CN214053534U - Long spiral pile foundation stiffening stirrup processing device - Google Patents

Long spiral pile foundation stiffening stirrup processing device Download PDF

Info

Publication number
CN214053534U
CN214053534U CN202022930968.8U CN202022930968U CN214053534U CN 214053534 U CN214053534 U CN 214053534U CN 202022930968 U CN202022930968 U CN 202022930968U CN 214053534 U CN214053534 U CN 214053534U
Authority
CN
China
Prior art keywords
transmission shaft
pile foundation
processing platform
central disc
long spiral
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202022930968.8U
Other languages
Chinese (zh)
Inventor
王泽军
董允
汪育庆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yunnan Construction Investment No9 Construction Co ltd
Original Assignee
Yunnan Construction Investment No9 Construction Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yunnan Construction Investment No9 Construction Co ltd filed Critical Yunnan Construction Investment No9 Construction Co ltd
Priority to CN202022930968.8U priority Critical patent/CN214053534U/en
Application granted granted Critical
Publication of CN214053534U publication Critical patent/CN214053534U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model discloses a long spiral pile foundation stiffening stirrup processingequipment relates to building engineering technical field, for solving current long spiral pile foundation stiffening stirrup and lack effectual location putting mechanism at the in-process of production and processing, lead to pile foundation stiffening stirrup to appear welding dislocation easily when the equipment welding production and cause the problem of great range error. The upper end of processing platform is provided with central disc, the both sides of central disc are provided with respectively and put the seat, the upper end of putting the seat is provided with puts the circular slot, the internally mounted of putting the circular slot has the support kicking block, the upper end of central disc is provided with strengthening rib jack and kicking block jack, the inside of processing platform is provided with driving motor, one side of driving motor is provided with the transmission shaft, the transmission shaft is connected with the lower extreme welded connection of central disc, and the centre of a circle point of transmission shaft and the bottom centre of a circle point coincidence of central disc.

Description

Long spiral pile foundation stiffening stirrup processing device
Technical Field
The utility model relates to a building engineering technical field specifically is a long spiral pile foundation stirrup processingequipment that puts more energy into.
Background
The building engineering refers to an engineering entity formed by the construction of various building constructions and their auxiliary facilities and the installation of lines, pipelines and equipment matched with them. The building construction is characterized by comprising a top cover, beam columns, walls, a foundation and a project which can form an internal space and meet the requirements of production, living, study and public activities of people, wherein the deep foundation consisting of piles and pile caps connected with the pile tops or the single-pile foundation connected with the piles and pile foundations is called a low-cap pile foundation for short, and if the pile bodies are completely buried in the soil and the bottom surfaces of the caps are in contact with the soil body; if the upper part of the pile body is exposed out of the ground and the bottom of the pile cap is positioned above the ground, the pile cap is called a high pile cap foundation, the building pile foundation is usually a low pile cap foundation, and in a high-rise building, the pile foundation is widely applied to the pile foundation, and pile cap stiffening stirrups are required to be tied and installed in advance before concrete pouring so as to reinforce the concrete structure.
The long spiral pile foundation stiffening stirrup of current lacks effectual location puts out mechanism at the in-process of production and processing, leads to pile foundation stiffening stirrup to appear welding dislocation easily when the assembly welding production and causes the problem of great range error, for this reason, we provide a long spiral pile foundation stiffening stirrup processingequipment.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a long spiral pile foundation stiffening stirrup processingequipment to current long spiral pile foundation stiffening stirrup of proposing lacks effectual location in the in-process of production and processing in solving above-mentioned background art and puts the mechanism, leads to pile foundation stiffening stirrup to appear welding dislocation easily when the equipment welding production and causes the problem of great range error.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a long spiral pile foundation stirrup processingequipment of putting more energy into, includes the processing platform, the upper end of processing platform is provided with central disc, the both sides of central disc are provided with respectively and put the seat, the upper end of putting the seat is provided with puts the circular slot, the internally mounted of putting the circular slot has the support kicking block, the upper end of central disc is provided with strengthening rib jack and kicking block jack, the inside of processing platform is provided with driving motor, one side of driving motor is provided with the transmission shaft, the lower extreme welded connection of transmission shaft and central disc, and the centre of a circle point of transmission shaft and the bottom centre of a circle point coincidence of central disc.
Preferably, the outside of transmission shaft is provided with the perforating hole, and perforating hole and transmission shaft integrated into one piece set up, be provided with the bearing on the inner wall of perforating hole, and bearing and the inner wall mechanical seal of perforating hole are connected, the transmission shaft passes through bearing and processing platform swing joint, and the transmission shaft through with perforating hole hookup location's two board and the unsettled installation of processing platform.
Preferably, all install synchronous roller, two on driving motor's the output and the lower extreme outer wall of transmission shaft synchronous roller is located same water flat line, and connects through the drive belt transmission between two synchronous roller.
Preferably, strengthening rib jack and kicking block jack all set up with central disc integrated into one piece, the internally mounted of strengthening rib jack has the screw thread strengthening rib, install inside lining circle hoop on the inner wall of screw thread strengthening rib, and inside lining circle hoop and screw thread strengthening rib integrated into one piece set up.
Preferably, two one side of putting the seat all is provided with spacing pin, the installation cover seat is all installed at the both ends of spacing pin, and the installation cover seat passes through the upper end fixed mounting of screw and processing platform, the lower extreme of processing platform is provided with four universal wheels.
Preferably, be provided with the maintenance coverboard on the preceding terminal surface of processing platform, and overhaul the coverboard and pass through the mounting screw on the open position in processing platform inner bin, one side of overhauing the coverboard is provided with opens and stops the switch, and opens and stop switch and driving motor's power supply line electric connection.
Compared with the prior art, the beneficial effects of the utility model are that:
1. the utility model discloses a go into the strengthening rib jack of the inside upper end of central disc respectively with the screw thread strengthening rib of a plurality of long spiral pile base stiffening hoops of group, the strengthening rib jack is inserted after full screw thread strengthening rib, take out the support kicking block from putting the circular slot of putting of seat, a support kicking block is all installed at every kicking block jack, then put inside lining circular hoop on the inner wall of the screw thread strengthening rib that encloses, support the kicking block through the installation and support, thereby reach the location and put long spiral pile foundation stiffening hoop component's purpose, overcome current long spiral pile foundation stiffening hoop and lacked effectual location put mechanism at the in-process of production and processing, lead to pile foundation stiffening hoop to appear easily when the equipment welding production welding dislocation and cause the problem of great range error.
2. The start-stop switch can be opened or closed in the welding process to control the start-stop work of the driving motor, so that the purpose of controlling the rotation and the rest of the central disc is achieved, the thread reinforcing rib is taken down and turned around after one lining circular hoop is welded, then the other end of the lining circular hoop is welded by the same method, and the purpose of quickly assembling, welding and processing the long spiral pile foundation stiffening hoop is achieved.
Drawings
Fig. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is a schematic view of the overall internal structure of the present invention;
FIG. 3 is a schematic view of the upper end structure of the processing table of the present invention;
FIG. 4 is a schematic structural view of a stiffening hoop for a long spiral pile foundation according to the present invention;
in the figure: 1. a processing table; 2. a universal wheel; 3. overhauling the shell plate; 4. a start-stop switch; 5. installing a sleeve seat; 6. a limit stop lever; 7. a placing seat; 8. supporting the top block; 9. a central disc; 10. a thread reinforcing rib; 11. a drive motor; 12. synchronously rotating the rollers; 13. a transmission belt; 14. a through hole; 15. a bearing; 16. a drive shaft; 17. placing a circular groove; 18. a reinforcing rib insertion hole; 19. a jack block jack; 20. the inside lining circle hoop.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Referring to fig. 1-4, the present invention provides an embodiment: the utility model provides a long spiral pile foundation stirrup processingequipment that puts more energy, including processing platform 1, the upper end of processing platform 1 is provided with central disc 9, the both sides of central disc 9 are provided with respectively and put seat 7, the upper end of putting seat 7 is provided with puts circular slot 17, the internally mounted who puts circular slot 17 has support kicking block 8, the upper end of central disc 9 is provided with strengthening rib jack 18 and kicking block jack 19, the inside of processing platform 1 is provided with driving motor 11, one side of driving motor 11 is provided with transmission shaft 16, transmission shaft 16 and the lower extreme welded connection of central disc 9, and the centre of a circle point of transmission shaft 16 and the coincidence of the bottom centre of a circle point of central disc 9.
Furthermore, a through hole 14 is formed outside the transmission shaft 16, the through hole 14 and the transmission shaft 16 are integrally formed, a bearing 15 is arranged on the inner wall of the through hole 14, the bearing 15 is in mechanical sealing connection with the inner wall of the through hole 14, the transmission shaft 16 is movably connected with the processing table 1 through the bearing 15, the transmission shaft 16 is mounted in a suspended manner with the processing table 1 through two stop plates at the connection position with the through hole 14, and the through hole 14 formed outside the transmission shaft 16 plays a role in penetrating with the transmission shaft 16 and extending into the processing table 1.
Further, all install synchronous roller 12 on the output of driving motor 11 and the lower extreme outer wall of transmission shaft 16, two synchronous roller 12 are located same water flat line, and connect through the transmission of drive belt 13 between two synchronous roller 12, and the synchronous roller 12 of all installing on the output of driving motor 11 and the lower extreme outer wall of transmission shaft 16 plays the effect of being convenient for drive belt 13 synchronous connection driving motor 11 and transmission shaft 16.
Further, strengthening rib jack 18 and kicking block jack 19 all set up with central disc 9 integrated into one piece, and the internally mounted of strengthening rib jack 18 has screw thread strengthening rib 10, installs inside lining hoop 20 on the inner wall of screw thread strengthening rib 10, and inside lining hoop 20 sets up with screw thread strengthening rib 10 integrated into one piece, and the internally mounted's of strengthening rib jack 18 screw thread strengthening rib 10 plays the effect of constituteing long spiral pile foundation and putting more energy into and bind round outer structure.
Further, two one sides of putting seat 7 all are provided with spacing pin 6, and installation sleeve seat 5 is all installed at the both ends of spacing pin 6, and installation sleeve seat 5 passes through the upper end fixed mounting of screw and processing platform 1, and the lower extreme of processing platform 1 is provided with four universal wheels 2, and two spacing pins 6 that one side of putting seat 7 all set up play the effect of protection processing platform 1.
Further, be provided with on the preceding terminal surface of processing platform 1 and overhaul shell plate 3, and overhaul shell plate 3 and pass through the mounting screw on the open position in processing platform 1 interior storehouse, one side of overhauing shell plate 3 is provided with opens and stops switch 4, and opens and stop switch 4 and driving motor 11's power supply line electric connection, and overhaul shell plate 3 that sets up on the preceding terminal surface of processing platform 1 plays the effect of being convenient for seal processing platform 1 interior storehouse open-ended.
The working principle is as follows: when in use, a plurality of thread reinforcing ribs 10 forming a long spiral pile base stiffening hoop are respectively inserted into a reinforcing rib jack 18 at the upper end inside a central disc 9, after the reinforcing rib jacks 18 are fully inserted with the thread reinforcing ribs 10, a supporting top block 8 is taken out from a placing circular groove 17 of a placing seat 7, each top block jack 19 is provided with one supporting top block 8, then a lining circular hoop 20 is placed on the inner wall of the enclosed thread reinforcing rib 10 and is supported by the supporting top block 8, so that the purpose of positioning and placing the components of the long spiral pile base stiffening hoop is achieved, then a worker can carry out welding work, the lining circular hoop 20 is welded with the inner walls of the thread reinforcing ribs 10, a start-stop switch 4 can be opened or closed in the welding process to control the start-stop work of a driving motor 11, the purpose of controlling the rotation and the stillness of the central disc 9 is achieved, the thread reinforcing ribs 10 are taken down and placed after one lining circular hoop 20 is welded, and then the other end is welded with a lining circular hoop 20 by the same method to finish the processing work of the long spiral pile foundation stiffening hoop.
It is obvious to a person skilled in the art that the invention is not restricted to details of the above-described exemplary embodiments, but that it can be implemented in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.

Claims (6)

1. The utility model provides a long spiral pile foundation stirrup processingequipment that puts more energy into, includes processing platform (1), its characterized in that: the upper end of processing platform (1) is provided with central disc (9), the both sides of central disc (9) are provided with respectively and put seat (7), the upper end of putting seat (7) is provided with puts circular slot (17), the internally mounted of putting circular slot (17) has support kicking block (8), the upper end of central disc (9) is provided with strengthening rib jack (18) and kicking block jack (19), the inside of processing platform (1) is provided with driving motor (11), one side of driving motor (11) is provided with transmission shaft (16), transmission shaft (16) and the lower extreme welded connection of central disc (9), and the centre of a circle point of transmission shaft (16) and the bottom centre of a circle point coincidence of central disc (9).
2. The long spiral pile foundation stiffening stirrup processing device according to claim 1, wherein: the outside of transmission shaft (16) is provided with perforating hole (14), and perforating hole (14) and transmission shaft (16) integrated into one piece set up, be provided with bearing (15) on the inner wall of perforating hole (14), and bearing (15) and the inner wall mechanical seal of perforating hole (14) are connected, transmission shaft (16) pass through bearing (15) and processing platform (1) swing joint, and transmission shaft (16) through with perforating hole (14) hookup location two stop plates with processing platform (1) unsettled installation.
3. The long spiral pile foundation stiffening stirrup processing device according to claim 1, wherein: all install synchronous roller (12), two on the output of driving motor (11) and the lower extreme outer wall of transmission shaft (16) synchronous roller (12) are located same water flat line, and connect through drive belt (13) transmission between two synchronous roller (12).
4. The long spiral pile foundation stiffening stirrup processing device according to claim 1, wherein: strengthening rib jack (18) and kicking block jack (19) all set up with central disc (9) integrated into one piece, the internally mounted of strengthening rib jack (18) has screw thread strengthening rib (10), install inside lining circle hoop (20) on the inner wall of screw thread strengthening rib (10), and inside lining circle hoop (20) and screw thread strengthening rib (10) integrated into one piece set up.
5. The long spiral pile foundation stiffening stirrup processing device according to claim 1, wherein: two one side of putting seat (7) all is provided with spacing pin (6), installation sleeve seat (5) are all installed at the both ends of spacing pin (6), and installation sleeve seat (5) pass through the upper end fixed mounting of screw and processing platform (1), the lower extreme of processing platform (1) is provided with four universal wheels (2).
6. The long spiral pile foundation stiffening stirrup processing device according to claim 1, wherein: the processing platform is characterized in that a maintenance shell plate (3) is arranged on the front end face of the processing platform (1), the maintenance shell plate (3) is installed on an opening position of an inner bin of the processing platform (1) through screws, a start-stop switch (4) is arranged on one side of the maintenance shell plate (3), and the start-stop switch (4) is electrically connected with a power supply line of a driving motor (11).
CN202022930968.8U 2020-12-09 2020-12-09 Long spiral pile foundation stiffening stirrup processing device Active CN214053534U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022930968.8U CN214053534U (en) 2020-12-09 2020-12-09 Long spiral pile foundation stiffening stirrup processing device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022930968.8U CN214053534U (en) 2020-12-09 2020-12-09 Long spiral pile foundation stiffening stirrup processing device

Publications (1)

Publication Number Publication Date
CN214053534U true CN214053534U (en) 2021-08-27

Family

ID=77406851

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022930968.8U Active CN214053534U (en) 2020-12-09 2020-12-09 Long spiral pile foundation stiffening stirrup processing device

Country Status (1)

Country Link
CN (1) CN214053534U (en)

Similar Documents

Publication Publication Date Title
CN101619630B (en) Mounting method of steel chimney and implementary jacking device
CN110295667B (en) Construction method of prefabricated building house
CN106996214A (en) A kind of communication tower provided with prefabricated pile basis
CN111675111A (en) Boiler hoisting sling in closed plant area and construction method
CN214053534U (en) Long spiral pile foundation stiffening stirrup processing device
CN210595164U (en) PC post lifts by crane auxiliary device upright
CN110304593B (en) PC column vertical lifting auxiliary device
CN211472493U (en) Drill rod pulling-out device for building construction
CN214498489U (en) Complete set cutting and dismantling equipment
CN112031172B (en) Reverse assembly method for container prefabricated house
CN208684271U (en) A kind of large-sized water turbine generator stator bar hanging apparatus
CN111576478A (en) Elevator well foundation structure
CN103386408A (en) Automatic oil storage tank overturning and cleaning device
CN216108486U (en) Piling equipment for ocean engineering
CN208054741U (en) A kind of Large Precast Members hoisting and overturning device
CN206956593U (en) A kind of automatic collision post
CN220704580U (en) Installation framework of construction pile foundation
CN101586393B (en) Synchronous lifting self-locking leveling device of elevator pitshaft model
CN200999457Y (en) Steel column supporting type hoister bracket supporting means
CN212452746U (en) Elevator well foundation structure
CN217093999U (en) Steel frame spraying device for electric power tower
CN220628518U (en) Self-loading and self-unloading electric power prefabricated cabin
CN214062523U (en) Novel combined iron tower
CN211037840U (en) Material soaking device for building construction
CN220909169U (en) Assembled component preformed hole construction auxiliary device based on BIM

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant