CN210896474U - Progress show board for construction management - Google Patents
Progress show board for construction management Download PDFInfo
- Publication number
- CN210896474U CN210896474U CN201922071292.9U CN201922071292U CN210896474U CN 210896474 U CN210896474 U CN 210896474U CN 201922071292 U CN201922071292 U CN 201922071292U CN 210896474 U CN210896474 U CN 210896474U
- Authority
- CN
- China
- Prior art keywords
- base
- wall
- display board
- construction management
- building construction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Road Signs Or Road Markings (AREA)
Abstract
本实用新型公开了一种建筑施工管理用进度展示板,属于建筑施工管理用设备技术领域。一种建筑施工管理用进度展示板,包括底座,所述底座的顶部转动连接有支撑柱,所述支撑柱远离底座的一端连接有三面板,所述支撑柱的底部连接有滑块,所述底座外壁开凿有与滑块相配合的滑轨,所述底座两侧外壁均连接有固定板,所述固定板与支撑柱外壁均连接有固定耳,两个所述固定耳之间连接有第一弹性元件,所述第一弹性元件的两端连接有挂钩,所述挂钩与固定耳相连,所述底座内活动连接有定位杆,所述支撑柱的底壁开凿有与定位杆相配合的定位孔;本实用新型方便多方位观看进度展示板,可避免在大风天气被刮倒,保证信息的传递,满足使用所需。
The utility model discloses a progress display board for building construction management, which belongs to the technical field of equipment for building construction management. A progress display board for building construction management includes a base, a support column is rotatably connected to the top of the base, three panels are connected to one end of the support column away from the base, a slider is connected to the bottom of the support column, and the base The outer wall is drilled with a sliding rail matched with the slider, the outer walls on both sides of the base are connected with a fixing plate, the fixing plate and the outer wall of the support column are both connected with fixing ears, and a first fixing lug is connected between the two fixing ears. An elastic element, the two ends of the first elastic element are connected with hooks, the hooks are connected with the fixing ears, the base is movably connected with a positioning rod, and the bottom wall of the support column is drilled with a positioning rod that cooperates with the positioning rod The utility model is convenient for viewing the progress display board in multiple directions, can avoid being blown down in strong wind weather, ensure the transmission of information, and meet the needs of use.
Description
技术领域technical field
本实用新型涉及建筑施工管理用设备技术领域,尤其涉及一种建筑施工管理用进度展示板。The utility model relates to the technical field of equipment for building construction management, in particular to a progress display board for building construction management.
背景技术Background technique
近年来随着经济的不断发展,经济体制有着巨大的改变,城市化建设的步伐逐步加快,对于建筑施工建设的需求随之不断增多,进而建设施工管理用设备的需求也越来越多,建筑施工过程中,往往需要将施工进度利用展示板进行展示,以便于项目负责人及时跟踪任务进度,同时也可以利用展示板手写当日或当季任务目标,实现直观的展示效果。In recent years, with the continuous development of the economy, the economic system has undergone tremendous changes, the pace of urbanization has gradually accelerated, and the demand for construction and construction has continued to increase, and the demand for construction management equipment has also increased. During the construction process, it is often necessary to use the display board to display the construction progress, so that the project leader can track the task progress in time. At the same time, the display board can also be used to write the task goals of the day or the current season to achieve an intuitive display effect.
但是现有的进度展示板只是在一面展示,不能满足多方位的视角观看,位于展示板后方的工人需要走到展示板的正前方才可以观看到施工进度信息,费时费力,且现有的展示板安装在室外,遇到大风天气易被刮倒,影响信息的传递,满足不了使用所需。However, the existing progress display board is only displayed on one side and cannot be viewed from multiple perspectives. The workers behind the display board need to walk directly in front of the display board to view the construction progress information, which is time-consuming and laborious, and the existing display board The board is installed outdoors, and it is easy to be knocked down in strong windy weather, which affects the transmission of information and cannot meet the needs of use.
实用新型内容Utility model content
本实用新型的目的是为了解决现有技术中存在的问题,而提出的一种建筑施工管理用进度展示板。The purpose of the utility model is to propose a progress display board for building construction management in order to solve the problems existing in the prior art.
为了实现上述目的,本实用新型采用了如下技术方案:In order to achieve the above-mentioned purpose, the utility model adopts the following technical solutions:
一种建筑施工管理用进度展示板,包括底座,所述底座的顶部转动连接有支撑柱,所述支撑柱远离底座的一端连接有三面板,所述支撑柱的底部连接有滑块,所述底座外壁开凿有与滑块相配合的滑轨,所述底座两侧外壁均连接有固定板,所述固定板与支撑柱外壁均连接有固定耳,两个所述固定耳之间连接有第一弹性元件,所述第一弹性元件的两端连接有挂钩,所述挂钩与固定耳相连,所述底座内活动连接有定位杆,所述支撑柱的底壁开凿有与定位杆相配合的定位孔。A progress display board for building construction management includes a base, a support column is rotatably connected to the top of the base, three panels are connected to one end of the support column away from the base, a slider is connected to the bottom of the support column, and the base The outer wall is drilled with a sliding rail matched with the slider, the outer walls on both sides of the base are connected with a fixing plate, the fixing plate and the outer wall of the support column are both connected with fixing ears, and a first fixing lug is connected between the two fixing ears. An elastic element, the two ends of the first elastic element are connected with hooks, the hooks are connected with the fixing ears, the base is movably connected with a positioning rod, and the bottom wall of the support column is drilled with a positioning rod that cooperates with the positioning rod hole.
优选的,所述底座内开凿有凹槽,所述凹槽内壁连接有第二弹性元件,所述第二弹性元件远离凹槽内壁的一端与定位杆相连,所述定位杆滑动连接在凹槽内。Preferably, a groove is drilled in the base, a second elastic element is connected to the inner wall of the groove, an end of the second elastic element away from the inner wall of the groove is connected to a positioning rod, and the positioning rod is slidably connected to the groove Inside.
优选的,所述定位杆远离第二弹性元件的一端设置有斜面,所述斜面与定位孔的内壁相抵。Preferably, one end of the positioning rod away from the second elastic element is provided with an inclined surface, and the inclined surface abuts against the inner wall of the positioning hole.
优选的,所述底座内开凿有两个空腔,所述底座外壁连接有与空腔相连通的进口。Preferably, two cavities are excavated in the base, and an inlet communicating with the cavities is connected to the outer wall of the base.
优选的,所述空腔内壁连接有固定轴,所述固定轴外壁套接有扭簧,所述固定轴外壁还连接有闭合板,所述闭合板与空腔外壁相抵。Preferably, the inner wall of the cavity is connected with a fixed shaft, the outer wall of the fixed shaft is sleeved with a torsion spring, and the outer wall of the fixed shaft is also connected with a closing plate, and the closing plate abuts against the outer wall of the cavity.
优选的,所述三面板外壁设置为导流状。Preferably, the three-panel outer wall is arranged in a flow-guiding shape.
与现有技术相比,本实用新型提供了一种建筑施工管理用进度展示板,具备以下有益效果:Compared with the prior art, the utility model provides a progress display board for building construction management, which has the following beneficial effects:
1、该建筑施工管理用进度展示板,该装置在无风天气时,定位杆嵌入定位孔中,工作者从各个角度均可以看到三面板上的任务进度,在有风天气时,可以通过进口将细沙倒入空腔内,增加底座的重量,从而提高装置的稳定性,风吹向三面板,使三面板带动支撑柱转动,三面板外壁设置为导流状,方便对风进行导流,支撑柱转动的时候,定位孔的内壁挤压定位杆,第二弹性元件收缩,定位杆缩进凹槽内,第一弹性元件发生扭转,在此过程中,滑块滑动在滑轨内,保证支撑柱转动的稳定性,三面板与支撑柱一起发生转动,在此过程中,三面板导流的一侧正对风向,可避免风力吹倒展示板,且三面板虽然发生了转动,但是工作者仍然可以多方位观看到三面板上的任务进度,当风力减弱时,第一弹性元件恢复,拉动支撑柱回转,使定位杆重新进入定位孔,对支撑柱进行定位。1. The progress display board for building construction management. The device is embedded in the positioning hole when there is no wind. The workers can see the progress of the tasks on the three panels from all angles. The inlet pours fine sand into the cavity to increase the weight of the base, thereby improving the stability of the device. The wind blows to the three panels, so that the three panels drive the support column to rotate. When the support column rotates, the inner wall of the positioning hole squeezes the positioning rod, the second elastic element shrinks, the positioning rod retracts into the groove, and the first elastic element twists. During this process, the slider slides in the slide rail , to ensure the stability of the rotation of the support column, and the three panels rotate together with the support column. During this process, the side of the three panels is facing the wind direction, which can prevent the wind from blowing down the display board, and although the three panels rotate, However, workers can still watch the progress of the task on the three panels from multiple directions. When the wind weakens, the first elastic element recovers, pulls the support column to rotate, and makes the positioning rod re-enter the positioning hole to position the support column.
该装置中未涉及部分均与现有技术相同或可采用现有技术加以实现,本实用新型方便多方位观看进度展示板,可避免在大风天气被刮倒,保证信息的传递,满足使用所需。The parts not involved in the device are the same as the existing technology or can be realized by using the existing technology, the utility model is convenient for viewing the progress display board in multiple directions, can avoid being blown down in strong wind weather, ensure the transmission of information, and meet the needs of use. .
附图说明Description of drawings
图1为本实用新型提出的一种建筑施工管理用进度展示板的结构示意图;Fig. 1 is the structural representation of a kind of progress display board for building construction management proposed by the utility model;
图2为本实用新型提出的一种建筑施工管理用进度展示板支撑柱的结构示意图;Fig. 2 is the structural representation of a kind of progress display board support column for building construction management proposed by the utility model;
图3为本实用新型提出的一种建筑施工管理用进度展示板的俯视图;3 is a top view of a progress display board for building construction management proposed by the utility model;
图4为本实用新型提出的一种建筑施工管理用进度展示板图1中A部分的结构示意图。FIG. 4 is a schematic structural diagram of part A in FIG. 1 of a progress display board for building construction management proposed by the present invention.
图中:1、底座;2、支撑柱;201、滑块;3、三面板;4、滑轨;5、固定板;6、固定耳;7、第一弹性元件;701、挂钩;8、定位杆;9、定位孔;10、凹槽;11、第二弹性元件;12、空腔;13、进口;14、固定轴;15、扭簧;16、闭合板。In the figure: 1, base; 2, support column; 201, slider; 3, three panels; 4, slide rail; 5, fixing plate; 6, fixing ear; 7, first elastic element; 701, hook; 8, 9. Positioning hole; 10. Groove; 11. Second elastic element; 12. Cavity; 13. Inlet; 14. Fixed shaft; 15. Torsion spring; 16. Closing plate.
具体实施方式Detailed ways
下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本实用新型一部分实施例,而不是全部的实施例。The technical solutions in the embodiments of the present utility model will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present utility model. Obviously, the described embodiments are only a part of the embodiments of the present utility model, rather than all the implementations. example.
在本实用新型的描述中,需要理解的是,术语“上”、“下”、“前”、“后”、“左”、“右”、“顶”、“底”、“内”、“外”等指示的方位或位置关系为基于附图所示的方位或位置关系,仅是为了便于描述本实用新型和简化描述,而不是指示或暗示所指的装置或元件必须具有特定的方位、以特定的方位构造和操作,因此不能理解为对本实用新型的限制。In the description of the present invention, it should be understood that the terms "upper", "lower", "front", "rear", "left", "right", "top", "bottom", "inside", The orientation or positional relationship indicated by "outside" is based on the orientation or positional relationship shown in the accompanying drawings, which is only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the indicated device or element must have a specific orientation , are constructed and operated in a specific orientation, and therefore should not be construed as a limitation of the present invention.
参照图1-4,一种建筑施工管理用进度展示板,包括底座1,底座1的顶部转动连接有支撑柱2,支撑柱2远离底座1的一端连接有三面板3,支撑柱2的底部连接有滑块201,底座1外壁开凿有与滑块201相配合的滑轨4,底座1两侧外壁均连接有固定板5,固定板5与支撑柱2外壁均连接有固定耳6,两个固定耳6之间连接有第一弹性元件7,第一弹性元件7的两端连接有挂钩701,挂钩701与固定耳6相连,底座1内活动连接有定位杆8,支撑柱2的底壁开凿有与定位杆8相配合的定位孔9。1-4, a progress display board for building construction management includes a
参照图1-2,底座1内开凿有凹槽10,凹槽10内壁连接有第二弹性元件11,第二弹性元件11远离凹槽10内壁的一端与定位杆8相连,定位杆8滑动连接在凹槽10内。1-2, a
参照图2,定位杆8远离第二弹性元件11的一端设置有斜面,斜面与定位孔9的内壁相抵。Referring to FIG. 2 , one end of the
参照图1,底座1内开凿有两个空腔12,底座1外壁连接有与空腔12相连通的进口13。Referring to FIG. 1 , two cavities 12 are excavated in the
参照图1,空腔12内壁连接有固定轴14,固定轴14外壁套接有扭簧15,固定轴14外壁还连接有闭合板16,闭合板16与空腔12外壁相抵。1 , the inner wall of the cavity 12 is connected with a
参照图3,三面板3外壁设置为导流状。Referring to FIG. 3 , the outer walls of the three
本实用新型中,该装置在无风天气时,定位杆8嵌入定位孔9中,工作者从各个角度均可以看到三面板3上的任务进度,在有风天气时,可以通过进口13将细沙倒入空腔12内,增加底座1的重量,从而提高装置的稳定性,风吹向三面板3,使三面板3带动支撑柱2转动,三面板3外壁设置为导流状,方便对风进行导流,支撑柱2转动的时候,定位孔9的内壁挤压定位杆8,第二弹性元件11收缩,定位杆8缩进凹槽10内,第一弹性元件7发生扭转,在此过程中,滑块201滑动在滑轨4内,保证支撑柱2转动的稳定性,三面板3与支撑柱2一起发生转动,在此过程中,三面板3导流的一侧正对风向,可避免风力吹倒展示板,且三面板3虽然发生了转动,但是工作者仍然可以多方位观看到三面板3上的任务进度,当风力减弱时,第一弹性元件7恢复,拉动支撑柱2回转,使定位杆8重新进入定位孔9,对支撑柱2进行定位;本实用新型方便多方位观看进度展示板,可避免在大风天气被刮倒,保证信息的传递,满足使用所需。In the present utility model, the
以上所述,仅为本实用新型较佳的具体实施方式,但本实用新型的保护范围并不局限于此,任何熟悉本技术领域的技术人员在本实用新型揭露的技术范围内,根据本实用新型的技术方案及其实用新型构思加以等同替换或改变,都应涵盖在本实用新型的保护范围之内。The above description is only a preferred embodiment of the present invention, but the protection scope of the present invention is not limited to this. Equivalent replacement or modification of the new technical solution and its utility model concept shall be included within the protection scope of the present utility model.
Claims (6)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201922071292.9U CN210896474U (en) | 2019-11-27 | 2019-11-27 | Progress show board for construction management |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201922071292.9U CN210896474U (en) | 2019-11-27 | 2019-11-27 | Progress show board for construction management |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN210896474U true CN210896474U (en) | 2020-06-30 |
Family
ID=71319064
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201922071292.9U Expired - Fee Related CN210896474U (en) | 2019-11-27 | 2019-11-27 | Progress show board for construction management |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN210896474U (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN113593450A (en) * | 2021-08-03 | 2021-11-02 | 中国建筑第五工程局有限公司 | Construction progress display device for building project |
-
2019
- 2019-11-27 CN CN201922071292.9U patent/CN210896474U/en not_active Expired - Fee Related
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN113593450A (en) * | 2021-08-03 | 2021-11-02 | 中国建筑第五工程局有限公司 | Construction progress display device for building project |
| CN113593450B (en) * | 2021-08-03 | 2023-01-24 | 中国建筑第五工程局有限公司 | A construction progress display device for housing construction projects |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN210896474U (en) | Progress show board for construction management | |
| CN211694203U (en) | Building construction supervision device based on BIM technology | |
| CN213844553U (en) | Panoramic digital twin intelligent factory model construction platform | |
| CN209213383U (en) | A kind of terrain recording auxiliary device for power grid planning | |
| CN2743591Y (en) | Double pull base | |
| CN207128449U (en) | A kind of portable instructional device of College English | |
| CN215908120U (en) | Exhaust duct structure of fireproof door for house | |
| CN216663913U (en) | A safety warning device for construction of a building project | |
| CN215443477U (en) | House construction is with preventing wind protection network | |
| CN113012597A (en) | Engineering progress display device for building engineering management | |
| CN206849448U (en) | A kind of gardens Sign Board | |
| CN210777586U (en) | Forestry data acquisition public notice equipment | |
| CN218268294U (en) | A smart industrial screen with a multi-angle adjustment mechanism | |
| CN108986650B (en) | Outdoor billboard windproof equipment | |
| CN221690560U (en) | Reversible show sand table | |
| CN220673120U (en) | Low voltage distribution cabinet | |
| CN207850209U (en) | A kind of multifunctional building tape measure | |
| CN219118224U (en) | Green retaining wall structure | |
| CN220435954U (en) | GIS equipment display device | |
| CN221861250U (en) | Vertical scroll hanging device | |
| CN211060922U (en) | Three-line laser projector | |
| CN216304482U (en) | Adjustable municipal garden construction is with preventing wind support | |
| CN221855805U (en) | A spliced movable board house structure | |
| CN220022705U (en) | A photovoltaic power generation panel bracket | |
| CN216388587U (en) | Intelligent terminal for managing construction engineering project consultation cost |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20200630 |
|
| CF01 | Termination of patent right due to non-payment of annual fee |
