CN214062523U - Novel combined iron tower - Google Patents

Novel combined iron tower Download PDF

Info

Publication number
CN214062523U
CN214062523U CN202022142315.3U CN202022142315U CN214062523U CN 214062523 U CN214062523 U CN 214062523U CN 202022142315 U CN202022142315 U CN 202022142315U CN 214062523 U CN214062523 U CN 214062523U
Authority
CN
China
Prior art keywords
fixedly connected
wall
swing joint
pillar
movably connected
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202022142315.3U
Other languages
Chinese (zh)
Inventor
王福生
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Dongyue Crane Fire Fighting Equipment Manufacturing Co ltd
Original Assignee
Shandong Dongyue Crane Fire Fighting Equipment Manufacturing Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Dongyue Crane Fire Fighting Equipment Manufacturing Co ltd filed Critical Shandong Dongyue Crane Fire Fighting Equipment Manufacturing Co ltd
Priority to CN202022142315.3U priority Critical patent/CN214062523U/en
Application granted granted Critical
Publication of CN214062523U publication Critical patent/CN214062523U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Jib Cranes (AREA)

Abstract

The utility model relates to a tower crane technical field just discloses novel combination formula iron tower, which comprises a base, the inside fixedly connected with of base reserves the post, the top fixedly connected with pillar of base, the top swing joint of pillar has the platform, the bottom fixedly connected with fixed block of platform, the inside swing joint of fixed block has the gear, the inside swing joint of the fixed body has the round pin post, the inside swing joint of round pin post has first bail, the outer wall swing joint of round pin post has the bracing piece, the inside swing joint of pillar has the installation body, the inside swing joint of the installation body has the pin rod, the top fixedly connected with studio of platform, the outer wall fixedly connected with ground jack of studio, the bottom fixedly connected with gravity piece of ground jack rod. This novel combination formula iron tower possesses easy to assemble iron tower, and convenient the climbing practices thrift physical power, improves advantages such as work efficiency.

Description

Novel combined iron tower
Technical Field
The utility model relates to a tower crane technical field specifically is novel combination formula iron tower.
Background
The tower crane has the function of bearing the upper load transmitted by the boom guy rope and the balance arm guy rope, and directly transmits the upper load to the tower body structure through the rotary tower, the rotary platform, the bearing seat and other structural components, the self-elevating tower top has a truncated cone column type, a forward or backward inclined truncated cone column type, a herringbone frame type and an inclined support frame type, all the upper rotary tower cranes need to be provided with balance weights, and the function of the tower crane is a support balance weight which is used for forming a balance moment required by the design and opposite to the hoisting moment in direction.
Present tower crane wide application in jack-up field, however novel combination formula iron tower still exists some not enoughly, and novel combination formula iron tower is inconvenient to be installed, and staff's during operation need scramble very high iron tower, wastes time and energy, influences staff's work efficiency, and inconvenient climbing onto one's top, so proposed novel combination formula iron tower and solved above-mentioned problem.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
The not enough to prior art, the utility model provides a novel combination formula iron tower possesses the easy to assemble iron tower, and convenient the climbing practices thrift physical power, improves advantages such as work efficiency, has solved the inconvenient installation of novel combination formula iron tower, and the staff during operation need scramble very high iron tower, wastes time and energy, influences staff's work efficiency, the inconvenient problem of climbing.
(II) technical scheme
For realizing above-mentioned easy to assemble iron tower, convenient the climbing practices thrift physical power, improves work efficiency's purpose, the utility model provides a following technical scheme: the novel combined iron tower comprises a base, wherein a reserved column is fixedly connected inside the base, a support column is fixedly connected to the top of the base, a platform is movably connected to the top of the support column, a fixed block is fixedly connected to the bottom of the platform, a gear is movably connected inside the fixed block, a chain is movably connected to the outer wall of the gear, a box body is fixedly connected to the front side of the chain, a chute body is fixedly connected to the outer wall of the support column, a first stud is movably connected inside the platform, a support is fixedly connected to the right side of the support column, an electric push rod is fixedly connected to the top of the support, a clamping rod is fixedly connected to the front side of the electric push rod, a motor is movably connected to the outer wall of the chain, a fixed body is fixedly connected to the outer wall of the support column, a pin column is movably connected inside the fixed body, and a first clamping nail is movably connected inside the pin column, the outer wall swing joint of round pin post has the bracing piece, the inside swing joint of pillar has the installation body, the inside swing joint of the installation body has the pin pole, the outer wall swing joint of pillar has the flat board, dull and stereotyped top swing joint has the staircase, the top fixedly connected with studio of platform, the outer wall fixedly connected with lifting rod of studio, the bottom fixedly connected with gravity piece of lifting rod.
Preferably, the bottom swing joint of pillar has the reservation post, the outer wall threaded connection of reservation post has first nut, the left side fixedly connected with slider of box, the outer wall swing joint of slider has the spout body.
Preferably, the outer wall of the first stud is movably connected with a support column, the outer wall of the first stud is movably connected with a second nut, the number of the first studs and the number of the second nuts are eight, and the outer wall of the clamping rod is movably connected with the inner wall of the chain.
Preferably, the motor is a positive and negative motor, the bottom of the motor is fixedly connected with a support, the bottom of the support is fixedly connected with a base, an output shaft of the motor is fixedly connected with a driving gear, and the outer wall of the driving gear is movably connected with a chain.
Preferably, the fixed body quantity of pillar outer wall is four, the blind hole has been seted up to the inside of pillar, the through-hole has been seted up to the inside of round pin post, the through-hole has been seted up to the inside of pin rod, the inside swing joint of pin rod has the second bail.
Preferably, a through hole is formed in the mounting body, the pin rod sequentially penetrates through the inside of the support column and the inside of the mounting body and extends to the outer wall of the support column, and the mounting body is a cross mounting body.
(III) advantageous effects
Compared with the prior art, the utility model provides a novel combination formula iron tower possesses following beneficial effect:
1. this novel combination formula iron tower, it alternates on the pillar to alternate through the reservation post on the base, carry out threaded connection by first nut, and the inside of the fixed body on the pillar alternates the inside of bracing piece at the fixed body by the round pin post, pass the through-hole at the round pin post inside by first bail, and then make two cards of first bail separately certain angle, it blocks to roll back the fixed body to the round pin post, then the installation body through the inside blind hole installation of pillar, alternate in the inside of pillar and installation body by the round pin pole, and then alternate inside the through-hole of round pin pole by the second bail, then separate certain angle through two cards of second bail, prevent that the round pin pole from breaking away from the pillar, then through the first double-screw bolt threaded connection platform on the pillar, thereby made things convenient for the installation.
2. This novel combination formula iron tower rotates through the motor on the base, drives the chain around the inside gear revolve of fixed block of platform bottom, and then has driven box on the chain smooth movement on the slider body on the pillar, then drives the pull rod activity through the electric putter at the support top on the pillar and carries out the rotation of fixed chain in the inside of chain to the location box has made things convenient for the climbing, practices thrift physical power, improves work efficiency, thereby has made things convenient for user's use.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a partially enlarged view of the portion A shown in FIG. 1 according to the present invention;
FIG. 3 is a partially enlarged view of a portion B shown in FIG. 1 according to the present invention;
fig. 4 is a partially enlarged schematic view of the portion C shown in fig. 1 according to the present invention.
In the figure: the device comprises a base 1, a reserved column 2, a support column 3, a platform 4, a fixing block 5, a gear 6, a chain 7, a box 8, a sliding groove 9, a first stud 10, a support 11, an electric push rod 12, a clamping rod 13, a motor 14, a fixing body 15, a pin column 16, a first clamp 17, a support rod 18, an installation body 19, a pin rod 20, a flat plate 21, an escalator 22, a working chamber 23, a lifting rod 24 and a gravity block 25.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-4, the novel combined iron tower comprises a base 1, a reserved column 2 is fixedly connected inside the base 1, a support column 3 is fixedly connected on the top of the base 1, four fixing bodies 15 are arranged on the outer wall of the support column 3, a blind hole is arranged inside the support column 3, a through hole is arranged inside a pin column 16, a through hole is arranged inside a pin rod 20, a second staple bolt is movably connected inside the pin rod 20, the reserved column 2 is movably connected on the bottom of the support column 3, a first nut is connected on the outer wall of the reserved column 2 in a threaded manner, a sliding block is fixedly connected on the left side of a box body 8, a sliding block body 9 is movably connected on the outer wall of the sliding block, a platform 4 is movably connected on the top of the support column 3, a fixing block 5 is fixedly connected on the bottom of the platform 4, a gear 6 is movably connected inside the fixing block 5, a chain 7 is movably connected on the outer wall of the gear 6, and a box body 8 is fixedly connected on the front side of the chain 7, the outer wall of the pillar 3 is fixedly connected with a chute body 9, the inner part of the platform 4 is movably connected with a first stud 10, the outer wall of the first stud 10 is movably connected with the pillar 3, the outer wall of the first stud 10 is movably connected with a second nut, the number of the first stud 10 and the second nut is eight, the outer wall of the clamping rod 13 is movably connected with the inner wall of the chain 7, the right side of the pillar 3 is fixedly connected with a bracket 11, the top of the bracket 11 is fixedly connected with an electric push rod 12, the front side of the electric push rod 12 is fixedly connected with the clamping rod 13, the outer wall of the chain 7 is movably connected with a motor 14, the motor 14 is a positive and negative motor, the bottom of the motor 14 is fixedly connected with a support, the bottom of the support is fixedly connected with a base 1, the output shaft of the motor 14 is fixedly connected with a driving gear, the outer wall of the driving gear is movably connected with the chain 7, and the outer wall of the pillar 3 is fixedly connected with a fixing body 15, the inside swing joint of the fixed body 15 has round pin post 16, the inside swing joint of round pin post 16 has first bail 17, the outer wall swing joint of round pin post 16 has bracing piece 18, the inside swing joint of pillar 3 has installation body 19, the through-hole has been seted up to the inside of installation body 19, round pin pole 20 passes the inside of pillar 3 and the inside of installation body 19 in proper order and extends to the outer wall of pillar 3, installation body 19 is the cross installation body, the inside swing joint of installation body 19 has round pin pole 20, the outer wall swing joint of pillar 3 has flat board 21, the top swing joint of flat board 21 has staircase 22, the top fixedly connected with studio 23 of platform 4, the outer wall fixedly connected with lifting rod 24 of studio 23, the bottom fixedly connected with gravity piece 25 of lifting rod 24.
To sum up, this novel combination formula iron tower, it alternates on pillar 3 through reservation post 2 on the base 1, carry out threaded connection by first nut, and the inside of the fixed body 15 on pillar 3 alternates the inside of bracing piece 18 at fixed body 15 by round pin post 16, by first bail 17 pass at the inside through-hole of round pin post 16, and then make two cards of first bail 17 separately certain angle, it blocks to roll back fixed body 15 to round pin post 16, then installation body 19 through the inside blind hole installation of pillar 3, alternate the inside at pillar 3 and installation body 19 by round pin rod 20, and then alternate inside the through-hole of round pin rod 20 by second bail, then separate certain angle through two cards of second bail, prevent that round pin rod 20 from breaking away from pillar 3, then through first double-screw bolt 10 threaded connection platform 4 on pillar 3, thereby made things convenient for the installation.
And, through the motor 14 rotation on base 1, drive chain 7 around the inside gear 6 rotation of fixed block 5 of platform 4 bottom, and then driven the box 8 on chain 7 steadily to move on the spout body 9 on pillar 3, then drive the pull rod 13 activity through the electric putter 12 at the support 11 top on pillar 3 and carry out the rotation of fixed chain 7 in the inside of chain 7, thereby fix a position box 8, made things convenient for the climbing, practice thrift physical power, improve work efficiency, thereby made things convenient for user's use.
It is to be noted that the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus. Without further limitation, an element defined by the phrase "comprising an … …" does not exclude the presence of other identical elements in a process, method, article, or apparatus that comprises the element.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. Novel combination formula iron tower, including base (1), its characterized in that: the inner fixed connection of the base (1) is provided with a reserved column (2), the top of the base (1) is fixedly connected with a support column (3), the top of the support column (3) is movably connected with a platform (4), the bottom of the platform (4) is fixedly connected with a fixed block (5), the inner movable connection of the fixed block (5) is provided with a gear (6), the outer wall of the gear (6) is movably connected with a chain (7), the front of the chain (7) is fixedly connected with a box body (8), the outer wall of the support column (3) is fixedly connected with a sliding groove body (9), the inner movable connection of the platform (4) is provided with a first stud (10), the right side of the support column (3) is fixedly connected with a support (11), the top of the support (11) is fixedly connected with an electric push rod (12), the front of the electric push rod (12) is fixedly connected with a clamping rod (13), the outer wall of the chain (7) is movably connected with a motor (14), the outer wall of the strut (3) is fixedly connected with a fixed body (15), a pin column (16) is movably connected inside the fixed body (15), a first clamping nail (17) is movably connected inside the pin column (16), the outer wall of the pin column (16) is movably connected with a supporting rod (18), the inner part of the supporting column (3) is movably connected with a mounting body (19), a pin rod (20) is movably connected inside the mounting body (19), a flat plate (21) is movably connected on the outer wall of the strut (3), the top of the flat plate (21) is movably connected with an escalator (22), the top of the platform (4) is fixedly connected with a working chamber (23), the outer wall of the working chamber (23) is fixedly connected with a lifting rod (24), and the bottom of the lifting rod (24) is fixedly connected with a gravity block (25).
2. The new modular iron tower of claim 1, characterized in that: the bottom swing joint of pillar (3) has reserved post (2), the outer wall threaded connection of reserved post (2) has first nut, the left side fixedly connected with slider of box (8), the outer wall swing joint of slider has chute body (9).
3. The new modular iron tower of claim 1, characterized in that: the outer wall swing joint of first double-screw bolt (10) has pillar (3), the outer wall swing joint of first double-screw bolt (10) has the second nut, the quantity of first double-screw bolt (10) and second nut is eight, the outer wall swing joint of kelly (13) has the inner wall of chain (7).
4. The new modular iron tower of claim 1, characterized in that: the motor (14) is a positive and negative motor, the bottom of the motor (14) is fixedly connected with a support, the bottom of the support is fixedly connected with a base (1), an output shaft of the motor (14) is fixedly connected with a driving gear, and the outer wall of the driving gear is movably connected with a chain (7).
5. The new modular iron tower of claim 1, characterized in that: the quantity of the fixing body (15) of pillar (3) outer wall is four, the blind hole has been seted up to the inside of pillar (3), the through-hole has been seted up to the inside of round pin post (16), the through-hole has been seted up to the inside of pin rod (20), the inside swing joint of pin rod (20) has the second bail.
6. The new modular iron tower of claim 1, characterized in that: the through-hole has been seted up to the inside of installation body (19), pin pole (20) pass the inside of pillar (3) and the inside of installation body (19) in proper order and extend to the outer wall of pillar (3), installation body (19) are the cross installation body.
CN202022142315.3U 2020-09-24 2020-09-24 Novel combined iron tower Active CN214062523U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022142315.3U CN214062523U (en) 2020-09-24 2020-09-24 Novel combined iron tower

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022142315.3U CN214062523U (en) 2020-09-24 2020-09-24 Novel combined iron tower

Publications (1)

Publication Number Publication Date
CN214062523U true CN214062523U (en) 2021-08-27

Family

ID=77394934

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022142315.3U Active CN214062523U (en) 2020-09-24 2020-09-24 Novel combined iron tower

Country Status (1)

Country Link
CN (1) CN214062523U (en)

Similar Documents

Publication Publication Date Title
CN109629814A (en) A kind of wind-powered electricity generation concrete tower mounting platform
CN214062523U (en) Novel combined iron tower
CN212387586U (en) Building engineering lifting device
CN210735910U (en) Self-lifting hoisting equipment suitable for assembly type additional elevator construction
CN212769658U (en) Special lifting auxiliary device for electric power iron tower
CN202296899U (en) Corner climbing pole crane
CN212336023U (en) Civil engineering is with small-size building pile driver
CN212336021U (en) Portable pile driver for constructional engineering
CN212078612U (en) Builder's jack is encorbelmented to building engineering construction
CN209482685U (en) A kind of wind-powered electricity generation concrete tower mounting platform
CN211169601U (en) Hoist device for construction
CN101429827B (en) Leaning tower self-stabilization upside-down mounting assembling apparatus and method thereof
CN217627279U (en) Novel tower crane
CN205822187U (en) Compound piling machine
CN219328406U (en) Manual and electric dual-purpose pile foundation hole depth measuring device
CN110980548A (en) Maintenance channel for crane
CN214059637U (en) Three-fork type special bale hanging frame for Pc steel bar raw material
CN212478475U (en) Steel construction building scaffold
CN216517101U (en) Building engineering strutting arrangement
CN215666756U (en) Hoisting platform convenient for hoisting plates
CN110902581B (en) Tower crane device for building
CN214780477U (en) A material hoisting device for building engineering
CN211813309U (en) Multi-functional lifting device of architectural equipment
CN210480678U (en) Lifting machine for building
CN210723966U (en) Power supply pole wire hoisting device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant