CN214064261U - Building site safety monitoring equipment of wisdom building site management and control platform - Google Patents

Building site safety monitoring equipment of wisdom building site management and control platform Download PDF

Info

Publication number
CN214064261U
CN214064261U CN202020770183.6U CN202020770183U CN214064261U CN 214064261 U CN214064261 U CN 214064261U CN 202020770183 U CN202020770183 U CN 202020770183U CN 214064261 U CN214064261 U CN 214064261U
Authority
CN
China
Prior art keywords
rod
fixedly connected
side wall
connecting rod
building site
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202020770183.6U
Other languages
Chinese (zh)
Inventor
杨乔雅
刘真
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Yawei Industrial Group Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202020770183.6U priority Critical patent/CN214064261U/en
Application granted granted Critical
Publication of CN214064261U publication Critical patent/CN214064261U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Emergency Alarm Devices (AREA)

Abstract

The utility model discloses a building site safety monitoring device of a smart building site management and control platform, which belongs to the technical field of smart building sites and comprises a base, wherein the upper end surface of the base is fixedly connected with a support rod, the side wall of the support rod is fixedly connected with one end of an installation rod, the other end of the installation rod is connected with a vertical adjusting device, the vertical adjusting device is connected with a first connecting rod, the first connecting rod is connected with the lower end of a second connecting rod through a horizontal adjusting device, the upper end of the second connecting rod is fixedly connected with a monitoring probe, the angle adjustment in the vertical direction is realized and the stability after the adjustment is ensured by adding structures such as a sliding rod, a positioning plate and an adjusting wheel, the adjustment is simple and convenient, the time and labor are saved, the angle adjustment in the horizontal direction is realized and the stability of the device after the adjustment is ensured by adding structures such as a rack, an arc-shaped rod and a clamping rod, simple and convenient, it is efficient to adjust, has avoided experimental apparatus's dismouting, has practiced thrift the teaching time.

Description

Building site safety monitoring equipment of wisdom building site management and control platform
Technical Field
The utility model relates to a wisdom building site technical field specifically is a building site safety monitoring equipment of wisdom building site management and control platform.
Background
The intelligent construction site is realized in the industry of the intelligent earth concept in the engineering field, and is a brand-new engineering full life cycle management concept.
The intelligent construction site is characterized in that an informatization means is used, engineering projects are accurately designed and simulated through a three-dimensional design platform, a construction project informatization ecological circle with interconnection cooperation, intelligent production and scientific management is built around construction process management, data mining analysis is carried out on the data and engineering information collected by the Internet of things in a virtual reality environment, process trend prediction and expert plans are provided, visual intelligent management of engineering construction is achieved, engineering management informatization level is improved, and green construction and ecological construction are gradually achieved.
The wisdom building site is planted more artificial intelligence, sensing technology, virtual reality high-tech technologies in building, machinery, personnel dress facility, place business turn over all kinds of objects such as gateway to being generally interconnected, forming "thing networking", be in the same place with "internet" integration again, realize engineering management is the integration of people and engineering job site futilely. At the core of the intelligent construction site, the way of interaction among all the major organizations and post personnel of the engineering is improved by a 'more intelligent' method so as to improve the definition, efficiency, flexibility and response speed of the interaction.
Wisdom, able to determine and change the quality of a city; the smart city determines and promotes the urban status and development level in the future. As a high-level stage of urbanization, the smart city is characterized in that the urban innovation is realized by large system integration, physical space and network space interaction and multiparty participation and interaction of the public, so that the urban management is more precise, the urban environment is more harmonious, the urban economy is higher, and the urban life is more favorable.
The building industry is one of the important material production departments and the prop industry of national economy in China, and meanwhile, the building industry is also a high-risk industry with multiple safety accidents. How to strengthen the safety management of the construction site, reduce the accident occurrence frequency, put an end to various illegal operations and illegal constructions and improve the quality of construction projects is an important research subject in front of all levels of government departments, people in the industry and broad students.
In the operation process at wisdom building site, often need use a lot of cameras, still need adjust the angle of surveillance camera head sometimes moreover, but current a lot of cameras all are with the screw fixation, just need dismantle when carrying out the angle modulation, very troublesome in order to solve this problem, provide a building site safety monitoring equipment of wisdom building site management and control platform.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a building site safety monitoring equipment of wisdom building site management and control platform to solve and provide the problem among the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: a construction site safety monitoring device of an intelligent construction site management and control platform comprises a base, wherein a supporting rod is fixedly connected to the upper end face of the base, the side wall of the supporting rod is fixedly connected with one end of an installation rod, the other end of the installation rod is connected with a vertical adjusting device, the vertical adjusting device is connected with a first connecting rod, the first connecting rod is connected with the lower end of a second connecting rod through a horizontal adjusting device, the upper end of the second connecting rod is fixedly connected with a monitoring probe, the vertical adjusting device comprises an installation box, the inner side wall of the installation box is fixedly connected with a fixed plate, a sliding rod is slidably inserted on the fixed plate, one end of the sliding rod is fixedly connected with a positioning plate, the inner rear wall of the installation box is rotatably connected with an adjusting wheel, the side wall of the adjusting wheel is fixedly connected with the first connecting rod, and the edge side wall of the adjusting wheel and the side wall of the positioning plate are both fixedly connected with correspondingly clamped convex blocks, the one end that the locating plate was kept away from to the slide bar rotates the one end that is connected with the threaded rod, the other end fixedly connected with adjust knob of threaded rod, the threaded rod rotate run through the lateral wall of mounting box and with the lateral wall threaded connection of mounting box.
Preferably, horizontal adjusting device includes the installation cavity, the lateral wall sliding connection of installation cavity has the slider, the lateral wall fixedly connected with rack of slider, the one end of the articulated arc pole of one end of rack, the lateral wall of the articulated second connecting rod of the other end of arc pole, the second connecting rod rotates with the diapire of installation cavity to be connected, rack toothing has the gear, the trailing flank center of gear rotates with the diapire of installation cavity to be connected, the diapire of installation cavity rotates and is connected with the screens pole, the lateral wall fixedly connected with fixture block of screens pole, fixture block and gear matching joint, the lateral wall of screens pole passes through the spring and is connected with the lateral wall of installation cavity, the one end of the lateral wall fixed connection stay cord of screens pole, the through-hole that the lateral wall of installation cavity was seted up is passed to the other end of stay cord and extends to the outside of installation cavity.
Preferably, the positioning plate is arc-shaped.
Preferably, the bump is a triangular prism and the plurality of bumps are closely arranged.
Preferably, an opening facilitating rotation of the first connecting rod is formed in the left upper portion of the mounting box.
Compared with the prior art, the beneficial effects of the utility model are that:
1. through adding structures such as slide bar, locating plate and regulating wheel, realized the angle modulation of vertical direction and guaranteed the stability after the regulation, adjust simple and conveniently, labour saving and time saving.
2. Through adding rack, arc pole and screens pole isotructure, realized the angle modulation of horizontal direction and guaranteed the stability of adjusting after the device, simple and convenient, it is efficient to adjust, has avoided the dismouting to monitor, convenient to use.
Drawings
In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings used in the description of the embodiments will be briefly introduced below, and it is obvious that the drawings in the following description are only some embodiments of the present invention, and it is obvious for those skilled in the art that other drawings can be obtained according to these drawings without creative efforts.
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic structural view of the vertical adjustment device of the present invention;
fig. 3 is a sectional view taken along line a-a of the present invention.
In the drawings, the components represented by the respective reference numerals are listed below:
1-base, 2-supporting rod, 3-mounting rod, 4-vertical adjusting device, 41-mounting box, 42-fixing plate, 43-sliding rod, 44-positioning plate, 45-adjusting wheel, 46-threaded rod, 47-adjusting knob, 5-first connecting rod, 6-second connecting rod, 7-monitoring probe, 8-horizontal adjusting device, 81-mounting cavity, 82-sliding block, 83-rack, 84-arc rod, 85-gear, 86-clamping rod, 87-spring and 88-pull rope.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by a person of ordinary skill in the art without creative efforts belong to the protection scope of the present invention.
Referring to fig. 1-3, the present invention provides a technical solution: a building site safety monitoring device of an intelligent building site management and control platform comprises a base 1, wherein a supporting rod 2 is fixedly connected to the upper end face of the base 1, one end of a mounting rod 3 is fixedly connected to the side wall of the supporting rod 2, the other end of the mounting rod 3 is connected with a vertical adjusting device 4, the vertical adjusting device 4 is connected with a first connecting rod 5, the first connecting rod 5 is connected with the lower end of a second connecting rod 6 through a horizontal adjusting device 8, a monitoring probe 7 is fixedly connected to the upper end of the second connecting rod 6, the vertical adjusting device 4 comprises a mounting box 41, a fixing plate 42 is fixedly connected to the inner side wall of the mounting box 41, a sliding rod 43 is slidably inserted on the fixing plate 42, one end of the sliding rod 43 is fixedly connected with a positioning plate 44, an adjusting wheel 45 is rotatably connected to the inner rear wall of the mounting box 41, the side wall of the adjusting wheel 45 is fixedly connected with the first connecting rod 5, and convex blocks which are correspondingly clamped and fixedly connected to the edge side wall of the adjusting wheel 45 and the side wall of the positioning plate 44, the one end that locating plate 44 was kept away from to slide bar 43 rotates the one end that is connected with threaded rod 46, threaded rod 46's other end fixedly connected with adjust knob 47, threaded rod 46 rotate run through the lateral wall of mounting box 41 and with the lateral wall threaded connection of mounting box 41, this structure is through adding slide bar 43, locating plate 44 and regulating wheel 45 isotructure, realized the angle modulation of vertical direction and guaranteed the stability after adjusting, adjust simple and conveniently, labour saving and time saving.
The horizontal adjusting device 8 comprises an installation cavity 81, a sliding block 82 is connected to the side wall of the installation cavity 81 in a sliding mode, a rack 83 is fixedly connected to the side wall of the sliding block 82, one end of the rack 83 is hinged to one end of an arc rod 84, the other end of the arc rod 84 is hinged to the side wall of a second connecting rod 6, the second connecting rod 6 is rotatably connected to the bottom wall of the installation cavity 81, a gear 85 is meshed with the rack 83, the center of the rear side face of the gear 85 is rotatably connected to the bottom wall of the installation cavity 81, a clamping rod 86 is rotatably connected to the bottom wall of the installation cavity 81, a clamping block is fixedly connected to the side wall of the clamping rod 86 and is in matched clamping connection with the gear 85, the side wall of the clamping rod 86 is connected to the side wall of the installation cavity 81 through a spring 87, one end of a pulling rope 88 is fixedly connected to the side wall of the clamping rod 86, the other end of the pulling rope 88 penetrates through a through hole formed in the side wall of the installation cavity 81 and extends to the outer side wall of the installation cavity 81, and the structure is formed by adding the rack 83, The arc-shaped rod 84, the clamping rod 86 and the like realize angle adjustment in the horizontal direction and guarantee the stability of the device after adjustment, and the device is simple and convenient to use, high in adjustment efficiency, and convenient to use, and avoids the disassembly and assembly of the monitoring probe 7.
Wherein, the locating plate 44 is the arc, and the lug is closely arranged between triangular prism and the multiple lugs, and the upper left side of mounting box 41 has seted up the opening that is convenient for the rotation of head rod 5.
One specific application of this embodiment is: the monitoring probe 7 is arranged on the second connecting rod 6, the angle of the experimental apparatus can be adjusted as required, when the angle adjustment on the vertical surface is required, the adjusting knob 47 is rotated, the adjusting knob 47 can drive the threaded rod 46 to rotate, the threaded rod 46 can pull the sliding rod 43 in the rotating process, so that the positioning plate 44 is separated from the adjusting wheel 45, the adjusting wheel 45 can rotate freely, after the adjusting wheel 45 rotates to the required position, the adjusting knob 47 is rotated reversely, so that the sliding rod 43 pushes the positioning plate 44, the positioning plate 44 is tightly abutted with the convex block on the adjusting wheel 45 again, at the moment, the adjusting wheel 45 is fixed and does not rotate any more, thereby realizing the angle adjustment on the vertical surface of the first connecting rod 5, when the angle adjustment on the horizontal surface is required, the pull rope 88 is pulled outwards, the pull rope 88 pulls the clamping block clamped on the gear 85 through the clamping rod 86, at this time, the second connecting rod 6 can be freely rotated, when the second connecting rod 6 is rotated to a desired position, the pull rope 88 is released, and under the action of the spring 87, the latch on the latch lever 86 will latch the gear 85 again, so that the rotation angle of the second connecting rod 6 is kept stable.
In the description herein, references to the description of "one embodiment," "an example," "a specific example," etc., mean that a particular feature, structure, material, or characteristic described in connection with the embodiment or example is included in at least one embodiment or example of the invention. In this specification, the schematic representations of the terms used above do not necessarily refer to the same embodiment or example. Furthermore, the particular features, structures, materials, or characteristics described may be combined in any suitable manner in any one or more embodiments or examples.
The preferred embodiments of the present invention disclosed above are intended only to help illustrate the present invention. The preferred embodiments are not intended to be exhaustive or to limit the invention to the precise embodiments disclosed. Obviously, many modifications and variations are possible in light of the above teaching. The embodiments were chosen and described in order to best explain the principles of the invention and its practical applications, to thereby enable others skilled in the art to best understand the invention for and utilize the invention. The present invention is limited only by the claims and their full scope and equivalents.

Claims (5)

1. The utility model provides a building site safety monitoring equipment of wisdom building site management and control platform, includes base (1), its characterized in that: the upper end face of the base (1) is fixedly connected with a supporting rod (2), the side wall of the supporting rod (2) is fixedly connected with one end of a mounting rod (3), the other end of the mounting rod (3) is connected with a vertical adjusting device (4), the vertical adjusting device (4) is connected with a first connecting rod (5), the first connecting rod (5) is connected with the lower end of a second connecting rod (6) through a horizontal adjusting device (8), the upper end of the second connecting rod (6) is fixedly connected with a monitoring probe (7), the vertical adjusting device (4) comprises a mounting box (41), the inner side wall of the mounting box (41) is fixedly connected with a fixing plate (42), a sliding rod (43) is inserted on the fixing plate (42) in a sliding mode, one end of the sliding rod (43) is fixedly connected with a positioning plate (44), and the inner rear wall of the mounting box (41) is rotatably connected with an adjusting wheel (45), the lateral wall and the head rod (5) fixed connection of regulating wheel (45), the equal fixedly connected with of lateral wall of the marginal lateral wall of regulating wheel (45) and locating plate (44) corresponds the lug of joint, the one end that locating plate (44) were kept away from in slide bar (43) rotates the one end that is connected with threaded rod (46), the other end fixedly connected with adjust knob (47) of threaded rod (46), threaded rod (46) rotate run through the lateral wall of mounting box (41) and with the lateral wall threaded connection of mounting box (41).
2. The worksite safety monitoring equipment of the intelligent worksite management and control platform according to claim 1, wherein: the horizontal adjusting device (8) comprises an installation cavity (81), a sliding block (82) is connected to the side wall of the installation cavity (81) in a sliding mode, a rack (83) is fixedly connected to the side wall of the sliding block (82), one end of the rack (83) is hinged to one end of an arc-shaped rod (84), the other end of the arc-shaped rod (84) is hinged to the side wall of a second connecting rod (6), the second connecting rod (6) is rotatably connected with the bottom wall of the installation cavity (81), a gear (85) is meshed with the rack (83), the center of the rear side face of the gear (85) is rotatably connected with the bottom wall of the installation cavity (81), a clamping rod (86) is rotatably connected with the bottom wall of the installation cavity (81), a clamping block is fixedly connected with the side wall of the clamping rod (86) and is connected with the clamping block in a matched and clamped mode with the gear (85), and the side wall of the clamping rod (86) is connected with the side wall of the installation cavity (81) through a spring (87), the side wall of the clamping rod (86) is fixedly connected with one end of a pull rope (88), and the other end of the pull rope (88) penetrates through a through hole formed in the side wall of the mounting cavity (81) and extends to the outer side of the mounting cavity (81).
3. The worksite safety monitoring equipment of the intelligent worksite management and control platform according to claim 1, wherein: the positioning plate (44) is arc-shaped.
4. The worksite safety monitoring equipment of the intelligent worksite management and control platform according to claim 1, wherein: the convex blocks are triangular prisms and are closely arranged among the plurality of convex blocks.
5. The worksite safety monitoring equipment of the intelligent worksite management and control platform according to claim 1, wherein: an opening convenient for the first connecting rod (5) to rotate is formed in the left upper portion of the mounting box (41).
CN202020770183.6U 2020-05-10 2020-05-10 Building site safety monitoring equipment of wisdom building site management and control platform Expired - Fee Related CN214064261U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020770183.6U CN214064261U (en) 2020-05-10 2020-05-10 Building site safety monitoring equipment of wisdom building site management and control platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020770183.6U CN214064261U (en) 2020-05-10 2020-05-10 Building site safety monitoring equipment of wisdom building site management and control platform

Publications (1)

Publication Number Publication Date
CN214064261U true CN214064261U (en) 2021-08-27

Family

ID=77386397

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020770183.6U Expired - Fee Related CN214064261U (en) 2020-05-10 2020-05-10 Building site safety monitoring equipment of wisdom building site management and control platform

Country Status (1)

Country Link
CN (1) CN214064261U (en)

Similar Documents

Publication Publication Date Title
CN203134246U (en) Intelligent drilling device simulation training system
CN214064261U (en) Building site safety monitoring equipment of wisdom building site management and control platform
CN212367413U (en) Safety control supervisory equipment is synthesized in wisdom city
CN213809619U (en) Building construction management security protection supervisory equipment
CN211506585U (en) Equipment inspection system of three-dimensional model
CN110701554A (en) Special electrical equipment of ocean engineering
CN210896474U (en) Progress show board for construction management
CN215670950U (en) Construction hoisting carrier for engineering management
CN211691367U (en) Building engineering construction supporting device of safety protection facility
CN210201975U (en) Wireless photovoltaic intelligent visual monitoring device capable of being arranged rapidly
CN220798138U (en) Supervision equipment
CN219510551U (en) Photographic measuring device convenient for height adjustment
CN207382456U (en) Multiple cascading networks video monitoring system
CN210865503U (en) Warning device for building site
CN113047419A (en) Civil engineering is with portable house of being convenient for build fast
CN212540038U (en) Adjustable water screen fineness detection device
CN110925557A (en) Security protection engineering is with control frame
CN215335692U (en) Building site alarm device for building with operating mode shows function
CN212002394U (en) Concatenation formula construction outer wall rock fall support of preventing
CN215891554U (en) Underground pipe culvert robot mount
CN212135852U (en) LED box body assembly
CN217540671U (en) Diversified scene intelligent lamp pole
CN220038131U (en) Apply to wisdom city construction wisdom pole
CN212906815U (en) Progress management display device that building engineering construction was used
CN220828044U (en) Building template easy to construct and splice

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20220414

Address after: 101200 3-3, floor 1, building 3, yard 106, Jinhe street, Mafang Town, Pinggu District, Beijing

Patentee after: Beijing Yawei Industrial Group Co.,Ltd.

Address before: 410000 room 618, building 18, Mingdu garden, No.22 Shuguang Middle Road, Yuhua District, Changsha City, Hunan Province

Patentee before: Yang Qiaoya

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210827

DD01 Delivery of document by public notice
DD01 Delivery of document by public notice

Addressee: Beijing Yawei Industrial Group Co.,Ltd.

Document name: Review Business Specific Letter