CN104555830A - Novel method of inversion construction process of fixed top cylindrical vertical type storage tank - Google Patents

Novel method of inversion construction process of fixed top cylindrical vertical type storage tank Download PDF

Info

Publication number
CN104555830A
CN104555830A CN201310481429.2A CN201310481429A CN104555830A CN 104555830 A CN104555830 A CN 104555830A CN 201310481429 A CN201310481429 A CN 201310481429A CN 104555830 A CN104555830 A CN 104555830A
Authority
CN
China
Prior art keywords
tank
lifting column
storage tank
balance
column
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201310481429.2A
Other languages
Chinese (zh)
Inventor
马有理
李若男
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Harbin University of Commerce
Original Assignee
Harbin University of Commerce
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Harbin University of Commerce filed Critical Harbin University of Commerce
Priority to CN201310481429.2A priority Critical patent/CN104555830A/en
Publication of CN104555830A publication Critical patent/CN104555830A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66FHOISTING, LIFTING, HAULING OR PUSHING, NOT OTHERWISE PROVIDED FOR, e.g. DEVICES WHICH APPLY A LIFTING OR PUSHING FORCE DIRECTLY TO THE SURFACE OF A LOAD
    • B66F7/00Lifting frames, e.g. for lifting vehicles; Platform lifts
    • B66F7/10Lifting frames, e.g. for lifting vehicles; Platform lifts with platforms supported directly by jacks
    • B66F7/16Lifting frames, e.g. for lifting vehicles; Platform lifts with platforms supported directly by jacks by one or more hydraulic or pneumatic jacks
    • B66F7/20Lifting frames, e.g. for lifting vehicles; Platform lifts with platforms supported directly by jacks by one or more hydraulic or pneumatic jacks by several jacks with means for maintaining the platforms horizontal during movement

Abstract

The invention relates to a novel method of an inversion construction process of a fixed top cylindrical vertical type storage tank, belongs to the technical field of petroleum storage, and aims to solve the problem that a lifting column cannot be mounted inside the fixed top cylindrical vertical type storage tank after a tank bottom plate, a top wall plate and a tank top are assembled in the inversion construction of the fixed top cylindrical vertical type storage tank. The technical key points of the novel method are as follows: the height of the lifting column before being mounted is less than that of the top wall plate, so that the lifting column can be mounted in place inside the tank body at a time, and meanwhile a balance column is mounted in the center of the storage tank; the lifting column is connected with the balance column through a pull rod, and an adjusting bolt is adopted to adjust the stress of the pull rod, so that the lifting column and the balance column can be lifted up smoothly. The lifting column and the balance column both consist of sleeves and inner cores and the inner cores are connected with a hydraulic oil system, so as to enable hydraulic oil to enter the sleeves, so that the sleeves and the wall of the tank are lifted upwards for a certain distance. At the moment, the lifting column and the balance column can be re-fixed, and then the wall of the tank can be lifted by an electric chain block independently.

Description

A kind of new mode of fixing tip circle tubular Auto-welding in Reversal Installation of Vertical Storage Tank technique
Technical field
The invention belongs to oil storage technical field, relate to the new mode of a kind of large-scale fixing top vertical cylinder storage tank inverted construction technique.
Background technology
Along with the fast development of China's economic construction and improving constantly of living standards of the people, China's oil consumption increases year by year. according to statistics, China's oil year in 2012, consumption reached about 500,000,000 tons. therefore, all parts of the country are being built and are building a large amount of crude oil banks and finished oil bank by continuing. and petrol storage tank is the dedicated storage equipment of crude oil and finished oil, the key link during oil storage is built. at present, the petroleum storage tank that China builds is based on field oil-tank, and in the majority with vertical and cylindrical metal structure.
The vertical and cylindrical metal storage tank of store product oil, its tank deck is generally fixing along structure. for the tank skin of this type of storage tank in construction, because flip-clip has following advantage:
1). Ground Operation, therefore construct comparatively safe, greatly reduce accident rate;
2). owing to not needing large-scale lifting appliance, can construction costs be reduced;
3). operating efficiency is high, can shorten the construction period;
4). be convenient to control construction quality.
So the construction of domestic large-scale fixed roof tank adopts the method more. and in inverted construction method, because motor-driven chain hoist multi-point lifting upside-down construction technique is simple, construction safety is reliable, being widely adopted in practice of construction. the construction technology of this kind of method is: the tank bottom of storage tank, in tank, lifting column and motor-driven chain hoist are evenly set around tank skin after top layer wallboard and tank deck construction, center mast is set at storage tank center simultaneously, inside tank skin, lower edge arranges packing, be fixed on tank skin with sight rail and jack swelling, lifting column and center mast are connected on top to strain lifting column, in tank, arrange control housing be used for controlling motor-driven chain hoist, maneuvering and control cabinet makes motor-driven chain hoist start simultaneously, promote packing, tank body is made slowly to increase, thus realize the order assembling of tank shell.
But this kind of method in practice of construction process because lifting column height must exceed the height of top layer wallboard, just top layer wallboard can be promoted to preposition, therefore, after tank deck and top layer wallboard are installed, lifting column cannot be erected in tank. two kinds of solutions that in practice of construction, general employing is following at present:
1). the basic ring beam outside tank arranges lifting column, promotes top layer wallboard and tank deck from outside. this kind of method needs to install a lifting column outside tank, makes construction become complicated, has often prolonged the construction period; In addition for the foundation not having ring beam, this kind of more difficult realization of construction method.
2). when tank deck is constructed, according to the desired location of lifting column, first reserve polylith top board wouldn't assemble, make to be arranged in the lifting column of border in tank and pass tank deck, treat top layer wallboard rise to desired location and with second layer wallboard assembly welding after, again these tank deck plates to be carried out assembling and welding. the problem that this kind of construction method is brought is: the tank deck plate mending dress reserved needs aloft work, adds difficulty of construction, the danger of construction is increased; This time promote tank body in addition, lifting column cannot be connected with center mast, only fixes lifting column by diagonal ligament, and during lifting tank body, its stressing conditions is poor.
Patent of the present invention is just in the tank skin work progress of fixed roof tank, top layer wallboard and tank deck construct after the problem arranged in tank existing for lifting column propose. lifting once mounting in tank of shutting out both can have been made in place, reserved top board can have been avoided again and the problem of the aloft work brought.
For oil storage, large-scale oil storage tank that is several, tens even more same warship lattice generally will be built in reservoir area, now adopting the method in patent of the present invention to install lifting column will make construction become simpler, convenient, greatly can improve operating efficiency, reduce construction cost, the economic benefit of enterprise.
Summary of the invention
The hydraulic lifting lifting column structure that the motor-driven chain hoist multi-point lifting flip-clip that the present invention relates to uses is as shown in Figure 1. and lifting column is primarily of 6---inner core, 7---sleeve, 8---pipe nipple composition.4---seal ring, it plays the sealing function between inner core 6 and sleeve 7. before lifting column is installed, 1---base plate has been laid complete, the assembling of order 9---top layer wallboard and 10---tank deck completes. in appropriate location, top layer wallboard lower end, 2---packing and 3---hanger are set, by 5---jack, wallboard is connected with lifting column. balance columns is as shown in the figure set at tank body center, be connected by the 12---cylinder lever connecting rod be horizontal between lifting column with balance columns, 13---is set at the midway location of cylinder lever connecting rod and adjusts bolt. paste strain sensing chip in the appropriate location of cylinder lever connecting rod 12 after to be installed, now regulate adjustment bolt 13, when making the pulling force of cylinder lever connecting rod 12 and jack 5 mention wallboard, the side direction capsizing moment that lifting column produces is balanced each other, slide axially to ensure can produce freely between inner core 6 and sleeve 7, jammed phenomenon is avoided to occur. in order to cylinder lever connecting rod 12 being made to remain level in lifting column rise process, balance Du has been designed to the structure (as figure) identical with lifting column. and lifting column is circumferential in being evenly arranged along tank skin in tank, as shown in Figure 2, each lifting column is connected with balance columns by cylinder lever connecting rod 12, so after regulating adjustment bolt 13, balance columns radial direction does not stress, also ensure that the smooth and easy rise of balance columns axis.
Lifting column and balance columns lean on the pressure of hydraulic oil upwards to rise. and its fuel-feed system is as shown in Figure 3. by hydraulic oil pump to fuel ring pipe fuel feeding, the oil inlet port of each lifting column (comprising the balance columns at center) bottom inner core is connected with fuel ring pipe by pipeline. and valve is equipped with in the entrance entering oil pipe line at each lifting column, regulate the valve at each lifting column oil inlet port place, it is made to open path identical, equal to ensure the flow of the hydraulic oil entered in lifting column sleeve 7, thus each lifting column can be made upwards to rise with identical speed. adjust regulating the valves of balance columns oil circuit entrance simultaneously, the upwards lifting speeds of balance columns is made to keep synchronous with the ascending velocity of surrounding lifting column.
Lifting column and balance columns by hydraulic oil jacking to during the highest desired location as shown in Figure 4. after being raised to this position, bearing is added between sleeve 7 and storage tank bottom plate 1, bearing and base plate 1 are welded and fixed, be connected by bolt, nut, pad with sleeve, and add oblique pull rib by the brace panel 11 of Fig. 1 and tank bottom 1 is welded and fixed. both now lifting column and balance columns were all rigidly connected with tank bottom, the stability of lifting column and balance columns when the tank body ensureing thereafter promotes.
Lifting column (balance columns) is by the height H of hydraulic oil jacking 2(Fig. 4) determined by following formula:
H 2=solid wall plate height-H 1+ a
Herein: H 1---the hoisting depth of motor-driven chain hoist, H 1=H-H '
And: jack installation dimension shown in H---Fig. 1;
The minor increment that may reach between jack two hook after H '---the jack selected promotes
A---design margin
Until each lifting column and balance columns be reinforced fixing after, handle motor-driven chain hoist, make top layer wallboard continue to raise H 1distance, space now between the lower edge of top layer wallboard 9 and tank bottom 1 can load second layer wallboard. after second layer wallboard assembly welding, packing 2 and hanger 3 are moved to the lower edge of this layer of wallboard, the height lifted by crane by motor-driven chain hoist both can meet the installation requirement of third layer wallboard. and the installation of its lower wall panels is identical therewith.
It is removable that fuel ring pipe can make multistage, connected each other by bolt with flange.Fuel ring pipe and other pipeline also adopt this kind of connection mode.After post to be hoisted and balance columns and tank bottom are rigidly connected, by clean for the hydraulic oil discharge in pipeline, remove oil feed line system and hydraulic oil pump, to ensure carrying out smoothly of subsequent construction.This fuel-feed system and lifting column and balance columns all reusable.
Accompanying drawing explanation
Fig. 1 is hydraulic lifting lifting column and balance columns figure.
Fig. 2 is balance columns and lifting column connection diagram.
Fig. 3 is fuel-feed system figure.
Fig. 4 be jacking to extreme higher position figure,
Detailed description of the invention
By normal construction operation first assembling jar base plate, top layer tank shell and tank deck plate.Then hydraulic lifting lifting column is set according to desired location, balance columns is set in tank center.At top layer wallboard near lower edge position installing packing 2 and hanger 3, motor-driven chain hoist 5 is installed tank skin and tank deck can be mentioned.Between each lifting column and balance columns, install cylinder lever connecting rod 12 and adjust bolt 13, and pasting strain sensing chip in the appropriate location of each pull bar, being carried out the tightening force of adjusting yoke 12 by bolt 13, make it balance side direction that the jack 5 pairs of lifting columns produce is toppled power.Connect oil feed line and hydraulic oil pump, make it to lifting column and balance columns fuel feeding.Regulate regulating the valves of each lifting column and balance columns entrance, make the ascending velocity of each lifting column and balance columns synchronous.After jacking to predetermined altitude, close hydraulic oil pump, under the sleeve 7 of lifting column and balance columns, install bearing, and add oblique pull rib by brace panel 11, make it be connected with base plate.Now dismountable fuel-feed system, later tank skin promotes can carry out complete independently by jack.

Claims (2)

1. the new mode of one kind large-scale fixing top vertical cylinder storage tank inverted construction technique, it is characterized in that: after the base plate of storage tank, top layer wallboard and tank deck assembling construction, desired location in tank is installed hydraulic lifting lifting column, is arranged balance columns in storage tank center, and lifting column is connected to be mentioned with tank skin.Each lifting column is all connected with balance columns, and has control apparatus therebetween, is used for regulating the stressed of lifting arm, ensures to promote Du and balance Du to be slowly raised up to preposition swimmingly under the pressure of hydraulic oil.
2. method according to claim 1, is characterized in that: in tank body work progress, and lifting column and balance Du can only install once, and avoid lifting column and balance columns to pass from tank deck when installing.
CN201310481429.2A 2013-10-15 2013-10-15 Novel method of inversion construction process of fixed top cylindrical vertical type storage tank Pending CN104555830A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310481429.2A CN104555830A (en) 2013-10-15 2013-10-15 Novel method of inversion construction process of fixed top cylindrical vertical type storage tank

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310481429.2A CN104555830A (en) 2013-10-15 2013-10-15 Novel method of inversion construction process of fixed top cylindrical vertical type storage tank

Publications (1)

Publication Number Publication Date
CN104555830A true CN104555830A (en) 2015-04-29

Family

ID=53073051

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310481429.2A Pending CN104555830A (en) 2013-10-15 2013-10-15 Novel method of inversion construction process of fixed top cylindrical vertical type storage tank

Country Status (1)

Country Link
CN (1) CN104555830A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106088756A (en) * 2016-06-07 2016-11-09 中冶天工集团天津有限公司 A kind of method of the cartridge type steel storage tank hydraulic pressure lift upside-down mounting based on BIM technology
CN110039217A (en) * 2019-06-06 2019-07-23 贵州建工集团第六建筑工程有限责任公司 A kind of upside-down mounting mode storage tank concentricity, ovality control construction method
CN110893520A (en) * 2019-11-29 2020-03-20 中石化第四建设有限公司 Storage tank inversion method
CN110905260A (en) * 2019-12-12 2020-03-24 河北建工集团有限责任公司 Construction method and jacking device for earth-covered oil tank and using method of jacking device

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
潘云锋等: "液压顶升倒装法施工技术在大型储罐中的应用", 《施工技术》 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106088756A (en) * 2016-06-07 2016-11-09 中冶天工集团天津有限公司 A kind of method of the cartridge type steel storage tank hydraulic pressure lift upside-down mounting based on BIM technology
CN110039217A (en) * 2019-06-06 2019-07-23 贵州建工集团第六建筑工程有限责任公司 A kind of upside-down mounting mode storage tank concentricity, ovality control construction method
CN110893520A (en) * 2019-11-29 2020-03-20 中石化第四建设有限公司 Storage tank inversion method
CN110905260A (en) * 2019-12-12 2020-03-24 河北建工集团有限责任公司 Construction method and jacking device for earth-covered oil tank and using method of jacking device

Similar Documents

Publication Publication Date Title
CN104555830A (en) Novel method of inversion construction process of fixed top cylindrical vertical type storage tank
CN103730231B (en) A kind of head cover of transformer lowering or hoisting gear
CN104627330B (en) A kind of formal dress construction method of the operation platform system of super-huge storage tank
CN204418784U (en) Inner steel cylinder of chimney hydraulic pressure lift construction equipment
CN205369291U (en) High -power offshore wind power generation unit single pile basis integrated form annex mechanism
CN102720386A (en) Inversing method of inner side clustering hoop of vertical storage tank
CN202596242U (en) Concrete tower
CN104563590A (en) Hydraulic lifting construction device and method for inner steel barrel of chimney
CN104594317A (en) Working platform, single pile foundation, offshore working platform and installing method of offshore working platform
CN210482265U (en) Hydraulic internal mold device of floating mooring pillar
CN204803864U (en) Marine booster stations structure in flange formula single pile basis
CN101580214A (en) Hydraulic lifting method for large-scale equipment
CN204825655U (en) Arc case roof beam lifts by crane focus off -centre and installation leveling system that takes one's place
CN201842226U (en) Air pressure floating barrel
CN212688952U (en) Negative pressure bucket type single pile gripper construction mechanism
CN204920244U (en) Supporting structure of large -span steel construction segmentation hoist and mount
CN108868787B (en) Shield starting construction method for river-crossing tunnel
CN204435337U (en) Workbench and single-pile foundation and offshore work platform
CN203834448U (en) Novel six-leg platform jacket
CN210459271U (en) Fan jacket structure for offshore wind power
CN210768719U (en) Hydraulic suction machine
CN103726505B (en) Offshore wind plant wind turbine foundation
CN105317054A (en) Draught fan foundation structure with single pile of transition sections and construction method
CN102454163B (en) Circulating synchronous hydraulic lifting process of upper module ultra-large offshore oil platform
CN102605864A (en) Inverted construction method for doom-roof tank

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20150429

WD01 Invention patent application deemed withdrawn after publication