is hinged with connecting plate, and optionally
Contacted with ground;
Boom, it passes through two the second through holes, and parallel with the supporting plate and the axis.
3. splash guard as claimed in claim 2 lays chassis automatically, it is characterised in that the supporting plate is the circle of inner hollow
Arc.
4. splash guard as claimed in claim 2 lays chassis automatically, it is characterised in that also includes:
More connecting rods, one end of every connecting rod are fixedly connected with connecting plate, the other end and with its same side, and positioned at most lower
The support bar connection of side.
5. splash guard as claimed in claim 1 lays chassis automatically, it is characterised in that the arc track is bent by I-steel
It is made;
The glider includes:
First plate body, its head clearance are provided with two otic placodes and second fixed block, and the second fixed block is located at two otic placodes
Between, and two otic placodes and the second fixed block are arranged along arc track, and the first through hole is provided with the second fixed block;
Two piece of second plate body, it is parallel to each other, and is arranged at intervals, and two piece of second plate body is vertical with first plate body respectively, and
It is fixedly connected with the bottom of the first plate body, a roller is respectively arranged with two piece of second plate body, two rollers is located at two respectively
The inner side of the plate body of block second, and in the groove of arc track;
Wherein, the concrete mode that one end of the first steel wire rope and one end of the second steel wire rope are connected with glider respectively is:
One end of first steel wire rope and one end of the second steel wire rope are connected with two otic placodes respectively.
6. splash guard as claimed in claim 5 lays chassis automatically, it is characterised in that on the door frame and the arc track
Multiple directive wheels are arranged at intervals with, first steel wire rope and second steel wire rope are arranged on the multiple directive wheel,
Directive wheel on the arc track is arranged to:When the glider is sliding on arc track, the guiding on arc track
Wheel can pass through the region that the arc track, the first plate body and two the second plate bodys surround.
7. splash guard as claimed in claim 1 lays chassis automatically, it is characterised in that the number of the hydraulic cylinder is eight,
Wherein four hydraulic cylinders are arranged at four angles at the top of door frame, and withstand the subarch frame, four additional hydraulic cylinder upwards
The both sides of door frame are arranged on, and are inclined upwardly.
8. splash guard as claimed in claim 2 lays chassis automatically, it is characterised in that the boom is by first body of rod and more
Group lug boss composition, first body of rod are cylindrical, are arranged at intervals with first body of rod along its axis direction described
Multigroup lug boss, every group of lug boss are made up of multiple lug bosses, between circumferencial direction of the multiple lug boss along the boom
Every setting, the lug boss is sector, and the internal diameter of the lug boss is equal with the external diameter of first body of rod, the lug boss
Inwall is fixedly connected with the outer wall of first body of rod.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720951033.3U CN206987847U (en) | 2017-08-01 | 2017-08-01 | Splash guard lays chassis automatically |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720951033.3U CN206987847U (en) | 2017-08-01 | 2017-08-01 | Splash guard lays chassis automatically |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206987847U true CN206987847U (en) | 2018-02-09 |
Family
ID=61418316
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720951033.3U Active CN206987847U (en) | 2017-08-01 | 2017-08-01 | Splash guard lays chassis automatically |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206987847U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108643941A (en) * | 2018-06-07 | 2018-10-12 | 中铁隧道股份有限公司 | Gantry type arch installs trolley |
-
2017
- 2017-08-01 CN CN201720951033.3U patent/CN206987847U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108643941A (en) * | 2018-06-07 | 2018-10-12 | 中铁隧道股份有限公司 | Gantry type arch installs trolley |
CN108643941B (en) * | 2018-06-07 | 2019-09-17 | 中铁隧道股份有限公司 | Gantry type arch installs trolley |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102296971A (en) | Lining method for tunnel emergency turnout strips and tunnel-lining trolley | |
CN106437795A (en) | Tunnel vehicle-mounted folding type multifunctional work rack | |
CN206092022U (en) | Be used for lining cutting rectangular -section or radiation gradual change rectangular -section formula operation car of crawling | |
CN106638185A (en) | Track layer automatically changing span in advancing process and use method | |
CN104533460B (en) | Support replacement formula formwork jumbo and the construction method of underpass concreting | |
CN104343263A (en) | Rotary lifting type three-dimensional garage | |
CN107119578A (en) | The Bridge Erector of the whole two-way erection in hole on a kind of asymmetric framing prefabricated case beam beam of achievable large-tonnage | |
CN205172590U (en) | Make up multi -purpose tunnel lining platform truck | |
CN105507427A (en) | Mounting method for extending single-layer latticed shell structure | |
CN206987847U (en) | Splash guard lays chassis automatically | |
CN205578009U (en) | Two lined steel bones RACK in tunnel equipment of being under construction | |
CN111733872B (en) | Pipe gallery construction method | |
CN206438353U (en) | A kind of traveling process becomes across track-laying machine automatically | |
CN218145304U (en) | Adjustable lifting appliance | |
JP7306627B2 (en) | Carriage with rail feeder | |
CN208870611U (en) | A kind of multi-functional trolley of tunnel self-propelled splash guard dossal reinforcing bar positioning one | |
CN209114417U (en) | Harbour integrated construction system based on stake top top pushing platform | |
CN205558915U (en) | Portable operation device | |
CN218621893U (en) | Trackless triangular hanging basket | |
CN206941414U (en) | The Bridge Erector of the whole two-way erection in hole on a kind of asymmetric framing prefabricated case beam beam of achievable large-tonnage | |
CN106988762B (en) | Full-section two-lining inverted arch shield equipment | |
CN109505251A (en) | A kind of arch steel structure truss bridge erection method | |
CN212612488U (en) | Movable underwater concrete pouring guide pipe trolley | |
CN206396905U (en) | A kind of across cylindrical reticulated shell structure integral slipping construction servicing unit of symmetrical doubly-linked | |
CN205932963U (en) | Many landing legs tire formula tracklaying crane |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |