CN214090912U - Novel safe type high-rise building climbing frame for installation formula building - Google Patents

Novel safe type high-rise building climbing frame for installation formula building Download PDF

Info

Publication number
CN214090912U
CN214090912U CN202023048202.3U CN202023048202U CN214090912U CN 214090912 U CN214090912 U CN 214090912U CN 202023048202 U CN202023048202 U CN 202023048202U CN 214090912 U CN214090912 U CN 214090912U
Authority
CN
China
Prior art keywords
scaffold board
building
frame
climbing frame
type high
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202023048202.3U
Other languages
Chinese (zh)
Inventor
翟冠霖
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202023048202.3U priority Critical patent/CN214090912U/en
Application granted granted Critical
Publication of CN214090912U publication Critical patent/CN214090912U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Non-Portable Lighting Devices Or Systems Thereof (AREA)

Abstract

The utility model discloses a novel safe type high-rise building climbs frame for installation formula building, climb the frame outward and be located including outer climbing the fender bracket outside the frame, its characterized in that, one side of fender bracket is connected with the room body, top in the fender bracket is equipped with electric block, electric block's bottom is equipped with rather than assorted chain, the bottom of chain is equipped with scaffold board mount, the fixed slot has been seted up on the scaffold board mount, be equipped with rather than assorted scaffold board on the fixed slot, the scaffold board pass through fixed establishment with the scaffold board mount is connected, fixed establishment is including being located a plurality of evenly distributed's of scaffold board bottom lug. Has the advantages that: through the cooperation design of scaffold board and fixed establishment, can conveniently dismantle change and installation to the scaffold board, can save the change time for the engineering progress.

Description

Novel safe type high-rise building climbing frame for installation formula building
Technical Field
The utility model relates to a frame technical field is climbed to the building, particularly, relates to a novel safe type high-rise building for installation formula building climbs frame.
Background
The climbing frame is also called a lifting frame, and can be classified into hydraulic, electric, manual and hand-pulling types according to its power source. The scaffold is a novel scaffold system developed in recent years and is mainly applied to high-rise shear wall type floors. It can climb up or down along the building. This system makes the scaffold technology completely improved: firstly, the frame does not need to be turned over; and secondly, the scaffold is free from the dismounting and mounting procedures (the scaffold is used until the construction is finished after one-time assembly), and is not limited by the height of a building, so that the manpower and the materials are greatly saved. And also has a great improvement on the traditional scaffold in the safety angle. Have development advantage in high-rise building extremely, the scaffold board is mostly the lug weld on the chain, is difficult to dismantle and change, meets to hardly changing the scaffold board under the condition that the scaffold board damaged, delays engineering time.
An effective solution to the problems in the related art has not been proposed yet.
SUMMERY OF THE UTILITY MODEL
To the problem among the correlation technique, the utility model provides a novel safe type high-rise building climbs frame for installation formula building to overcome the above-mentioned technical problem that current correlation technique exists.
Therefore, the utility model discloses a specific technical scheme as follows:
a novel safety high-rise building climbing frame for an installation type building comprises an outer climbing frame and a protective frame positioned outside the outer climbing frame, and is characterized in that one side of the protective frame is connected with a house body, an electric hoist is arranged at the top end in the protective frame, a chain matched with the electric hoist is arranged at the bottom end of the electric hoist, a scaffold board fixing frame is arranged at the bottom end of the chain, a fixing groove is formed in the scaffold board fixing frame, a scaffold board matched with the fixing groove is arranged on the fixing groove, the scaffold board is connected with the scaffold board fixing frame through a fixing mechanism, the fixing mechanism comprises a plurality of uniformly distributed convex blocks positioned at the bottom end of the scaffold board, a limit groove matched with the convex blocks is arranged at the top end of the scaffold board fixing frame, a partition chamber is arranged in the scaffold board fixing frame and positioned at one side of the limit groove, and a movable block transversely arranged in the partition chamber, be equipped with in the movable block and extend to the horizontal pole of spacing inslot, one side of horizontal pole just is located the spacing inslot is equipped with the tooth piece, the lug is close to one side opening of compartment be equipped with tooth piece assorted tooth's socket, be equipped with the cover in the movable block and locate reset spring on the horizontal pole, the horizontal pole is kept away from one side of tooth piece extends to the movable block is equipped with the lantern ring outward, be equipped with in the compartment and run through the lantern ring extends to the montant of scaffold board mount top.
Preferably, the top end of the vertical rod is provided with a pull ring which is of a circular structure, and the pull ring is sleeved with an anti-skid rubber ring matched with the pull ring.
Preferably, the plurality of bumps are respectively positioned at the corners of the scaffold board, and the scaffold board is provided with the fluorescent strips.
Preferably, the surfaces of the scaffold boards are both plated with an epoxy resin layer and a waterproof plain mortar layer.
Preferably, the lantern ring is provided with a hole matched with the vertical rod, and the bottom end in the compartment is provided with a T-shaped groove matched with the vertical rod.
Preferably, the top end of the fixing groove is provided with a wear-resistant anti-slip pad, and the fixing groove is provided with fluorescent paint.
The utility model has the advantages that: through the cooperation design of scaffold board and fixed establishment, can conveniently dismantle change and installation to the scaffold board, can save the change time for the engineering progress.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required to be used in the embodiments will be briefly described below, and it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to these drawings without creative efforts.
Fig. 1 is a schematic structural view of a novel safety type high-rise building climbing frame for an installation type building according to an embodiment of the invention;
fig. 2 is a top view of a scaffold board fixing frame in a novel safety type high-rise building climbing frame for an installation type building according to an embodiment of the present invention;
fig. 3 is a top view of a scaffold board in a novel safety type high-rise building climbing frame for an installation type building according to an embodiment of the present invention;
fig. 4 is a schematic structural diagram of a fixing mechanism in a novel safe type high-rise building climbing frame for an installation type building according to the embodiment of the utility model.
In the figure:
1. an outer climbing frame; 2. a protection frame; 3. a house body; 4. an electric hoist; 5. a chain; 6. a scaffold board fixing frame; 7. fixing grooves; 8. a scaffold board; 9. a bump; 10. a limiting groove; 11. a compartment; 12. a movable block; 13. a cross bar; 14. a tooth block; 15. a tooth socket; 16. a return spring; 17. a collar; 18. a vertical rod; 19. and (4) a pull ring.
Detailed Description
For further explanation of the embodiments, the drawings are provided as part of the disclosure and serve primarily to illustrate the embodiments and, together with the description, to explain the principles of operation of the embodiments, and to provide further explanation of the invention and advantages thereof, it will be understood by those skilled in the art that various other embodiments and advantages of the invention are possible, and that elements in the drawings are not to scale and that like reference numerals are generally used to designate like elements.
According to the utility model discloses an embodiment provides a novel safe type high-rise building climbs frame for installation formula building.
The first embodiment is as follows:
as shown in figures 1-4, the novel safety type high-rise building climbing frame for the installation type building according to the embodiment of the invention comprises an outer climbing frame 1 and a protection frame 2 positioned outside the outer climbing frame 1, and is characterized in that one side of the protection frame 2 is connected with a house body 3, an electric hoist 4 is arranged at the top end in the protection frame 2, a chain 5 matched with the electric hoist 4 is arranged at the bottom end of the electric hoist 4, a scaffold board fixing frame 6 is arranged at the bottom end of the chain 5, a fixing groove 7 is arranged on the scaffold board fixing frame 6, a scaffold board 8 matched with the fixing groove 7 is arranged on the fixing groove 7, the scaffold board 8 is connected with the scaffold board fixing frame 6 through a fixing mechanism, the fixing mechanism comprises a plurality of evenly distributed lugs 9 positioned at the bottom end of the scaffold board 8, and a limit groove 10 matched with the lugs 9 is arranged at the top end of the scaffold board fixing frame 6, just be located in scaffold board mount 6 one side of spacing groove 10 is equipped with compartment 11, be equipped with the movable block 12 of horizontal setting in the compartment 11, be equipped with in the movable block 12 and extend to horizontal pole 13 in the spacing groove 10, one side of horizontal pole 13 just is located be equipped with tooth piece 14 in the spacing groove 10, lug 9 is close to one side opening of compartment 11 be equipped with tooth piece 14 assorted tooth's socket 15, be equipped with the cover in the movable block 12 and locate reset spring 16 on the horizontal pole 13, horizontal pole 13 is kept away from one side of tooth piece 14 extends to the movable block 12 is equipped with the lantern ring 17 outward, be equipped with in the compartment 11 and run through the lantern ring 17 and extend to the montant 18 of scaffold board mount 6 top.
Example two:
as shown in fig. 1-4, the top of montant 18 is equipped with pull ring 19, pull ring 19 is circular structure, just the cover is equipped with on the pull ring 19 and goes assorted anti-skidding rubber circle, and is a plurality of lug 9 is located respectively the edge of scaffold board 8, just be equipped with the phosphor strip on the scaffold board 8, epoxy layer and waterproof plain mortar layer are all plated on the surface of scaffold board 8. Through the design of epoxy layer and waterproof plain mortar layer, can make the anticorrosive waterproof of scaffold board, reduce the change frequency of scaffold board.
Example two:
as shown in fig. 1 to 4, a hole matched with the vertical rod 18 is formed in the lantern ring 17, a T-shaped groove matched with the vertical rod 18 is formed in the bottom end of the compartment 11, a wear-resistant anti-slip pad is arranged at the top end of the fixing groove 7, and fluorescent paint is arranged on the fixing groove 7.
For the convenience of understanding the technical solution of the present invention, the following detailed description is made on the working principle or the operation mode of the present invention in the practical process.
In the time of practical application, the safety when the fender bracket 2 can increase the workman and go up and down, start electric block 4, electric block 4 drives chain 5 and goes up and down, chain 5 drives frame 6 and goes up and down, the workman stands on scaffold board 8, can realize personnel's lift, when needs installation scaffold board 8, align and insert lug 9 and spacing groove 10 on the scaffold board 8, lug 9 is at its tooth's socket 15 of male in-process and the meshing of tooth piece 14, make tooth piece 14 extrude reset spring 16 to the laminating of scaffold board 8 and fixed slot 7 at the in-process of meshing, its tooth piece 14 meshes with tooth's socket 15, reach the effect of fixed scaffold board 8, when needs dismantle scaffold board 8, staff's pulling montant 18 moves left, make montant 18 drive horizontal pole 13 move left, make tooth piece 14 and tooth's socket 15 separate, reach the effect of corresponding dismantlement.
To sum up, with the help of the above technical scheme of the utility model, through scaffold board 8 and fixed establishment's cooperation design, can conveniently dismantle change and installation to scaffold board 8, can save the change time for the engineering progress.
The above description is only a preferred embodiment of the present invention, and should not be taken as limiting the invention, and any modifications, equivalent replacements, improvements, etc. made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (6)

1. The utility model provides a novel safe type high-rise building climbs frame for installation formula building, includes outer climbing frame (1) and is located outer climbing frame (1) outer fender bracket (2), a serial communication port, one side of fender bracket (2) is connected with the room body (3), top in fender bracket (2) is equipped with electric block (4), the bottom of electric block (4) is equipped with rather than assorted chain (5), the bottom of chain (5) is equipped with scaffold board mount (6), fixed slot (7) have been seted up on scaffold board mount (6), be equipped with on fixed slot (7) rather than assorted scaffold board (8), scaffold board (8) through fixed establishment with scaffold board mount (6) are connected, fixed establishment is including being located a plurality of evenly distributed's in scaffold board (8) bottom lug (9), the top of scaffold board mount (6) be equipped with lug (9) assorted spacing groove (10) ) A compartment (11) is arranged in the scaffold board fixing frame (6) and positioned at one side of the limiting groove (10), a movable block (12) which is transversely arranged is arranged in the compartment (11), a cross bar (13) which extends into the limit groove (10) is arranged in the movable block (12), a tooth block (14) is arranged on one side of the cross bar (13) and positioned in the limit groove (10), one side opening of the convex block (9) close to the compartment (11) is provided with a tooth groove (15) matched with the tooth block (14), a return spring (16) sleeved on the cross rod (13) is arranged in the movable block (12), one side of the cross rod (13) far away from the tooth block (14) extends to the outside of the movable block (12) and is provided with a collar (17), a vertical rod (18) which penetrates through the lantern ring (17) and extends to the upper part of the scaffold board fixing frame (6) is arranged in the compartment (11).
2. The novel safety type high-rise building climbing frame for the erection type building as claimed in claim 1, wherein a pull ring (19) is provided on the top end of the vertical rod (18), the pull ring (19) is of a circular structure, and an anti-skid rubber ring matched with the pull ring (19) is sleeved on the pull ring (19).
3. The novel safety type climbing frame for high-rise buildings as claimed in claim 1, wherein a plurality of the protrusions (9) are respectively located at the corners of the scaffold board (8), and fluorescent strips are arranged on the scaffold board (8).
4. The novel safety type high-rise building creel for the installation type building as claimed in claim 1, wherein the surfaces of the scaffold boards (8) are plated with an epoxy resin layer and a waterproof mortar layer.
5. The novel safety type high-rise building climbing frame for the installation type building as claimed in claim 1, wherein the lantern ring (17) is provided with a hole matched with the vertical rod (18), and the bottom end in the compartment (11) is provided with a T-shaped groove matched with the vertical rod (18).
6. The novel safety type high-rise building climbing frame for the installation type building as claimed in claim 1, wherein a wear-resistant non-slip mat is arranged at the top end of the fixing groove (7), and fluorescent paint is arranged on the fixing groove (7).
CN202023048202.3U 2020-12-17 2020-12-17 Novel safe type high-rise building climbing frame for installation formula building Expired - Fee Related CN214090912U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202023048202.3U CN214090912U (en) 2020-12-17 2020-12-17 Novel safe type high-rise building climbing frame for installation formula building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202023048202.3U CN214090912U (en) 2020-12-17 2020-12-17 Novel safe type high-rise building climbing frame for installation formula building

Publications (1)

Publication Number Publication Date
CN214090912U true CN214090912U (en) 2021-08-31

Family

ID=77428370

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202023048202.3U Expired - Fee Related CN214090912U (en) 2020-12-17 2020-12-17 Novel safe type high-rise building climbing frame for installation formula building

Country Status (1)

Country Link
CN (1) CN214090912U (en)

Similar Documents

Publication Publication Date Title
CN201221193Y (en) High altitude packway ceiling construction operating platform
CN204804298U (en) Building material hoist and mount construction scaffold
CN111021749A (en) Simple hoisting mechanism for bare concrete exterior wall cladding and construction method thereof
CN214090912U (en) Novel safe type high-rise building climbing frame for installation formula building
CN207700708U (en) A kind of shellring shape ceiling mounted tracks of unit glass curtain wall
CN220644578U (en) Rural construction assembled building
CN112942847A (en) Construction method for mounting decorative plate outside old curtain wall by crossing bottom barrier
CN216662305U (en) Super high-rise tower crane bottom attached hydraulic self-climbing hard protection platform
CN213015340U (en) Protective net plate for climbing frame
CN213087087U (en) Passive door and window outdoor side heat preservation protection component
CN208361837U (en) A kind of Lifting basket of no suspension mechanism
CN212079184U (en) A combination formula safety ladder cage for construction
CN109230953B (en) A slide rail formula moving platform for building tower crane
CN113896124A (en) Super high-rise tower crane bottom attached hydraulic self-climbing hard protection platform, installation process and climbing method thereof
CN217420151U (en) Aluminum alloy curtain wall with anti-drop structure
CN212245823U (en) Integrate and install elevator top structure additional
CN217054268U (en) Climbing frame butt-joint structure suitable for engineering
CN217998902U (en) A net piece mounting structure for aluminum alloy climbs frame
CN205777485U (en) Self-elevating type elevator hoistway shear wall creeping formwork operating platform
CN201232328Y (en) Prefabricating combined inside and outside wall safety ceramic tile
CN213391182U (en) Upright rod connecting piece convenient to mount
CN110422772A (en) Climbing machine device device and method
CN109098453B (en) Outer wall surface installation and construction process of sandwich board of steel structure factory building
CN211257752U (en) Environment-friendly construction steel construction scaffold
CN213539583U (en) Floor tile convenient to assemble

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210831