CN220704580U - Installation framework of construction pile foundation - Google Patents
Installation framework of construction pile foundation Download PDFInfo
- Publication number
- CN220704580U CN220704580U CN202321608818.2U CN202321608818U CN220704580U CN 220704580 U CN220704580 U CN 220704580U CN 202321608818 U CN202321608818 U CN 202321608818U CN 220704580 U CN220704580 U CN 220704580U
- Authority
- CN
- China
- Prior art keywords
- pile foundation
- fixedly connected
- pile
- installation framework
- platform
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000010276 construction Methods 0.000 title claims abstract description 16
- 238000009434 installation Methods 0.000 title claims abstract description 16
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 36
- 230000000694 effects Effects 0.000 abstract description 21
- 239000002689 soil Substances 0.000 abstract description 8
- 230000000670 limiting effect Effects 0.000 abstract description 3
- 229910000831 Steel Inorganic materials 0.000 description 12
- 239000010959 steel Substances 0.000 description 12
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 8
- 239000007921 spray Substances 0.000 description 5
- 229910052742 iron Inorganic materials 0.000 description 4
- 238000000034 method Methods 0.000 description 4
- 230000009286 beneficial effect Effects 0.000 description 3
- 230000007547 defect Effects 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 230000002093 peripheral effect Effects 0.000 description 2
- 238000004062 sedimentation Methods 0.000 description 2
- 238000009736 wetting Methods 0.000 description 2
- 230000004075 alteration Effects 0.000 description 1
- 238000009412 basement excavation Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000002474 experimental method Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000005507 spraying Methods 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
- 230000001960 triggered effect Effects 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Landscapes
- Foundations (AREA)
Abstract
The utility model relates to the technical field of pile foundations and discloses an installation framework for a construction pile foundation, which comprises a pile foundation, wherein the top of the pile foundation is fixedly connected with a platform, the top of the outer side wall of the pile foundation is fixedly connected with a fixing frame, the top of the inner side wall of the pile foundation is clamped with a contact plate, one end of the contact plate is rotationally connected with a connecting rod, the bottom of the connecting rod is rotationally connected with a limiting rod, the outer side walls of the platform are fixedly connected with connecting blocks, and the inner parts of the connecting blocks are clamped with connecting columns. This installation framework of construction pile foundation, through the setting of mount, reached the effect that prevents the pile foundation slope and improve the bearing capacity, and through the setting of contact plate and gag lever post, reached the fixed pile foundation and prevented the effect of collapsing and covering, effectually strengthened the fastness of pile foundation, through the setting of water tank, water pipe and shower nozzle, reached the effect of moist soil when piling, effectually saved time and the manpower of piling, accelerated pile speed, improved the result of use.
Description
Technical Field
The utility model relates to the technical field of pile foundations, in particular to an installation framework for a construction pile foundation.
Background
The pile foundation consists of a foundation pile and a bearing platform connected with the pile top. If the pile body is buried in the soil, the bottom surface of the pile cap is in contact with the soil, the pile is called a low pile cap pile foundation, and if the pile body is exposed to the ground and the pile cap is above the ground, the pile is called a high pile cap pile foundation.
The utility model discloses a steel pipe pile foundation for an iron tower and a transformer substation framework in the public number CN211257055U, which comprises a steel pipe pile foundation main body and a flange plate arranged at the top end of the steel pipe pile foundation main body, wherein a stiffening connecting plate is welded between the outer peripheral wall of one end of the steel pipe pile foundation main body and the bottom of the flange plate, a plurality of anti-overturning connecting plates are symmetrically arranged along the outer peripheral wall of the steel pipe pile foundation main body and are connected with anti-overturning covering plates through bolts, and the stiffening connecting plates are connected with anti-sedimentation devices through bolts, so that the steel pipe pile foundation has the beneficial effects that: the steel pipe pile foundation main body is adopted to replace the traditional concrete foundation excavated greatly, the environment damage is small, the construction is safe and convenient, the construction period is short, the potential safety hazard of collapse during foundation pit excavation is avoided, the defect that the steel pipe pile foundation main body is easy to shift in the later use process is avoided by adopting the anti-overturning plate, and the defect that the steel pipe pile foundation main body is easy to subside in the later use process is avoided by adopting the anti-sedimentation plate.
However, this steel pipe pile foundation for iron towers, transformer substation frameworks has the following disadvantages:
(1) The firmness is poor, the steel pipe pile foundation for the iron tower and the transformer substation framework is not provided with effective fixing measures, and factors such as low bearing capacity, low firmness and the like are easy to generate in use;
(2) The pile effect is relatively poor, and this a steel pipe pile foundation for iron tower, transformer substation's framework relies on the mode of hammering when using, comparatively primitive, extravagant time and manpower.
Disclosure of Invention
(one) solving the technical problems
The utility model solves the technical problems of higher practicability, simple structure and poor firmness and poor piling effect in the background art by simple operation.
(II) technical scheme
In order to achieve the above purpose, the utility model is realized by the following technical scheme: the utility model provides a construction pile foundation's installation framework, includes the pile foundation, the top fixedly connected with platform of pile foundation, the top fixedly connected with mount of pile foundation lateral wall, the top joint of pile foundation inside wall has the contact plate, the one end rotation of contact plate is connected with the connecting rod, the bottom rotation of connecting rod is connected with the gag lever post.
Optionally, the equal fixedly connected with connecting block of lateral wall of platform, the inside joint of connecting block has the spliced pole, has played the effect of connecting the platform.
Optionally, the middle part fixedly connected with connection platform at platform top, the top fixedly connected with rope of connection platform has played the effect of convenient removal.
Optionally, one side fixedly connected with water tank at platform top, the top of water tank rotates and is connected with the case lid, has played the effect of storing water.
Optionally, the bottom joint of water tank has the water pipe, the bottom fixedly connected with shower nozzle of water pipe has played the effect of moist soil.
Optionally, the inner bottom fixedly connected with diaphragm pump body of water tank, one side electric connection of diaphragm pump body has the motor body, has played the effect of feedwater pressure boost.
(III) beneficial effects
The utility model provides an installation framework of a construction pile foundation, which has the following beneficial effects:
1. this installation framework of construction pile foundation through the setting of mount, has reached the effect that prevents the pile foundation slope and improve bearing capacity to through the setting of contact plate and gag lever post, reached the fixed pile foundation and prevented the effect of collapsing and covering, effectually strengthened the fastness of pile foundation.
2. This installation framework of construction pile foundation through the setting of water tank, water pipe and shower nozzle, has reached the effect of moist soil when piling, the effectual time and the manpower of having saved the pile for pile speed has improved the result of use.
Drawings
FIG. 1 is a schematic diagram of the structure of the present utility model;
FIG. 2 is a schematic diagram of the structure of the water tank of the present utility model;
FIG. 3 is a schematic view of the structure of the contact plate and the stop lever of the present utility model;
FIG. 4 is a schematic view of the structure of the water pipe and the spray head of the present utility model.
In the figure: 1. pile foundation; 2. a platform; 3. a connection station; 4. a water tank; 5. a diaphragm pump body; 6. a motor body; 7. a rope; 8. a connecting block; 9. a connecting column; 10. a fixing frame; 11. a contact plate; 12. a connecting rod; 13. a limit rod; 14. a water pipe; 15. a spray head; 16. a case cover.
Detailed Description
The technical solutions in the embodiments of the present utility model will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present utility model. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
Referring to fig. 1 to 4, the present utility model provides a technical solution: the utility model provides a construction pile foundation's installation framework, including pile foundation 1, pile foundation 1's top fixedly connected with platform 2, pile foundation 1's top fixedly connected with mount 10, through the setting of mount 10, reached the effect of fixed pile foundation 1, pile foundation 1's inside wall's top joint has contact plate 11, through the setting of contact plate 11, reached the effect of touching connecting rod 12, contact plate 11's one end is rotated and is connected with connecting rod 12, connecting rod 12's bottom is rotated and is connected with gag lever post 13, through the setting of gag lever post 13, reached the effect of restriction pile foundation 1 position;
the connecting blocks 8 are fixedly connected to the outer side walls of the platforms 2, connecting columns 9 are clamped in the connecting blocks 8, and the effect of connecting the platforms 2 is achieved through the arrangement of the connecting columns 9;
the middle part of the top of the platform 2 is fixedly connected with a connecting table 3, the top of the connecting table 3 is fixedly connected with a rope 7, and the effect of convenient movement is achieved through the arrangement of the rope 7;
one side of the top of the platform 2 is fixedly connected with a water tank 4, the top of the water tank 4 is rotationally connected with a tank cover 16, and the effect of storing water is achieved through the arrangement of the water tank 4;
the bottom of the water tank 4 is clamped with a water pipe 14, the bottom of the water pipe 14 is fixedly connected with a spray head 15, and the effect of wetting soil is achieved through the arrangement of the water pipe 14 and the spray head 15;
the inner bottom of the water tank 4 is fixedly connected with a diaphragm pump body 5, one side of the diaphragm pump body 5 is electrically connected with a motor body 6, and the effect of water supply pressurization is achieved through the arrangement of the diaphragm pump body 5.
In the utility model, the working steps of the device are as follows:
a first step of: firstly, conveying the pile foundation 1 to a proper area through a rope 7, then filling water into a water tank 4, driving the pile foundation 1 into the ground in a piling mode, spraying water in the water tank 4 from a spray head 15 through a water pipe 14 by the pressurized flow of a diaphragm pump body 5 in the piling process, and wetting soil to facilitate piling;
and a second step of: after the pile foundation 1 is driven into the ground, the fixing frame 10 plays a role in fixing, then the contact plate 11 is triggered, the limiting rod 13 is driven to lift upwards, a limiting effect is achieved in soil, and finally the connecting column 9 is clamped into the connecting block 8.
It should be noted that, the device structure and the drawings of the present utility model mainly describe the principle of the present utility model, in terms of the technology of the design principle, the arrangement of the power mechanism, the power supply system, the control system, etc. of the device is not completely described, and on the premise that the person skilled in the art understands the principle of the present utility model, the specific details of the power mechanism, the power supply system and the control system can be clearly known, the control mode of the application file is automatically controlled by the controller, and the control circuit of the controller can be realized by simple programming of the person skilled in the art;
the standard parts used in the method can be purchased from the market, and can be customized according to the description of the specification and the drawings, the specific connection modes of the parts are conventional means such as mature bolts, rivets and welding in the prior art, the machines, the parts and the equipment are conventional models in the prior art, and the structures and the principles of the parts are all known by the skilled person through technical manuals or through conventional experimental methods.
Although embodiments of the present utility model have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and alterations can be made therein without departing from the principles and spirit of the utility model, the scope of which is defined in the appended claims and their equivalents.
Claims (6)
1. The utility model provides a construction pile foundation's installation framework, includes pile foundation (1), its characterized in that: the top fixedly connected with platform (2) of pile foundation (1), the top fixedly connected with mount (10) of pile foundation (1) lateral wall, the top joint of pile foundation (1) inside wall has contact plate (11), the one end rotation of contact plate (11) is connected with connecting rod (12), the bottom rotation of connecting rod (12) is connected with gag lever post (13).
2. The installation framework of a construction pile according to claim 1, wherein: the outer side walls of the platforms (2) are fixedly connected with connecting blocks (8), and connecting columns (9) are clamped inside the connecting blocks (8).
3. The installation framework of a construction pile according to claim 1, wherein: the middle part at the top of platform (2) fixedly connected with connection platform (3), the top fixedly connected with rope (7) of connection platform (3).
4. The installation framework of a construction pile according to claim 1, wherein: one side of platform (2) top fixedly connected with water tank (4), the top of water tank (4) rotates and is connected with case lid (16).
5. The installation framework for constructing pile foundations of claim 4, wherein: the bottom joint of water tank (4) has water pipe (14), the bottom fixedly connected with shower nozzle (15) of water pipe (14).
6. The installation framework for constructing pile foundations of claim 4, wherein: the inner bottom of the water tank (4) is fixedly connected with a diaphragm pump body (5), and one side of the diaphragm pump body (5) is electrically connected with a motor body (6).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202321608818.2U CN220704580U (en) | 2023-06-22 | 2023-06-22 | Installation framework of construction pile foundation |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202321608818.2U CN220704580U (en) | 2023-06-22 | 2023-06-22 | Installation framework of construction pile foundation |
Publications (1)
Publication Number | Publication Date |
---|---|
CN220704580U true CN220704580U (en) | 2024-04-02 |
Family
ID=90445317
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202321608818.2U Active CN220704580U (en) | 2023-06-22 | 2023-06-22 | Installation framework of construction pile foundation |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN220704580U (en) |
-
2023
- 2023-06-22 CN CN202321608818.2U patent/CN220704580U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206034408U (en) | A back pitching pile formula jacket structure for marine booster station | |
CN201746849U (en) | Basic structure of offshore wind-power-station fan | |
CN204849814U (en) | Marine fan | |
CN220704580U (en) | Installation framework of construction pile foundation | |
CN105735399B (en) | Multifunction diving dirt pumping plant irrigation and drainage complexes | |
CN201713827U (en) | Fan base structure of offshore wind power station | |
CN107902565A (en) | A kind of industrial process waters mud lifting device | |
CN208664080U (en) | Cantilever box beam temporary consolidation cuts off system | |
CN110304593B (en) | PC column vertical lifting auxiliary device | |
CN104555830A (en) | Novel method of inversion construction process of fixed top cylindrical vertical type storage tank | |
CN208152232U (en) | A kind of integrated pump station being installed on urban parking area | |
CN108756202A (en) | A kind of recyclable building builder's jack fixing device and application method | |
CN213651673U (en) | Wisdom building site tower crane system | |
CN214614144U (en) | Steel sheet pile cofferdam convenient to equipment for hydraulic engineering construction | |
CN210104812U (en) | Automatic installation structure for scour prevention layer of offshore wind power foundation | |
CN213899305U (en) | Improved integral underwater-installation axial-flow pump station | |
CN209144803U (en) | Prefabricated taper pipe wall opening hollow pile | |
CN207434310U (en) | Vertical compression equipment is moved in a kind of garbage disposal | |
CN203034470U (en) | Caisson device applied to water foundation pit | |
CN113522947A (en) | Soil remediation device for honeycomb cellular rainwater garden | |
CN206815771U (en) | A kind of civil engineering work project treatment device | |
CN108453908A (en) | Cantilever box beam temporary consolidation cuts off system and cuts off method | |
CN219886689U (en) | Movable grouting machine for structural joints on horizontal plane of hydropower station dam | |
CN219753232U (en) | Pile foundation bottom cleaning equipment | |
CN214053534U (en) | Long spiral pile foundation stiffening stirrup processing device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |